SlideShare a Scribd company logo
1 of 3
Date; 31/12/2014
Ch.Eng. Ahmed Sami Mahmoud Ali
Position Applied for: Utility Operation Manager
Current Address:-
HI CLASS-2 Building no. 503
2 Kamal El-Deen Salah Street.
Smoha
Alexandria
EGYPT
TEL.; 03/4260126 Alex, EGYPT
Mobile Phone; 01203299992 - 0105415668
E-mail:ahmedsami_1960@hotmail.com
Personal Details;
Birth date; 14/8/1960
Birth place; Souhag, Egypt
Civil Status; Married
Nationality; Egyptian
Religion ; Islam
Educational Attainment;
1. B.Sc. in Chemical Engineering from Alexandria University, Egypt, 1984.
2. Diploma of Post graduate studies in Petrochemicals industries and design basis of Heat
Exchangers from Alexandria University, 1989-1991.
Work Experiences;
1. Seven years' experience as ''Process Engineer'' in the Egyptian Petrochemicals Co. in El
Ameria - Alex. Egypt, from the Startup Operation Procedures of the P.V.C Project
(Normal operation, Shut down, EM. Shutdown operation) with the Japanese Company,
"Toyo Engineering Corporation with Mitsui Tatsui Chemicals Inc.''.
2. Eight years' experience as ''Utility Deptt. Manager'' in Arab Company for Special Steel
(ARCO Steel)Located in Sadat City (Foreign investment and Egyptian companies and
Banks) from Civil Construction, Equipment Installation, Pre-commissioning&
Commissioning and Startup Operation Procedures, with the Korean Co. ''Posec
Engineering''.
3. Six years' experience as ''Utility Operation Manager'' in Alex. Fiber Co.(AFCO) in
Elameria - Alex. Egypt from Civil Construction, Equipment Installation,
Commissioning and Startup Operation Procedures, with the ''Multinational Indian
Birla Group''.
4. Four years' experience till now as :
 Three years 'Utility Operation Sector Manager' in (EPROM project) in Amerya Free
Zone - Alex. Egypt (E-STYRENICS CO. project) from Civil Construction,
Equipment Installation, Pre-commissioning& Commissioning and Startup
Operation Procedures till the steady state.
 One year till now in ''Technical Support Office'' as Utility 'Ass. G. Manager'
at EPROM-Head Office.
Job Description;
1. I have been worked as an ''Operation process Engineer'' in VCM Plant of Egyptian
Petrochemicals Co. where I was responsible about four units and 15 operators through
the modern designed applying digital control systemTDCS-3000 for the following plants;
 Air Separation Plant for producing Oxygen and Nitrogen in Gas and Liquid
phases.
 EDC (Ethylene Dichloride) Purification Plant by Distillation (Atmospheric and
Vacuum Distillation).
 EDC Cracker Furnace Plant for producing VCM (Vinyl Chloride Monomer)
 EDC Recovery and Waste treatment Plant.
2. I have been worked as ''Utility Manager'' in (ARCO Steel) where I was responsible about
the Operation and Maintenance (Electra.& Mech.) too, to keep the following plants
running in good conditions and higher improvement performance with low cost
and healthy Environment conditions;
 Water Treatment Plant(R.O. of 150 M3/HR) and Cooling Towers of 60,000
m3/month of makeup water (ICW,DCW and Soft Water) for RMP,CCM and EAF
 Air Separation Plant (1000 Nm3/hr. gas Oxygen, 60 Nm3/hr. liquid Nitrogen and
30 Nm3/hr. liquid Argon)
 Air Compression station 7400 Nm3/hr. at 6 bars Capacity(for Plant and
Instrument Air)
 Boiler Plant, (Water-Tube) 8 ton /hr. at 30 bars super-heated steam by using
Natural Gas.
 Fire Fighting System; Hydrant and Automatic protection system.
3. I have been worked as ''Utility Operation Manager' 'in (AFCO) where I am responsible
about;
Utility Plants Operation, Productivity, Improvement, Cost, Training and
Environment;
 Reverse Osmoses Water Treatment Plant (R.O), 150 m3/hr. of < 10 µS. of
conductivity.
 DM water Plant (Mixed Bed); 150 m3/hr. < 0.03 µS and 3000 m3 cycle life volume.
 Brine Chillers; 315 TR/each Capacity* Three chillers.
 Water Chiller; 300 TR/each Capacity* Three chillers.
 Cooling Towers; 6 units *550 m3/hr.
 Air Compression Plant; 1327 Nm3/hr.
 Nitrogen Plant; 25 Nm3/hr.
 Effluent Treatment Plant; 100 m3/hr.
4. I am working as ''Utility Operation Manager' 'in (EPROM- Polystyrene project) where I was
responsible about:
1) Utility Plants Operation, Productivity, Improvement, Consumption and
Training for 3 years;
 DM water Plant (Ion Exchange &Mixed Bed)
 Boiler (Fire-Tube)
 Heater(Oil heater)
 Water Chiller
 Cooling Towers
 Air Compression Plant
 Nitrogen Plant;
 Effluent Treatment Plant
 Sanitary Plant
2) Technical Support Office Ass. G. Manager one year's till now:
 Supervising all the company projects.
 Supporting all the company projects in operation and problem solving.
 Training to the operation engineers.
Training Courses;
1. Air Separation Plant in Germany (Linde Co.)
2. Water Treatment Plants Operation Technology and Maintenance in
Korea (Changwon Co.)
3. Acrylic Fiber Utilities in Thailand (Thai Acrylic Fiber
4. Soft skills programs in Egypt.
5. WCM system in Egypt.

More Related Content

Similar to A. Sami C.V. (20)

Resume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed ZaherResume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed Zaher
 
Resume-1 (4)
Resume-1 (4)Resume-1 (4)
Resume-1 (4)
 
ahmed saad cv
ahmed saad cvahmed saad cv
ahmed saad cv
 
Hamdy cv
Hamdy cvHamdy cv
Hamdy cv
 
RAJU LETEST UTILITY RESUME
RAJU LETEST UTILITY RESUMERAJU LETEST UTILITY RESUME
RAJU LETEST UTILITY RESUME
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
Mohamed Ellboudy - Copy (2)
Mohamed Ellboudy - Copy (2)Mohamed Ellboudy - Copy (2)
Mohamed Ellboudy - Copy (2)
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
Kannan resume
Kannan resumeKannan resume
Kannan resume
 
Supriyadi Resume Updated 2016
Supriyadi Resume Updated 2016Supriyadi Resume Updated 2016
Supriyadi Resume Updated 2016
 
Muhammad's CV
Muhammad's CVMuhammad's CV
Muhammad's CV
 
Profile kumaresan
Profile        kumaresanProfile        kumaresan
Profile kumaresan
 
NADEEM CV
NADEEM CV NADEEM CV
NADEEM CV
 
Osama's_CV
Osama's_CVOsama's_CV
Osama's_CV
 
Ashraf - CV
Ashraf - CVAshraf - CV
Ashraf - CV
 
Control room operator
Control room operatorControl room operator
Control room operator
 
SARAVANA SR.E&I ENGR AUG 2015
SARAVANA SR.E&I ENGR AUG 2015SARAVANA SR.E&I ENGR AUG 2015
SARAVANA SR.E&I ENGR AUG 2015
 
Moh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaaMoh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaa
 
Eng Fady C.V
Eng Fady  C.VEng Fady  C.V
Eng Fady C.V
 
M.samy
M.samyM.samy
M.samy
 

A. Sami C.V.

  • 1. Date; 31/12/2014 Ch.Eng. Ahmed Sami Mahmoud Ali Position Applied for: Utility Operation Manager Current Address:- HI CLASS-2 Building no. 503 2 Kamal El-Deen Salah Street. Smoha Alexandria EGYPT TEL.; 03/4260126 Alex, EGYPT Mobile Phone; 01203299992 - 0105415668 E-mail:ahmedsami_1960@hotmail.com Personal Details; Birth date; 14/8/1960 Birth place; Souhag, Egypt Civil Status; Married Nationality; Egyptian Religion ; Islam Educational Attainment; 1. B.Sc. in Chemical Engineering from Alexandria University, Egypt, 1984. 2. Diploma of Post graduate studies in Petrochemicals industries and design basis of Heat Exchangers from Alexandria University, 1989-1991. Work Experiences; 1. Seven years' experience as ''Process Engineer'' in the Egyptian Petrochemicals Co. in El Ameria - Alex. Egypt, from the Startup Operation Procedures of the P.V.C Project (Normal operation, Shut down, EM. Shutdown operation) with the Japanese Company, "Toyo Engineering Corporation with Mitsui Tatsui Chemicals Inc.''. 2. Eight years' experience as ''Utility Deptt. Manager'' in Arab Company for Special Steel (ARCO Steel)Located in Sadat City (Foreign investment and Egyptian companies and Banks) from Civil Construction, Equipment Installation, Pre-commissioning& Commissioning and Startup Operation Procedures, with the Korean Co. ''Posec Engineering''.
  • 2. 3. Six years' experience as ''Utility Operation Manager'' in Alex. Fiber Co.(AFCO) in Elameria - Alex. Egypt from Civil Construction, Equipment Installation, Commissioning and Startup Operation Procedures, with the ''Multinational Indian Birla Group''. 4. Four years' experience till now as :  Three years 'Utility Operation Sector Manager' in (EPROM project) in Amerya Free Zone - Alex. Egypt (E-STYRENICS CO. project) from Civil Construction, Equipment Installation, Pre-commissioning& Commissioning and Startup Operation Procedures till the steady state.  One year till now in ''Technical Support Office'' as Utility 'Ass. G. Manager' at EPROM-Head Office. Job Description; 1. I have been worked as an ''Operation process Engineer'' in VCM Plant of Egyptian Petrochemicals Co. where I was responsible about four units and 15 operators through the modern designed applying digital control systemTDCS-3000 for the following plants;  Air Separation Plant for producing Oxygen and Nitrogen in Gas and Liquid phases.  EDC (Ethylene Dichloride) Purification Plant by Distillation (Atmospheric and Vacuum Distillation).  EDC Cracker Furnace Plant for producing VCM (Vinyl Chloride Monomer)  EDC Recovery and Waste treatment Plant. 2. I have been worked as ''Utility Manager'' in (ARCO Steel) where I was responsible about the Operation and Maintenance (Electra.& Mech.) too, to keep the following plants running in good conditions and higher improvement performance with low cost and healthy Environment conditions;  Water Treatment Plant(R.O. of 150 M3/HR) and Cooling Towers of 60,000 m3/month of makeup water (ICW,DCW and Soft Water) for RMP,CCM and EAF  Air Separation Plant (1000 Nm3/hr. gas Oxygen, 60 Nm3/hr. liquid Nitrogen and 30 Nm3/hr. liquid Argon)  Air Compression station 7400 Nm3/hr. at 6 bars Capacity(for Plant and Instrument Air)  Boiler Plant, (Water-Tube) 8 ton /hr. at 30 bars super-heated steam by using Natural Gas.  Fire Fighting System; Hydrant and Automatic protection system. 3. I have been worked as ''Utility Operation Manager' 'in (AFCO) where I am responsible about; Utility Plants Operation, Productivity, Improvement, Cost, Training and Environment;  Reverse Osmoses Water Treatment Plant (R.O), 150 m3/hr. of < 10 µS. of conductivity.  DM water Plant (Mixed Bed); 150 m3/hr. < 0.03 µS and 3000 m3 cycle life volume.  Brine Chillers; 315 TR/each Capacity* Three chillers.
  • 3.  Water Chiller; 300 TR/each Capacity* Three chillers.  Cooling Towers; 6 units *550 m3/hr.  Air Compression Plant; 1327 Nm3/hr.  Nitrogen Plant; 25 Nm3/hr.  Effluent Treatment Plant; 100 m3/hr. 4. I am working as ''Utility Operation Manager' 'in (EPROM- Polystyrene project) where I was responsible about: 1) Utility Plants Operation, Productivity, Improvement, Consumption and Training for 3 years;  DM water Plant (Ion Exchange &Mixed Bed)  Boiler (Fire-Tube)  Heater(Oil heater)  Water Chiller  Cooling Towers  Air Compression Plant  Nitrogen Plant;  Effluent Treatment Plant  Sanitary Plant 2) Technical Support Office Ass. G. Manager one year's till now:  Supervising all the company projects.  Supporting all the company projects in operation and problem solving.  Training to the operation engineers. Training Courses; 1. Air Separation Plant in Germany (Linde Co.) 2. Water Treatment Plants Operation Technology and Maintenance in Korea (Changwon Co.) 3. Acrylic Fiber Utilities in Thailand (Thai Acrylic Fiber 4. Soft skills programs in Egypt. 5. WCM system in Egypt.