SlideShare a Scribd company logo
1 of 21
Download to read offline
(Irrigation and Hydraulic Department, Ain Shams University, Cairo, Egypt)
Ahmed Abdelkader, George Essam, Youman Gamal
El-Salloum New Marina
Graduation Project Summary Report, Cairo, Egypt, 24th- 28th October 2021
Cairo Water Week, CWW2021
Ministry of Water Resources & Irrigation
NUMERICAL INVESTIGATION OF WAVE TRANSFORMATION AT
AL-SALLUM, NORTHWEST COAST, EGYPT
MetOcean Data Collection/ Analysis
A– Data Collection
A.1– Meteorological/ Wind Data
In Order to Assist the Wave Climate in/ around the mentioned region, it’s required to investigate the sur-
rounding wind field that cause generation of short crest wind-waves. Wind hourly-based parameters
(velocity components u and v) were extracted as wind records for the previous 40-year from ECMWF-
ERA5 Platform at location (25.27 Long, 31.63 Lat) in figure (1), and got verified from DHI Data Portal as
shown in figure (2)
A.2– Oceanic/ wave Data
In respect of robust simulation of wave transformation/ propagation , not only wind data collection is a must
but also offshore-wave data . Offshore waves hourly-based parameters (significant height, peak period and
wave mean direction) were estimated based on the wind-generated waves analytical formulations, which is
SPM1984, that approach tests the wave formation into two regimes (Fetch Limited formulation or Fully De-
veloped Seas formulation), based on the storm’s parameters such as fetch length, storm duration and wind
speed. Hence, the following wave climate was estimated along the offshore boundary to get imposed on that
open/ wave-maker boundaries of the model, at location (25.27 Long, 31.63 Lat) figures (3&4).
A.3– Tidal Data
Tidal variation/ tidal harmonic constituents were collected and got analyzed, in purpose of conducting ap-
propriate estimation of the design water level, moreover adjusting the sea-bed levels to one of the tidal da-
tums whether MWL or CD to be ready for the model depth interpolation, see data and sources in figures
(5&6).
A.4– Hydrographic/ Bathymetric data
After reviewing some sources of bathymetric data, it was concluded that, the most reliable ocean-bed levels
with suitable resolution was the digitized Navionics Sonar Chart data (on behalf of admiralty charts), shown
in figures (7&8)
Long-term Data Analysis
A– EVA/ Extreme Value Analysis
The statistics of long-term prediction of wind/wave requires that the individual data points used in the sta-
tistical analysis be statistically independent. Hence any hourly record depends very much on the record of
the previous hours and hence the theoretical condition of statistical independence is not met. Hence, in or-
der to produce independent data points, only storms should be considered. The commonly used method to
separate wind/waves is called Peak Over Threshold (POT) analysis. A threshold wind stress of 9.0 m/s was
selected for the UA hourly values. The Weibull distribution was used as explained by William Kamphuis
for the extreme wave analysis where the probability of exceedance Q is expressed by:
The data was sorted from the largest to the smallest values and ranked from 1 to the number of POT values
(N). The value of Q is determined from m/(N+1) where m is the rank. The parameter W is calculated ac-
cording to:
Design lifetime N NNE NE ENE E W WNW NW NNW
25 23.9 18.9 15.9 15 17.4 26.7 25.8 23.3 23.8
50 26.8 20.6 16.8 15.6 18.5 28.3 27.3 24.6 25.9
75 28.6 21.6 17.3 16 19.1 29.2 28.2 25.4 27.1
100 29.9 22.4 17.6 16.2 19.6 29.9 28.8 26 28
A best fit is determined for the values of Hs
against W, figure(9). The parameters γ and β are
determined from the best fit line. Finally, the wind
stresses for different return periods (25, 50, 75 and
100 yrs.) were determined for each 22.5o
/sector,
neglecting the directions which coming from the
land, table (1).
Ain-Shams University
Faculty of Engineering
Civil Engineering Branch
Irrigation and Hydraulics Department
Water & Hydraulic Structures Program
Prepared by Eng. Ahmed Abdelkader
Reviewed by Eng. Omar Nemr
Approved by Dr. Ahmed Balah
Drawing no. 2
Figure (1) - wind records for the previous 40-
year from ECMWF-ERA5 Platform
Figure (2) - wind records for the previous 40-years
from DHI Data portal.
Figure (3) - wave rose concluded from (SPM-
84) wind-Generated waves formulations.
Figure (4) - one year time series of Wave heights from DHI data portal.
Figure (5) - Tidal datums at AL-Sallum.
Figure (6) - Tidal signal based on (IHO) & (OSU) data.
Figure (7) - Navionics sonar chart. Figure (8) - Digitized Bathymetry based on Navionics chart datum.
Figure (9) - Weibull distribution for data with (alpha = 1)
Table (1) - Wind stress (UA) for different return period from seaward directions.
NUMERICAL INVESTIGATION OF WAVE TRANSFORMATION AT
AL-SALLUM, NORTHWEST COAST, EGYPT
Cont. Long-term Data Analysis
B– Extreme Wave Parameters Estimate
B1– Significant Wave Height
Corresponding wave height values of the investigated return period wind stresses had been estimated based
on SPM1984 metric formulation and had go examined case by case if whether it was fetch limited or fully
developed seas, those formulations are shown below. The examined return periods Hs’s has been tabulated
below, in table (1).
B2– Wave Peak Period/ Tp
Accordingly, waves peak period had been estimated based on conducting the previous criteria, but using the
peak period formulations which are shown below. The examined 50 years) return periods Tp’s has been
tabulated below, table (2).
Model Results Extraction
A– Extreme 2D Wave Map
B– Extreme Design Wave Parameters at Multiple Locations on Breakwater
Ain-Shams University
Faculty of Engineering
Civil Engineering Branch
Irrigation and Hydraulics Department
Water & Hydraulic Structures Program
Prepared by Eng. Ahmed Abdelkader
Reviewed by Eng. Omar Nemr
Approved by Dr. Ahmed Balah
Drawing NO. 3
MIKE21– SW Model Building
A– Generating Computational Mesh
In order to approach the best simulation of waves transformation and to obtain resulted wave maps with the best ac-
curacy and resolution, it was necessary to conduct the computational mesh with a suitable mesh element’s size
which can cover the narrowest entrances within the domain. Not only the mesh element size was dominating the
generation process but also reaching to that resolution by the minimum number of mesh nodes to reduce the run-
ning time, is a privilege. Achieving those criteria (obtaining the required resolution with minimal number of mesh
nodes) has been done by nesting options/ properties during mesh generation process, taking into consideration the
appropriate smoothness rations within the consecutive elements sizes. Nesting technique is well represented in fig-
ure (1).
B– Boundaries Types Selecting
The outer mesh nodes were set as boundary nodes and divided into two types, the three open boundaries (North, West and
East) set to wave-maker boundaries, the Southern boundary was set to land boundary as shown in figure (2).
Extreme conditions- 50years design lifetime
Nautical Direction (o
) Hs (m) Tp (s) Wind speed (m/s)
270 4.3 4.526 20.010
292.5 5.5 4.693 19.433
315 6.3 5.456 17.855
337.5 5.5 15.955 18.619
0 7 13.317 19.143
22.5 4.8 13.777 15.457
45 2.9 14.954 13.095
67.5 2.6 15.700 12.330
90 2.6 13.517 14.163
Nearshore Wave Roses Extraction
Offshore wave conditions Extracted Results
Extreme conditions- 50years design life time MBW1-Head MBW2–Trunk SBW1 Port Entrance
Direction Hs Tp Wind Speed Hs Tp Hs Tp Hs Tp Hs Tp
270 4.3 4.526 20.010 2.91766 13.6389 2.0243 13.2148 0.816377 10.0508 1.765 12.6326
292.5 5.5 4.693 19.433 2.97428 13.711 2.03216 13.6995 0.753636 13.6957 1.75664 13.698
315 6.3 5.456 17.855 3.00831 14.9366 2.05186 14.9434 0.76696 14.9604 1.77459 14.95
337.5 5.5 15.955 18.619 2.99121 15.6635 2.04694 15.6887 0.771651 15.7169 1.77377 15.6991
0 7 13.317 19.143 2.77561 13.5851 1.92171 13.5769 0.731868 13.572 1.66971 13.5748
22.5 4.8 13.777 15.457 0.771316 3.99452 0.668733 3.98178 0.444187 4.03576 0.633498 4.00947
45 2.9 14.954 13.095 1.54956 5.0974 1.19906 5.15171 0.515386 5.22233 1.07857 5.26889
67.5 2.6 15.700 12.330 2.05067 5.78215 1.44782 5.83441 0.543614 6.38687 1.26177 5.91267
90 2.6 13.517 14.163 3.03692 16.1202 2.06864 16.1278 0.743505 16.1234 1.77819 16.1161
Table (1)-Wind-generated wave formulations
Table (2)
Figure (1)- Nesting Technique to achieve required smoothness Figure (2)-Wave –Maker boundary and land boundary
Nearshore wave rose presented in figure
(5) show that northwest direction is still
the prevailing wave direction.
This consistent with offshore wave rose,
and also reasonable because there is no
dramatic change in bathymetry.
Nearshore wave rose shows that there is
no wave height greater than 3.2 meter
which will be used later in design depth
of navigation channel.
Figure (3)- 2D wave map for extreme events Figure (4)- Main locations of calculation extreme wave parameters
Figure (5) - Nearshore wave rose at El-Salloum marina area
Prof.Dr. ABD EL MOHSEN EL MONGY
Sheet Name :
25 July 2021
Presented By:
Date :
Results of extreme Analysis
TO FIT
Scale : Sheet No. :
Yasmeen Abdelbaset Abdelhady
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER E. MOSTAFA
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKARYA
4
EL-SALLOUM NEW MARINA
NORTHWESTERN COAST, EGYPT
Bathymetry
Notes:
Wave height are in meters.
Wave period are in seconds.
Wave Direction are in degrees.
Wave Height
Wave Period
Main Wave Direction
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
R
o
a
d
R
o
a
d
-
T
w
o
L
a
n
e
s
Q
u
a
y
W
a
l
l
R
o
a
d
Natural Shore Line
to
Alexandria
to
Libia
Toe (-4.50)
2:1
(2.00)
Toe (-9.25)
Toe (-3.15)
2:1
2:1
2:1
2:1
2:1
(2.00
)
(2.00)
Toe (-9.25)
International coastal road
International coastal road
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(h)YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
M
o
t
o
r
B
o
a
t
s
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T. .
T
R
. .
.
.
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
e
v
e
t
m
e
n
t
Revetment
2
:
1
2
:
1
2:1
2:1
2
:1
2:1
2:1
2:1
2:1
(2.00)
(2.00)
(2.00)
(2.00)
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
Drawing Title :
July 2021
Presented By:
Date :
project General Location
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
1
R
o
a
d
R
o
a
d
-
T
w
o
L
a
n
e
s
Q
u
a
y
W
a
l
l
R
o
a
d
Natural Shore Line
to
Alexandria
to
Libia
0
SCALE BAR 1:1000
20 200
50 100
Toe (-4.50)
2:1
(2.00)
Toe (-9.25)
Toe (-3.15)
2:1
2:1
2:1
2:1
2:1
(2.00)
(2.00)
Toe (-9.25)
International coastal road
International coastal road
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(h)YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3110/250
AK2200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
M
o
t
o
r
B
o
a
t
s
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T. .
T
R
. .
.
.
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
e
v
e
t
m
e
n
t
Revetment
2
:
1
2
:
1
2:1
2:1
2
:1
2:1
2:1
2:1
2:1
(2.00)
(2.00)
(2.00)
(2.00)
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
Drawing Title :
July 2021
Presented By:
Date :
Master plan
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
navigation channel layout
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
Wind Rose
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
Remarks
.180207 ASU-Logo-400.jpg
5
R
o
a
d
R
o
a
d
-
T
w
o
L
a
n
e
s
R
o
a
d
Toe (-4.5
0)
2:1
(2.00
)
Toe (-9.2
5)
Toe (-3.1
5)
2:1
2:1
2:1
2:1
2:1
(2.00)
(2.00)
Toe (-9.25)
International coastal road
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60+
10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T. .
T
R
. .
.
.
(
-
4
.
0
0
)
(-4.00
)
(
-
8
.
5
0
)
(
-
1
0
.
0
0
)
R
e
v
e
t
m
e
n
t
Revetment
2
:
1
2
:
1
2:1
2:1
2
:1
2:1
5
:
1
5
:
1
5:1
2:1 5:1
5:1
5:1
R
oa
d
R
oa
d
-
T
w
o
La
ne
s
Q
u
a
y
W
a
l
l
R
oa
d
Natural Shore Line
to
Alexandria
to
Libia
To
e (-4
.50
)
2:1
(
2.00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:1
2:1
(
2.00
)
(2.00
)
To
e (-9
.25
)
In
te
rnational coasta
l road
Internatio
nal coastal road
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5 95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
M
o
to
r
B
o
a
ts
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T
. .
T
R
. .
.
.
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
e
v
e
tm
e
n
t
Revetm
ent
2
:1
2
:1
2:1
2:1
2:1
2:1
2:1
2:1
2:1
(2
.00)
(2.00
)
(2.00
)
(2
.00)
143
40
19
Shore line
Shore
line
89999
-10.06
90705
90706
-0.06
90707
-0.06
90708
-0.06
90709
-0.06
90710
-0.06
90711
-0.06
90712
-0.06
90716
-0.06
90717
-0.06
90718
-0.06
90719
-0.06
91565
-0.06
91566
-0.06
91567
-0.06
91568
-0.06
91569
-0.06
91570
-0.06
91571
-0.06
91572
-0.06
91573
-0.06
91574
-0.06
91575
-0.06
91576
-0.06
91577
-0.06
91578
-0.06
91579
-0.06
91580
-0.06
91581
-0.06
91582
-0.06
91583
-0.06
91584
-0.06
91585
-0.06
91586
-0.06
91587
-0.06
91588
-0.06
91589
-0.06
91590
-0.06
91591
-0.06
91592
-0.06
91593
-0.06
91594
-0.06
91595
-0.06
91596
-0.06
91597
-0.06
91598
-0.06
91599
-0.06
91600
-0.06
91601
-0.06
91602
-0.06
91603
-0.06
91604
-0.06
91605
-0.06
91606
-0.06
91607
-0.06
91608
-0.06
91609
-0.06
91610
-0.06
91611
-0.06
91612
-0.06
91613
-0.06
91614
-0.06
91615
-0.06
91616
-0.06
91617
-0.06
91618
-0.06
91619
-0.06
91620
-0.06
91621
-0.06
91622
-0.06
91623
-0.06
91624
-0.06
91625
-0.06
91629
-0.06
91630
-0.06
91631
-0.06
91648
-0.06
91649
-0.06
91650
-0.06
91651
-0.06
91652
-0.06
91653
-0.06
91654
-0.06
91655
-0.06
91656
-0.06
91657
-0.06
91658
-0.06
91659
-0.06
91660
-0.06
91661
-0.06
91662
-0.06
91663
-0.06
91664
-0.06
91665
-0.06
91666
-0.06
91667
-0.06
91668
-0.06
91669
-0.06
0+
20
0.
00
0+
40
0.
00
0+
70
0.
00
1+
00
0.
00
1+
30
0.
00
(-10.00)
(-8.00)
(-6.00)
(-4.00)
(-2.00)
(0.00)
(-10.00)
(-10.00)
(1803 M)
(
1
9
0
M
)
(
S
e
c
t
i
o
n
1
-
1
)
(
S
e
c
t
i
o
n
2
-
2
)
(
S
e
c
t
i
o
n
3
-
3
)
(
S
e
c
t
i
o
n
4
-
4
)
(
S
e
c
t
i
o
n
5
-
5
)
(
S
e
c
t
i
o
n
6
-
6
)
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Navigation channel profile
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
W E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
.180207 ASU-Logo-400.jpg
7
Channel Bed(-10.00)
Sea Bed
L.W.L (0.00)
Sections
Station (M)
Sea Bed Level
Channel Bed Level
H.W.L
L.W.L (0.00) (0.00) (0.00) (0.00) (0.00)
(+0.1)
(0.00)
(+0.1)
(+0.1)
(+0.1)
(+0.1)
(+0.1)
(-10.00) (-10.00) (-10.00) (-10.00) (-10.00) (-10.00)
(-3.00) (-4.37) (-5.42) (-6.63) (-7.50) (-8.56)
0 200 400 700 1000 1300
(1) (2) (3) (4) (5) (6)
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
navigation channel x.sec
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
NC. Layout PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
Remarks
.180207 ASU-Logo-400.jpg
6
Road
Road
-
Two
Lane
s
Q
u
a
y
W
a
ll
Road
Natural Shore
Line
to
Libia
Toe
(-4.50)
2:1
(2.0
0)
Toe
(-9.25)
Toe
(-3.15)
2:1
2:1
2:1
2:1
2:1
(
2.00
)
(2.0
0)
Toe
(-9.25)
Int
ern
ati
on
al
co
as
tal
roa
d
Int
ern
ati
on
al
co
as
tal
roa
d
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ RAMPASI E=%8
PASLANMAZ ÇELİK KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL TAŞ KAPLAMA
YÖRESEL TAŞ KAPLAMA
YÖRESEL TAŞ KAPLAMA
YÖRESEL TAŞ KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
ac
ht
s
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mot
or
Boa
ts
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
.
.
.
.T.
.
T
R
. .
.
.
eal
e
a
l
e
a
l
e
a
l
eal
eal
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
eal
e
a
l
eal
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
Rev
etm
ent
Rev
etm
ent
2:1
2:1
2:1
2:1
2:1
2:1
2:1
2:1
2:1
(2.00)
(2.00)
(2.00)
(2.00)
90707
-0.06
90708
-0.06
90709
-0.06
90710
-0.06
90711
-0.06
90712
-0.06
90716
-0.06
91576
-0.06
91577
-0.06
91578
-0.06
91579
-0.06
91580
-0.06
91581
-0.06
91582
-0.06
91583
-0.06
91584
-0.06
91585
-0.06
91586
-0.06
91587
-0.06
91588
-0.06
91589
-0.06
91590
-0.06
91591
-0.06
91592
-0.06
91593
-0.06
91594
-0.06
91595
-0.06
91596
-0.06
91597
-0.06
91598
-0.06
91599
-0.06
91600
-0.06
91601
-0.06
91602
-0.06
91603
-0.06
91604
-0.06
91605
-0.06
91606
-0.06
91607
-0.06
91608
-0.06
91609
-0.06
91610
-0.06
91611
-0.06
91612
-0.06
91613
-0.06
91614
-0.06
91615
-0.06
91616
-0.06
91617
-0.06
91618
-0.06
91619
-0.06
91620
-0.06
91621
-0.06
91622
-0.06
91623
-0.06
91624
-0.06
91625
-0.06
91629
-0.06
91630
-0.06
91631
-0.06
91648
-0.06
91649
-0.06
91650
-0.06
91651
-0.06
91652
-0.06
91653
-0.06
91654
-0.06
91655
-0.06
91656
-0.06
91657
-0.06
0+200.
00
0+400
.00
0+700
.00
1+000
.00
1+300
.00
(-10.00)
(-8.00)
(-6.00)
(-4.00)
(-2.00)
(0.00)
(-10.00)
(-10.00)
(1803 M)
(1
90
M
)
(S
e
c
ti
o
n
1
-1
)
(S
e
c
ti
o
n
2
-2
)
(S
e
c
ti
o
n
3
-3
)
(S
e
c
ti
o
n
4
-4
)
(S
e
c
ti
o
n
5
-5
)
(S
e
c
ti
o
n
6
-6
)
(-10.00)
(-10.00)
(-10.00)
(-10.00)
(-10.00)
(-10.00)
(-1.53)
(-4.65)
l.w.l (0.00)
l.w.l (0.00)
(-2.86)
(-5.92)
l.w.l (0.00)
l.w.l (0.00)
l.w.l (0.00)
(-4.00)
(-7.00)
(-5.22)
(-8.00)
(-6.37)
(-8.74)
(-7.43)
(-9.77)
5
:
1
5
:
1
l.w.l (0.00)
5
:
1
5
:
1
5
:
1
5
:
1
5
:
1
5
:
1
5
:
1
5
:
1
5
:
1
5
:
1
241 14.32
4.23
Section(6-6)
Section(5-5)
241.1 21.35
10.52
Section(4-4)
28.37
241.1
15.06
36.5
241.1
21.67
Section(3-3)
44.10
241.1
28.12
Section(2-2)
52.93
241.1
35.73
Section(1-1)
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
MBW Head PLAN
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.B
.
.
.
.
.
H
.
.
.
B
M
.
.
.B
.
H
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
M
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.
.
.
.
.
.
.
.
. .
. .
. .
W
.H
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
B
.
.
. .
.
.
.
.
.
. .
W
. .
B
.
.
.
. .
W
. . .
W
.T
. .
T
R
. .
.H
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
.180207 ASU-Logo-400.jpg
18
Toe (-4.50)
2:1
(2.00)
Toe (-9.25)
Toe (-3.15)
2:1
2:1 2:1 2:1
(2.00)
(2.00)
Toe (-9.25)
16
5
5
84,6
22,5
10.3
Head of MBW
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
MBW X.sections
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
A.
.
C.
O.
.S.
H
.
.A
.
.S
.
I.
.
H
E
.A
.
.A.
.A.
.A.
.S.
S.O
.
.A.
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.A
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.A
.
.A
.
.C
.
E
.
A
.
.A.
.A.
.A.
.H
.
S.
. .S.
.A
.
.A
.
.S
.
.
.
.A
.
A
.U
.
.
.A
. .A
.
.A
.
.A
.
I.S.
.S.
.
.A
.
D.S.
.S. .
.T
. .
E
TENSION
AREA
.S.
.H
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
.180207 ASU-Logo-400.jpg
9
SECTION (4-4) IN HEAD
at depth 4.50 m
0.5 1.0
(2.00)
1.0 0.5
(1.00)
(-4.60)
(-0.55)
(-1.73) 2:1
5
Core (20-80kg)
D50 (0.19)
16 m
2:1
Secondary
(510 kg)
Secondary
(510 kg)
Armour
(5.09 ton)
Armour
(5.09 ton)
1
2
.
5
5
1
.
1
8
2
.
5
5
1
.1
8
Armour
(5.09 ton)
Secondary
(510 kg)
(-10.00)
0.5 1.0
(2.00)
1.0 0.5
16 m
1
Armour
(2.624 ton)
Secondary
(262 kg)
Secondary
(510 kg)
Secondary
(262 kg)
Armour
(5.09 ton)
Armour
(2.624 ton)
5
5
(1.00)
(0.05)
(-0.90)
Core (20-80kg)
D50 (0.19)
(-10.00)
0
.
9
5
2
.
0
5
SECTION (3-3) IN TRUNK
at depth 3.9 m
2:1
2:1
(-3.80)
(-3.05)
0.75
2
3
4
5
7
7
0,75
Sand Leyar
Block Pavement
0,25
(+2.00)
(+0.20)
(-2.40)
(-5.00)
(-7.00)
(-8.50)
(-10.00)
1:1
Filter
RUBBLE 2:1
2:1
1
:
1
(-11.50)
SAND FILL
RUBBLE
(2.00)
Armour
(1.38 ton)
(1.00)
SECTION (2-2) IN TRUNK
at depth 2.8 m
30 m
(-2.05)
(-2.80)
1
,
6
6
Secondary
(138 kg)
0
,7
6
Core (20-80kg)
D50 (0.19)
Secondary
(138 kg)
(0.34)
(-0.42)
2
3
4
5
7
7
0,75
Sand Leyar
Block Pavement
0,25
(+2.00)
(+0.20)
(-2.40)
(-5.00)
(-7.00)
(-8.50)
(-10.00)
1
:
1
Filter
RUBBLE 2:1
2:1
1
:
1
(-11.50)
SAND FILL
RUBBLE
(2.00)
Armour
(1.44 ton)
(1.00)
SECTION (1-1) IN TRUNK
at depth 1.3 m
30 m
(-0.55)
(-1.30)
1
.
4
4
Secondary
(91 kg)
0
.6
7
Core (20-80kg)
D50 (0.19)
Secondary
(138 kg)
(0.56)
(-0.11)
Fenders
Fenders
(3.65)
(3.65)
(3.65)
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Mbw profile
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.B
.
.
.
P.
.
.
.
.
B
M
.
.
.B
.
.
.
P.
.
P.
.
P.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
M
P.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
P.
.
P.
.
.
.
.
.
P. .
P. .
. .
W
.
.
. . . .
P.
.
P.
.
.
.
.
.
.
.
.
.
B
.
.
.
P.
.
P.
.
P.
.
. .
W
. .
B
.
.
.
. .
W
. .P.
W
.T
.P.
T
R
P. .
P.
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
.180207 ASU-Logo-400.jpg
12
1.66
(2-2)
(-1.30)
---
1.44
(1-1)
(-2.80)
2.55
(4-4)
(-4.50)
(0.00)
1.18
0.76
0.67
400
200
100
(-3.90)
0.95
2.05
300
(3-3)
(0.20)
(2.00)
(3.65)
(-0.11) (-0.42) (-1.73)
(-0.90)
--- ---
--- 2.55
2.05
1.18
0.95
MBW Profile
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
SBW Head PLAN
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.B
.
.
.
.S.
H
.
.
.
B
.S
.
.B
.
H
.
.
.
.
.
.
.
.
.S.
S.
.
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.
.
.
.
.
.
.
.
. .
. .
. .
W
.H
.
S.
. .S.
.
.
.
.
.S
.
.
.
.
.
.
.
B
.
.
. .
.
.
.
.
.
.S.
W
.S.
B
.
.
.
.S.
W
.S. .
W
.T
. .
T
S
R
.S.
.H
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
.180207 ASU-Logo-400.jpg
10
2:1 2:1 2:1
(2.00) (2.00) (2.00) (2.00)
(2.00) (2.00)
(2.00)
6
31,46
5
1,5
Head of SBW
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Quay wall at cruise ship basin
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
To
e (-4
.50
)
2:1
(
2.
00
)
Toe
(-9
.25
)
Toe
(-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(
2.
00
)
(
2.
00
)
Toe
(-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3 110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T
. .
T
R
. .
.
.
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
eal
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
eal
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
.180207 ASU-Logo-400.jpg
12
0,75
Sand Leyar
Block Pavement
(+3.00)
(+0.00)
(-2.00)
(-4.50)
(-6.50)
(-8.50)
(-10.00)
1
:
1
Filter
RUBBLE 2:1
2:1
1
:
1
SAND FILL
RUBBLE
4
5
7
7
3
Fender
QUAY WALL X.SECTION
at cruise ship basin
20
SEC. ELEVATION
4
3
2
3
5
3
4
4
2.5
5 3
2.5
7
2
2
1st Block (Head)
2nd block
3rd block 4th & 5th block
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Quay wall at navigation channel
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T
. .
T
R
. .
.
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
.180207 ASU-Logo-400.jpg
13
20
SEC. ELEVATION
2nd block 3rd block
4th block 5th & 6th block
2
9
1,8
7
3,3
1,5
3
4,5
2,6
5
3,5
2
4
3,5
2,6
1st Block (Head)
2
3
4
5
7
7
0,75
Sand Leyar
Block Pavement
0,25
(+2.00)
(+0.20)
(-2.40)
(-5.00)
(-7.00)
(-8.50)
(-10.00)
1
:
1
Filter
RUBBLE 2:1
2:1
1
:
1
(-11.50)
SAND FILL
RUBBLE
4,5 4,5 4,5
3,5 3,5 3,5 3,5
3,3 3,3 3,3 3,3 3,3
3,5 3,5 3,5 3,5
3,3 3,3 3,3 3,3 3,3
Fender
QUAY WALL X.SECTION
at navigation channel
R
o
a
d
R
o
a
d
-
T
w
o
L
a
n
e
s
R
o
a
d
Toe (-4.5
0)
2:1
(2.00)
Toe (-9.2
5)
Toe (-3.1
5)
2:1
2:1
2:1
2:1
2:1
(2.00
)
(2.00)
Toe (-9.2
5)
International coastal road
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T. .
T
R
. .
.
.
(
-
4
.
0
0
)
(-4.00
)
(
-
8
.
5
0
)
(
-
1
0
.
0
0
)
R
e
v
e
t
m
e
n
t
Revetment
2
:
1
2
:
1
2:1
2:1
2
:1
2:1
5
:
1
5
:
1
5:1
2:1
5:1
5:1
5:1
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Dredgingn Plan
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
Remarks
.180207 ASU-Logo-400.jpg
14
WIND ROSE
WIND ROSE
Revetment
Re
ve
tm
en
t
2:1
2:1
2:1
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
REVETMENT
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T
. .
T
R
. .
.
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
.180207 ASU-Logo-400.jpg
15
Revetment
Yachts
Revetment
Re
ve
tm
en
t
2:1
2:1
2:1
2:1
2
:
1
50
2
4
required walkway length = 30 meter
3 floating Pontoon of (AM10000) were used
with length = 10m & width = 3m
3
0
108.56
required walkway length = 108.5 meter
11 floating pontoon of (AM10000) were used
with length = 10m & width = 3m
24 x5.5
1.8
required finger length = 19.2 meter
2 floating pontoon of (AF100) were used
with length = 10m & width = 1.5m
required Finger length = 10 meter
1 floating pontoon of (AF100) was used
with length = 10m & width = 1.5m
for both yachts & motorboats, Required Gangway length = 12m
for Motorboats, the required Gangway width = 0.9 m
for Yachts, the required Gangway width = 1.2 m
for Motorboats, the required Gangway width = 0.9 m
Purchased Gangway type is (AG120) 12m long & 1.2m wide
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Pontoon (1)
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T
. .
T
R
. .
.
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
..publisherPicture1.png
WIND ROSE
..publisherPicture1.png
17
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Pontoon (2)
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T
. .
T
R
. .
.
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
..publisherPicture1.png
.180207 ASU-Logo-400.jpg
18
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Guide Pier
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W
KEY PLAN
E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
WIND ROSE
Ro
ad
Ro
ad
-
Tw
o
La
ne
s
Q
u
a
y
W
a
l
l
Ro
ad
to
Alexandria
to
Libia
Toe
(-4
.50
)
2:1
(2.
00
)
To
e (-9
.25
)
To
e (-3
.15
)
2:1
2:1
2:1
2:
1
2:1
(2.
00
)
(2.
00
)
To
e (-9
.25
)
In
te
rn
ational coasta
l ro
ad
In
te
rn
ational coasta
l ro
ad
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
(
h
)
YERİNDE
BELİRLENECEKTİR.
ÖZÜRLÜ
RAMPASI
E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
eal
eal
eal
eal
eal
eal
Y
a
c
h
t
s
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
Mo
tor
Bo
ats
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T
. .
T
R
. .
.
.
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
e
a
l
e
a
l
eal
e
a
l
eal
e
a
l
e
a
l
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
eal
e
a
l
e
a
l
R
ev
et
m
en
t
Rev
etmen
t
2:
1
2:
1
2:1
2:1
2:1
2:1
T
o
e
(
-
4
.
5
0
)
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
2
:
1
2
:
1
2
:
1
2
:
1
(
2
.
0
0
)
T
o
e
(
-
9
.
2
5
)
..publisherPicture1.png
.180207 ASU-Logo-400.jpg
19
EL-SALLOUM NEW MARINA
Prof.Dr. ABDEL MOHSEN EL MONGY
.180207 ASU-Logo-400.jpg
Drawing Title :
July 2021
Presented By:
Date :
Navigation Aids
TO FIT
Scale : Drawing No. :
Ahmed Abdelkader Abdelmoneem
Supervised By:
IRRIGATION AND HYDRAULICS DEPARTMENT
B.Sc. GRADUATION PROJECT
(2020-2021)
HARBOUR ENGINEERING PROJECT
FACULTY OF ENGINEERING
AIN SHAMS UNIVERSITY
S
N
W E
Prof.Dr. SONIA EL SERAFY
Prof.Dr. YASSER MOSTAFA
Dr. MORAD ABDEL SALHEN
EGYPTIAN WESTERN DESERT CORRIDOR
Dr. AHMED BALAH
Prof.Dr. AYMAN ZAKRIA
.180207 ASU-Logo-400.jpg
22
Navigation channel layout
Roa
d
Roa
d
-
Two
Lan
es
Roa
d
Toe
(-4.50
)
2:1
(
2.00
)
Toe
(-9.25
)
Toe
(-3.15
)
2:1
2:1
2:1
2:1
2:1
(
2.00
)
(
2.00
)
Toe
(-9.25
)
In
te
rn
at
iona
l co
as
ta
l ro
ad
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
. .
( h ) YERİNDE BELİRLENECEKTİR.
ÖZÜRLÜ RAMPASI E=%8
PASLANMAZ
ÇELİK
KORKULUK
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AP4
115/160
ALÇI
ÇERÇEVE+VİTRAY
AK3
110/250
AK3
110/250
AK2
200/250
P5
135/200
AK5
95/200
5
+8.47
+4.70
+6.30
+4.70
+6.30
+0.50
+2.50
+0.50
+2.50
±0.00
+2.50
-0.60tsk
±0.00
+2.50
±0.00
+2.50
+1.40
-0.60tsk
+4.87
+6.50
+6.00
+3.74
+3.56
+3.56
+7.25
+6.75
+7.25
+6.75
+7.20
+9.52
3
+9.62
+7.80
+10.85
+10.85
+10.85
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
YÖRESEL
TAŞ
KAPLAMA
KURŞUN KAPLAMA
YÖRESEL TAŞ KAPLAMA
+10.60
+10.08
KÜTAHYA
ÇİNİ
PANO
+4.42
+5.60
.
.
.
.
.
.
.
.
.
.
. .
. .
. .
.
.
. . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
. .
. .
.
.
.
. .
. . .
.T.
.
T
R
.
.
.
.
(-
4
.0
0
)
(-4.0
0
)
(-
8
.5
0
)
(
-
1
0
.0
0
)
Rev
etm
ent
Re
vet
me
nt
2:1
2:1
2:1
2:1
2:1
2:1
5:1
5:1
5:1
2:1
5:1
5:1
5:1
Tidal levels

More Related Content

Similar to CWW-(El-Salloum New Marina) Drawing.pdf

East_Esplanade_Modelling_2008[1]
East_Esplanade_Modelling_2008[1]East_Esplanade_Modelling_2008[1]
East_Esplanade_Modelling_2008[1]Faruk Kader
 
An Experimental Study of Weibull and Rayleigh Distribution Functions of Wind ...
An Experimental Study of Weibull and Rayleigh Distribution Functions of Wind ...An Experimental Study of Weibull and Rayleigh Distribution Functions of Wind ...
An Experimental Study of Weibull and Rayleigh Distribution Functions of Wind ...TELKOMNIKA JOURNAL
 
IDENTIFICATION OF TOWER AND BOOM-WAKES USING COLLOCATED ANEMOMETERS AND LIDAR...
IDENTIFICATION OF TOWER AND BOOM-WAKES USING COLLOCATED ANEMOMETERS AND LIDAR...IDENTIFICATION OF TOWER AND BOOM-WAKES USING COLLOCATED ANEMOMETERS AND LIDAR...
IDENTIFICATION OF TOWER AND BOOM-WAKES USING COLLOCATED ANEMOMETERS AND LIDAR...IAEME Publication
 
Final course project report
Final course project reportFinal course project report
Final course project reportKaggwa Abdul
 
WindResourceAndSiteAssessment.pdf
WindResourceAndSiteAssessment.pdfWindResourceAndSiteAssessment.pdf
WindResourceAndSiteAssessment.pdfSAKTHI NIVASHAN.S
 
International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER) International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER) ijceronline
 
AIP-Procceding-Article
AIP-Procceding-ArticleAIP-Procceding-Article
AIP-Procceding-ArticleMehdi Karimi
 
Head Loss Estimation for Water Jets from Flip Buckets
Head Loss Estimation for Water Jets from Flip BucketsHead Loss Estimation for Water Jets from Flip Buckets
Head Loss Estimation for Water Jets from Flip Bucketstheijes
 
Analyzing the Sea Weather Effects to the Ship Maneuvering in Vietnam’s Sea fr...
Analyzing the Sea Weather Effects to the Ship Maneuvering in Vietnam’s Sea fr...Analyzing the Sea Weather Effects to the Ship Maneuvering in Vietnam’s Sea fr...
Analyzing the Sea Weather Effects to the Ship Maneuvering in Vietnam’s Sea fr...TELKOMNIKA JOURNAL
 
10 n18 ijeset0702917-v7-is2-631-640
10 n18 ijeset0702917-v7-is2-631-64010 n18 ijeset0702917-v7-is2-631-640
10 n18 ijeset0702917-v7-is2-631-640Songpol Charuvisit
 
Using Half Pipes as Permeable Breakwater
Using Half Pipes as Permeable BreakwaterUsing Half Pipes as Permeable Breakwater
Using Half Pipes as Permeable BreakwaterIRJET Journal
 
Lalit Anjum Wind Resource_PPT
Lalit Anjum Wind Resource_PPTLalit Anjum Wind Resource_PPT
Lalit Anjum Wind Resource_PPTLalit Anjum
 
Absolute Measurement Of The Acceleration Due To Gravity In Greece
Absolute Measurement Of The Acceleration Due To Gravity In GreeceAbsolute Measurement Of The Acceleration Due To Gravity In Greece
Absolute Measurement Of The Acceleration Due To Gravity In GreeceSandra Long
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...India UK Water Centre (IUKWC)
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)inventionjournals
 
meteodynWT meso coupling downscaling regional planing
meteodynWT meso coupling downscaling regional planingmeteodynWT meso coupling downscaling regional planing
meteodynWT meso coupling downscaling regional planingJean-Claude Meteodyn
 
IRJET- Hydrostatic and Hydrodynamic Analysis of TLP Supported 5MW Wind Turbin...
IRJET- Hydrostatic and Hydrodynamic Analysis of TLP Supported 5MW Wind Turbin...IRJET- Hydrostatic and Hydrodynamic Analysis of TLP Supported 5MW Wind Turbin...
IRJET- Hydrostatic and Hydrodynamic Analysis of TLP Supported 5MW Wind Turbin...IRJET Journal
 

Similar to CWW-(El-Salloum New Marina) Drawing.pdf (20)

5 ijsrms-02617 (1)
5 ijsrms-02617 (1)5 ijsrms-02617 (1)
5 ijsrms-02617 (1)
 
East_Esplanade_Modelling_2008[1]
East_Esplanade_Modelling_2008[1]East_Esplanade_Modelling_2008[1]
East_Esplanade_Modelling_2008[1]
 
An Experimental Study of Weibull and Rayleigh Distribution Functions of Wind ...
An Experimental Study of Weibull and Rayleigh Distribution Functions of Wind ...An Experimental Study of Weibull and Rayleigh Distribution Functions of Wind ...
An Experimental Study of Weibull and Rayleigh Distribution Functions of Wind ...
 
IDENTIFICATION OF TOWER AND BOOM-WAKES USING COLLOCATED ANEMOMETERS AND LIDAR...
IDENTIFICATION OF TOWER AND BOOM-WAKES USING COLLOCATED ANEMOMETERS AND LIDAR...IDENTIFICATION OF TOWER AND BOOM-WAKES USING COLLOCATED ANEMOMETERS AND LIDAR...
IDENTIFICATION OF TOWER AND BOOM-WAKES USING COLLOCATED ANEMOMETERS AND LIDAR...
 
L012438186
L012438186L012438186
L012438186
 
Final course project report
Final course project reportFinal course project report
Final course project report
 
WindResourceAndSiteAssessment.pdf
WindResourceAndSiteAssessment.pdfWindResourceAndSiteAssessment.pdf
WindResourceAndSiteAssessment.pdf
 
International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER) International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)
 
AIP-Procceding-Article
AIP-Procceding-ArticleAIP-Procceding-Article
AIP-Procceding-Article
 
Mercator Ocean newsletter 10
Mercator Ocean newsletter 10Mercator Ocean newsletter 10
Mercator Ocean newsletter 10
 
Head Loss Estimation for Water Jets from Flip Buckets
Head Loss Estimation for Water Jets from Flip BucketsHead Loss Estimation for Water Jets from Flip Buckets
Head Loss Estimation for Water Jets from Flip Buckets
 
Analyzing the Sea Weather Effects to the Ship Maneuvering in Vietnam’s Sea fr...
Analyzing the Sea Weather Effects to the Ship Maneuvering in Vietnam’s Sea fr...Analyzing the Sea Weather Effects to the Ship Maneuvering in Vietnam’s Sea fr...
Analyzing the Sea Weather Effects to the Ship Maneuvering in Vietnam’s Sea fr...
 
10 n18 ijeset0702917-v7-is2-631-640
10 n18 ijeset0702917-v7-is2-631-64010 n18 ijeset0702917-v7-is2-631-640
10 n18 ijeset0702917-v7-is2-631-640
 
Using Half Pipes as Permeable Breakwater
Using Half Pipes as Permeable BreakwaterUsing Half Pipes as Permeable Breakwater
Using Half Pipes as Permeable Breakwater
 
Lalit Anjum Wind Resource_PPT
Lalit Anjum Wind Resource_PPTLalit Anjum Wind Resource_PPT
Lalit Anjum Wind Resource_PPT
 
Absolute Measurement Of The Acceleration Due To Gravity In Greece
Absolute Measurement Of The Acceleration Due To Gravity In GreeceAbsolute Measurement Of The Acceleration Due To Gravity In Greece
Absolute Measurement Of The Acceleration Due To Gravity In Greece
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
meteodynWT meso coupling downscaling regional planing
meteodynWT meso coupling downscaling regional planingmeteodynWT meso coupling downscaling regional planing
meteodynWT meso coupling downscaling regional planing
 
IRJET- Hydrostatic and Hydrodynamic Analysis of TLP Supported 5MW Wind Turbin...
IRJET- Hydrostatic and Hydrodynamic Analysis of TLP Supported 5MW Wind Turbin...IRJET- Hydrostatic and Hydrodynamic Analysis of TLP Supported 5MW Wind Turbin...
IRJET- Hydrostatic and Hydrodynamic Analysis of TLP Supported 5MW Wind Turbin...
 

Recently uploaded

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...gragchanchal546
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 

Recently uploaded (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 

CWW-(El-Salloum New Marina) Drawing.pdf

  • 1. (Irrigation and Hydraulic Department, Ain Shams University, Cairo, Egypt) Ahmed Abdelkader, George Essam, Youman Gamal El-Salloum New Marina Graduation Project Summary Report, Cairo, Egypt, 24th- 28th October 2021 Cairo Water Week, CWW2021 Ministry of Water Resources & Irrigation
  • 2. NUMERICAL INVESTIGATION OF WAVE TRANSFORMATION AT AL-SALLUM, NORTHWEST COAST, EGYPT MetOcean Data Collection/ Analysis A– Data Collection A.1– Meteorological/ Wind Data In Order to Assist the Wave Climate in/ around the mentioned region, it’s required to investigate the sur- rounding wind field that cause generation of short crest wind-waves. Wind hourly-based parameters (velocity components u and v) were extracted as wind records for the previous 40-year from ECMWF- ERA5 Platform at location (25.27 Long, 31.63 Lat) in figure (1), and got verified from DHI Data Portal as shown in figure (2) A.2– Oceanic/ wave Data In respect of robust simulation of wave transformation/ propagation , not only wind data collection is a must but also offshore-wave data . Offshore waves hourly-based parameters (significant height, peak period and wave mean direction) were estimated based on the wind-generated waves analytical formulations, which is SPM1984, that approach tests the wave formation into two regimes (Fetch Limited formulation or Fully De- veloped Seas formulation), based on the storm’s parameters such as fetch length, storm duration and wind speed. Hence, the following wave climate was estimated along the offshore boundary to get imposed on that open/ wave-maker boundaries of the model, at location (25.27 Long, 31.63 Lat) figures (3&4). A.3– Tidal Data Tidal variation/ tidal harmonic constituents were collected and got analyzed, in purpose of conducting ap- propriate estimation of the design water level, moreover adjusting the sea-bed levels to one of the tidal da- tums whether MWL or CD to be ready for the model depth interpolation, see data and sources in figures (5&6). A.4– Hydrographic/ Bathymetric data After reviewing some sources of bathymetric data, it was concluded that, the most reliable ocean-bed levels with suitable resolution was the digitized Navionics Sonar Chart data (on behalf of admiralty charts), shown in figures (7&8) Long-term Data Analysis A– EVA/ Extreme Value Analysis The statistics of long-term prediction of wind/wave requires that the individual data points used in the sta- tistical analysis be statistically independent. Hence any hourly record depends very much on the record of the previous hours and hence the theoretical condition of statistical independence is not met. Hence, in or- der to produce independent data points, only storms should be considered. The commonly used method to separate wind/waves is called Peak Over Threshold (POT) analysis. A threshold wind stress of 9.0 m/s was selected for the UA hourly values. The Weibull distribution was used as explained by William Kamphuis for the extreme wave analysis where the probability of exceedance Q is expressed by: The data was sorted from the largest to the smallest values and ranked from 1 to the number of POT values (N). The value of Q is determined from m/(N+1) where m is the rank. The parameter W is calculated ac- cording to: Design lifetime N NNE NE ENE E W WNW NW NNW 25 23.9 18.9 15.9 15 17.4 26.7 25.8 23.3 23.8 50 26.8 20.6 16.8 15.6 18.5 28.3 27.3 24.6 25.9 75 28.6 21.6 17.3 16 19.1 29.2 28.2 25.4 27.1 100 29.9 22.4 17.6 16.2 19.6 29.9 28.8 26 28 A best fit is determined for the values of Hs against W, figure(9). The parameters γ and β are determined from the best fit line. Finally, the wind stresses for different return periods (25, 50, 75 and 100 yrs.) were determined for each 22.5o /sector, neglecting the directions which coming from the land, table (1). Ain-Shams University Faculty of Engineering Civil Engineering Branch Irrigation and Hydraulics Department Water & Hydraulic Structures Program Prepared by Eng. Ahmed Abdelkader Reviewed by Eng. Omar Nemr Approved by Dr. Ahmed Balah Drawing no. 2 Figure (1) - wind records for the previous 40- year from ECMWF-ERA5 Platform Figure (2) - wind records for the previous 40-years from DHI Data portal. Figure (3) - wave rose concluded from (SPM- 84) wind-Generated waves formulations. Figure (4) - one year time series of Wave heights from DHI data portal. Figure (5) - Tidal datums at AL-Sallum. Figure (6) - Tidal signal based on (IHO) & (OSU) data. Figure (7) - Navionics sonar chart. Figure (8) - Digitized Bathymetry based on Navionics chart datum. Figure (9) - Weibull distribution for data with (alpha = 1) Table (1) - Wind stress (UA) for different return period from seaward directions.
  • 3. NUMERICAL INVESTIGATION OF WAVE TRANSFORMATION AT AL-SALLUM, NORTHWEST COAST, EGYPT Cont. Long-term Data Analysis B– Extreme Wave Parameters Estimate B1– Significant Wave Height Corresponding wave height values of the investigated return period wind stresses had been estimated based on SPM1984 metric formulation and had go examined case by case if whether it was fetch limited or fully developed seas, those formulations are shown below. The examined return periods Hs’s has been tabulated below, in table (1). B2– Wave Peak Period/ Tp Accordingly, waves peak period had been estimated based on conducting the previous criteria, but using the peak period formulations which are shown below. The examined 50 years) return periods Tp’s has been tabulated below, table (2). Model Results Extraction A– Extreme 2D Wave Map B– Extreme Design Wave Parameters at Multiple Locations on Breakwater Ain-Shams University Faculty of Engineering Civil Engineering Branch Irrigation and Hydraulics Department Water & Hydraulic Structures Program Prepared by Eng. Ahmed Abdelkader Reviewed by Eng. Omar Nemr Approved by Dr. Ahmed Balah Drawing NO. 3 MIKE21– SW Model Building A– Generating Computational Mesh In order to approach the best simulation of waves transformation and to obtain resulted wave maps with the best ac- curacy and resolution, it was necessary to conduct the computational mesh with a suitable mesh element’s size which can cover the narrowest entrances within the domain. Not only the mesh element size was dominating the generation process but also reaching to that resolution by the minimum number of mesh nodes to reduce the run- ning time, is a privilege. Achieving those criteria (obtaining the required resolution with minimal number of mesh nodes) has been done by nesting options/ properties during mesh generation process, taking into consideration the appropriate smoothness rations within the consecutive elements sizes. Nesting technique is well represented in fig- ure (1). B– Boundaries Types Selecting The outer mesh nodes were set as boundary nodes and divided into two types, the three open boundaries (North, West and East) set to wave-maker boundaries, the Southern boundary was set to land boundary as shown in figure (2). Extreme conditions- 50years design lifetime Nautical Direction (o ) Hs (m) Tp (s) Wind speed (m/s) 270 4.3 4.526 20.010 292.5 5.5 4.693 19.433 315 6.3 5.456 17.855 337.5 5.5 15.955 18.619 0 7 13.317 19.143 22.5 4.8 13.777 15.457 45 2.9 14.954 13.095 67.5 2.6 15.700 12.330 90 2.6 13.517 14.163 Nearshore Wave Roses Extraction Offshore wave conditions Extracted Results Extreme conditions- 50years design life time MBW1-Head MBW2–Trunk SBW1 Port Entrance Direction Hs Tp Wind Speed Hs Tp Hs Tp Hs Tp Hs Tp 270 4.3 4.526 20.010 2.91766 13.6389 2.0243 13.2148 0.816377 10.0508 1.765 12.6326 292.5 5.5 4.693 19.433 2.97428 13.711 2.03216 13.6995 0.753636 13.6957 1.75664 13.698 315 6.3 5.456 17.855 3.00831 14.9366 2.05186 14.9434 0.76696 14.9604 1.77459 14.95 337.5 5.5 15.955 18.619 2.99121 15.6635 2.04694 15.6887 0.771651 15.7169 1.77377 15.6991 0 7 13.317 19.143 2.77561 13.5851 1.92171 13.5769 0.731868 13.572 1.66971 13.5748 22.5 4.8 13.777 15.457 0.771316 3.99452 0.668733 3.98178 0.444187 4.03576 0.633498 4.00947 45 2.9 14.954 13.095 1.54956 5.0974 1.19906 5.15171 0.515386 5.22233 1.07857 5.26889 67.5 2.6 15.700 12.330 2.05067 5.78215 1.44782 5.83441 0.543614 6.38687 1.26177 5.91267 90 2.6 13.517 14.163 3.03692 16.1202 2.06864 16.1278 0.743505 16.1234 1.77819 16.1161 Table (1)-Wind-generated wave formulations Table (2) Figure (1)- Nesting Technique to achieve required smoothness Figure (2)-Wave –Maker boundary and land boundary Nearshore wave rose presented in figure (5) show that northwest direction is still the prevailing wave direction. This consistent with offshore wave rose, and also reasonable because there is no dramatic change in bathymetry. Nearshore wave rose shows that there is no wave height greater than 3.2 meter which will be used later in design depth of navigation channel. Figure (3)- 2D wave map for extreme events Figure (4)- Main locations of calculation extreme wave parameters Figure (5) - Nearshore wave rose at El-Salloum marina area
  • 4. Prof.Dr. ABD EL MOHSEN EL MONGY Sheet Name : 25 July 2021 Presented By: Date : Results of extreme Analysis TO FIT Scale : Sheet No. : Yasmeen Abdelbaset Abdelhady Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER E. MOSTAFA Dr. AHMED BALAH Prof.Dr. AYMAN ZAKARYA 4 EL-SALLOUM NEW MARINA NORTHWESTERN COAST, EGYPT Bathymetry Notes: Wave height are in meters. Wave period are in seconds. Wave Direction are in degrees. Wave Height Wave Period Main Wave Direction
  • 5. © 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS R o a d R o a d - T w o L a n e s Q u a y W a l l R o a d Natural Shore Line to Alexandria to Libia Toe (-4.50) 2:1 (2.00) Toe (-9.25) Toe (-3.15) 2:1 2:1 2:1 2:1 2:1 (2.00 ) (2.00) Toe (-9.25) International coastal road International coastal road . . . . . . . . . . . . . . . . . . . . . . . . . . . (h)YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4115/160 ALÇI ÇERÇEVE+VİTRAY AP4115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal M o t o r B o a t s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T. . T R . . . . e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l R e v e t m e n t Revetment 2 : 1 2 : 1 2:1 2:1 2 :1 2:1 2:1 2:1 2:1 (2.00) (2.00) (2.00) (2.00) EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY Drawing Title : July 2021 Presented By: Date : project General Location TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA 1
  • 6. R o a d R o a d - T w o L a n e s Q u a y W a l l R o a d Natural Shore Line to Alexandria to Libia 0 SCALE BAR 1:1000 20 200 50 100 Toe (-4.50) 2:1 (2.00) Toe (-9.25) Toe (-3.15) 2:1 2:1 2:1 2:1 2:1 (2.00) (2.00) Toe (-9.25) International coastal road International coastal road . . . . . . . . . . . . . . . . . . . . . . . . . . . (h)YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3110/250 AK2200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal M o t o r B o a t s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T. . T R . . . . e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l R e v e t m e n t Revetment 2 : 1 2 : 1 2:1 2:1 2 :1 2:1 2:1 2:1 2:1 (2.00) (2.00) (2.00) (2.00) EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY Drawing Title : July 2021 Presented By: Date : Master plan TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA
  • 7. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : navigation channel layout TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W Wind Rose E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA Remarks .180207 ASU-Logo-400.jpg 5 R o a d R o a d - T w o L a n e s R o a d Toe (-4.5 0) 2:1 (2.00 ) Toe (-9.2 5) Toe (-3.1 5) 2:1 2:1 2:1 2:1 2:1 (2.00) (2.00) Toe (-9.25) International coastal road . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60+ 10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T. . T R . . . . ( - 4 . 0 0 ) (-4.00 ) ( - 8 . 5 0 ) ( - 1 0 . 0 0 ) R e v e t m e n t Revetment 2 : 1 2 : 1 2:1 2:1 2 :1 2:1 5 : 1 5 : 1 5:1 2:1 5:1 5:1 5:1
  • 8. R oa d R oa d - T w o La ne s Q u a y W a l l R oa d Natural Shore Line to Alexandria to Libia To e (-4 .50 ) 2:1 ( 2.00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2:1 2:1 ( 2.00 ) (2.00 ) To e (-9 .25 ) In te rnational coasta l road Internatio nal coastal road . . . . . . . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal M o to r B o a ts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T . . T R . . . . e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l R e v e tm e n t Revetm ent 2 :1 2 :1 2:1 2:1 2:1 2:1 2:1 2:1 2:1 (2 .00) (2.00 ) (2.00 ) (2 .00) 143 40 19 Shore line Shore line 89999 -10.06 90705 90706 -0.06 90707 -0.06 90708 -0.06 90709 -0.06 90710 -0.06 90711 -0.06 90712 -0.06 90716 -0.06 90717 -0.06 90718 -0.06 90719 -0.06 91565 -0.06 91566 -0.06 91567 -0.06 91568 -0.06 91569 -0.06 91570 -0.06 91571 -0.06 91572 -0.06 91573 -0.06 91574 -0.06 91575 -0.06 91576 -0.06 91577 -0.06 91578 -0.06 91579 -0.06 91580 -0.06 91581 -0.06 91582 -0.06 91583 -0.06 91584 -0.06 91585 -0.06 91586 -0.06 91587 -0.06 91588 -0.06 91589 -0.06 91590 -0.06 91591 -0.06 91592 -0.06 91593 -0.06 91594 -0.06 91595 -0.06 91596 -0.06 91597 -0.06 91598 -0.06 91599 -0.06 91600 -0.06 91601 -0.06 91602 -0.06 91603 -0.06 91604 -0.06 91605 -0.06 91606 -0.06 91607 -0.06 91608 -0.06 91609 -0.06 91610 -0.06 91611 -0.06 91612 -0.06 91613 -0.06 91614 -0.06 91615 -0.06 91616 -0.06 91617 -0.06 91618 -0.06 91619 -0.06 91620 -0.06 91621 -0.06 91622 -0.06 91623 -0.06 91624 -0.06 91625 -0.06 91629 -0.06 91630 -0.06 91631 -0.06 91648 -0.06 91649 -0.06 91650 -0.06 91651 -0.06 91652 -0.06 91653 -0.06 91654 -0.06 91655 -0.06 91656 -0.06 91657 -0.06 91658 -0.06 91659 -0.06 91660 -0.06 91661 -0.06 91662 -0.06 91663 -0.06 91664 -0.06 91665 -0.06 91666 -0.06 91667 -0.06 91668 -0.06 91669 -0.06 0+ 20 0. 00 0+ 40 0. 00 0+ 70 0. 00 1+ 00 0. 00 1+ 30 0. 00 (-10.00) (-8.00) (-6.00) (-4.00) (-2.00) (0.00) (-10.00) (-10.00) (1803 M) ( 1 9 0 M ) ( S e c t i o n 1 - 1 ) ( S e c t i o n 2 - 2 ) ( S e c t i o n 3 - 3 ) ( S e c t i o n 4 - 4 ) ( S e c t i o n 5 - 5 ) ( S e c t i o n 6 - 6 ) EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Navigation channel profile TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S W E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE .180207 ASU-Logo-400.jpg 7 Channel Bed(-10.00) Sea Bed L.W.L (0.00) Sections Station (M) Sea Bed Level Channel Bed Level H.W.L L.W.L (0.00) (0.00) (0.00) (0.00) (0.00) (+0.1) (0.00) (+0.1) (+0.1) (+0.1) (+0.1) (+0.1) (-10.00) (-10.00) (-10.00) (-10.00) (-10.00) (-10.00) (-3.00) (-4.37) (-5.42) (-6.63) (-7.50) (-8.56) 0 200 400 700 1000 1300 (1) (2) (3) (4) (5) (6)
  • 9. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : navigation channel x.sec TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W NC. Layout PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA Remarks .180207 ASU-Logo-400.jpg 6 Road Road - Two Lane s Q u a y W a ll Road Natural Shore Line to Libia Toe (-4.50) 2:1 (2.0 0) Toe (-9.25) Toe (-3.15) 2:1 2:1 2:1 2:1 2:1 ( 2.00 ) (2.0 0) Toe (-9.25) Int ern ati on al co as tal roa d Int ern ati on al co as tal roa d . . . . . . . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y ac ht s eal eal eal eal eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal Mot or Boa ts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T. . T R . . . . eal e a l e a l e a l eal eal eal e a l eal eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal eal eal eal eal eal eal e a l eal e a l eal eal e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l Rev etm ent Rev etm ent 2:1 2:1 2:1 2:1 2:1 2:1 2:1 2:1 2:1 (2.00) (2.00) (2.00) (2.00) 90707 -0.06 90708 -0.06 90709 -0.06 90710 -0.06 90711 -0.06 90712 -0.06 90716 -0.06 91576 -0.06 91577 -0.06 91578 -0.06 91579 -0.06 91580 -0.06 91581 -0.06 91582 -0.06 91583 -0.06 91584 -0.06 91585 -0.06 91586 -0.06 91587 -0.06 91588 -0.06 91589 -0.06 91590 -0.06 91591 -0.06 91592 -0.06 91593 -0.06 91594 -0.06 91595 -0.06 91596 -0.06 91597 -0.06 91598 -0.06 91599 -0.06 91600 -0.06 91601 -0.06 91602 -0.06 91603 -0.06 91604 -0.06 91605 -0.06 91606 -0.06 91607 -0.06 91608 -0.06 91609 -0.06 91610 -0.06 91611 -0.06 91612 -0.06 91613 -0.06 91614 -0.06 91615 -0.06 91616 -0.06 91617 -0.06 91618 -0.06 91619 -0.06 91620 -0.06 91621 -0.06 91622 -0.06 91623 -0.06 91624 -0.06 91625 -0.06 91629 -0.06 91630 -0.06 91631 -0.06 91648 -0.06 91649 -0.06 91650 -0.06 91651 -0.06 91652 -0.06 91653 -0.06 91654 -0.06 91655 -0.06 91656 -0.06 91657 -0.06 0+200. 00 0+400 .00 0+700 .00 1+000 .00 1+300 .00 (-10.00) (-8.00) (-6.00) (-4.00) (-2.00) (0.00) (-10.00) (-10.00) (1803 M) (1 90 M ) (S e c ti o n 1 -1 ) (S e c ti o n 2 -2 ) (S e c ti o n 3 -3 ) (S e c ti o n 4 -4 ) (S e c ti o n 5 -5 ) (S e c ti o n 6 -6 ) (-10.00) (-10.00) (-10.00) (-10.00) (-10.00) (-10.00) (-1.53) (-4.65) l.w.l (0.00) l.w.l (0.00) (-2.86) (-5.92) l.w.l (0.00) l.w.l (0.00) l.w.l (0.00) (-4.00) (-7.00) (-5.22) (-8.00) (-6.37) (-8.74) (-7.43) (-9.77) 5 : 1 5 : 1 l.w.l (0.00) 5 : 1 5 : 1 5 : 1 5 : 1 5 : 1 5 : 1 5 : 1 5 : 1 5 : 1 5 : 1 241 14.32 4.23 Section(6-6) Section(5-5) 241.1 21.35 10.52 Section(4-4) 28.37 241.1 15.06 36.5 241.1 21.67 Section(3-3) 44.10 241.1 28.12 Section(2-2) 52.93 241.1 35.73 Section(1-1)
  • 10. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : MBW Head PLAN TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad .B . . . . . H . . . B M . . .B . H . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 M . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats . . . . . . . . . . . . . . W .H . . . . . . . . . . . . . . . . . B . . . . . . . . . . . W . . B . . . . . W . . . W .T . . T R . . .H . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) .180207 ASU-Logo-400.jpg 18 Toe (-4.50) 2:1 (2.00) Toe (-9.25) Toe (-3.15) 2:1 2:1 2:1 2:1 (2.00) (2.00) Toe (-9.25) 16 5 5 84,6 22,5 10.3 Head of MBW
  • 11. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : MBW X.sections TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad A. . C. O. .S. H . .A . .S . I. . H E .A . .A. .A. .A. .S. S.O . .A. ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 .A . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats .A . .A . .C . E . A . .A. .A. .A. .H . S. . .S. .A . .A . .S . . . .A . A .U . . .A . .A . .A . .A . I.S. .S. . .A . D.S. .S. . .T . . E TENSION AREA .S. .H . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) .180207 ASU-Logo-400.jpg 9 SECTION (4-4) IN HEAD at depth 4.50 m 0.5 1.0 (2.00) 1.0 0.5 (1.00) (-4.60) (-0.55) (-1.73) 2:1 5 Core (20-80kg) D50 (0.19) 16 m 2:1 Secondary (510 kg) Secondary (510 kg) Armour (5.09 ton) Armour (5.09 ton) 1 2 . 5 5 1 . 1 8 2 . 5 5 1 .1 8 Armour (5.09 ton) Secondary (510 kg) (-10.00) 0.5 1.0 (2.00) 1.0 0.5 16 m 1 Armour (2.624 ton) Secondary (262 kg) Secondary (510 kg) Secondary (262 kg) Armour (5.09 ton) Armour (2.624 ton) 5 5 (1.00) (0.05) (-0.90) Core (20-80kg) D50 (0.19) (-10.00) 0 . 9 5 2 . 0 5 SECTION (3-3) IN TRUNK at depth 3.9 m 2:1 2:1 (-3.80) (-3.05) 0.75 2 3 4 5 7 7 0,75 Sand Leyar Block Pavement 0,25 (+2.00) (+0.20) (-2.40) (-5.00) (-7.00) (-8.50) (-10.00) 1:1 Filter RUBBLE 2:1 2:1 1 : 1 (-11.50) SAND FILL RUBBLE (2.00) Armour (1.38 ton) (1.00) SECTION (2-2) IN TRUNK at depth 2.8 m 30 m (-2.05) (-2.80) 1 , 6 6 Secondary (138 kg) 0 ,7 6 Core (20-80kg) D50 (0.19) Secondary (138 kg) (0.34) (-0.42) 2 3 4 5 7 7 0,75 Sand Leyar Block Pavement 0,25 (+2.00) (+0.20) (-2.40) (-5.00) (-7.00) (-8.50) (-10.00) 1 : 1 Filter RUBBLE 2:1 2:1 1 : 1 (-11.50) SAND FILL RUBBLE (2.00) Armour (1.44 ton) (1.00) SECTION (1-1) IN TRUNK at depth 1.3 m 30 m (-0.55) (-1.30) 1 . 4 4 Secondary (91 kg) 0 .6 7 Core (20-80kg) D50 (0.19) Secondary (138 kg) (0.56) (-0.11) Fenders Fenders (3.65) (3.65) (3.65)
  • 12. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Mbw profile TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad .B . . . P. . . . . B M . . .B . . . P. . P. . P. . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 M P. . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats P. . P. . . . . . P. . P. . . . W . . . . . . P. . P. . . . . . . . . . B . . . P. . P. . P. . . . W . . B . . . . . W . .P. W .T .P. T R P. . P. . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) .180207 ASU-Logo-400.jpg 12 1.66 (2-2) (-1.30) --- 1.44 (1-1) (-2.80) 2.55 (4-4) (-4.50) (0.00) 1.18 0.76 0.67 400 200 100 (-3.90) 0.95 2.05 300 (3-3) (0.20) (2.00) (3.65) (-0.11) (-0.42) (-1.73) (-0.90) --- --- --- 2.55 2.05 1.18 0.95 MBW Profile
  • 13. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : SBW Head PLAN TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad .B . . . .S. H . . . B .S . .B . H . . . . . . . . .S. S. . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats . . . . . . . . . . . . . . W .H . S. . .S. . . . . .S . . . . . . . B . . . . . . . . . .S. W .S. B . . . .S. W .S. . W .T . . T S R .S. .H . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) .180207 ASU-Logo-400.jpg 10 2:1 2:1 2:1 (2.00) (2.00) (2.00) (2.00) (2.00) (2.00) (2.00) 6 31,46 5 1,5 Head of SBW
  • 14. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Quay wall at cruise ship basin TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia To e (-4 .50 ) 2:1 ( 2. 00 ) Toe (-9 .25 ) Toe (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 ( 2. 00 ) ( 2. 00 ) Toe (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad . . . . . . . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s eal eal e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T . . T R . . . . e a l e a l e a l e a l e a l eal eal e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l eal eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l eal R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) .180207 ASU-Logo-400.jpg 12 0,75 Sand Leyar Block Pavement (+3.00) (+0.00) (-2.00) (-4.50) (-6.50) (-8.50) (-10.00) 1 : 1 Filter RUBBLE 2:1 2:1 1 : 1 SAND FILL RUBBLE 4 5 7 7 3 Fender QUAY WALL X.SECTION at cruise ship basin 20 SEC. ELEVATION 4 3 2 3 5 3 4 4 2.5 5 3 2.5 7 2 2 1st Block (Head) 2nd block 3rd block 4th & 5th block
  • 15. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Quay wall at navigation channel TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad . . . . . . . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T . . T R . . . . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) .180207 ASU-Logo-400.jpg 13 20 SEC. ELEVATION 2nd block 3rd block 4th block 5th & 6th block 2 9 1,8 7 3,3 1,5 3 4,5 2,6 5 3,5 2 4 3,5 2,6 1st Block (Head) 2 3 4 5 7 7 0,75 Sand Leyar Block Pavement 0,25 (+2.00) (+0.20) (-2.40) (-5.00) (-7.00) (-8.50) (-10.00) 1 : 1 Filter RUBBLE 2:1 2:1 1 : 1 (-11.50) SAND FILL RUBBLE 4,5 4,5 4,5 3,5 3,5 3,5 3,5 3,3 3,3 3,3 3,3 3,3 3,5 3,5 3,5 3,5 3,3 3,3 3,3 3,3 3,3 Fender QUAY WALL X.SECTION at navigation channel
  • 16. R o a d R o a d - T w o L a n e s R o a d Toe (-4.5 0) 2:1 (2.00) Toe (-9.2 5) Toe (-3.1 5) 2:1 2:1 2:1 2:1 2:1 (2.00 ) (2.00) Toe (-9.2 5) International coastal road . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T. . T R . . . . ( - 4 . 0 0 ) (-4.00 ) ( - 8 . 5 0 ) ( - 1 0 . 0 0 ) R e v e t m e n t Revetment 2 : 1 2 : 1 2:1 2:1 2 :1 2:1 5 : 1 5 : 1 5:1 2:1 5:1 5:1 5:1 EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Dredgingn Plan TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA Remarks .180207 ASU-Logo-400.jpg 14 WIND ROSE WIND ROSE
  • 17. Revetment Re ve tm en t 2:1 2:1 2:1 EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : REVETMENT TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad . . . . . . . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T . . T R . . . . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) .180207 ASU-Logo-400.jpg 15 Revetment
  • 18. Yachts Revetment Re ve tm en t 2:1 2:1 2:1 2:1 2 : 1 50 2 4 required walkway length = 30 meter 3 floating Pontoon of (AM10000) were used with length = 10m & width = 3m 3 0 108.56 required walkway length = 108.5 meter 11 floating pontoon of (AM10000) were used with length = 10m & width = 3m 24 x5.5 1.8 required finger length = 19.2 meter 2 floating pontoon of (AF100) were used with length = 10m & width = 1.5m required Finger length = 10 meter 1 floating pontoon of (AF100) was used with length = 10m & width = 1.5m for both yachts & motorboats, Required Gangway length = 12m for Motorboats, the required Gangway width = 0.9 m for Yachts, the required Gangway width = 1.2 m for Motorboats, the required Gangway width = 0.9 m Purchased Gangway type is (AG120) 12m long & 1.2m wide EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Pontoon (1) TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad . . . . . . . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T . . T R . . . . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) ..publisherPicture1.png WIND ROSE ..publisherPicture1.png 17
  • 19. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Pontoon (2) TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad . . . . . . . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T . . T R . . . . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) ..publisherPicture1.png .180207 ASU-Logo-400.jpg 18
  • 20. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Guide Pier TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W KEY PLAN E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA WIND ROSE Ro ad Ro ad - Tw o La ne s Q u a y W a l l Ro ad to Alexandria to Libia Toe (-4 .50 ) 2:1 (2. 00 ) To e (-9 .25 ) To e (-3 .15 ) 2:1 2:1 2:1 2: 1 2:1 (2. 00 ) (2. 00 ) To e (-9 .25 ) In te rn ational coasta l ro ad In te rn ational coasta l ro ad . . . . . . . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . eal eal eal eal eal eal Y a c h t s e a l e a l e a l e a l e a l e a l e a l e a l eal e a l eal eal eal eal eal eal eal eal eal eal Mo tor Bo ats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T . . T R . . . . eal eal e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l e a l e a l e a l e a l e a l e a l eal eal eal eal eal eal eal eal eal eal e a l e a l e a l e a l eal e a l eal e a l e a l eal eal eal eal eal eal eal eal eal eal eal e a l e a l R ev et m en t Rev etmen t 2: 1 2: 1 2:1 2:1 2:1 2:1 T o e ( - 4 . 5 0 ) 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) 2 : 1 2 : 1 2 : 1 2 : 1 ( 2 . 0 0 ) T o e ( - 9 . 2 5 ) ..publisherPicture1.png .180207 ASU-Logo-400.jpg 19
  • 21. EL-SALLOUM NEW MARINA Prof.Dr. ABDEL MOHSEN EL MONGY .180207 ASU-Logo-400.jpg Drawing Title : July 2021 Presented By: Date : Navigation Aids TO FIT Scale : Drawing No. : Ahmed Abdelkader Abdelmoneem Supervised By: IRRIGATION AND HYDRAULICS DEPARTMENT B.Sc. GRADUATION PROJECT (2020-2021) HARBOUR ENGINEERING PROJECT FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY S N W E Prof.Dr. SONIA EL SERAFY Prof.Dr. YASSER MOSTAFA Dr. MORAD ABDEL SALHEN EGYPTIAN WESTERN DESERT CORRIDOR Dr. AHMED BALAH Prof.Dr. AYMAN ZAKRIA .180207 ASU-Logo-400.jpg 22 Navigation channel layout Roa d Roa d - Two Lan es Roa d Toe (-4.50 ) 2:1 ( 2.00 ) Toe (-9.25 ) Toe (-3.15 ) 2:1 2:1 2:1 2:1 2:1 ( 2.00 ) ( 2.00 ) Toe (-9.25 ) In te rn at iona l co as ta l ro ad . . . . . . . . . . . . . . . . . . . . . ( h ) YERİNDE BELİRLENECEKTİR. ÖZÜRLÜ RAMPASI E=%8 PASLANMAZ ÇELİK KORKULUK AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AP4 115/160 ALÇI ÇERÇEVE+VİTRAY AK3 110/250 AK3 110/250 AK2 200/250 P5 135/200 AK5 95/200 5 +8.47 +4.70 +6.30 +4.70 +6.30 +0.50 +2.50 +0.50 +2.50 ±0.00 +2.50 -0.60tsk ±0.00 +2.50 ±0.00 +2.50 +1.40 -0.60tsk +4.87 +6.50 +6.00 +3.74 +3.56 +3.56 +7.25 +6.75 +7.25 +6.75 +7.20 +9.52 3 +9.62 +7.80 +10.85 +10.85 +10.85 YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA YÖRESEL TAŞ KAPLAMA KURŞUN KAPLAMA YÖRESEL TAŞ KAPLAMA +10.60 +10.08 KÜTAHYA ÇİNİ PANO +4.42 +5.60 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T. . T R . . . . (- 4 .0 0 ) (-4.0 0 ) (- 8 .5 0 ) ( - 1 0 .0 0 ) Rev etm ent Re vet me nt 2:1 2:1 2:1 2:1 2:1 2:1 5:1 5:1 5:1 2:1 5:1 5:1 5:1 Tidal levels