Zinc One Resources is focused on reactivating the past-producing Bongará Zinc Mine Project in Peru. A 2018 drill program confirmed high-grade zinc mineralization at the Mina Chica deposit, with one hole intersecting 19.5 meters grading nearly 48% zinc. The program also expanded known mineralization at the Mina Grande Sur deposit. Historical resource estimates for the project total over 1 million tonnes of measured and indicated resources grading 21.61% zinc, plus over 200,000 tonnes of inferred resources at 21.18% zinc. Zinc One plans metallurgical testing in late 2018 and a preliminary economic assessment by the end of the year as it works to restart production, potentially by 2020
2. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Cautionary Statement on Forward-Looking Statements
Information set forth in this presentation contains forward-looking statements that are based on assumptions as of the date of this summary. These
statements reflect management’s current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One
cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by a number of material factors, many
of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to metal prices, changes in planned
work resulting from weather, logical, technical or other factors, the possibility that results of work will not fulfill expectations and realize the perceived
potential of Zinc One’s mineral properties, uncertainties involved in the interpretation of drilling results and other tests, the possibility that required
permits may not be obtained in a timely manner or at all, risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions, the
possibility of cost overruns or unanticipated expenses in work programs, the risk of environmental contamination or damage resulting from the
exploration operations, ability to obtain sufficient financing to implement its exploration, Zinc One receiving favorable economic studies on its mineral
projects and development plans on Zinc One’s mineral properties and the need to comply with environmental and governmental regulations.
Accordingly, actual and future events, conditions and results may differ materially from the estimates, beliefs, intentions and expectations expressed or
implied in the forward looking information. Except as required under applicable securities legislation, Zinc One undertakes no obligation to publicly
update or revise forward-looking information.
Cautionary Statement on Historical Resource Estimate
The historical resource estimate set forth in this presentation was prepared by the previous operator, Corianta S.A. in an internal report dated June 13,
2011 on the Bongará Zinc Oxide Mine. Although the historical resource estimate used “measure resources”, “indicated resources” and “inferred
resources”, the historical estimate was not done in compliance with CIM standards. Zinc One considers these categories relevant as it represents the Zinc
One’s main target for exploration and development work on the Bongará Zinc Mine. Zinc One is confirming the reliability of the historical resource
estimate and the information supporting the historical resource estimate. The qualified person has not done sufficient work to classify the historical
estimate as a current mineral resource. Zinc One is not treating these historical estimates current mineral resources.
Qualified Persons
Bill Williams, Ph.D., CPG, COO and a director of Zinc One, is a qualified person as defined in National Instrument 43-101 – Standards of Disclosure for
Mineral Projects, and has reviewed and approved all technical information in this presentation.
Forward-Looking Statement
2
3. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Zinc One Fundamentals
3
Zinc One Resources is focused on reactivating production at
Bongará Zinc Mine Project, Peru and recently completed a successful drill program.
Bongará Zinc Mine Project, Peru
â–Ş Very high-grade Zn past producer 2007-2008
• Mined 150,000 tonnes @ > 20% Zn
• Processed in Waelz kiln with > 90% recovery (>65% Zn conc.) from zinc oxides, carbonates, and silicates
• Mineralization at or near surface allowing for open pit mining
â–Ş Historical resource
• Measured and Indicated: >1, 000,000 tonnes @ 21.61% Zn*
• Inferred: > 200,000 tonnes @ 21.18% Zn*
â–Ş Successful 2018 drill program that confirmed, and perhaps increased, historical resources
â–Ş Excellent upside potential for discovery of new deposits
â–Ş Near-term production potential
â–Ş Strong community support
*See Cautionary Statement
4. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
â–Ş 220 DDH for 7,820 metres completed in July 2018
â–Ş High-grade discovery at Mina Chica
• 200 metres x 120 metres – open to west
• Core zone 100 metres x 100 metres with near-surface zinc grades >30%
â–Ş Mina Grande Sur historical mineralization confirmed and expanded
• 350 metres (NS) x <200 metres (EW)
â–Ş Mina Grande Sur historical mineralization confirmed and expanded
• Open to northeast
2018 Drill Program Highlights
4
Completion of resource estimate expected October 2018.
Mina Chica #13 – 19.5-19.8 metres ~48% Zn
5. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
1 year Chart
Capital Structure
Issued & Outstanding 124,027,275 Market Capitalization C$18 M
Options 6,484,094 52 Week Range C$0.135 – 0.55
Warrants 20,157,218 Average Daily Volume - TSX-V ~130,000
Fully Diluted 152,418,587
As of August 2018
5
7. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Zinc is currently the 4th most
widely consumed metal in the
world after iron, aluminum,
and copper and the 24th most
abundant element in the
Earth’s crust.
Uses of Zinc Today
7
Galvanizing
(corrosion protection
of steel, vehicles, etc.)
60%
Zinc base alloys
(die cast
industry)
15%
Bronze/Brass
14%
Zinc compounds
(zinc oxide/zinc sulfate)
8%
Zinc alloys
15%
Advances in zinc battery technology
Zinc batteries have been used for decades.
Improved technology has led to longer-life and
steadier voltage output and the potential as a fuel
cell providing power to electric vehicles including
scooters, buses and trucks.
Advances in zinc for human health
Zinc deficiency takes a toll on humans and
agricultural productivity. It is the most common
micronutrient deficiency affecting >50% of
agricultural soils. Zinc fertilizer can significantly
increase crop yield, boost nutritional value and
improve farmers incomes.
Source: International Zinc Association
8. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Peru is a Global Leader in the Mining Sector
➢ World’s 3rd largest producer of zinc.
➢ Legal and tax systems designed to support mining
➢ Investment law guarantees security of foreign and domestic
investments
➢ Growing economy driven largely by mining
➢ Immense potential for future development
➢ More than 50 years of Canadian-Peruvian mining collaboration
Peru: Mining-Friendly Country
8
9. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Location Map – Bongará Zinc Mine Project
Source: 2017 Watts, Griffis and McQuat, 2017 Technical Report on the Bongará Zinc Project for Zinc One Resources
â–Ş Located in north-central Peru comprised of 11,125 ha
▪ 100%-interest in Bongará Zinc Mine and
Charlotte Bongará Zinc projects
• Consolidation provide opportunity to re-activate
mine and further exploration
• Multiple mineralization zones include Mina
Grande (Sur, Centro, Norte), Mina Chica, Bongarita,
Campo Cielo and Cristal
â–Ş Infrastructure including public roads and water supply
â–Ş Ongoing partnerships with 13 communities
9
10. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Historic Mining Project
â–Ş Open pit (quarry) mining from 2007 - 2008
â–Ş 150,000 tonnes @ >20% Zn mined
â–Ş Direct Ship Ore (DSO) - 540 km to coast
â–Ş Processed in Waelz kiln (pyrometallurgy):
>65% con @ >90% recovery
â–Ş Historical Measured + Indicated resource:
>1,000,000 tonnes @ 21.61% Zn*
â–Ş Historical Inferred resource:
>200,000 tonnes @ 21.18% Zn*
â–Ş Shut down in 2008 due to decrease in zinc price
10
*See Cautionary Statement on Historical Resource Estimate.
11. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
â–Ş Carbonate-hosted, stratabound zinc mineralization
classified as Mississippi Valley-type deposit (MVT)
â–Ş Mineralization
• Mostly hosted by strongly dolomitized
brecciated, vuggy, and fractured limestones that
can be heavily weathered
• Occurs also as tabular bodies with irregular
boundaries, especially along the periphery of
breccias
• Base of mineralization is typically faulted
â–Ş Zinc minerals include:
• Hydrozincite (zinc oxide mineral),
• Smithsonite (zinc carbonate mineral),
• Hemimorphite (zinc silicate mineral), and a
• Zinc-aluminum-iron silicate
Bongará Geology
11
MCH-18-013 with >50% zinc, mostly as hydrozincite
Sampling at Mina Grande Sur
12. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Successful Drill Program with Upside Potential
19.8 m @ 46.8% from 1.9 m depth
33.7 m @ 24.2% from 15.6 m depth
21.0 m @ 27.5% from 5.8 m depth
39.0 m @ 27.4% from 23.8 m depth
20.5 m @ 34.3% from surface
49.5 m @ 38.7% from 7.0 m depth
18.0 m @ 36.0% from 21.0 m depth
15.0 m @ 28.9% from surface
12
13. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33 13
Discovery at Mina Chica (220 metres x 120 metres, open)
100 m x 100 m core
>30% Zn near surface
Mina Chica
#14 – 16.5-16.7m
~43% Zn
14. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
MVT Model Applicable at Mina Chica
Source: Sangster, 1990
14
15. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Regional Tectonic Evolution
Mineralized host
formations
Source: 2017 Watts, Griffis and McQuat, 2017 Technical
Report on the Bongara Zinc Project for Zinc One Resources
Bongará Zn Oxide
Florida Canyon
Sulphide
Bongará Zn Oxide
Florida Canyon
Sulphide
â–Ş Shallow Zn-oxide mineralization in
Cordorsinga formation
â–Ş Potential for underlying sulphide
mineralization in Chambara formation
â–Ş Both oxide and sulphide mineralization
remain open in several directions
15
16. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Bongará Geology and Mineralization
Bongará Project
Mineralized host formations
â–Ş Several mineralized zones
• Mina Grande (Sur, Centro, Norte)
• Mina Chica
• Bongaritá
• Campo Cielo
• Cristal
Source: 2017 Watts, Griffis and McQuat, 2017 Technical
Report on the Bongara Zinc Project for Zinc One Resources
16
17. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Bongará Zinc Mine Project
â–Ş Mineralized showings over ~10 km along strike
â–Ş Resources outlined only in ~3 km of system
â–Ş Exploration potential
• ~20 km of potential favourable
stratigraphy exposed on surface
• Down-dip extensions to system
(mineralization developed along the axis of
an anticline implying down dip to both
east and west)
• Mineralization also deeper in stratigraphic
sequence
Future Exploration
2018 Drill Program
17
18. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Future Exploration
?
Bongará
Source: USGS Scientific Investigation Report 2010-5070-A
113 MVT deposits & 10 districts
(Taylor, et al., 2009)
18
19. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Delineation & Exploration Drilling
19
20. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Proposed Zinc Oxide Processing and Recovery
20
â–Ş Waelz kiln technology
• Commonly used to recycle zinc from electric-arc-furnace dust
• Simple on-site construction and operation
• Relatively low capital costs
• Comparatively high zinc recovery (>95%)
• Up to 70% zinc as oxide in final product
• Process approved by U.S. EPA
21. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Corporate Objectives
âś“ Zinc One and Forrester Metals finalize Arrangement Resolution April 2017
âś“ Zinc One purchases mineral rights June 2017
âś“ Community Access Agreement approved by local authority July 2017
âś“ Ministry of Energy & Mines (MEM) accepts mine closure suspension August 2017
âś“ Application for drill platforms to MEM October 2017
âś“ Drill platforms approved by MEM December 2017
✓ Drilling commences at Bongará Mine Project January 2018
âś“ Drilling completed in areas outlined in scope of work July 2018
➢ Metallurgical testing Q4 2018
➢ Completion of resource estimate Q3/Q4 2018
➢ Preliminary Economic Assessment (PEA) Q4 2018
Production anticipated by 2020 subject to favorable economic studies.
21
22. Zinc One Resources Inc. WWW.ZINCONE.COM TSX-V: Z l OTC: ZZZOF l FSE: RH33
Thank You
Suite 410 – 1040 West Georgia Street
Vancouver, BC, Canada
V6E 4H1
Phone: 604-683-0911
Calle Monterrey # 373 oficina 1001
Chacarilla del Estanque, Santiago de Surco
Phone: 51 1 5876441
Jim Walchuck
President & CEO
jwalchuck@zincone.com
Bill Williams
COO
bwilliams@zincone.com
Monica Hamm
VP, Investor Relations
mhamm@zincone.com
22