SlideShare a Scribd company logo
1 of 11
WORK STUDY AND METHOD STUDY
Work Study
 Work study is one of the techniques for
improving the productivity
◦ It is a generic term for the techniques of
method study and work measurement.
 Method study is the technique of
systematic recording and critical
estimation of existing and proposed
ways of doing work and developing an
easier and economical method.
Work Study
 Work study is the term used in Great Britain
while in the USA it is called Time and Motion
Study.
 Both concerned with discovering the best ways of
doing jobs and with establishing time and output
standards based upon such methods.
 The time and motion study (or time-motion
study) is a business efficiency technique that
combines the Time Study work of Frederick
Winslow Taylor with the Motion Study work of
Frank and Lillian Gilbreth.
 It is a major part of scientific management
(Taylorism).
 Time study developed in the direction of establishing
standard times
Work Study
 Work study is a combination of two groups of
techniques, method study and work
measurement, which are used to examine
people's work and indicate the factors which
affect efficiency.
 Work study is normally used in an attempt to
increase output from given resources with little
or no additional capital investment.
◦ This is achieved by systematically analysing existing
operations, processes and work methods.
Work Study
The basic procedure of work study is as follows:
 Select the job or process to be studied.
 Record everything that happens during observation.
 Examine the recorded facts critically
 Develop the most economic methods, taking into
account all the circumstances.
 Measure the amount of work involved in the method
used and calculate a “standard time” for doing it.
 Define the new method and the related time.
 Install the new method and time as agreed standard
practice.
 Maintain the new standard practice by proper control
procedures.
Work Measurement
Work measurement establishes the time a
qualified worker needs to carry out a specified job
at a defined level of performance.
Standard Time: Amount of time it should take a
qualified worker to complete a specific task,
working at a sustainable rate, using given
methods, tools and equipment, raw material and
workplace arrangements.
Work measurement helps in investigating,
reducing and subsequently eliminating
ineffective time, during which useful work is not
being performed.
Method Analysis
 Job design often begins with a methods
analysis of an overall operation. It might be
called as a macro-view of the job.
 It then moves from the general to specific
details of the job, concentrating on
arrangement of the workplace and
movements of the worker.
 It can be a good source of productivity
enhancement.
 Method Study: Whereas method study
helps us eliminate unnecessary movement.
Method Study
 Method study is the systematic recording and
critical examination of existing and proposed
ways of doing work in order to develop and
apply easier and more effective methods and
to reduce costs.
◦ It is used to improve processes and
procedures, plant layout, design of plant and
equipment; to reduce human effort and
fatigue, use of materials, machines and
manpower, and to develop better physical and
working environments.
Drivers of Method Analysis
 Changes in tools and equipment.
 Changes in product design, or new products.
 Changes in materials or procedures.
 Government regulations.
 Other factors (e.g. Accidents, quality
problems)
Application of Method Analysis
Methods analysis is done both for existing
jobs and new jobs.
◦ For an existing job, the analyst observe the
job as it currently being done and then
devise improvements.
◦ For a new job, the analyst rely on a
description of the job and an ability to
visualize the operation in advance.
Procedure in method analysis
1. Identify operation to be studied and collect
all essential facts regarding tools,
equipment, materials, etc.
2. For existing job, discuss the job with
operator and supervisor to get their views/
inputs.
3. Study and document the present method
of an existing job with the help of process
chart.
4. Analyze the job.
5. Propose new methods.
6. Install the new method.
7. Follow up installation to ensure

More Related Content

Similar to Work-study.pptx

Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
Shweta Varshney
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
varsharocks
 
L 05- industrial management
L 05- industrial managementL 05- industrial management
L 05- industrial management
Tanya Mathur
 

Similar to Work-study.pptx (20)

Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Work Study
Work StudyWork Study
Work Study
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
 
Work study
Work studyWork study
Work study
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
 
Work Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptxWork Study and Method Study Presentation.pptx
Work Study and Method Study Presentation.pptx
 
Work Study
Work StudyWork Study
Work Study
 
Work study
Work studyWork study
Work study
 
Garments
Garments Garments
Garments
 
Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
 
Work study
Work studyWork study
Work study
 
Work Study
Work Study Work Study
Work Study
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
L 05- industrial management
L 05- industrial managementL 05- industrial management
L 05- industrial management
 
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 

Recently uploaded (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 

Work-study.pptx

  • 1. WORK STUDY AND METHOD STUDY
  • 2. Work Study  Work study is one of the techniques for improving the productivity ◦ It is a generic term for the techniques of method study and work measurement.  Method study is the technique of systematic recording and critical estimation of existing and proposed ways of doing work and developing an easier and economical method.
  • 3. Work Study  Work study is the term used in Great Britain while in the USA it is called Time and Motion Study.  Both concerned with discovering the best ways of doing jobs and with establishing time and output standards based upon such methods.  The time and motion study (or time-motion study) is a business efficiency technique that combines the Time Study work of Frederick Winslow Taylor with the Motion Study work of Frank and Lillian Gilbreth.  It is a major part of scientific management (Taylorism).  Time study developed in the direction of establishing standard times
  • 4. Work Study  Work study is a combination of two groups of techniques, method study and work measurement, which are used to examine people's work and indicate the factors which affect efficiency.  Work study is normally used in an attempt to increase output from given resources with little or no additional capital investment. ◦ This is achieved by systematically analysing existing operations, processes and work methods.
  • 5. Work Study The basic procedure of work study is as follows:  Select the job or process to be studied.  Record everything that happens during observation.  Examine the recorded facts critically  Develop the most economic methods, taking into account all the circumstances.  Measure the amount of work involved in the method used and calculate a “standard time” for doing it.  Define the new method and the related time.  Install the new method and time as agreed standard practice.  Maintain the new standard practice by proper control procedures.
  • 6. Work Measurement Work measurement establishes the time a qualified worker needs to carry out a specified job at a defined level of performance. Standard Time: Amount of time it should take a qualified worker to complete a specific task, working at a sustainable rate, using given methods, tools and equipment, raw material and workplace arrangements. Work measurement helps in investigating, reducing and subsequently eliminating ineffective time, during which useful work is not being performed.
  • 7. Method Analysis  Job design often begins with a methods analysis of an overall operation. It might be called as a macro-view of the job.  It then moves from the general to specific details of the job, concentrating on arrangement of the workplace and movements of the worker.  It can be a good source of productivity enhancement.  Method Study: Whereas method study helps us eliminate unnecessary movement.
  • 8. Method Study  Method study is the systematic recording and critical examination of existing and proposed ways of doing work in order to develop and apply easier and more effective methods and to reduce costs. ◦ It is used to improve processes and procedures, plant layout, design of plant and equipment; to reduce human effort and fatigue, use of materials, machines and manpower, and to develop better physical and working environments.
  • 9. Drivers of Method Analysis  Changes in tools and equipment.  Changes in product design, or new products.  Changes in materials or procedures.  Government regulations.  Other factors (e.g. Accidents, quality problems)
  • 10. Application of Method Analysis Methods analysis is done both for existing jobs and new jobs. ◦ For an existing job, the analyst observe the job as it currently being done and then devise improvements. ◦ For a new job, the analyst rely on a description of the job and an ability to visualize the operation in advance.
  • 11. Procedure in method analysis 1. Identify operation to be studied and collect all essential facts regarding tools, equipment, materials, etc. 2. For existing job, discuss the job with operator and supervisor to get their views/ inputs. 3. Study and document the present method of an existing job with the help of process chart. 4. Analyze the job. 5. Propose new methods. 6. Install the new method. 7. Follow up installation to ensure