POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION

                IN POWER SECTOR




                                                1
CHITALE & CHITALE PARTNERS




             By
   K.A. Sivaram, Partner
CHITALE & CHITALE
    PARTNERS

ADVOCATES & LEGAL CONSULTANTS




                                        2
CHITALE & CHITALE PARTNERS



Transmission and Distribution of Power in India

    This presentation covers an overview of the law and policies of the
   Government of India for transmission and distribution of power,
   comprised in :

   The Electricity Act, 2003
   The National Tariff Policy, 2006
   Guidelines on Tariff Determination by Competitive Bidding
   Foreign Direct Investment Policy




                                                               3
CHITALE & CHITALE PARTNERS


Policy Directives Applicable


       The Electricity Act, 2003

         The Electricity Act, 2003 (“Electricity Act”) lays down the law
       relating to generation, transmission, distribution, trading and use
       of electricity. It provides for liberal and progressive framework for
       power sector development and facilitation of investment by
       creating competitive environment, and reforming the distribution
       segment of power industry. The Electricity Act has several
       enabling provisions, with a view to promote accelerated
       development of the power sector.

       The Electricity Act:
       Removes / reduces entry barriers
       Mandates open access in transmission
       Permits multiple licensees in distribution
       Constitutes Central and State Regulatory Commissions - to


                                                                 4
       develop market (including trading)
CHITALE & CHITALE PARTNERS


Policy Directives Applicable

    •   Central government to prepare National Electricity Policy and Tariff
        Policy. (Section 3-6)

    •   Generation is delicensed. Captive generation is freely permitted.
        Hydro projects need approval of State Government and central
        Electricity Authority (CEA) (Section 7-11)

    •   The Central Electricity Regulatory Commission (“CERC”) / State
        Electricity Regulatory Commissions (“SERC”) are the licensing
        authorities for transmission, distribution and trading of electricity.
        The CERC / SERC have the power to grant, revoke, amend or
        suspend the licence granted. (Sections 12- 24)

    •   The CERC / SERC may specify any general or specific conditions
        under the licence. (Section 16)

    •   Central Transmission Utilities (CTUs) / State Transmission Utilities
        (STUs) as well as Government companies are deemed to be the
        transmission licensees. (Section 14).




                                                                                 5
CHITALE & CHITALE PARTNERS

 The Electricity Act, 2003 on Transmission and Distribution
Transmission

   There would be Transmission Utilities at the Centre and in the States to undertake
   planning and development of transmission system. (Sections 38, 39)
   Load despatch to be in the hands of a government company / organization.
   Flexibility regarding keeping Transmission Utility and Load Despatch Centre
   together or separating them. Load Despatch function is critical for grid stability and
   neutrality as compared to generation and distribution. (Sections 26, 27, 28, 31, 32)
   Transmission companies to be licensed by the Appropriate Commission after
   giving due consideration to the views of the Transmission Utility. (Section 15(5)
   (b))
   The National Load Despacth Centre (NLDC) and Regional Load Dispatch Centres
   (RLDCs) / Transmission Utilities / Transmission Licensees do not trade in power.
   The RLDCs ensure integrated operation of the power system and optimum
   scheduling and despatch of electricity. (Sections 26, 27, 31, 32, 38, 39, 41)
   Non-discriminatory open access to the transmission system to be provided to the
   distribution licensees, generating companies. Provision for progressive reduction
   of surcharge and cross subsidies. (Sections 38-40)
   This would generate competitive pressures and lead to gradual cost reduction.




                                                                         6
CHITALE & CHITALE PARTNERS

The Electricity Act, 2003 on Transmission and Distribution contd..

Distribution
      Distribution to be licensed by SERCs. Distribution Licensees are also
      free to take up generation. Also generating companies are free to take
      up distribution. This would facilitate private sector participation.
      (Sections 12-14)
      Retail tariff is to be determined by the CERC / SERC. (Section 62)
      Metering is mandatory. (Section 55)
      CERC / SERC have been given powers to suspend/revoke licence of
      the distribution/transmission companies. (Sections 19, 24)
      Open access in distribution to be allowed by SERC in phases.
    (Section 42)
      In addition to the wheeling charges, provision for surcharge if open
      access is allowed before elimination of cross subsidies, to take care of
      current level of cross subsidy. Licensee’s obligation to supply.


                                                                 7
    (Section 42).
      Provision relating to safety and standards of performance
     (Section 53-57)
CHITALE & CHITALE PARTNERS

Tariff determination by competitive bidding

           Guidelines for Determination of Tariff by Bidding Process for
      Procurement of Power by Distribution Licensees (often referred to as
      the Procurers) have been framed by the Central Government and the
      same are to be adopted by CERC / SERC as provided by Section 63
      of the Electricity Act. The specific objectives of these guidelines are
      as follows:
      Promote competitive procurement of electricity by distribution
      licensees
      Facilitate transparency and fairness in procurement processes;
      Facilitate reduction of information asymmetries for various bidders;
      Protect consumer interests by facilitating competitive conditions in
      procurement of electricity;
      Enhance standardization and reduce ambiguity and hence time for
      materialization of projects;
      Provide flexibility to suppliers on internal operations while ensuring
      certainty on availability of power and tariffs for buyers.


                                                              8
CHITALE & CHITALE PARTNERS
The National Tariff Policy, 2006

 Transmission:

       Implementation of suitable transmission tariff framework for all inter-
       State transmission, including transmission of electricity across the
       territory of an intervening State as well as conveyance within the
       State which is incidental to such inter-state transmission.
       National tariff framework implemented should be sensitive to
       distance, direction and related to quantum of power flow. This would
       be developed by CERC taking into consideration the advice of the
       Central Electricity Authority (CEA).
       Transmission charges in proportion to the respective utilization of the
       transmission system.
       Prior agreement with the beneficiaries would not be a pre-condition
       for network expansion.
       Transactions should be charged on the basis of average losses
       arrived at after appropriately considering the distance and directional
       sensitivity, as applicable to relevant voltage level, on the
       transmission system.
       Financial incentives and disincentives should be implemented for the


                                                                  9
       CTUs and the STUs around the key performance indicators (KPI) for
       these organizations.
CHITALE & CHITALE PARTNERS
The National Tariff Policy, 2006 contd…

 Distribution:

       Implementation of Multi-Year Tariff (MYT) framework to minimize risks for utilities
       and consumers, promote efficiency and appropriate reduction of system losses
       and attract investments.
       Introduction of mechanisms for sharing of excess profits and losses with the
       consumers as part of the overall MYT framework.
       Incumbent licensees should have the option of filing for separate revenue
       requirements and tariffs for an area where the State Commission has issued
       multiple distribution licences, pursuant to the provisions of Section 14 of the Act
       read with the Policy.
       CERC / SERCs should initiate tariff determination and regulatory scrutiny on a
       suo moto basis in case the licensee does not initiate filings in time.
       The Policy also lays down methodology for tariff determination.
       The Policy lays down that the amount of cross-subsidy surcharge and the
       additional surcharge to be levied from consumers who are permitted open access
       should not be so onerous that it eliminates competition which is intended to be
       fostered in generation and supply of power directly to the consumers through
       open access.
       The Electricity Act provides that the Appropriate Commission may fix the trading



                                                                        10
       margin, if considered necessary. Though there is a need to promote trading in
       electricity for making the markets competitive, the Appropriate Commission
       should monitor the trading transactions continuously and ensure that the
       electricity traders do not indulge in profiteering in situation of power shortages.
       Fixing of trading margin should be resorted to for achieving this objective.
CHITALE & CHITALE PARTNERS


Foreign Direct Investment Policy


        In accordance with the Consolidated FDI Policy
        (effective from October 1, 2010), 100% FDI is
        allowed under the automatic route.

        For transmission of electric energy produced in
        hydro-electric, coal/lignite based thermal, oil
        based thermal and gas based thermal power
        plants. Also, the same is applicable for
        distribution of electric energy to households,
        industrial, commercial and other users.

        However FDI is not allowed when electricity is
        produced in atomic power plant / atomic energy
        since private investment in this sector/activity is
        prohibited and is reserved for public sector.




                                                                      11
CHITALE & CHITALE PARTNERS




       Thank You




CHITALE & CHITALE PARTNERS



                                        12
         C-83, Neeti Bagh,
        New Delhi-110 049
  Phone: +91-11-4164-2965/66/67
     Facsimile: 91-11-41642964
   e-mail: suchitra@chitales.com,                        12
      kasivaram@chitales.com

More Related Content

What's hot

Presentation on captive power plants
Presentation on captive power plantsPresentation on captive power plants
Presentation on captive power plantsJay Ranvir
 
Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003rapper44
 
Electricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendmentsElectricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendmentsAmitava Nag
 
Electricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardElectricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardIPPAI
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...Amitava Nag
 
Mo p electricity rules, 2005
Mo p electricity rules, 2005Mo p electricity rules, 2005
Mo p electricity rules, 2005Anil Kumar
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of ElectricityRupesh Bobbili
 
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...Emmanuel Aondowase Anchaver
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012rupeshsingh_1
 
report on completion of internship period
report on completion of internship periodreport on completion of internship period
report on completion of internship periodSwati Pawar
 
Solving Nigeria's Power Problems
Solving Nigeria's Power ProblemsSolving Nigeria's Power Problems
Solving Nigeria's Power ProblemsOlumuyiwa Abiodun
 
Electricity laws and regulations
Electricity laws and regulationsElectricity laws and regulations
Electricity laws and regulationsAkshat Goel
 
Mega-Mergers and Impacts on Local Government
Mega-Mergers and Impacts on Local GovernmentMega-Mergers and Impacts on Local Government
Mega-Mergers and Impacts on Local GovernmentBest Best and Krieger LLP
 

What's hot (20)

Presentation on captive power plants
Presentation on captive power plantsPresentation on captive power plants
Presentation on captive power plants
 
Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003
 
Open access ppt
Open access pptOpen access ppt
Open access ppt
 
Electricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendmentsElectricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendments
 
Electricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forwardElectricity Act 2003, Amendments and way forward
Electricity Act 2003, Amendments and way forward
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...
 
Mo p electricity rules, 2005
Mo p electricity rules, 2005Mo p electricity rules, 2005
Mo p electricity rules, 2005
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
Potential Effects of the Eligible Customer Declaration in the Nigerian Electr...
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012
 
Electricity Amendment Bill, 2020
Electricity Amendment Bill, 2020Electricity Amendment Bill, 2020
Electricity Amendment Bill, 2020
 
report on completion of internship period
report on completion of internship periodreport on completion of internship period
report on completion of internship period
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Ee09 801 eed ppt
Ee09 801 eed pptEe09 801 eed ppt
Ee09 801 eed ppt
 
Solving Nigeria's Power Problems
Solving Nigeria's Power ProblemsSolving Nigeria's Power Problems
Solving Nigeria's Power Problems
 
Electricity laws and regulations
Electricity laws and regulationsElectricity laws and regulations
Electricity laws and regulations
 
Captive gen
Captive genCaptive gen
Captive gen
 
Tariff policy
Tariff policyTariff policy
Tariff policy
 
Mega-Mergers and Impacts on Local Government
Mega-Mergers and Impacts on Local GovernmentMega-Mergers and Impacts on Local Government
Mega-Mergers and Impacts on Local Government
 
Cbte regulations2019
Cbte regulations2019Cbte regulations2019
Cbte regulations2019
 

Viewers also liked

a transformation of human life by information technology
a transformation of human life by information technology a transformation of human life by information technology
a transformation of human life by information technology Larastri Kumaralalita
 
Evaluation
EvaluationEvaluation
EvaluationLiam175
 
#MCN2014 - How to manage multiple twitter accounts
#MCN2014 - How to manage multiple twitter accounts#MCN2014 - How to manage multiple twitter accounts
#MCN2014 - How to manage multiple twitter accountsW. Ryan Dodge
 
York Region Arts Council, Arts Café: Building & Measuring Social Media Strategy
York Region Arts Council, Arts Café: Building & Measuring Social Media StrategyYork Region Arts Council, Arts Café: Building & Measuring Social Media Strategy
York Region Arts Council, Arts Café: Building & Measuring Social Media StrategyW. Ryan Dodge
 
MCN 2013 - After you've opened Pandora's Box
MCN 2013 - After you've opened Pandora's BoxMCN 2013 - After you've opened Pandora's Box
MCN 2013 - After you've opened Pandora's BoxW. Ryan Dodge
 
Why are we a Twitter 1st Museum?
Why are we a Twitter 1st Museum?Why are we a Twitter 1st Museum?
Why are we a Twitter 1st Museum?W. Ryan Dodge
 
MuseumNext 2015 - Wearable Tech Panel
MuseumNext 2015 - Wearable Tech PanelMuseumNext 2015 - Wearable Tech Panel
MuseumNext 2015 - Wearable Tech PanelW. Ryan Dodge
 
ICT innovation initiative in Indonesia
ICT innovation initiative in IndonesiaICT innovation initiative in Indonesia
ICT innovation initiative in IndonesiaLarastri Kumaralalita
 
Museum Computer Network - Getting the hang of Google+ Hangouts on Air
Museum Computer Network - Getting the hang of Google+ Hangouts on AirMuseum Computer Network - Getting the hang of Google+ Hangouts on Air
Museum Computer Network - Getting the hang of Google+ Hangouts on AirW. Ryan Dodge
 
MCN 2013 - Onsite social media activation at events
MCN 2013 - Onsite social media activation at eventsMCN 2013 - Onsite social media activation at events
MCN 2013 - Onsite social media activation at eventsW. Ryan Dodge
 
CMA Digital Strategy Workshop
CMA Digital Strategy WorkshopCMA Digital Strategy Workshop
CMA Digital Strategy WorkshopW. Ryan Dodge
 
Estructura de un sistema
Estructura de un sistemaEstructura de un sistema
Estructura de un sistemakema15vite
 
Autorretratos
AutorretratosAutorretratos
AutorretratosCEF16
 
Tropicália.ppt
Tropicália.pptTropicália.ppt
Tropicália.pptCEF16
 
Actividad 2.4 juventud de hoy
Actividad 2.4 juventud de hoyActividad 2.4 juventud de hoy
Actividad 2.4 juventud de hoyferdiazdos
 
Evaluacion final jorge luis sandoval escobar 4to. ccll
Evaluacion final jorge luis sandoval escobar 4to. ccllEvaluacion final jorge luis sandoval escobar 4to. ccll
Evaluacion final jorge luis sandoval escobar 4to. ccllJorge Luis Sandoval
 

Viewers also liked (17)

a transformation of human life by information technology
a transformation of human life by information technology a transformation of human life by information technology
a transformation of human life by information technology
 
Tópicos especiais 2015
Tópicos especiais 2015Tópicos especiais 2015
Tópicos especiais 2015
 
Evaluation
EvaluationEvaluation
Evaluation
 
#MCN2014 - How to manage multiple twitter accounts
#MCN2014 - How to manage multiple twitter accounts#MCN2014 - How to manage multiple twitter accounts
#MCN2014 - How to manage multiple twitter accounts
 
York Region Arts Council, Arts Café: Building & Measuring Social Media Strategy
York Region Arts Council, Arts Café: Building & Measuring Social Media StrategyYork Region Arts Council, Arts Café: Building & Measuring Social Media Strategy
York Region Arts Council, Arts Café: Building & Measuring Social Media Strategy
 
MCN 2013 - After you've opened Pandora's Box
MCN 2013 - After you've opened Pandora's BoxMCN 2013 - After you've opened Pandora's Box
MCN 2013 - After you've opened Pandora's Box
 
Why are we a Twitter 1st Museum?
Why are we a Twitter 1st Museum?Why are we a Twitter 1st Museum?
Why are we a Twitter 1st Museum?
 
MuseumNext 2015 - Wearable Tech Panel
MuseumNext 2015 - Wearable Tech PanelMuseumNext 2015 - Wearable Tech Panel
MuseumNext 2015 - Wearable Tech Panel
 
ICT innovation initiative in Indonesia
ICT innovation initiative in IndonesiaICT innovation initiative in Indonesia
ICT innovation initiative in Indonesia
 
Museum Computer Network - Getting the hang of Google+ Hangouts on Air
Museum Computer Network - Getting the hang of Google+ Hangouts on AirMuseum Computer Network - Getting the hang of Google+ Hangouts on Air
Museum Computer Network - Getting the hang of Google+ Hangouts on Air
 
MCN 2013 - Onsite social media activation at events
MCN 2013 - Onsite social media activation at eventsMCN 2013 - Onsite social media activation at events
MCN 2013 - Onsite social media activation at events
 
CMA Digital Strategy Workshop
CMA Digital Strategy WorkshopCMA Digital Strategy Workshop
CMA Digital Strategy Workshop
 
Estructura de un sistema
Estructura de un sistemaEstructura de un sistema
Estructura de un sistema
 
Autorretratos
AutorretratosAutorretratos
Autorretratos
 
Tropicália.ppt
Tropicália.pptTropicália.ppt
Tropicália.ppt
 
Actividad 2.4 juventud de hoy
Actividad 2.4 juventud de hoyActividad 2.4 juventud de hoy
Actividad 2.4 juventud de hoy
 
Evaluacion final jorge luis sandoval escobar 4to. ccll
Evaluacion final jorge luis sandoval escobar 4to. ccllEvaluacion final jorge luis sandoval escobar 4to. ccll
Evaluacion final jorge luis sandoval escobar 4to. ccll
 

Similar to K a-sivaram-chitale-policy-framework-for-transmission-distribution

Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxmsounak95
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorVijay Menghani
 
Nepr As Role By Rifai
Nepr As Role By RifaiNepr As Role By Rifai
Nepr As Role By RifaiIEEEP Karachi
 
Presentation on IEA 2003.pptx
Presentation on IEA 2003.pptxPresentation on IEA 2003.pptx
Presentation on IEA 2003.pptxMaheshThombare9
 
Tariffs for Electricity Generation, Transmission and Distribution
Tariffs for Electricity Generation, Transmission and DistributionTariffs for Electricity Generation, Transmission and Distribution
Tariffs for Electricity Generation, Transmission and DistributionDaily 10 Minutes
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNAIPPAI
 
Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxmsounak95
 
Comments on draft cerc sharing of transmission charges and losses regulations...
Comments on draft cerc sharing of transmission charges and losses regulations...Comments on draft cerc sharing of transmission charges and losses regulations...
Comments on draft cerc sharing of transmission charges and losses regulations...Amitava Nag
 
Indian power sector (chirag harwani)
Indian power sector (chirag harwani)Indian power sector (chirag harwani)
Indian power sector (chirag harwani)chiragharwani
 
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...electricitygovernance
 
Esci rec presentation 13 feb 2013
Esci rec presentation   13 feb 2013Esci rec presentation   13 feb 2013
Esci rec presentation 13 feb 2013Sandeep Melana
 
2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)Nicholas Cicale
 
11. Open Access- Intra State, Inter State.pdf
11.  Open Access- Intra State, Inter State.pdf11.  Open Access- Intra State, Inter State.pdf
11. Open Access- Intra State, Inter State.pdfKriteshKumar12
 
Power Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaPower Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaAmitava Nag
 
A Review of Restructured Power Development and Reform Programme in India
A Review of Restructured Power Development and Reform Programme in IndiaA Review of Restructured Power Development and Reform Programme in India
A Review of Restructured Power Development and Reform Programme in Indiaijiert bestjournal
 

Similar to K a-sivaram-chitale-policy-framework-for-transmission-distribution (20)

Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
Nepr As Role By Rifai
Nepr As Role By RifaiNepr As Role By Rifai
Nepr As Role By Rifai
 
Presentation on IEA 2003.pptx
Presentation on IEA 2003.pptxPresentation on IEA 2003.pptx
Presentation on IEA 2003.pptx
 
A present energy scenario
A present energy scenarioA present energy scenario
A present energy scenario
 
OPEN ACCESS REGULATION
OPEN ACCESS REGULATIONOPEN ACCESS REGULATION
OPEN ACCESS REGULATION
 
PHILIPPINE GRID CODE
PHILIPPINE GRID CODE PHILIPPINE GRID CODE
PHILIPPINE GRID CODE
 
Tariffs for Electricity Generation, Transmission and Distribution
Tariffs for Electricity Generation, Transmission and DistributionTariffs for Electricity Generation, Transmission and Distribution
Tariffs for Electricity Generation, Transmission and Distribution
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
 
Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptx
 
Comments on draft cerc sharing of transmission charges and losses regulations...
Comments on draft cerc sharing of transmission charges and losses regulations...Comments on draft cerc sharing of transmission charges and losses regulations...
Comments on draft cerc sharing of transmission charges and losses regulations...
 
Indian power sector (chirag harwani)
Indian power sector (chirag harwani)Indian power sector (chirag harwani)
Indian power sector (chirag harwani)
 
Restructuring and Privatization
Restructuring and PrivatizationRestructuring and Privatization
Restructuring and Privatization
 
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
Promotion of Clean Energy, Energy Efficiency and DSM by Maharasthra Electrici...
 
Esci rec presentation 13 feb 2013
Esci rec presentation   13 feb 2013Esci rec presentation   13 feb 2013
Esci rec presentation 13 feb 2013
 
TBCB_29032019.pptx
TBCB_29032019.pptxTBCB_29032019.pptx
TBCB_29032019.pptx
 
2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)
 
11. Open Access- Intra State, Inter State.pdf
11.  Open Access- Intra State, Inter State.pdf11.  Open Access- Intra State, Inter State.pdf
11. Open Access- Intra State, Inter State.pdf
 
Power Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaPower Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in India
 
A Review of Restructured Power Development and Reform Programme in India
A Review of Restructured Power Development and Reform Programme in IndiaA Review of Restructured Power Development and Reform Programme in India
A Review of Restructured Power Development and Reform Programme in India
 

K a-sivaram-chitale-policy-framework-for-transmission-distribution

  • 1. CHITALE & CHITALE PARTNERS ADVOCATES & LEGAL CONSULTANTS O N G C POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR 1
  • 2. CHITALE & CHITALE PARTNERS By K.A. Sivaram, Partner CHITALE & CHITALE PARTNERS ADVOCATES & LEGAL CONSULTANTS 2
  • 3. CHITALE & CHITALE PARTNERS Transmission and Distribution of Power in India This presentation covers an overview of the law and policies of the Government of India for transmission and distribution of power, comprised in : The Electricity Act, 2003 The National Tariff Policy, 2006 Guidelines on Tariff Determination by Competitive Bidding Foreign Direct Investment Policy 3
  • 4. CHITALE & CHITALE PARTNERS Policy Directives Applicable The Electricity Act, 2003 The Electricity Act, 2003 (“Electricity Act”) lays down the law relating to generation, transmission, distribution, trading and use of electricity. It provides for liberal and progressive framework for power sector development and facilitation of investment by creating competitive environment, and reforming the distribution segment of power industry. The Electricity Act has several enabling provisions, with a view to promote accelerated development of the power sector. The Electricity Act: Removes / reduces entry barriers Mandates open access in transmission Permits multiple licensees in distribution Constitutes Central and State Regulatory Commissions - to 4 develop market (including trading)
  • 5. CHITALE & CHITALE PARTNERS Policy Directives Applicable • Central government to prepare National Electricity Policy and Tariff Policy. (Section 3-6) • Generation is delicensed. Captive generation is freely permitted. Hydro projects need approval of State Government and central Electricity Authority (CEA) (Section 7-11) • The Central Electricity Regulatory Commission (“CERC”) / State Electricity Regulatory Commissions (“SERC”) are the licensing authorities for transmission, distribution and trading of electricity. The CERC / SERC have the power to grant, revoke, amend or suspend the licence granted. (Sections 12- 24) • The CERC / SERC may specify any general or specific conditions under the licence. (Section 16) • Central Transmission Utilities (CTUs) / State Transmission Utilities (STUs) as well as Government companies are deemed to be the transmission licensees. (Section 14). 5
  • 6. CHITALE & CHITALE PARTNERS The Electricity Act, 2003 on Transmission and Distribution Transmission There would be Transmission Utilities at the Centre and in the States to undertake planning and development of transmission system. (Sections 38, 39) Load despatch to be in the hands of a government company / organization. Flexibility regarding keeping Transmission Utility and Load Despatch Centre together or separating them. Load Despatch function is critical for grid stability and neutrality as compared to generation and distribution. (Sections 26, 27, 28, 31, 32) Transmission companies to be licensed by the Appropriate Commission after giving due consideration to the views of the Transmission Utility. (Section 15(5) (b)) The National Load Despacth Centre (NLDC) and Regional Load Dispatch Centres (RLDCs) / Transmission Utilities / Transmission Licensees do not trade in power. The RLDCs ensure integrated operation of the power system and optimum scheduling and despatch of electricity. (Sections 26, 27, 31, 32, 38, 39, 41) Non-discriminatory open access to the transmission system to be provided to the distribution licensees, generating companies. Provision for progressive reduction of surcharge and cross subsidies. (Sections 38-40) This would generate competitive pressures and lead to gradual cost reduction. 6
  • 7. CHITALE & CHITALE PARTNERS The Electricity Act, 2003 on Transmission and Distribution contd.. Distribution Distribution to be licensed by SERCs. Distribution Licensees are also free to take up generation. Also generating companies are free to take up distribution. This would facilitate private sector participation. (Sections 12-14) Retail tariff is to be determined by the CERC / SERC. (Section 62) Metering is mandatory. (Section 55) CERC / SERC have been given powers to suspend/revoke licence of the distribution/transmission companies. (Sections 19, 24) Open access in distribution to be allowed by SERC in phases. (Section 42) In addition to the wheeling charges, provision for surcharge if open access is allowed before elimination of cross subsidies, to take care of current level of cross subsidy. Licensee’s obligation to supply. 7 (Section 42). Provision relating to safety and standards of performance (Section 53-57)
  • 8. CHITALE & CHITALE PARTNERS Tariff determination by competitive bidding Guidelines for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensees (often referred to as the Procurers) have been framed by the Central Government and the same are to be adopted by CERC / SERC as provided by Section 63 of the Electricity Act. The specific objectives of these guidelines are as follows: Promote competitive procurement of electricity by distribution licensees Facilitate transparency and fairness in procurement processes; Facilitate reduction of information asymmetries for various bidders; Protect consumer interests by facilitating competitive conditions in procurement of electricity; Enhance standardization and reduce ambiguity and hence time for materialization of projects; Provide flexibility to suppliers on internal operations while ensuring certainty on availability of power and tariffs for buyers. 8
  • 9. CHITALE & CHITALE PARTNERS The National Tariff Policy, 2006 Transmission: Implementation of suitable transmission tariff framework for all inter- State transmission, including transmission of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission. National tariff framework implemented should be sensitive to distance, direction and related to quantum of power flow. This would be developed by CERC taking into consideration the advice of the Central Electricity Authority (CEA). Transmission charges in proportion to the respective utilization of the transmission system. Prior agreement with the beneficiaries would not be a pre-condition for network expansion. Transactions should be charged on the basis of average losses arrived at after appropriately considering the distance and directional sensitivity, as applicable to relevant voltage level, on the transmission system. Financial incentives and disincentives should be implemented for the 9 CTUs and the STUs around the key performance indicators (KPI) for these organizations.
  • 10. CHITALE & CHITALE PARTNERS The National Tariff Policy, 2006 contd… Distribution: Implementation of Multi-Year Tariff (MYT) framework to minimize risks for utilities and consumers, promote efficiency and appropriate reduction of system losses and attract investments. Introduction of mechanisms for sharing of excess profits and losses with the consumers as part of the overall MYT framework. Incumbent licensees should have the option of filing for separate revenue requirements and tariffs for an area where the State Commission has issued multiple distribution licences, pursuant to the provisions of Section 14 of the Act read with the Policy. CERC / SERCs should initiate tariff determination and regulatory scrutiny on a suo moto basis in case the licensee does not initiate filings in time. The Policy also lays down methodology for tariff determination. The Policy lays down that the amount of cross-subsidy surcharge and the additional surcharge to be levied from consumers who are permitted open access should not be so onerous that it eliminates competition which is intended to be fostered in generation and supply of power directly to the consumers through open access. The Electricity Act provides that the Appropriate Commission may fix the trading 10 margin, if considered necessary. Though there is a need to promote trading in electricity for making the markets competitive, the Appropriate Commission should monitor the trading transactions continuously and ensure that the electricity traders do not indulge in profiteering in situation of power shortages. Fixing of trading margin should be resorted to for achieving this objective.
  • 11. CHITALE & CHITALE PARTNERS Foreign Direct Investment Policy In accordance with the Consolidated FDI Policy (effective from October 1, 2010), 100% FDI is allowed under the automatic route. For transmission of electric energy produced in hydro-electric, coal/lignite based thermal, oil based thermal and gas based thermal power plants. Also, the same is applicable for distribution of electric energy to households, industrial, commercial and other users. However FDI is not allowed when electricity is produced in atomic power plant / atomic energy since private investment in this sector/activity is prohibited and is reserved for public sector. 11
  • 12. CHITALE & CHITALE PARTNERS Thank You CHITALE & CHITALE PARTNERS 12 C-83, Neeti Bagh, New Delhi-110 049 Phone: +91-11-4164-2965/66/67 Facsimile: 91-11-41642964 e-mail: suchitra@chitales.com, 12 kasivaram@chitales.com