SlideShare a Scribd company logo
Mary Rhodes Pipeline:
A Synthesis of Disciplines
by Alex Barabanov
Senior Project Manager
City of Corpus Christi Water Department
alexba@cctexas.com
361. 826. 1873
November 6, 2013
About You
• ENGINEERS
– Civil
– Environmental
– Structural
– Chemical
– Mechanical
– Electrical
– Other
• SCIENTISTS
• OTHER
• ACADEMIC LEVEL
– Undergraduate
– Graduate / Master’s
– Graduate/ PhD
• WORK EXPERIENCE
– Internships
– Currently working
– Past industrial
experience
2Mary Rhodes Pipeline: A Synthesis of Disciplines
About Me
• WORK EXPERIENCE
– Senior Project Manager for the Water Department / City of Corpus Christi
– 4 years of industrial automation projects, 1.5 years Capital Improvements projects
– Electrical Engineer / FMC Technologies
• EDUCATION
– BS Computer Engineering / VLSI design (University of Utah)
– MBA (Texas A&M University-Corpus Christi)
– PE candidate with Texas Board of Professional Engineers (tested 2 weeks ago)
• INTERESTS
– Systems engineering and systems thinking,
organizational knowledge management, and team dynamics
– Read, bike, plan mountain adventures
3Mary Rhodes Pipeline: A Synthesis of Disciplines
The Next Hour
• Project background
• Project Phase 2 and my contribution to it
• Select Challenges
• Making the project happen: a synthesis of
disciplines
• Systems Thinking, Systems Engineering, Project
Management
• Resources to help gain holistic view
4Mary Rhodes Pipeline: A Synthesis of Disciplines
Who Was Mary Rhodes?
• Mayor of Corpus Christi
1991-1997
• Contributed to developing
water resources
• Attacked drought before
drought attacked us
• Passed away shortly before
completion of the project
Mary Rhodes Pipeline: A Synthesis of Disciplines 5
Project Overview
• Map goes here • Phase 1 (1998)
– 101 mi, 64” pipe
– 3 pump stations
– 40 MGD
– Supplies 40% of
area’s water
• Phase 2 (2015)
– 42 mi, 54” pipe
– 2 pump stations
– 40 MGD
Mary Rhodes Pipeline: A Synthesis of Disciplines 6
BUY ANNUALLY
ONW WATER RIGHTS
Phase I - Justification
Mary Rhodes Pipeline: A Synthesis of Disciplines 7
Phase I - Justification
8Mary Rhodes Pipeline: A Synthesis of Disciplines
Phase I - Justification
Save Lake Corpus Christi guests and residents…
9Mary Rhodes Pipeline: A Synthesis of Disciplines
Project Justification
… from this!
Mary Rhodes Pipeline: A Synthesis of Disciplines 10
Phase II - Justification
Area Water Demand Projections by TWDB
11Mary Rhodes Pipeline: A Synthesis of Disciplines
Phase II – New Industrial Clients
Mary Rhodes Pipeline: A Synthesis of Disciplines 12
Phase II – New Pumping Complex
13Mary Rhodes Pipeline: A Synthesis of Disciplines
Phase II – Tie-in Into Phase I
Mary Rhodes Pipeline: A Synthesis of Disciplines 14
A Modern Control Room
Mary Rhodes Pipeline: A Synthesis of Disciplines 15
A Modern Pump Control Cabinet
Mary Rhodes Pipeline: A Synthesis of Disciplines 16
Phase II – Select Challenges
• Pumps are controlled by level in tank 42 miles
away
• Unmanned operation requires high reliability
• How should one pumping system to respond
to failures of the other?
• Operating and maintaining pipeline means
jobs. Who will get them?
17Mary Rhodes Pipeline: A Synthesis of Disciplines
CC Project Life Cycle
CONCEPT
• Need
• Want
• Problem
• Justification
DESIGN
• Technical
• Financial
• Legal
• Negotiation
• Management
BID
• Advertise
• Evaluate Bids
• Award
• Answer RFIs
BUILD
(Construction)
• Purchase
• Construction
• Testing/Inspection
• Startup/Commissio
ning
O&M
• Use new
product/system
• Receive benefit
• Maintain
• Pay off debt
• Learn Lessons
18Mary Rhodes Pipeline: A Synthesis of Disciplines
Owner, Stakeholders
Engineer
Contractor
Defense Acquisition Life Cycle
19Mary Rhodes Pipeline: A Synthesis of Disciplines
Project Life Cycle
CONCEPT
• Need
• Want
• Problem
• Justification
DESIGN
• Technical
• Financial
• Legal
• Negotiation
• Management
BID
• Advertise
• Evaluate Bids
• Award
• Answer RFIs
BUILD
(Construction)
• Purchase
• Construction
• Testing/Inspection
• Startup/Commissio
ning
O&M
• Use new
product/system
• Receive benefit
• Maintain
• Pay off debt
• Learn Lessons
20Mary Rhodes Pipeline: A Synthesis of Disciplines
1. Project Management
2. Systems Engineering
3. Requirements Management
4. Testing, Verification, and Validation
1. Project Management
Project parameters:
cannot have all
Mary Rhodes Pipeline: A Synthesis of Disciplines 21
1. Project Management
Mary Rhodes Pipeline: A Synthesis of Disciplines 22
SOURCE: Program Management Body of Knowledge (PMBOK), 2000 edition
2. Systems Engineering
23Mary Rhodes Pipeline: A Synthesis of Disciplines
2. Systems Engineering
Design Build
24Mary Rhodes Pipeline: A Synthesis of Disciplines
Engineering vs. Business
25Mary Rhodes Pipeline: A Synthesis of Disciplines
Engineering vs. Business
26Mary Rhodes Pipeline: A Synthesis of Disciplines
3. Requirements Management
HIERARCHY VIEW
• End User Requirements
– “Deliver 40 MGD”
• Sub-System Requirements
– “Control system shall remain
operational upon loss of AC
power for 60 min”
• Component Requirements
– “Motor shall be 350 HP”
TYPE VIEW
• Functional—what system will
do
– “Shut down if communication
is lost for 40 min”
• Non-Functional—what
features the system will have
– “AC power and signal cables
shall have minimum 18 inch
separation”
• Performance—how fast or
how well
– “Valve shall reach fully open
state within 5 minutes of OPEN
command”
Mary Rhodes Pipeline: A Synthesis of Disciplines 27
4. Testing, Verification, and Validation
• Testing: observation and analysis
– Destructive or non-destructive
– Black vs. White Box
– Can be expensive
• Verification: test results vs. expectations
– Meaningful only if expectations (i.e. requirements) are
known
• Validation: outcome vs. intent
– Obtained with project outcome meets user’s requirements
and intent
Mary Rhodes Pipeline: A Synthesis of Disciplines 28
Benefits of Systems Approach
• Better Product, less expensive, on time
• Makes real impact on society and
environment
• Improves quality of our lives
• Makes your work more meaningful
• Greater personal satisfaction from chosen
career
29Mary Rhodes Pipeline: A Synthesis of Disciplines
Resources—Online
• City of Corpus Christi Water Department
http://www.cctexas.com/government/water/index
• PublicPurchase.com—free bid packages
http://www.publicpurchase.com/
• New Industrial Customers in San Patricio County
http://sanpatwater.com/water%20contracts%209.4.13.php
• Region N Water Demand Projection (by TWDB, 2016)
http://www.twdb.state.tx.us/waterplanning/data/projections/2017/demandproj.asp
• Defense Acquisition Life Cycle wall chart
https://ilc.dau.mil/pdf/Front_Ver_54_June_15_2010_34x22.pdf
• The Marshmallow Challenge video (6 min)
http://www.ted.com/talks/tom_wujec_build_a_tower.html
• Project Management Institute (PMI)
http://www.pmi.org/
• International Council on Systems Engineering (INCOSE)
http://www.incose.org/
30Mary Rhodes Pipeline: A Synthesis of Disciplines
Resources—Literature
31Mary Rhodes Pipeline: A Synthesis of Disciplines
Mary Rhodes Pipeline: A Synthesis of Disciplines 32

More Related Content

Similar to Mary Rhodes Water Pipeline - A Synthesis of Disciplines

Leed for SWE WE 14
Leed for SWE WE 14Leed for SWE WE 14
DOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant WorkshopDOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant Workshop
Cuyahoga County Planning Commission
 
Capstone Design conference
Capstone Design conferenceCapstone Design conference
Capstone Design conferenceRieley Loch
 
Measuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionMeasuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionCarlos Costa
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
San Diego County Water Authority
 
Lotus-technicals-PPT.pdf
Lotus-technicals-PPT.pdfLotus-technicals-PPT.pdf
Lotus-technicals-PPT.pdf
Lotus technicals
 
A Journey into the Digital World
A Journey into the Digital WorldA Journey into the Digital World
A Journey into the Digital World
AVEVA Group plc
 
TI-2515/191 Inspection Prepatation Webinar
TI-2515/191 Inspection Prepatation WebinarTI-2515/191 Inspection Prepatation Webinar
TI-2515/191 Inspection Prepatation Webinar
James Breunig P.E.
 
BUS Methodology presentation from 21st November 2013
BUS Methodology presentation from 21st November 2013BUS Methodology presentation from 21st November 2013
BUS Methodology presentation from 21st November 2013
CIBSE_Yorkshire
 
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
California Asphalt Pavement Association
 
BSc-SysAnal-1- Introduction.pptx
BSc-SysAnal-1- Introduction.pptxBSc-SysAnal-1- Introduction.pptx
BSc-SysAnal-1- Introduction.pptx
pgupostgrad
 
TMC Meeting - TPO Miami River Tunnel Feasibility Study
TMC Meeting - TPO Miami River Tunnel Feasibility StudyTMC Meeting - TPO Miami River Tunnel Feasibility Study
TMC Meeting - TPO Miami River Tunnel Feasibility Study
Miami-Dade Transportation Planning Organization
 
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
Florida Public Works Expo - 2016 - Tampa, Florida
 
Design-Build of Bloomsburg, PA WTP
Design-Build of Bloomsburg, PA WTPDesign-Build of Bloomsburg, PA WTP
Design-Build of Bloomsburg, PA WTP
CDMSmithBuilds
 
Santa Clara Energy Partners
Santa Clara Energy PartnersSanta Clara Energy Partners
Santa Clara Energy Partners
jaybeaulieu
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Toronto Public Consultation Unit
 
Performance testing and specifications
Performance testing and specificationsPerformance testing and specifications
Performance testing and specifications
California Asphalt Pavement Association
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
EMRoundtable
 
AME Presentation - ThP-39 - Jacksonville 2014
AME Presentation - ThP-39 - Jacksonville 2014AME Presentation - ThP-39 - Jacksonville 2014
AME Presentation - ThP-39 - Jacksonville 2014Andrew Feller
 
ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving
Akachidike (AkaChi) Kanu
 

Similar to Mary Rhodes Water Pipeline - A Synthesis of Disciplines (20)

Leed for SWE WE 14
Leed for SWE WE 14Leed for SWE WE 14
Leed for SWE WE 14
 
DOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant WorkshopDOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant Workshop
 
Capstone Design conference
Capstone Design conferenceCapstone Design conference
Capstone Design conference
 
Measuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionMeasuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed Session
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
 
Lotus-technicals-PPT.pdf
Lotus-technicals-PPT.pdfLotus-technicals-PPT.pdf
Lotus-technicals-PPT.pdf
 
A Journey into the Digital World
A Journey into the Digital WorldA Journey into the Digital World
A Journey into the Digital World
 
TI-2515/191 Inspection Prepatation Webinar
TI-2515/191 Inspection Prepatation WebinarTI-2515/191 Inspection Prepatation Webinar
TI-2515/191 Inspection Prepatation Webinar
 
BUS Methodology presentation from 21st November 2013
BUS Methodology presentation from 21st November 2013BUS Methodology presentation from 21st November 2013
BUS Methodology presentation from 21st November 2013
 
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
 
BSc-SysAnal-1- Introduction.pptx
BSc-SysAnal-1- Introduction.pptxBSc-SysAnal-1- Introduction.pptx
BSc-SysAnal-1- Introduction.pptx
 
TMC Meeting - TPO Miami River Tunnel Feasibility Study
TMC Meeting - TPO Miami River Tunnel Feasibility StudyTMC Meeting - TPO Miami River Tunnel Feasibility Study
TMC Meeting - TPO Miami River Tunnel Feasibility Study
 
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
 
Design-Build of Bloomsburg, PA WTP
Design-Build of Bloomsburg, PA WTPDesign-Build of Bloomsburg, PA WTP
Design-Build of Bloomsburg, PA WTP
 
Santa Clara Energy Partners
Santa Clara Energy PartnersSanta Clara Energy Partners
Santa Clara Energy Partners
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Performance testing and specifications
Performance testing and specificationsPerformance testing and specifications
Performance testing and specifications
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
AME Presentation - ThP-39 - Jacksonville 2014
AME Presentation - ThP-39 - Jacksonville 2014AME Presentation - ThP-39 - Jacksonville 2014
AME Presentation - ThP-39 - Jacksonville 2014
 
ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving
 

Recently uploaded

Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
obonagu
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 

Recently uploaded (20)

Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 

Mary Rhodes Water Pipeline - A Synthesis of Disciplines

  • 1. Mary Rhodes Pipeline: A Synthesis of Disciplines by Alex Barabanov Senior Project Manager City of Corpus Christi Water Department alexba@cctexas.com 361. 826. 1873 November 6, 2013
  • 2. About You • ENGINEERS – Civil – Environmental – Structural – Chemical – Mechanical – Electrical – Other • SCIENTISTS • OTHER • ACADEMIC LEVEL – Undergraduate – Graduate / Master’s – Graduate/ PhD • WORK EXPERIENCE – Internships – Currently working – Past industrial experience 2Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 3. About Me • WORK EXPERIENCE – Senior Project Manager for the Water Department / City of Corpus Christi – 4 years of industrial automation projects, 1.5 years Capital Improvements projects – Electrical Engineer / FMC Technologies • EDUCATION – BS Computer Engineering / VLSI design (University of Utah) – MBA (Texas A&M University-Corpus Christi) – PE candidate with Texas Board of Professional Engineers (tested 2 weeks ago) • INTERESTS – Systems engineering and systems thinking, organizational knowledge management, and team dynamics – Read, bike, plan mountain adventures 3Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 4. The Next Hour • Project background • Project Phase 2 and my contribution to it • Select Challenges • Making the project happen: a synthesis of disciplines • Systems Thinking, Systems Engineering, Project Management • Resources to help gain holistic view 4Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 5. Who Was Mary Rhodes? • Mayor of Corpus Christi 1991-1997 • Contributed to developing water resources • Attacked drought before drought attacked us • Passed away shortly before completion of the project Mary Rhodes Pipeline: A Synthesis of Disciplines 5
  • 6. Project Overview • Map goes here • Phase 1 (1998) – 101 mi, 64” pipe – 3 pump stations – 40 MGD – Supplies 40% of area’s water • Phase 2 (2015) – 42 mi, 54” pipe – 2 pump stations – 40 MGD Mary Rhodes Pipeline: A Synthesis of Disciplines 6 BUY ANNUALLY ONW WATER RIGHTS
  • 7. Phase I - Justification Mary Rhodes Pipeline: A Synthesis of Disciplines 7
  • 8. Phase I - Justification 8Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 9. Phase I - Justification Save Lake Corpus Christi guests and residents… 9Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 10. Project Justification … from this! Mary Rhodes Pipeline: A Synthesis of Disciplines 10
  • 11. Phase II - Justification Area Water Demand Projections by TWDB 11Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 12. Phase II – New Industrial Clients Mary Rhodes Pipeline: A Synthesis of Disciplines 12
  • 13. Phase II – New Pumping Complex 13Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 14. Phase II – Tie-in Into Phase I Mary Rhodes Pipeline: A Synthesis of Disciplines 14
  • 15. A Modern Control Room Mary Rhodes Pipeline: A Synthesis of Disciplines 15
  • 16. A Modern Pump Control Cabinet Mary Rhodes Pipeline: A Synthesis of Disciplines 16
  • 17. Phase II – Select Challenges • Pumps are controlled by level in tank 42 miles away • Unmanned operation requires high reliability • How should one pumping system to respond to failures of the other? • Operating and maintaining pipeline means jobs. Who will get them? 17Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 18. CC Project Life Cycle CONCEPT • Need • Want • Problem • Justification DESIGN • Technical • Financial • Legal • Negotiation • Management BID • Advertise • Evaluate Bids • Award • Answer RFIs BUILD (Construction) • Purchase • Construction • Testing/Inspection • Startup/Commissio ning O&M • Use new product/system • Receive benefit • Maintain • Pay off debt • Learn Lessons 18Mary Rhodes Pipeline: A Synthesis of Disciplines Owner, Stakeholders Engineer Contractor
  • 19. Defense Acquisition Life Cycle 19Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 20. Project Life Cycle CONCEPT • Need • Want • Problem • Justification DESIGN • Technical • Financial • Legal • Negotiation • Management BID • Advertise • Evaluate Bids • Award • Answer RFIs BUILD (Construction) • Purchase • Construction • Testing/Inspection • Startup/Commissio ning O&M • Use new product/system • Receive benefit • Maintain • Pay off debt • Learn Lessons 20Mary Rhodes Pipeline: A Synthesis of Disciplines 1. Project Management 2. Systems Engineering 3. Requirements Management 4. Testing, Verification, and Validation
  • 21. 1. Project Management Project parameters: cannot have all Mary Rhodes Pipeline: A Synthesis of Disciplines 21
  • 22. 1. Project Management Mary Rhodes Pipeline: A Synthesis of Disciplines 22 SOURCE: Program Management Body of Knowledge (PMBOK), 2000 edition
  • 23. 2. Systems Engineering 23Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 24. 2. Systems Engineering Design Build 24Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 25. Engineering vs. Business 25Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 26. Engineering vs. Business 26Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 27. 3. Requirements Management HIERARCHY VIEW • End User Requirements – “Deliver 40 MGD” • Sub-System Requirements – “Control system shall remain operational upon loss of AC power for 60 min” • Component Requirements – “Motor shall be 350 HP” TYPE VIEW • Functional—what system will do – “Shut down if communication is lost for 40 min” • Non-Functional—what features the system will have – “AC power and signal cables shall have minimum 18 inch separation” • Performance—how fast or how well – “Valve shall reach fully open state within 5 minutes of OPEN command” Mary Rhodes Pipeline: A Synthesis of Disciplines 27
  • 28. 4. Testing, Verification, and Validation • Testing: observation and analysis – Destructive or non-destructive – Black vs. White Box – Can be expensive • Verification: test results vs. expectations – Meaningful only if expectations (i.e. requirements) are known • Validation: outcome vs. intent – Obtained with project outcome meets user’s requirements and intent Mary Rhodes Pipeline: A Synthesis of Disciplines 28
  • 29. Benefits of Systems Approach • Better Product, less expensive, on time • Makes real impact on society and environment • Improves quality of our lives • Makes your work more meaningful • Greater personal satisfaction from chosen career 29Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 30. Resources—Online • City of Corpus Christi Water Department http://www.cctexas.com/government/water/index • PublicPurchase.com—free bid packages http://www.publicpurchase.com/ • New Industrial Customers in San Patricio County http://sanpatwater.com/water%20contracts%209.4.13.php • Region N Water Demand Projection (by TWDB, 2016) http://www.twdb.state.tx.us/waterplanning/data/projections/2017/demandproj.asp • Defense Acquisition Life Cycle wall chart https://ilc.dau.mil/pdf/Front_Ver_54_June_15_2010_34x22.pdf • The Marshmallow Challenge video (6 min) http://www.ted.com/talks/tom_wujec_build_a_tower.html • Project Management Institute (PMI) http://www.pmi.org/ • International Council on Systems Engineering (INCOSE) http://www.incose.org/ 30Mary Rhodes Pipeline: A Synthesis of Disciplines
  • 32. Mary Rhodes Pipeline: A Synthesis of Disciplines 32