SlideShare a Scribd company logo
1 of 3
Download to read offline
AHMED FAHMY ZAKY
Electrical Power Engineer
Career Objective:
I want to make a sound position in corporate world and work enthusiastically in team to achieve
goal of the organization with devotion and hard work.
Personal Information:
 Date of Birth : 13th
April 1991
 Place of Birth : Alexandria, Egypt
 Nationality : Egyptian
 Marital Status : Single
 Military Status : Completed at 1st
December 2014
Contact Information:
 Address : Smouha - Alexandria, Egypt
 E-mail address : ahmed.fahmy31@gmail.com
 Phone numbers : +201121915922
+2034284730
Education:
 Bachelor's Degree of Electrical Power Engineering and Machinery (June 2013) from
Alexandria University, Faculty of Engineering, Electrical Engineering Department with
overall average: Good (70 %).
 Graduation Project: Low and Medium Voltage Power Distribution of Industrial City
(Grade : Excellent)
Work Experience:
 From 1/2/2015 till now working for United Engineer 2000 Company as a commissioning and
testing engineer.
Projects:
The Egyptian Ethylene and Derivatives Co. (ETHYDCO)
1. Precommissioning tests on ABB and Fuji Electric switchgears ( 11 kV , 6.6 kV , 400 V)
 Hipot test on medium voltage switchgear busbars
 Hipot test on medium voltage cables
 Primary injection test on CTs and VTs
 Secondary injection test on Digital Protection Relays (ABB Relion: REF630 , REF620 ,
REM630 , REM620, RET615 – GE: Multilin 750 , Multilin 339)
 Contact resistance test on bus ducts
 Function test on auxiliary circuits
2. Installation and Testing of NISSIN Gas Insulated Switchgear (GIS):
 Assembly of GIS sections
 Gas filling (SF6)
 Gas tightness test
 Operation check of gas density switches
 Measurement of Insulation resistance of main circuit and control circuit
 Measurement of the resistance of the main circuit
 Phase sequence check
 Measurement of moisture of SF6
 SF6 Gas purity test
 Power Frequency voltage dry test
 Mechanical operation test on gas circuit breaker, disconnecting switch and earthing
switches
 Timing test for gas circuit breaker, disconnecting switch and earthing switches
 Polarity test and insulation resistance measurement for CT and VT
3. Installation and testing of SIEMENS 40 MVA Power Transformer (66 kV / 11 kV)
 Assembly of transformer’s accessories (Radiators – Bucholz relay – Conservator tank –
Medium voltage bushings and terminal box)
 Oil filling and treatment
 Measurement of voltage ratio and check of phase displacement
 Measurement of dc insulation resistance
 Oil test (Breakdown voltage – Humidity)
 Functional test of auxiliary circuits and protection equipments
 Leakage visual check
 Insulation test of auxiliary circuits
4. High voltage cables laying (66 kV)
 Laying of high voltage cables (66 kV , 1x240 mm2
) over 1000 m
 Termination of cables using: PFISTERER hi voltage seperable connector (CONNEX 4)
Badr Petroleum Co. (BAPETCO – NEAG1)
Precommissioning tests on EGEMAC switchgear (11 kV)
 Hipot test on medium voltage switch gear busbars
 Secondary injection test on Digital Protection Relays (Schneider: VAMP 40, VAMP 230)
Summer Training:
 Aug:Sep 2010 at Misr Petroleum co.
 Jul:Aug 2011 at Sidi-Krir Power Station.
 Aug:Sep 2012 at Alexandria Steel Forming co. (Alex Form)
Extra curriculum study:
 Automatic Control from 4th
to 8th
of September 2011, Basics of PLC from 11th
to 15th
of
September 2011 and SCADA Systems from 18th
to 22nd
of September 2011
(Schneider Electric Certified)
 Microcontrollers (AVR)
 Matlab (Level 1)
Computer Skills:
 Microsoft Office : Word – Power Point – Excel
 Matlab
 AutoCAD
Language Skills:
 Arabic : Native
 English : Fluent

More Related Content

What's hot

Single phase active power filtering method using diode-rectifier-fed motor drive
Single phase active power filtering method using diode-rectifier-fed motor driveSingle phase active power filtering method using diode-rectifier-fed motor drive
Single phase active power filtering method using diode-rectifier-fed motor driveAsoka Technologies
 
Mobile charger presentation
Mobile charger presentationMobile charger presentation
Mobile charger presentationYãwãr Cena
 
amit cv electrical engineer
amit cv electrical engineeramit cv electrical engineer
amit cv electrical engineeramitsjob1981
 
Robotic cable inspection system
Robotic cable inspection system Robotic cable inspection system
Robotic cable inspection system Mahesh Thiruveedula
 
Final Resume Deepak Sir
Final Resume Deepak SirFinal Resume Deepak Sir
Final Resume Deepak SirDEEPAK GIRASE
 
Snap-In High Vibration Products: AEC-Q200 Automotive for High Voltage Perform...
Snap-In High Vibration Products: AEC-Q200 Automotive for High Voltage Perform...Snap-In High Vibration Products: AEC-Q200 Automotive for High Voltage Perform...
Snap-In High Vibration Products: AEC-Q200 Automotive for High Voltage Perform...KEMET Electronics Corporation
 
Syntech electromech private limited
Syntech electromech private limitedSyntech electromech private limited
Syntech electromech private limitedakkiakhila1
 
Speed Control of DC Motor
Speed Control of DC MotorSpeed Control of DC Motor
Speed Control of DC MotorMafaz Ahmed
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsIrfan Vali
 
Weekly2 05 54261505
Weekly2 05 54261505Weekly2 05 54261505
Weekly2 05 54261505CN Neung
 
Automatic Street lamp on/off working process
Automatic Street lamp on/off working processAutomatic Street lamp on/off working process
Automatic Street lamp on/off working processZiaulHaque73
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MIrfan Vali
 
Rajesh Resume ....
Rajesh Resume ....Rajesh Resume ....
Rajesh Resume ....Rajesh Ahdu
 

What's hot (20)

Single phase active power filtering method using diode-rectifier-fed motor drive
Single phase active power filtering method using diode-rectifier-fed motor driveSingle phase active power filtering method using diode-rectifier-fed motor drive
Single phase active power filtering method using diode-rectifier-fed motor drive
 
Mobile charger presentation
Mobile charger presentationMobile charger presentation
Mobile charger presentation
 
amit cv electrical engineer
amit cv electrical engineeramit cv electrical engineer
amit cv electrical engineer
 
Robotic cable inspection system
Robotic cable inspection system Robotic cable inspection system
Robotic cable inspection system
 
Muhammad Ahmed 01
Muhammad Ahmed 01Muhammad Ahmed 01
Muhammad Ahmed 01
 
Mohamed ElGazzar Egypt
Mohamed ElGazzar EgyptMohamed ElGazzar Egypt
Mohamed ElGazzar Egypt
 
Final Resume Deepak Sir
Final Resume Deepak SirFinal Resume Deepak Sir
Final Resume Deepak Sir
 
Snap-In High Vibration Products: AEC-Q200 Automotive for High Voltage Perform...
Snap-In High Vibration Products: AEC-Q200 Automotive for High Voltage Perform...Snap-In High Vibration Products: AEC-Q200 Automotive for High Voltage Perform...
Snap-In High Vibration Products: AEC-Q200 Automotive for High Voltage Perform...
 
Syntech electromech private limited
Syntech electromech private limitedSyntech electromech private limited
Syntech electromech private limited
 
CV 5 yrs
CV 5 yrsCV 5 yrs
CV 5 yrs
 
Speed Control of DC Motor
Speed Control of DC MotorSpeed Control of DC Motor
Speed Control of DC Motor
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume Projects
 
Weekly2 05 54261505
Weekly2 05 54261505Weekly2 05 54261505
Weekly2 05 54261505
 
Automatic Street lamp on/off working process
Automatic Street lamp on/off working processAutomatic Street lamp on/off working process
Automatic Street lamp on/off working process
 
mudassar
mudassarmudassar
mudassar
 
SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&M
 
ManeeshSolankiResume
ManeeshSolankiResumeManeeshSolankiResume
ManeeshSolankiResume
 
RVNL_Report_ppt
RVNL_Report_pptRVNL_Report_ppt
RVNL_Report_ppt
 
ali mostafa cv
ali mostafa cvali mostafa cv
ali mostafa cv
 
Rajesh Resume ....
Rajesh Resume ....Rajesh Resume ....
Rajesh Resume ....
 

Similar to My CV

Similar to My CV (20)

Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Ashraf - CV
Ashraf - CVAshraf - CV
Ashraf - CV
 
khaled.elhag CV
khaled.elhag CVkhaled.elhag CV
khaled.elhag CV
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
ENGHOSSAM kHAIRY
ENGHOSSAM kHAIRY ENGHOSSAM kHAIRY
ENGHOSSAM kHAIRY
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
Electrical technician mohamed abdelkareim
Electrical technician mohamed abdelkareimElectrical technician mohamed abdelkareim
Electrical technician mohamed abdelkareim
 
Mohamed Azzouz C.V
Mohamed  Azzouz C.VMohamed  Azzouz C.V
Mohamed Azzouz C.V
 
CV 4 ME
CV 4 MECV 4 ME
CV 4 ME
 
c.v
c.vc.v
c.v
 
Mohamed hamdy cv
Mohamed hamdy cvMohamed hamdy cv
Mohamed hamdy cv
 
CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17 CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
NEW Cv
NEW CvNEW Cv
NEW Cv
 
Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2
 
Abdel Rahman Mokhtar C.V. updated
Abdel Rahman Mokhtar C.V. updatedAbdel Rahman Mokhtar C.V. updated
Abdel Rahman Mokhtar C.V. updated
 

My CV

  • 1. AHMED FAHMY ZAKY Electrical Power Engineer Career Objective: I want to make a sound position in corporate world and work enthusiastically in team to achieve goal of the organization with devotion and hard work. Personal Information:  Date of Birth : 13th April 1991  Place of Birth : Alexandria, Egypt  Nationality : Egyptian  Marital Status : Single  Military Status : Completed at 1st December 2014 Contact Information:  Address : Smouha - Alexandria, Egypt  E-mail address : ahmed.fahmy31@gmail.com  Phone numbers : +201121915922 +2034284730 Education:  Bachelor's Degree of Electrical Power Engineering and Machinery (June 2013) from Alexandria University, Faculty of Engineering, Electrical Engineering Department with overall average: Good (70 %).  Graduation Project: Low and Medium Voltage Power Distribution of Industrial City (Grade : Excellent) Work Experience:  From 1/2/2015 till now working for United Engineer 2000 Company as a commissioning and testing engineer. Projects: The Egyptian Ethylene and Derivatives Co. (ETHYDCO) 1. Precommissioning tests on ABB and Fuji Electric switchgears ( 11 kV , 6.6 kV , 400 V)  Hipot test on medium voltage switchgear busbars  Hipot test on medium voltage cables  Primary injection test on CTs and VTs  Secondary injection test on Digital Protection Relays (ABB Relion: REF630 , REF620 , REM630 , REM620, RET615 – GE: Multilin 750 , Multilin 339)
  • 2.  Contact resistance test on bus ducts  Function test on auxiliary circuits 2. Installation and Testing of NISSIN Gas Insulated Switchgear (GIS):  Assembly of GIS sections  Gas filling (SF6)  Gas tightness test  Operation check of gas density switches  Measurement of Insulation resistance of main circuit and control circuit  Measurement of the resistance of the main circuit  Phase sequence check  Measurement of moisture of SF6  SF6 Gas purity test  Power Frequency voltage dry test  Mechanical operation test on gas circuit breaker, disconnecting switch and earthing switches  Timing test for gas circuit breaker, disconnecting switch and earthing switches  Polarity test and insulation resistance measurement for CT and VT 3. Installation and testing of SIEMENS 40 MVA Power Transformer (66 kV / 11 kV)  Assembly of transformer’s accessories (Radiators – Bucholz relay – Conservator tank – Medium voltage bushings and terminal box)  Oil filling and treatment  Measurement of voltage ratio and check of phase displacement  Measurement of dc insulation resistance  Oil test (Breakdown voltage – Humidity)  Functional test of auxiliary circuits and protection equipments  Leakage visual check  Insulation test of auxiliary circuits 4. High voltage cables laying (66 kV)  Laying of high voltage cables (66 kV , 1x240 mm2 ) over 1000 m  Termination of cables using: PFISTERER hi voltage seperable connector (CONNEX 4) Badr Petroleum Co. (BAPETCO – NEAG1) Precommissioning tests on EGEMAC switchgear (11 kV)  Hipot test on medium voltage switch gear busbars  Secondary injection test on Digital Protection Relays (Schneider: VAMP 40, VAMP 230) Summer Training:  Aug:Sep 2010 at Misr Petroleum co.  Jul:Aug 2011 at Sidi-Krir Power Station.  Aug:Sep 2012 at Alexandria Steel Forming co. (Alex Form)
  • 3. Extra curriculum study:  Automatic Control from 4th to 8th of September 2011, Basics of PLC from 11th to 15th of September 2011 and SCADA Systems from 18th to 22nd of September 2011 (Schneider Electric Certified)  Microcontrollers (AVR)  Matlab (Level 1) Computer Skills:  Microsoft Office : Word – Power Point – Excel  Matlab  AutoCAD Language Skills:  Arabic : Native  English : Fluent