The document outlines a 2-week production schedule, with tasks assigned to each date including creating props and costume lists, location shots, scheduling contingencies, shooting lists, assigning crew roles and lighting plans, risk assessments, shooting scenes 1-2 using a steady cam and tripod, shooting scene 3, shooting scenes 4-9 in one day, viewing raw footage and doing continuity editing, creating a rough cut and sound design, re-shooting if needed, final editing and rendering in HD, and presenting the final project.