SOURCE OF WEATHER PARAMETER
• PVSYST – Software (meteonorm 6.74)
• Some other data was taken from (Pvgis.com)
Algorithm of the calculation:
• The Olmo model was used for the calculation
Irradiation for different Azimuth and Tilt
angles respectively.
• All other arithmetic was done on Excel
ORTHO-PHOTO OF THE SITE
4°45'22.8"N 7°00'46.5"E
4.756326, 7.012925
Port Harcourt Nigeria
MATRIX OF SOLAR IRRADIATION
(kWh/m2)0 10 20 30 40 50 60 70 80 90
180 1648 1600 1530 1430 1300 1150 987 836 693 550
170 1648 1600 1530 1430 1300 1160 996 840 695 557
160 1648 1600 1630 1430 1310 1170 1020 862 710 569
150 1648 1610 1540 1440 1330 1200 1050 896 742 596
140 1648 1610 1550 1460 1350 1220 1080 934 783 637
130 1648 1610 1550 1470 1370 1250 1120 973 825 680
120 1648 1620 1560 1490 1390 1280 1150 1010 866 720
110 1648 1620 1570 1500 1410 1310 1180 1040 901 755
100 1648 1630 1580 1520 1430 1330 1210 1070 930 783
90 1648 1630 1600 1530 1450 1350 1230 1170 953 804
80 1648 1640 1600 1550 1470 1370 1250 1110 967 816
70 1648 1640 1610 1560 1480 1370 1260 1120 972 820
60 1648 1650 1620 1570 1490 1390 1270 1120 972 816
50 1648 1650 1630 1580 1500 1390 1270 1120 965 803
40 1648 1660 1630 1580 1500 1400 1270 1120 955 786
30 1648 1660 1640 1590 1510 1400 1270 1110 944 768
20 1648 1660 1640 1590 1510 1410 1270 1110 936 753
10 1648 1660 1650 1600 1520 1410 1270 1110 923 748
0 1648 1664 1650 1600 1520 1410 1270 1100 922 751
-10 1648 1660 1650 1600 1520 1410 1270 1110 923 748
-20 1648 1660 1640 1590 1510 1410 1270 1110 936 753
-30 1648 1660 1640 1590 1510 1400 1270 1110 944 768
-40 1648 1660 1630 1580 1500 1400 1270 1120 955 786
-50 1648 1650 1630 1580 1500 1390 1270 1120 965 803
-60 1648 1650 1620 1570 1490 1390 1270 1120 972 816
-70 1648 1640 1610 1560 1480 1370 1260 1120 972 820
-80 1648 1640 1600 1550 1470 1370 1250 1110 967 816
-90 1648 1630 1600 1530 1450 1350 1230 1170 953 804
-100 1648 1630 1580 1520 1430 1330 1210 1070 930 783
-110 1648 1620 1570 1500 1410 1310 1180 1040 901 755
-120 1648 1620 1560 1490 1390 1280 1150 1010 866 720
-130 1648 1610 1550 1470 1370 1250 1120 973 825 680
-140 1648 1610 1550 1460 1350 1220 1080 934 783 637
-150 1648 1610 1540 1440 1330 1200 1050 896 742 596
-160 1648 1600 1630 1430 1310 1170 1020 862 710 569
-170 1648 1600 1530 1430 1300 1160 996 840 695 557
-180 1648 1600 1530 1430 1300 1150 987 836 693 550
ORIENTATION WITH MAXIMUM IRRADIATION
(kWh/m2)
Max. Irradiation
@ Azimuth 0-degree, tilt
angle 10-degrees
Max. Irradiance value:
1664kW/m2
ORIENTATION OF MY ROOF
• Orientation of my PV system:
• Azimuth: 0-degree
• Plane Tilt: 10-degree
Yearly Irradiance on my roof (kWh/m2)
• 1664kWh/m2
Annual Electricity consumption of my household
• 4190.18kWh
ELECTRICITY CONSUMPTION OF MY HOUSE
• DAILY CONSUMPTION:- 11.64kW/DAY
• ANNUAL CONSUMPTION:- 11.64* 360days
»419O.18kWh
MODULE PARAMETERS
P.S The circle module specification was what I used for the
installation.
INVERTER PARAMETERS
Inverter Name: Sunny Boy 3600
Smart Energy
• Maximum power rating (AC):3.6 -
5.2 kw
• Max. input (DC)voltage 750 V
• MPP voltage range / rated input
voltage 125 V – 500 V /400
• Maximum output current: 16A
• Maximum Efficiency: 97 %
ELECTRICAL CIRCUIT DIAGRAM
MONTHLY HORIZONTAL IRRADIATION
(kWh/m2)
MONTH IRRADIATION (kWh/m2)
Jan 176
Feb 148
Mar 164
Apr 144
May 140
Jun 111
Jul 109
Aug 113
Sep 113
Oct 128
Nov 135
Dec 167
MONTHLY IN-PLANE IRRADIATION OF
AT THE ROOF (kWh/m2)
MONTH IRRADIATION (kWh/m2)
Jan 188
Feb 153
Mar 165
Apr 140
May 134
Jun 106
Jul 105
Aug 110
Sep 113
Oct 130
Nov 141
Dec 179
MONTHLY AVE. AIR TEMPERATURE
MONTH AVE. AIR TEMP 0C
JANUARY 27.39
FEBRUARY 28.18
MARCH 28
APRIL 27
MAY 27.18
JUNE 25.79
JULY 25.61
AUGUST 24.92
SEPTEMBER 25.15
OCTOBER 26.07
NOVEMBER 26.4
DECEMBER 27.42
MAX. OUT PUT POWER IN THE
SYSTEM IN A YEAR
MONTH P-MAX (18 MOD) Wh
JANUARY 4011.84
FEBRUARY 3836.34
MARCH 3795.48
APRIL 3530.16
MAY 3057.3
JUNE 3012.84
JULY 2879.82
AUGUST 3239.1
SEPTEMBER 3786.66
OCTOBER 4178.88
NOVEMBER 3917.88
DECEMBER 3969
YEARLY MAX. OUT PUT
POWER IN THE SYSTEM :
4.2kW
P.R @ EACH MONTH FOR THE 1ST
YEAR
MONTH P.R
JANUARY 0.96
FEBRUARY 0.97
MARCH 0.96
APRIL 0.94
MAY 0.95
JUNE 0.99
JULY 0.98
AUGUST 0.96
SEPTEMBER 0.97
OCTOBER 0.97
NOVEMBER 0.97
DECEMBER 0.97
P.R, YR, YF OF THE 1ST YEAR
• Yf – 1480 kWh/kWp
• Yr – 1604 hours
• P.R – 92%
AVEREGE MODULE TEMPERATURE
MONTH AVE. Mod Tem.
JANUARY 33.07
FEBRUARY 33.77
MARCH 33.18
APRIL 31.77
MAY 31.48
JUNE 29.66
JULY 29.2
AUGUST 28.5
SEPTEMBER 29.6
OCTOBER 30.99
NOVEMBER 31.83
DECEMBER 33.26
MAX. MOD. TEMPERATURE IN A
YEAR
MONTH H. Mod.Tem.
JANUARY 63.59
FEBRUARY 62.27
MARCH 59.53
APRIL 57.19
MAY 54.85
JUNE 52.42
JULY 49.92
AUGUST 51.97
SEPTEMBER 56.88
OCTOBER 62.45
NOVEMBER 60.94
DECEMBER 60.83
MAX. TEMPERATURE:
63.590C
ANNUAL ENERGY PRODUCTION
@1ST YEAR
MONTH ENERGY (kWh)
JANUARY 581.86
FEBRUARY 515.08
MARCH 533.15
APRIL 479.55
MAY 449.17
JUNE 396.17
JULY 381.12
AUGUST 449.99
SEPTEMBER 449.99
OCTOBER 508.43
NOVEMBER 541.29
DECEMBER 598.30
TOTAL 5884.O8
ENERGY PRODUCED IN TEN YEARS
YEAR ENERGY(kWh)
1 5884.1
2 5589.90
3 5310.40
4 5044.88
5 4792.64
6 4553.00
7 4325.35
8 4109.09
9 3903.63
10 3708.45
TOTAL 47221.44
COST OF TEN YEARS ENERGY
INVESTMENT COST
1Wp=1.2Euro
PRICE OF YEAR ONE 5,400 Euro
PRICE OF TEN YEARS ELECTRICITY
COST 0.11Euro/kWh
11cent/kWh
THANK YOU FOR
LISTENING

More Related Content

Viewers also liked

Employer branding inom vård och omsorg i Helsingborgs stad - hur ska vi attra...
Employer branding inom vård och omsorg i Helsingborgs stad - hur ska vi attra...Employer branding inom vård och omsorg i Helsingborgs stad - hur ska vi attra...
Employer branding inom vård och omsorg i Helsingborgs stad - hur ska vi attra...David Väcklén
 
SAPUI5_TimeUp_for_Inwerken
SAPUI5_TimeUp_for_InwerkenSAPUI5_TimeUp_for_Inwerken
SAPUI5_TimeUp_for_InwerkenShujian Zhang
 
Safety walk-Manuel Fernandez
Safety walk-Manuel FernandezSafety walk-Manuel Fernandez
Safety walk-Manuel FernandezManny Fernandez
 
PageRank in Multithreading
PageRank in MultithreadingPageRank in Multithreading
PageRank in MultithreadingShujian Zhang
 
Narcotráfico en méxico
Narcotráfico en méxicoNarcotráfico en méxico
Narcotráfico en méxicoagus28vale
 
Openstack Summit Tokyo 2015 - Building a private cloud to efficiently handle ...
Openstack Summit Tokyo 2015 - Building a private cloud to efficiently handle ...Openstack Summit Tokyo 2015 - Building a private cloud to efficiently handle ...
Openstack Summit Tokyo 2015 - Building a private cloud to efficiently handle ...Pierre GRANDIN
 

Viewers also liked (18)

Analyses of contents pages
Analyses of contents pagesAnalyses of contents pages
Analyses of contents pages
 
'Line photo' analyses
'Line photo' analyses'Line photo' analyses
'Line photo' analyses
 
Employer branding inom vård och omsorg i Helsingborgs stad - hur ska vi attra...
Employer branding inom vård och omsorg i Helsingborgs stad - hur ska vi attra...Employer branding inom vård och omsorg i Helsingborgs stad - hur ska vi attra...
Employer branding inom vård och omsorg i Helsingborgs stad - hur ska vi attra...
 
Analyses of double page spreads
Analyses of double page spreadsAnalyses of double page spreads
Analyses of double page spreads
 
Hemtjanst vasteras
Hemtjanst vasterasHemtjanst vasteras
Hemtjanst vasteras
 
CV Rusmir Bajraktarevic Pdf.
CV Rusmir Bajraktarevic Pdf.CV Rusmir Bajraktarevic Pdf.
CV Rusmir Bajraktarevic Pdf.
 
'Line photo' analyses 2
'Line photo' analyses 2'Line photo' analyses 2
'Line photo' analyses 2
 
SAPUI5_TimeUp_for_Inwerken
SAPUI5_TimeUp_for_InwerkenSAPUI5_TimeUp_for_Inwerken
SAPUI5_TimeUp_for_Inwerken
 
Safety walk-Manuel Fernandez
Safety walk-Manuel FernandezSafety walk-Manuel Fernandez
Safety walk-Manuel Fernandez
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysis
 
Presentation1
Presentation1Presentation1
Presentation1
 
Analyses of contents pages
Analyses of contents pagesAnalyses of contents pages
Analyses of contents pages
 
PageRank in Multithreading
PageRank in MultithreadingPageRank in Multithreading
PageRank in Multithreading
 
'Line photo' analyses 3
'Line photo' analyses 3'Line photo' analyses 3
'Line photo' analyses 3
 
2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
 
Narcotráfico en méxico
Narcotráfico en méxicoNarcotráfico en méxico
Narcotráfico en méxico
 
Achieving High Penetrations of PV by Roger Hill
Achieving High Penetrations of PV by Roger HillAchieving High Penetrations of PV by Roger Hill
Achieving High Penetrations of PV by Roger Hill
 
Openstack Summit Tokyo 2015 - Building a private cloud to efficiently handle ...
Openstack Summit Tokyo 2015 - Building a private cloud to efficiently handle ...Openstack Summit Tokyo 2015 - Building a private cloud to efficiently handle ...
Openstack Summit Tokyo 2015 - Building a private cloud to efficiently handle ...
 

Similar to SOLAR PV PLANNING BY: OLUWABI ABAYOMI

The effects of weather on construction scheduling webinar, 22 October 2018
The effects of weather on construction scheduling webinar, 22 October 2018The effects of weather on construction scheduling webinar, 22 October 2018
The effects of weather on construction scheduling webinar, 22 October 2018Association for Project Management
 
ABB POLIM-H..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-H..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...ABB POLIM-H..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-H..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...Thorne & Derrick International
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfANANDA DS
 
ABB POLIM-S..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-S..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...ABB POLIM-S..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-S..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...Thorne & Derrick International
 
Energy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plantEnergy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plantMANOJ KUMAR MAHARANA
 
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...Thorne & Derrick International
 
Why solar...???
Why solar...???Why solar...???
Why solar...???Saim Ahmed
 
City council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentationCity council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentationCity of San Angelo Texas
 
ABB POLIM-I..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-I..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...ABB POLIM-I..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-I..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...Thorne & Derrick International
 
3 calculating condensate loads
3 calculating condensate loads3 calculating condensate loads
3 calculating condensate loadsIskandar Hasibuan
 
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.pptcapwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.pptakhoanguyeneng
 
ABB MWK High Voltage Surge Arresters AC 4kV - 44kV - AC Surge Arresters & Pr...
ABB MWK High Voltage Surge Arresters AC 4kV - 44kV -  AC Surge Arresters & Pr...ABB MWK High Voltage Surge Arresters AC 4kV - 44kV -  AC Surge Arresters & Pr...
ABB MWK High Voltage Surge Arresters AC 4kV - 44kV - AC Surge Arresters & Pr...Thorne & Derrick International
 
Example kitchen ventilation calculation
Example kitchen ventilation calculationExample kitchen ventilation calculation
Example kitchen ventilation calculationwilliammana
 
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...Rohan Raibagkar
 
Mini scada system for monitoring pv and wind installation in meteorology stat...
Mini scada system for monitoring pv and wind installation in meteorology stat...Mini scada system for monitoring pv and wind installation in meteorology stat...
Mini scada system for monitoring pv and wind installation in meteorology stat...slmnsvn
 
ABB MWD High Voltage Surge Arresters AC 4kV - 44kV - AC Surge Arresters & Pr...
ABB MWD High Voltage Surge Arresters AC 4kV - 44kV -  AC Surge Arresters & Pr...ABB MWD High Voltage Surge Arresters AC 4kV - 44kV -  AC Surge Arresters & Pr...
ABB MWD High Voltage Surge Arresters AC 4kV - 44kV - AC Surge Arresters & Pr...Thorne & Derrick International
 
Sukam solar ppt
Sukam solar pptSukam solar ppt
Sukam solar pptSafi Khan
 
Smart Utilities 2012 - Peak Demand
Smart Utilities 2012 - Peak DemandSmart Utilities 2012 - Peak Demand
Smart Utilities 2012 - Peak DemandDr Robert Simpson
 

Similar to SOLAR PV PLANNING BY: OLUWABI ABAYOMI (20)

The effects of weather on construction scheduling webinar, 22 October 2018
The effects of weather on construction scheduling webinar, 22 October 2018The effects of weather on construction scheduling webinar, 22 October 2018
The effects of weather on construction scheduling webinar, 22 October 2018
 
ABB POLIM-H..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-H..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...ABB POLIM-H..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-H..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
 
ABB POLIM-S..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-S..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...ABB POLIM-S..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-S..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
 
Energy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plantEnergy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plant
 
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
 
Why solar...???
Why solar...???Why solar...???
Why solar...???
 
City council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentationCity council 8 6-13 ai 32 vv ground water group presentation
City council 8 6-13 ai 32 vv ground water group presentation
 
ABB POLIM-I..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-I..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...ABB POLIM-I..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
ABB POLIM-I..N High Voltage Surge Arresters AC up to 72 kV - AC Surge Arreste...
 
3 calculating condensate loads
3 calculating condensate loads3 calculating condensate loads
3 calculating condensate loads
 
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.pptcapwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
 
ABB MWK High Voltage Surge Arresters AC 4kV - 44kV - AC Surge Arresters & Pr...
ABB MWK High Voltage Surge Arresters AC 4kV - 44kV -  AC Surge Arresters & Pr...ABB MWK High Voltage Surge Arresters AC 4kV - 44kV -  AC Surge Arresters & Pr...
ABB MWK High Voltage Surge Arresters AC 4kV - 44kV - AC Surge Arresters & Pr...
 
Example kitchen ventilation calculation
Example kitchen ventilation calculationExample kitchen ventilation calculation
Example kitchen ventilation calculation
 
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
Performance Evaluation of 830kW Wind Turbine and an Analysis of Various Param...
 
Presentation-for-teachers.pptx
Presentation-for-teachers.pptxPresentation-for-teachers.pptx
Presentation-for-teachers.pptx
 
Mini scada system for monitoring pv and wind installation in meteorology stat...
Mini scada system for monitoring pv and wind installation in meteorology stat...Mini scada system for monitoring pv and wind installation in meteorology stat...
Mini scada system for monitoring pv and wind installation in meteorology stat...
 
ABB MWD High Voltage Surge Arresters AC 4kV - 44kV - AC Surge Arresters & Pr...
ABB MWD High Voltage Surge Arresters AC 4kV - 44kV -  AC Surge Arresters & Pr...ABB MWD High Voltage Surge Arresters AC 4kV - 44kV -  AC Surge Arresters & Pr...
ABB MWD High Voltage Surge Arresters AC 4kV - 44kV - AC Surge Arresters & Pr...
 
Sukam solar ppt
Sukam solar pptSukam solar ppt
Sukam solar ppt
 
Aluma core
Aluma coreAluma core
Aluma core
 
Smart Utilities 2012 - Peak Demand
Smart Utilities 2012 - Peak DemandSmart Utilities 2012 - Peak Demand
Smart Utilities 2012 - Peak Demand
 

SOLAR PV PLANNING BY: OLUWABI ABAYOMI

  • 2. SOURCE OF WEATHER PARAMETER • PVSYST – Software (meteonorm 6.74) • Some other data was taken from (Pvgis.com) Algorithm of the calculation: • The Olmo model was used for the calculation Irradiation for different Azimuth and Tilt angles respectively. • All other arithmetic was done on Excel
  • 3. ORTHO-PHOTO OF THE SITE 4°45'22.8"N 7°00'46.5"E 4.756326, 7.012925 Port Harcourt Nigeria
  • 4. MATRIX OF SOLAR IRRADIATION (kWh/m2)0 10 20 30 40 50 60 70 80 90 180 1648 1600 1530 1430 1300 1150 987 836 693 550 170 1648 1600 1530 1430 1300 1160 996 840 695 557 160 1648 1600 1630 1430 1310 1170 1020 862 710 569 150 1648 1610 1540 1440 1330 1200 1050 896 742 596 140 1648 1610 1550 1460 1350 1220 1080 934 783 637 130 1648 1610 1550 1470 1370 1250 1120 973 825 680 120 1648 1620 1560 1490 1390 1280 1150 1010 866 720 110 1648 1620 1570 1500 1410 1310 1180 1040 901 755 100 1648 1630 1580 1520 1430 1330 1210 1070 930 783 90 1648 1630 1600 1530 1450 1350 1230 1170 953 804 80 1648 1640 1600 1550 1470 1370 1250 1110 967 816 70 1648 1640 1610 1560 1480 1370 1260 1120 972 820 60 1648 1650 1620 1570 1490 1390 1270 1120 972 816 50 1648 1650 1630 1580 1500 1390 1270 1120 965 803 40 1648 1660 1630 1580 1500 1400 1270 1120 955 786 30 1648 1660 1640 1590 1510 1400 1270 1110 944 768 20 1648 1660 1640 1590 1510 1410 1270 1110 936 753 10 1648 1660 1650 1600 1520 1410 1270 1110 923 748 0 1648 1664 1650 1600 1520 1410 1270 1100 922 751 -10 1648 1660 1650 1600 1520 1410 1270 1110 923 748 -20 1648 1660 1640 1590 1510 1410 1270 1110 936 753 -30 1648 1660 1640 1590 1510 1400 1270 1110 944 768 -40 1648 1660 1630 1580 1500 1400 1270 1120 955 786 -50 1648 1650 1630 1580 1500 1390 1270 1120 965 803 -60 1648 1650 1620 1570 1490 1390 1270 1120 972 816 -70 1648 1640 1610 1560 1480 1370 1260 1120 972 820 -80 1648 1640 1600 1550 1470 1370 1250 1110 967 816 -90 1648 1630 1600 1530 1450 1350 1230 1170 953 804 -100 1648 1630 1580 1520 1430 1330 1210 1070 930 783 -110 1648 1620 1570 1500 1410 1310 1180 1040 901 755 -120 1648 1620 1560 1490 1390 1280 1150 1010 866 720 -130 1648 1610 1550 1470 1370 1250 1120 973 825 680 -140 1648 1610 1550 1460 1350 1220 1080 934 783 637 -150 1648 1610 1540 1440 1330 1200 1050 896 742 596 -160 1648 1600 1630 1430 1310 1170 1020 862 710 569 -170 1648 1600 1530 1430 1300 1160 996 840 695 557 -180 1648 1600 1530 1430 1300 1150 987 836 693 550
  • 5. ORIENTATION WITH MAXIMUM IRRADIATION (kWh/m2) Max. Irradiation @ Azimuth 0-degree, tilt angle 10-degrees Max. Irradiance value: 1664kW/m2
  • 6. ORIENTATION OF MY ROOF • Orientation of my PV system: • Azimuth: 0-degree • Plane Tilt: 10-degree Yearly Irradiance on my roof (kWh/m2) • 1664kWh/m2 Annual Electricity consumption of my household • 4190.18kWh
  • 7. ELECTRICITY CONSUMPTION OF MY HOUSE • DAILY CONSUMPTION:- 11.64kW/DAY • ANNUAL CONSUMPTION:- 11.64* 360days »419O.18kWh
  • 8. MODULE PARAMETERS P.S The circle module specification was what I used for the installation.
  • 9. INVERTER PARAMETERS Inverter Name: Sunny Boy 3600 Smart Energy • Maximum power rating (AC):3.6 - 5.2 kw • Max. input (DC)voltage 750 V • MPP voltage range / rated input voltage 125 V – 500 V /400 • Maximum output current: 16A • Maximum Efficiency: 97 %
  • 11. MONTHLY HORIZONTAL IRRADIATION (kWh/m2) MONTH IRRADIATION (kWh/m2) Jan 176 Feb 148 Mar 164 Apr 144 May 140 Jun 111 Jul 109 Aug 113 Sep 113 Oct 128 Nov 135 Dec 167
  • 12. MONTHLY IN-PLANE IRRADIATION OF AT THE ROOF (kWh/m2) MONTH IRRADIATION (kWh/m2) Jan 188 Feb 153 Mar 165 Apr 140 May 134 Jun 106 Jul 105 Aug 110 Sep 113 Oct 130 Nov 141 Dec 179
  • 13. MONTHLY AVE. AIR TEMPERATURE MONTH AVE. AIR TEMP 0C JANUARY 27.39 FEBRUARY 28.18 MARCH 28 APRIL 27 MAY 27.18 JUNE 25.79 JULY 25.61 AUGUST 24.92 SEPTEMBER 25.15 OCTOBER 26.07 NOVEMBER 26.4 DECEMBER 27.42
  • 14. MAX. OUT PUT POWER IN THE SYSTEM IN A YEAR MONTH P-MAX (18 MOD) Wh JANUARY 4011.84 FEBRUARY 3836.34 MARCH 3795.48 APRIL 3530.16 MAY 3057.3 JUNE 3012.84 JULY 2879.82 AUGUST 3239.1 SEPTEMBER 3786.66 OCTOBER 4178.88 NOVEMBER 3917.88 DECEMBER 3969 YEARLY MAX. OUT PUT POWER IN THE SYSTEM : 4.2kW
  • 15. P.R @ EACH MONTH FOR THE 1ST YEAR MONTH P.R JANUARY 0.96 FEBRUARY 0.97 MARCH 0.96 APRIL 0.94 MAY 0.95 JUNE 0.99 JULY 0.98 AUGUST 0.96 SEPTEMBER 0.97 OCTOBER 0.97 NOVEMBER 0.97 DECEMBER 0.97
  • 16. P.R, YR, YF OF THE 1ST YEAR • Yf – 1480 kWh/kWp • Yr – 1604 hours • P.R – 92%
  • 17. AVEREGE MODULE TEMPERATURE MONTH AVE. Mod Tem. JANUARY 33.07 FEBRUARY 33.77 MARCH 33.18 APRIL 31.77 MAY 31.48 JUNE 29.66 JULY 29.2 AUGUST 28.5 SEPTEMBER 29.6 OCTOBER 30.99 NOVEMBER 31.83 DECEMBER 33.26
  • 18. MAX. MOD. TEMPERATURE IN A YEAR MONTH H. Mod.Tem. JANUARY 63.59 FEBRUARY 62.27 MARCH 59.53 APRIL 57.19 MAY 54.85 JUNE 52.42 JULY 49.92 AUGUST 51.97 SEPTEMBER 56.88 OCTOBER 62.45 NOVEMBER 60.94 DECEMBER 60.83 MAX. TEMPERATURE: 63.590C
  • 19. ANNUAL ENERGY PRODUCTION @1ST YEAR MONTH ENERGY (kWh) JANUARY 581.86 FEBRUARY 515.08 MARCH 533.15 APRIL 479.55 MAY 449.17 JUNE 396.17 JULY 381.12 AUGUST 449.99 SEPTEMBER 449.99 OCTOBER 508.43 NOVEMBER 541.29 DECEMBER 598.30 TOTAL 5884.O8
  • 20. ENERGY PRODUCED IN TEN YEARS YEAR ENERGY(kWh) 1 5884.1 2 5589.90 3 5310.40 4 5044.88 5 4792.64 6 4553.00 7 4325.35 8 4109.09 9 3903.63 10 3708.45 TOTAL 47221.44
  • 21. COST OF TEN YEARS ENERGY INVESTMENT COST 1Wp=1.2Euro PRICE OF YEAR ONE 5,400 Euro PRICE OF TEN YEARS ELECTRICITY COST 0.11Euro/kWh 11cent/kWh