12. Continued…. NTPC had planned to add about 1,000 MW thru renewable resources by 2017. In addition, capacity addition of 301 MW through Solar PV and Thermal by March 2014 has envisaged in line with National Solar Mission. In this kind of project I would like to analyze different possible locations for power generation plant from renewable sources. Check the feasibility of the operation. Check the cost effectiveness of the project. Consideration of different constraints. Conducting value chain analysis. Availability of raw materials and man power. Demand and supply analysis of power. Forecasting demand.
13. My Expectation from NTPC Allocation of live project. Support and clarification in different critical situations. Support and admiration of good ideas.