-Dispatch for hour 10:00-11:00
-Maximum capacity
-1 round is free ramping up!
- Dispatch for each hour – 12 hours in
total
- First: monopoly
- Duopoly
- If time: common market
- Renewables have mandatory
dispatch
- Forecast with small error
- Ramping costs
- Maximal change
- Violation of maximum change
makes plant trip: very high cost
- Nuclear TC = 150
- Gas TC = 10
- Coal = 70

More Related Content

Viewers also liked

Ee w09.1 m_ organization of electricity markets_ liberalisation, competition...
Ee  w09.1 m_ organization of electricity markets_ liberalisation, competition...Ee  w09.1 m_ organization of electricity markets_ liberalisation, competition...
Ee w09.1 m_ organization of electricity markets_ liberalisation, competition...Silvester Van Koten
 
Ee w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
Ee  w04.2 w_ 2. electricity generation _ part 3 (generation technologies)Ee  w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
Ee w04.2 w_ 2. electricity generation _ part 3 (generation technologies)Silvester Van Koten
 
Ee w04.1 m_ 2. electricity generation _ part 2 (simulation)
Ee  w04.1 m_ 2. electricity generation _ part 2 (simulation)Ee  w04.1 m_ 2. electricity generation _ part 2 (simulation)
Ee w04.1 m_ 2. electricity generation _ part 2 (simulation)Silvester Van Koten
 
1. electricity markets_ Transmission
1. electricity markets_ Transmission1. electricity markets_ Transmission
1. electricity markets_ TransmissionSilvester Van Koten
 
Ee w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
Ee  w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...Ee  w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
Ee w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...Silvester Van Koten
 
Principles of transmission, applied to the eu transmission network 2011.12.06
Principles of transmission, applied to the eu transmission network 2011.12.06Principles of transmission, applied to the eu transmission network 2011.12.06
Principles of transmission, applied to the eu transmission network 2011.12.06Silvester Van Koten
 
Ee w08.1 m_ 3. renewables and the electricity industry (climate change)
Ee  w08.1 m_ 3. renewables and the electricity industry (climate change)Ee  w08.1 m_ 3. renewables and the electricity industry (climate change)
Ee w08.1 m_ 3. renewables and the electricity industry (climate change)Silvester Van Koten
 
True miracles and disasters (in Energy and Climate)
True miracles and disasters (in Energy and Climate)True miracles and disasters (in Energy and Climate)
True miracles and disasters (in Energy and Climate)Silvester Van Koten
 
Ee w03.1 m_ 1. the system (transmission) part 1
Ee  w03.1 m_ 1. the system (transmission) part 1Ee  w03.1 m_ 1. the system (transmission) part 1
Ee w03.1 m_ 1. the system (transmission) part 1Silvester Van Koten
 
5 ie454 l1_ sustainability & externalities
5 ie454  l1_ sustainability & externalities5 ie454  l1_ sustainability & externalities
5 ie454 l1_ sustainability & externalitiesSilvester Van Koten
 
The bully, the wimp and the tough man
The bully, the wimp and the tough manThe bully, the wimp and the tough man
The bully, the wimp and the tough manSilvester Van Koten
 
Wealthfront Equity Plan
Wealthfront Equity PlanWealthfront Equity Plan
Wealthfront Equity PlanWealthfront
 

Viewers also liked (14)

Ee w09.1 m_ organization of electricity markets_ liberalisation, competition...
Ee  w09.1 m_ organization of electricity markets_ liberalisation, competition...Ee  w09.1 m_ organization of electricity markets_ liberalisation, competition...
Ee w09.1 m_ organization of electricity markets_ liberalisation, competition...
 
Ee w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
Ee  w04.2 w_ 2. electricity generation _ part 3 (generation technologies)Ee  w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
Ee w04.2 w_ 2. electricity generation _ part 3 (generation technologies)
 
Ee w04.1 m_ 2. electricity generation _ part 2 (simulation)
Ee  w04.1 m_ 2. electricity generation _ part 2 (simulation)Ee  w04.1 m_ 2. electricity generation _ part 2 (simulation)
Ee w04.1 m_ 2. electricity generation _ part 2 (simulation)
 
1. electricity markets_ Transmission
1. electricity markets_ Transmission1. electricity markets_ Transmission
1. electricity markets_ Transmission
 
Ee w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
Ee  w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...Ee  w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
Ee w09.1 m_ ee_ 4. renewables and the electricity industry (climate change) ...
 
Make change easier!
Make change easier!Make change easier!
Make change easier!
 
Electricity Economics
Electricity EconomicsElectricity Economics
Electricity Economics
 
Principles of transmission, applied to the eu transmission network 2011.12.06
Principles of transmission, applied to the eu transmission network 2011.12.06Principles of transmission, applied to the eu transmission network 2011.12.06
Principles of transmission, applied to the eu transmission network 2011.12.06
 
Ee w08.1 m_ 3. renewables and the electricity industry (climate change)
Ee  w08.1 m_ 3. renewables and the electricity industry (climate change)Ee  w08.1 m_ 3. renewables and the electricity industry (climate change)
Ee w08.1 m_ 3. renewables and the electricity industry (climate change)
 
True miracles and disasters (in Energy and Climate)
True miracles and disasters (in Energy and Climate)True miracles and disasters (in Energy and Climate)
True miracles and disasters (in Energy and Climate)
 
Ee w03.1 m_ 1. the system (transmission) part 1
Ee  w03.1 m_ 1. the system (transmission) part 1Ee  w03.1 m_ 1. the system (transmission) part 1
Ee w03.1 m_ 1. the system (transmission) part 1
 
5 ie454 l1_ sustainability & externalities
5 ie454  l1_ sustainability & externalities5 ie454  l1_ sustainability & externalities
5 ie454 l1_ sustainability & externalities
 
The bully, the wimp and the tough man
The bully, the wimp and the tough manThe bully, the wimp and the tough man
The bully, the wimp and the tough man
 
Wealthfront Equity Plan
Wealthfront Equity PlanWealthfront Equity Plan
Wealthfront Equity Plan
 

Ee w08.1 m_ trading game

  • 1. -Dispatch for hour 10:00-11:00 -Maximum capacity -1 round is free ramping up!
  • 2. - Dispatch for each hour – 12 hours in total - First: monopoly - Duopoly - If time: common market - Renewables have mandatory dispatch - Forecast with small error - Ramping costs - Maximal change - Violation of maximum change makes plant trip: very high cost - Nuclear TC = 150 - Gas TC = 10 - Coal = 70