1. Curriculum vitae
Personal Information:
Name: Khaled El-hag Ahmed Mohamed Mohamed Zaki
Nationality: Egyptian
Birth date: 1/12/1985
Passport No.: A01050533
Gender: Male
Marital Status: Married
Military state: Completely exempt
Address: Alexandria – Saba basha - 36 khalil matran St.
Phone Number: +2035842069
Mobile Number: +201210050620 OR +201019699169
Email address: Khaled.elhag76@gmail.com
eng_khaledelhagahmed@yahoo.com
Have valid Driving license
Profile:
Hard work in personal and in group, Creative, work under Pressure, do my best to
achieve my target.
Career Objective:
Seeking for a good opportunity in your company to improve my skills and increase
my knowledge in the field of Electrical, Instrumentation and Control Engineering.
2. Education:
School: Graduated from English High Schools
University: Alexandria University – Faculty of Engineering
Electronics and communication department
Graduation Project: Project in Evolution of Mobile Communication
Systemsfrom 2G up to 4G
Project grade: Excellent
Qualifications:
Mater Degree in Communication Engineering 2014.
Automated Measurements and maintenance in Petroleum Indusrty.
B.Sc degree in Communication and Electronics engineering 2008
Graduation grade: Good
Courses:
Electric Protection System: Discrimination, Protective relays calcification,
current and transformers, over current protection, differential protection, earth
fault and earth leakage protection.
Automatic Control, PLC, SCADA: Course include Basics of Automatic
Control, The ladder diagram, the Programming logic control level 1
(introduction) and level 2 (Advanced), training on RSLogix, RSlink, RS
Emmiulator 500, RS view, performing some PLS programs, and troubleshooting
solution, Basics of SCADA system.
Microsoft Office (Word, PowerPoint, Excel)
3. Computer skills: Excellent.
Windows.
Microsoft office(ICDL)
AutoCAD.
Language:
Arabic: Mother tongue
English: Fluent
Training at:
GASCO: General training in the electrical Department and the instrumentation
department and in the control room taking general knowledge on the
instrumentation (control valves, sensors, level transmitters) and PLC and DCS.
ANRPC: (Alexandria National Refining and Petrochemicals Company) general
training on the control system (DCS and PLC).
Faculty of Engineering: Electronic Circuits Design Course.
Current Job:
Working at Alexandria Petroleum Maintenance Company
(Petromaint)
Job Title: Instrumentation /Control / Electrical Engineer
Working from: 4/2009 till Now.
4. Work Experience:
7 years Experience as Electrical & Instrument/Control Project Engineer.
Job Description:
o I’m Responsible on all the Electrical and Instrument Works done in the
site and giving reports and taking approval on the works from the Client.
o I'm hired to Abo Qir Petroleum Company as Instrumentation and
control Project Engineer. ( From 15/2/2014 till NOW )
Electrical and instrument Works:
Instrument installation (Radar tank gauge (RTG), level transmitter, Level
Switch, Pressure Switch, tank gauge, breathing valve, PSV, PCV, SDV,
BDV, Level and Pressure transmitters).
Installing of complete fire alarm and fire fighting system (Fire alarm
Electrical Network, Detectors (Smoke detectors, Gas detectors, flame
detectors and heat detectors), Panels, Manual call points, Abort switch,
Manual release, Siren, Bell, shutters, Fire Fighting system containing the
steel pipes of suitable diameter c/w High Pressure Switch, and Co2
cylinders).
Supervision and review any fabrication work related to electrical in field
(cable tray, Racks, junction box, stands, frames.)
Reading P&ID and Ladder diagram of the PLC and getting information
concerning Instruments at the site and on pipe lines and Tanks.
5. Working as an owner offshore on AQPC platforms in fire alarm and
fighting projects, installation of instruments, calibration, and making
commissioning and startup.
Installation and connecting a Well Head Control Panel OFFSHORE and
connecting all the required tubing and cables for the panel and the wells.
Carry out preliminary, basic, and detailed instrumentation engineering
studies and produce associated deliverables, e.g. MTOs, datasheets, cable
routes, drawings, control philosophies, SAFE charts, etc.
Review Engineering of New project, including P&IDs, Data sheets,
instruments specifications, and cables specifications. Supervision on the
contractor works in the E&I works, and reviewing work reports, testing
cables and instruments calibration.
Laying cables according to cable schedule and Single line diagram.
Low voltage cables and Medium voltage cables termination.
Perform the Insulation test for medium voltage cables
Install electrical and control systems.
Installing Electrical Panels and make connection and termination.
Installing indoor and outdoor lighting system.
Installing Lighting Fixtures (Street lighting Fixture, Garden lighting
fixture, High master, EX Lighting Fixtures, Lighting fixtures on tanks).
Installing the earthing system and connecting it to the existing one.
Construction the telephone and dish and network system.
Cable tray fabrication and installation.
6. OWNER PROJECT FROM TO
Sidpec Construction of the alternative pit 28/4/2009 16/7/2009
Agiba Electrical Works for Meliha Camp 26/7/2009 23/8/2009
Petrodara
Electrical Works for Service
Camp
1/9/2009 15/10/2009
Petroshah
d
Electrical and Mechanical Works
for Zahraa early production area
27/10/2009 10/12/2009
Petrogas
Electrical and Instrument works
for new spherical tanks
20/12/2009 1/4/2011
Sumed
Fire Alarm and firefighting
System
15/4/2011 12/2/2012
Agiba Raml produced water treatment 1/3/2012 31/3/2012
Dapetco E&I works for the Dew point 1/4/2012 31/7/2012
WASCO
Electrical & Instrument works for
New Compressor area
1/8/2012 1/12/2013
AQPC
Fire And GAS Alarm system
installation on the platfroms
15/2/2014 NOW