Service Portfolio Management
Rob Virden, MBA, PMP, CSM, CSPO, ITIL
Solutions Architect, Office of the CIO, Sandia National Labs
rvirden@sandia.gov, 505-844-0963
SAND2016-3958C
What is Portfolio Management?
 PMI –
 “The coordinated management of one or more portfolios to achieve
organizational strategies and objectives.”
 It’s the “…processes, tools, and techniques used to identify, select,
prioritize, govern, allocate resources, monitor, and report the
contributions of the portfolio components to, and their respective
alignment with, organizational objectives.
 (The standard for portfolio management. 3rd Edition(2013). Newtown
Square, PA: Project Management Institute. )
 Typically refers to investment, project, or IT Portfolio Management.
2
How do you know?
 Five Questions:
 Are we investing in the right things?
 Are we optimizing our capacity?
 Are we realizing the promised benefits?
 Can we absorb all the changes?
 How well are we executing?
 Project portfolio management: A view from the management trenches.
(2009). Hoboken, NJ: Wiley.
3
What is Service Portfolio Management (SPM)?
 ITIL - A service portfolio describes a provider’s services in
terms of business value. The service portfolio is the complete
set of services that is managed by a service provider. It
includes three categories of services:
 Service Pipeline
 Service Catalog
 Retired Services
 Cannon, D., Wheeldon, D., Lacy, S., & Hanna, A. (2011). ITIL service
strategy. London: TSO.
4
Five Questions redux
 Establishes a decision framework to answer strategic
questions:
 Why should a customer buy these services?
 Why should they buy these services from us?
 What are the pricing or chargeback models?
 What are our strengths and weaknesses, priorities, and risks?
 How should our resources and capabilities be allocated?
 The purpose of SPM is to ensure that the service provider has
the right mix of services to the balance the investment in IT
with the ability to meet business outcomes.
5
Service Portfolio vs. Investment Portfolio
 They are functionally equivalent, but not equal:
 Investing in a specific project, or a service?
 The aggregation of projects and programs make up a service
 Two separate but interdependent processes
 IT Portfolio Management is a sub-set of processes within the overall
ITIL Service Strategy area
6
Goal/Challenges
 Identify the right mix of investments at the right time
 Size and Timing
 Cyclical; Beginning, Middle, End
 Windfall/Reserve
 Reallocation
 Type
 Strategic Investments
 M&O
 Run, Grow, Transform
7
Challenges cont’d
 Source
 Indirect
 Direct
 Service Centers
 Division Support
 Time consuming and effort intensive
 Proposals
 Estimates
 Approvals
 Submission
8
Challenges cont’d
 Alignment to (who’s?) Strategy
 Lab
 Mission
 Organizational
 Departmental
 Personal
 Lack of centralized portfolio
 Distributed IT environment
9
Paths to Clarity
 Investment Timeline
 SPM Process
 Service Definition
 Centralized Repository
 ITSM
 Performance Monitoring
 Partnerships
 Steering Committees
 Five Questions
10
Project Portfolio Timeline
11
Project Portfolio Process
12
FY16 Services within the Sandia ITS Service Portfolio
1. Service Desk
2. NM Desktop
Computing Services
3. Desktop & Mobile
Enabling
Technologies
4. CA Desktop
Computing Services
5. Unified
Communications
Services
6. Collaboration
Services
7. Video Services
Workforce
Computing
Services
8. Environment,
Safety, & Health
Systems Services
9. Corporate
Governance
Systems Services
10. Financial
Management
Systems Services
11. Human Resources
Systems Services
12. Supply Chain
Systems Services
13. Manufacturing
Systems Solutions
Enterprise
Business
Services
14. Information Content
Services
15. Information
Analytics Services
16. Records
Management
Services
17. Technical Library
Services
18. Web Content
Services
19. Enterprise Database
Services
Information
Management
Services
30. CIO Relationship Management
31. IT Service Management
32. IT Portfolio Management
33. IT Strategic Planning
34. Management Assurance
35. IT Policy Management
36. IT Financial Management
Information
Technology
Strategy
23. Application Enabling
Technologies
24. Computing Platform
Services
25. Computing
Infrastructure
Services
26. Network Services
27. Telephone Services
28. Wired Infrastructure
Services
29. Radio Infrastructure
Services
IT Enabling
Systems &
Infrastructure
Services
20. Project
Management
Services
21. Configuration
Management
Services
22. Facilities & Asset
Management
Systems Services
Mission
Business
Management
Services
5/3/2016
Services Repository
14
Services Detail
15
Drill down to the proposal
16
Proposals Repository
 Ability to filter by year, status, cycle, type, family, area, etc:
17
Proposal Statuses
 Phased Input
 Proposed/Draft
 Basic details
 Accepted
 Full details and detailed cost estimates
 Approved
 Funded amount, funding source, software cap
18
Home Page
 Home page with links to resources, templates, calendar, etc.
19
ITSM
 Service Level Management (SLM) Process
 SLA/OLA
 Business Relationship Management (BRM) Process
 Service Catalog
 Request Fulfillment
 Problem, Incident, Change Management
 End to End Service
20
Partnerships
 Business Office
 Line and Program reporting
 Financial Management
 Financial Analysts and Center Business Analysts roles
 Integrated Mission Support
 Alignment to Executive Office Cadence
 Use of IMS Tool
21
Steering Committees
 Service Portfolio Board
 CIO, Deputy CIO, Center Directors
 CITAC
 Mission Support Senior Management
 Common Engineering Environment
 Enterprise resource for technical resources
22
Performance Monitoring
 Management Assurance Review (MAR)
 MAR Timeline
 Quad Chart
23
Five Questions
 Are we investing in the right things?
 Centralized Repository
 Services Definition and repository
 Steering Committees
 Are we optimizing our capacity?
 Supply and Demand Management
 Resource (Skills) Management
 Are we realizing the promised benefits?
 Performance Management
 Can we absorb all the changes?
 Organizational Change
 How well are we executing?
 Overall PPM Funding Process
24
Five Questions cont’d
 Why should a customer buy these services?
 Services Value
 Why should they buy these services from us?
 Value proposition
 What are the pricing or chargeback models?
 Cost models
 What are our strengths and weaknesses, priorities, and risks?
 How should our resources and capabilities be allocated?
25
ES&H End2End Services – Phased Approach
FY16 ES&H SLA in place
ES&H incidents and
service requests tracked
problem management
practiced using the ITSM
tool (18 appls).
ES&H applications
populated in Troux
FY16 ES&H OLA in place
ES&H incidents &
problem trending
reports in place.
Build service model for 5
ES&H applications in
CMDB
Quarterly SLA service
reviews held, with IT
performance metrics.
ES&H knowledge articles
written and in use by
CCHD/ES&H Service.
Add 13 additional
applications to CMDB.
Event monitoring of
ES&H applications
May - Aug Sep - Dec
Jan - Apr
26
MAR Structure
27
Program Health - Green
Status (Across all Services):
Critical Incidents – 0
High, Medium, Low Incidents – 4
Missed SLAs – 2
• Mean Time to Restore Service (MTRS) for Long Distance
Telephone service took 8 hours, exceeding target of 1 hour
• Mean Time Between Failures (MTBF) for SCN network in
905 exceeded target of 30 days.
Met/Exceeded SLAs - 19
Key Financial Metrics $ Projected over/under
Service Delivery Issues Rating
Issue 1… (Owner)
Issue 2… (Owner)
Issue 3… (Owner)
Service Delivery Programmatic Risks Rating
Risk 1… (Owner)
Risk 2… (Owner)
Risk 3… (Owner)
Budget $K Costs YTD $K % SP Costed % Cost+Com Rating
$0 $0 % %
Key Commitments/Projects
• Commitment/Project 1 Status
• Commitment/Project 2 Status
• Commitment/Project 3 Status
ITS-05 Program
IT Enabling Systems & Infrastructure Services
ITS Program MAR Template V4
28
Application Enabling Technologies
Computing Platform Services
Computing Infrastructure Services
Network and Telephone
Wired Infrastructure
Radio Infrastructure
Program Health - Green
Key Indicators (Averaged KPI):
MTBSI (Meantime Between Service Incidents)
– 90 days (Target 30 days)
MTRS (Meantime to Restore Service)
– 3 Hours (Target 2 Hours)
Key Financial Metrics
$ Projected over/under
Service Delivery Issues Rating
Issue 1… (Owner)
Issue 2… (Owner)
Issue 3… (Owner)
Service Delivery Programmatic Risks Rating
Risk 1… (Owner)
Risk 2… (Owner)
Risk 3… (Owner)
Budget $K Costs YTD $K % SP Costed % Cost+Com Rating
$0 $0 % %
Key Commitments/Projects
• Commitment/Project 1 Status
• Commitment/Project 2 Status
• Commitment/Project 3 Status
ITS-05 Telephone Services
ITS Program MAR Template V4
29
MAR Timeline
30

More Related Content

Similar to 1365320.pdf

Management summary presentation
Management summary presentationManagement summary presentation
Management summary presentationIT Strategy Group
 
Accelerating and Optimizing Returns on Telecom Network Capital Investments
Accelerating and Optimizing Returns on Telecom Network Capital InvestmentsAccelerating and Optimizing Returns on Telecom Network Capital Investments
Accelerating and Optimizing Returns on Telecom Network Capital InvestmentsGaea Global Technologies, Inc.
 
Application Portfolio Rationalization - Whitepaper
Application Portfolio Rationalization - WhitepaperApplication Portfolio Rationalization - Whitepaper
Application Portfolio Rationalization - WhitepaperNIIT Technologies
 
Financial Analytics pafp 11-21-13
Financial Analytics   pafp 11-21-13Financial Analytics   pafp 11-21-13
Financial Analytics pafp 11-21-13gristak
 
The IT Service Definition Journey
The IT Service Definition JourneyThe IT Service Definition Journey
The IT Service Definition JourneyPete Hidalgo
 
Technology business management_7.13
Technology business management_7.13Technology business management_7.13
Technology business management_7.13Jim Sutter
 
Technology business management_7.13
Technology business management_7.13Technology business management_7.13
Technology business management_7.13James Sutter
 
Iscope Digital : Integrated IT Service Management
Iscope Digital : Integrated IT Service ManagementIscope Digital : Integrated IT Service Management
Iscope Digital : Integrated IT Service ManagementIscope Digital
 
Integrated IT Service Management: From Strategy to Implementing to User Adoption
Integrated IT Service Management: From Strategy to Implementing to User AdoptionIntegrated IT Service Management: From Strategy to Implementing to User Adoption
Integrated IT Service Management: From Strategy to Implementing to User AdoptionCA Technologies
 
Transforming to Managed Services with ALT ASM for Large pharmaceutical
Transforming to Managed Services with ALT ASM for Large pharmaceuticalTransforming to Managed Services with ALT ASM for Large pharmaceutical
Transforming to Managed Services with ALT ASM for Large pharmaceuticalChristian T
 
2 application aware storage drives business agility & competitive advantage
2 application aware storage drives business agility & competitive advantage2 application aware storage drives business agility & competitive advantage
2 application aware storage drives business agility & competitive advantageDr. Wilfred Lin (Ph.D.)
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical DebtCAST
 
Technology for HR Shared Services
Technology for HR Shared ServicesTechnology for HR Shared Services
Technology for HR Shared ServicesScottMadden, Inc.
 
Framing the business case service provider v1 2
Framing the business case    service provider  v1 2Framing the business case    service provider  v1 2
Framing the business case service provider v1 2pskoularikos
 
Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1p6academy
 

Similar to 1365320.pdf (20)

HR Shared Service Expansion
HR Shared Service ExpansionHR Shared Service Expansion
HR Shared Service Expansion
 
Management summary presentation
Management summary presentationManagement summary presentation
Management summary presentation
 
Accelerating and Optimizing Returns on Telecom Network Capital Investments
Accelerating and Optimizing Returns on Telecom Network Capital InvestmentsAccelerating and Optimizing Returns on Telecom Network Capital Investments
Accelerating and Optimizing Returns on Telecom Network Capital Investments
 
Application Portfolio Rationalization - Whitepaper
Application Portfolio Rationalization - WhitepaperApplication Portfolio Rationalization - Whitepaper
Application Portfolio Rationalization - Whitepaper
 
Overview to itil
Overview to itilOverview to itil
Overview to itil
 
Financial Analytics pafp 11-21-13
Financial Analytics   pafp 11-21-13Financial Analytics   pafp 11-21-13
Financial Analytics pafp 11-21-13
 
The IT Service Definition Journey
The IT Service Definition JourneyThe IT Service Definition Journey
The IT Service Definition Journey
 
Technology business management_7.13
Technology business management_7.13Technology business management_7.13
Technology business management_7.13
 
Technology business management_7.13
Technology business management_7.13Technology business management_7.13
Technology business management_7.13
 
Tamillakshmi Manoharan - CAMS
Tamillakshmi Manoharan - CAMSTamillakshmi Manoharan - CAMS
Tamillakshmi Manoharan - CAMS
 
Iscope Digital : Integrated IT Service Management
Iscope Digital : Integrated IT Service ManagementIscope Digital : Integrated IT Service Management
Iscope Digital : Integrated IT Service Management
 
Integrated IT Service Management: From Strategy to Implementing to User Adoption
Integrated IT Service Management: From Strategy to Implementing to User AdoptionIntegrated IT Service Management: From Strategy to Implementing to User Adoption
Integrated IT Service Management: From Strategy to Implementing to User Adoption
 
Transforming to Managed Services with ALT ASM for Large pharmaceutical
Transforming to Managed Services with ALT ASM for Large pharmaceuticalTransforming to Managed Services with ALT ASM for Large pharmaceutical
Transforming to Managed Services with ALT ASM for Large pharmaceutical
 
Application Sustainability Assessment Framework within the Canada Revenue Ag...
Application Sustainability Assessment Framework within the Canada Revenue Ag...Application Sustainability Assessment Framework within the Canada Revenue Ag...
Application Sustainability Assessment Framework within the Canada Revenue Ag...
 
2 application aware storage drives business agility & competitive advantage
2 application aware storage drives business agility & competitive advantage2 application aware storage drives business agility & competitive advantage
2 application aware storage drives business agility & competitive advantage
 
Data Governance
Data GovernanceData Governance
Data Governance
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical Debt
 
Technology for HR Shared Services
Technology for HR Shared ServicesTechnology for HR Shared Services
Technology for HR Shared Services
 
Framing the business case service provider v1 2
Framing the business case    service provider  v1 2Framing the business case    service provider  v1 2
Framing the business case service provider v1 2
 
Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1Oracle eppm for asset intensive industries ppt part 1
Oracle eppm for asset intensive industries ppt part 1
 

More from AbdetaImi

TISA-Important-Business-Services-Guide-November-2021.pdf
TISA-Important-Business-Services-Guide-November-2021.pdfTISA-Important-Business-Services-Guide-November-2021.pdf
TISA-Important-Business-Services-Guide-November-2021.pdfAbdetaImi
 
performancemanagementpowerpointpresentationslides-210709054745 (1) (2).docx
performancemanagementpowerpointpresentationslides-210709054745 (1) (2).docxperformancemanagementpowerpointpresentationslides-210709054745 (1) (2).docx
performancemanagementpowerpointpresentationslides-210709054745 (1) (2).docxAbdetaImi
 
46589-infographic ppt-blue.pptx
46589-infographic ppt-blue.pptx46589-infographic ppt-blue.pptx
46589-infographic ppt-blue.pptxAbdetaImi
 
best paper 4AP.pdf
best paper 4AP.pdfbest paper 4AP.pdf
best paper 4AP.pdfAbdetaImi
 
Machine Learning.pdf
Machine Learning.pdfMachine Learning.pdf
Machine Learning.pdfAbdetaImi
 
ICCIDS.2017.8272633 (1).pdf
ICCIDS.2017.8272633 (1).pdfICCIDS.2017.8272633 (1).pdf
ICCIDS.2017.8272633 (1).pdfAbdetaImi
 
ICCIDS.2017.8272633.pdf
ICCIDS.2017.8272633.pdfICCIDS.2017.8272633.pdf
ICCIDS.2017.8272633.pdfAbdetaImi
 
IIAI-AAI.2012.36.pdf
IIAI-AAI.2012.36.pdfIIAI-AAI.2012.36.pdf
IIAI-AAI.2012.36.pdfAbdetaImi
 
SettingGoalsAndExpectationsForSupervisors.pptx
SettingGoalsAndExpectationsForSupervisors.pptxSettingGoalsAndExpectationsForSupervisors.pptx
SettingGoalsAndExpectationsForSupervisors.pptxAbdetaImi
 
GATE-PDF-1.pdf
GATE-PDF-1.pdfGATE-PDF-1.pdf
GATE-PDF-1.pdfAbdetaImi
 
Bioinformatics2015.pdf
Bioinformatics2015.pdfBioinformatics2015.pdf
Bioinformatics2015.pdfAbdetaImi
 
9th_International_Conference_on_Computer.pdf
9th_International_Conference_on_Computer.pdf9th_International_Conference_on_Computer.pdf
9th_International_Conference_on_Computer.pdfAbdetaImi
 
Biginer it-service-catalog.pdf
Biginer it-service-catalog.pdfBiginer it-service-catalog.pdf
Biginer it-service-catalog.pdfAbdetaImi
 
GATE-PDF-1.pdf
GATE-PDF-1.pdfGATE-PDF-1.pdf
GATE-PDF-1.pdfAbdetaImi
 
Bioinformatics2015.pdf
Bioinformatics2015.pdfBioinformatics2015.pdf
Bioinformatics2015.pdfAbdetaImi
 
9th_International_Conference_on_Computer.pdf
9th_International_Conference_on_Computer.pdf9th_International_Conference_on_Computer.pdf
9th_International_Conference_on_Computer.pdfAbdetaImi
 
938838223-MIT.pdf
938838223-MIT.pdf938838223-MIT.pdf
938838223-MIT.pdfAbdetaImi
 
ITILV41.docx
ITILV41.docxITILV41.docx
ITILV41.docxAbdetaImi
 
gartner ITSM.docx
gartner ITSM.docxgartner ITSM.docx
gartner ITSM.docxAbdetaImi
 
DEFINITION.docx
DEFINITION.docxDEFINITION.docx
DEFINITION.docxAbdetaImi
 

More from AbdetaImi (20)

TISA-Important-Business-Services-Guide-November-2021.pdf
TISA-Important-Business-Services-Guide-November-2021.pdfTISA-Important-Business-Services-Guide-November-2021.pdf
TISA-Important-Business-Services-Guide-November-2021.pdf
 
performancemanagementpowerpointpresentationslides-210709054745 (1) (2).docx
performancemanagementpowerpointpresentationslides-210709054745 (1) (2).docxperformancemanagementpowerpointpresentationslides-210709054745 (1) (2).docx
performancemanagementpowerpointpresentationslides-210709054745 (1) (2).docx
 
46589-infographic ppt-blue.pptx
46589-infographic ppt-blue.pptx46589-infographic ppt-blue.pptx
46589-infographic ppt-blue.pptx
 
best paper 4AP.pdf
best paper 4AP.pdfbest paper 4AP.pdf
best paper 4AP.pdf
 
Machine Learning.pdf
Machine Learning.pdfMachine Learning.pdf
Machine Learning.pdf
 
ICCIDS.2017.8272633 (1).pdf
ICCIDS.2017.8272633 (1).pdfICCIDS.2017.8272633 (1).pdf
ICCIDS.2017.8272633 (1).pdf
 
ICCIDS.2017.8272633.pdf
ICCIDS.2017.8272633.pdfICCIDS.2017.8272633.pdf
ICCIDS.2017.8272633.pdf
 
IIAI-AAI.2012.36.pdf
IIAI-AAI.2012.36.pdfIIAI-AAI.2012.36.pdf
IIAI-AAI.2012.36.pdf
 
SettingGoalsAndExpectationsForSupervisors.pptx
SettingGoalsAndExpectationsForSupervisors.pptxSettingGoalsAndExpectationsForSupervisors.pptx
SettingGoalsAndExpectationsForSupervisors.pptx
 
GATE-PDF-1.pdf
GATE-PDF-1.pdfGATE-PDF-1.pdf
GATE-PDF-1.pdf
 
Bioinformatics2015.pdf
Bioinformatics2015.pdfBioinformatics2015.pdf
Bioinformatics2015.pdf
 
9th_International_Conference_on_Computer.pdf
9th_International_Conference_on_Computer.pdf9th_International_Conference_on_Computer.pdf
9th_International_Conference_on_Computer.pdf
 
Biginer it-service-catalog.pdf
Biginer it-service-catalog.pdfBiginer it-service-catalog.pdf
Biginer it-service-catalog.pdf
 
GATE-PDF-1.pdf
GATE-PDF-1.pdfGATE-PDF-1.pdf
GATE-PDF-1.pdf
 
Bioinformatics2015.pdf
Bioinformatics2015.pdfBioinformatics2015.pdf
Bioinformatics2015.pdf
 
9th_International_Conference_on_Computer.pdf
9th_International_Conference_on_Computer.pdf9th_International_Conference_on_Computer.pdf
9th_International_Conference_on_Computer.pdf
 
938838223-MIT.pdf
938838223-MIT.pdf938838223-MIT.pdf
938838223-MIT.pdf
 
ITILV41.docx
ITILV41.docxITILV41.docx
ITILV41.docx
 
gartner ITSM.docx
gartner ITSM.docxgartner ITSM.docx
gartner ITSM.docx
 
DEFINITION.docx
DEFINITION.docxDEFINITION.docx
DEFINITION.docx
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 

1365320.pdf

  • 1. Photos placed in horizontal position with even amount of white space between photos and header Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-AC04-94AL85000. SAND NO. 2011-XXXXP Service Portfolio Management Rob Virden, MBA, PMP, CSM, CSPO, ITIL Solutions Architect, Office of the CIO, Sandia National Labs rvirden@sandia.gov, 505-844-0963 SAND2016-3958C
  • 2. What is Portfolio Management?  PMI –  “The coordinated management of one or more portfolios to achieve organizational strategies and objectives.”  It’s the “…processes, tools, and techniques used to identify, select, prioritize, govern, allocate resources, monitor, and report the contributions of the portfolio components to, and their respective alignment with, organizational objectives.  (The standard for portfolio management. 3rd Edition(2013). Newtown Square, PA: Project Management Institute. )  Typically refers to investment, project, or IT Portfolio Management. 2
  • 3. How do you know?  Five Questions:  Are we investing in the right things?  Are we optimizing our capacity?  Are we realizing the promised benefits?  Can we absorb all the changes?  How well are we executing?  Project portfolio management: A view from the management trenches. (2009). Hoboken, NJ: Wiley. 3
  • 4. What is Service Portfolio Management (SPM)?  ITIL - A service portfolio describes a provider’s services in terms of business value. The service portfolio is the complete set of services that is managed by a service provider. It includes three categories of services:  Service Pipeline  Service Catalog  Retired Services  Cannon, D., Wheeldon, D., Lacy, S., & Hanna, A. (2011). ITIL service strategy. London: TSO. 4
  • 5. Five Questions redux  Establishes a decision framework to answer strategic questions:  Why should a customer buy these services?  Why should they buy these services from us?  What are the pricing or chargeback models?  What are our strengths and weaknesses, priorities, and risks?  How should our resources and capabilities be allocated?  The purpose of SPM is to ensure that the service provider has the right mix of services to the balance the investment in IT with the ability to meet business outcomes. 5
  • 6. Service Portfolio vs. Investment Portfolio  They are functionally equivalent, but not equal:  Investing in a specific project, or a service?  The aggregation of projects and programs make up a service  Two separate but interdependent processes  IT Portfolio Management is a sub-set of processes within the overall ITIL Service Strategy area 6
  • 7. Goal/Challenges  Identify the right mix of investments at the right time  Size and Timing  Cyclical; Beginning, Middle, End  Windfall/Reserve  Reallocation  Type  Strategic Investments  M&O  Run, Grow, Transform 7
  • 8. Challenges cont’d  Source  Indirect  Direct  Service Centers  Division Support  Time consuming and effort intensive  Proposals  Estimates  Approvals  Submission 8
  • 9. Challenges cont’d  Alignment to (who’s?) Strategy  Lab  Mission  Organizational  Departmental  Personal  Lack of centralized portfolio  Distributed IT environment 9
  • 10. Paths to Clarity  Investment Timeline  SPM Process  Service Definition  Centralized Repository  ITSM  Performance Monitoring  Partnerships  Steering Committees  Five Questions 10
  • 13. FY16 Services within the Sandia ITS Service Portfolio 1. Service Desk 2. NM Desktop Computing Services 3. Desktop & Mobile Enabling Technologies 4. CA Desktop Computing Services 5. Unified Communications Services 6. Collaboration Services 7. Video Services Workforce Computing Services 8. Environment, Safety, & Health Systems Services 9. Corporate Governance Systems Services 10. Financial Management Systems Services 11. Human Resources Systems Services 12. Supply Chain Systems Services 13. Manufacturing Systems Solutions Enterprise Business Services 14. Information Content Services 15. Information Analytics Services 16. Records Management Services 17. Technical Library Services 18. Web Content Services 19. Enterprise Database Services Information Management Services 30. CIO Relationship Management 31. IT Service Management 32. IT Portfolio Management 33. IT Strategic Planning 34. Management Assurance 35. IT Policy Management 36. IT Financial Management Information Technology Strategy 23. Application Enabling Technologies 24. Computing Platform Services 25. Computing Infrastructure Services 26. Network Services 27. Telephone Services 28. Wired Infrastructure Services 29. Radio Infrastructure Services IT Enabling Systems & Infrastructure Services 20. Project Management Services 21. Configuration Management Services 22. Facilities & Asset Management Systems Services Mission Business Management Services 5/3/2016
  • 16. Drill down to the proposal 16
  • 17. Proposals Repository  Ability to filter by year, status, cycle, type, family, area, etc: 17
  • 18. Proposal Statuses  Phased Input  Proposed/Draft  Basic details  Accepted  Full details and detailed cost estimates  Approved  Funded amount, funding source, software cap 18
  • 19. Home Page  Home page with links to resources, templates, calendar, etc. 19
  • 20. ITSM  Service Level Management (SLM) Process  SLA/OLA  Business Relationship Management (BRM) Process  Service Catalog  Request Fulfillment  Problem, Incident, Change Management  End to End Service 20
  • 21. Partnerships  Business Office  Line and Program reporting  Financial Management  Financial Analysts and Center Business Analysts roles  Integrated Mission Support  Alignment to Executive Office Cadence  Use of IMS Tool 21
  • 22. Steering Committees  Service Portfolio Board  CIO, Deputy CIO, Center Directors  CITAC  Mission Support Senior Management  Common Engineering Environment  Enterprise resource for technical resources 22
  • 23. Performance Monitoring  Management Assurance Review (MAR)  MAR Timeline  Quad Chart 23
  • 24. Five Questions  Are we investing in the right things?  Centralized Repository  Services Definition and repository  Steering Committees  Are we optimizing our capacity?  Supply and Demand Management  Resource (Skills) Management  Are we realizing the promised benefits?  Performance Management  Can we absorb all the changes?  Organizational Change  How well are we executing?  Overall PPM Funding Process 24
  • 25. Five Questions cont’d  Why should a customer buy these services?  Services Value  Why should they buy these services from us?  Value proposition  What are the pricing or chargeback models?  Cost models  What are our strengths and weaknesses, priorities, and risks?  How should our resources and capabilities be allocated? 25
  • 26. ES&H End2End Services – Phased Approach FY16 ES&H SLA in place ES&H incidents and service requests tracked problem management practiced using the ITSM tool (18 appls). ES&H applications populated in Troux FY16 ES&H OLA in place ES&H incidents & problem trending reports in place. Build service model for 5 ES&H applications in CMDB Quarterly SLA service reviews held, with IT performance metrics. ES&H knowledge articles written and in use by CCHD/ES&H Service. Add 13 additional applications to CMDB. Event monitoring of ES&H applications May - Aug Sep - Dec Jan - Apr 26
  • 28. Program Health - Green Status (Across all Services): Critical Incidents – 0 High, Medium, Low Incidents – 4 Missed SLAs – 2 • Mean Time to Restore Service (MTRS) for Long Distance Telephone service took 8 hours, exceeding target of 1 hour • Mean Time Between Failures (MTBF) for SCN network in 905 exceeded target of 30 days. Met/Exceeded SLAs - 19 Key Financial Metrics $ Projected over/under Service Delivery Issues Rating Issue 1… (Owner) Issue 2… (Owner) Issue 3… (Owner) Service Delivery Programmatic Risks Rating Risk 1… (Owner) Risk 2… (Owner) Risk 3… (Owner) Budget $K Costs YTD $K % SP Costed % Cost+Com Rating $0 $0 % % Key Commitments/Projects • Commitment/Project 1 Status • Commitment/Project 2 Status • Commitment/Project 3 Status ITS-05 Program IT Enabling Systems & Infrastructure Services ITS Program MAR Template V4 28 Application Enabling Technologies Computing Platform Services Computing Infrastructure Services Network and Telephone Wired Infrastructure Radio Infrastructure
  • 29. Program Health - Green Key Indicators (Averaged KPI): MTBSI (Meantime Between Service Incidents) – 90 days (Target 30 days) MTRS (Meantime to Restore Service) – 3 Hours (Target 2 Hours) Key Financial Metrics $ Projected over/under Service Delivery Issues Rating Issue 1… (Owner) Issue 2… (Owner) Issue 3… (Owner) Service Delivery Programmatic Risks Rating Risk 1… (Owner) Risk 2… (Owner) Risk 3… (Owner) Budget $K Costs YTD $K % SP Costed % Cost+Com Rating $0 $0 % % Key Commitments/Projects • Commitment/Project 1 Status • Commitment/Project 2 Status • Commitment/Project 3 Status ITS-05 Telephone Services ITS Program MAR Template V4 29