Session Title: Leading
Construction Industry to Lean-
Agile (LeAgile) Project
Management
Session Code: NA15AGL01
Suhail Iqbal, PE, PfMP, PgMP, PMP, PMI-PBA, PMI-SP, PMI-RMP, PMI-ACP, CAPM
SysComp International Private Limited, Pakistan.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Objective
To introduce a new concept of Lean-Agile
(LeAgile) Project Management for Construction
Industry.
Not only to highlight the positive need for adoption
of agility in construction but also an attempt to
marry it up with the lean construction.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Contents
• Introduction to Lean and Agile
• Lean and Lean Construction
• Possibility of Agility in Construction
• Can Lean and Agile be used in unison?
• Proposed application of Lean-Agile (LeAgile)
Project Management in Construction.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Questions Addressed
1. What is LeAgile? Does this term exist already or we just
invented it?
2. What is the biggest challenge in introducing agile in
construction industry?
3. How do we propose lean and agile approaches can be used in
construction industry?
4. Is there any existing methodology or approach which closely
resembles the idea of LeAgile in Construction?
5. Will the existence of Lean Construction facilitate the
acceptance of LeAgile Construction?
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Introduction to Lean and Agile
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘Lean’ and ‘Agile’
• ‘Lean’ and ‘Agile’ - two separate approaches
• Some identified relationship
• Parallel development paths
• Some common features and intrusions
• Sometimes mistaken to be the same.
• Both approaches - distinct and unique in purpose
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘Lean’ and ‘Agile’ – What to do?
• Find a way how to best utilize them together.
• Find the similarities and differences
• Try to have the best of the both worlds.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘Lean’ and ‘Agile’ – Construction
Industry
• Difficult to draw a parallel or clear distinction.
• Most organized and well managed industry
– still causes a lot of waste
– already realised the need to be lean,
• Concept of lean construction is already accepted.
• Clearer objectives and static scope
• Assumed “agile is not for construction”
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘Lean’ and ‘Agile’ - LeAgile
• If lean and agile can work together in software
and other industries, then why not construction?
• Construction projects may be few but command
larger budgets.
• Greatest benefits to reap if agile and lean can
work for them together.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘Lean’ and ‘Agile’ – Diverse Views
• Many researchers and diverse views
– Agile - as a way to do things within the overall
perspective of lean
– Some debate they cannot work together at all. We
will try to establish
• Reinforce the commonalities of both and
• Smoothen out the jagged edges
• Present a fit for construction industry.
• Marriage of convenience - LeAgile
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Definitions – Lean is Value
• “Lean is an approach that identifies the value
inherent in specific products, identifies the
value stream for each product, supports the
flow of value, lets the customer pull value from
the producer, and pursues perfection.”
(Karkukly, 2013)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Definitions – Lean
Doing more with less
• “Lean is doing more with less. Use the least
amount of effort, energy, equipment, time, facility
space, materials, and capital – while giving
customers exactly what they want.”
(Womack & Jones, 2008)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Definitions - Agile
• Agility is the ability to both create and respond
to change in order to profit in a turbulent
business environment.
• Agility is the ability to balance flexibility and
stability.
(Highsmith, 2002)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Definitions – LeAgile (Lacher View)
• Lacher and Bodamer (2009)
– Agility in Project Management.
– Agile in the perspective of lean.
• Lacher and Varisco (2008)
– Agile is the implementation of Lean Thinking.
– Lean-Agile is a combination of Lean Thinking and
Agile disciplines.
– Lean is the ‘What’ and Agile is the ‘How’.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Lean Organization – Exact and Precise
• Most economical usage of resources - Just-In-
Time (JIT).
• Manages and maintains flow of all its materials
and resources
• Eliminates all chances of waste.
• Reach a level of precision.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Lean Organization – Managing Projects
• Work and only the work required contributing
directly to the organizational objectives.
• All such effort leading to waste is not taken up.
• Highly proactive and experienced with
processes.
• Be able to forecast and plan very soundly.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Agile Projects
• Focus is not on accuracy or precision but on
speed and flexibility.
• How quickly team can react to the changing
requirements
• Be able to complete the job in less than expected
times.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Agile – How it works?
• Distributes whole work in smaller chunks.
• Concentrates on one piece at a time.
• Remaining work is open to suggestion and
change.
• Cost effective response to customer demand.
• Based on flexibility of design, production and
delivery.
• Projects with constantly changing scopes.
• Delivers the product faster.
• Reduces the development cycle considerably.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘Lean’ and ‘Agile’ – Foci & Scope
• Lean focuses on reducing waste,
• Agile focuses on being alert to opportunities
effecting changes in a fast manner.
• Agile is for projects with constantly changing
scope.
• Lean needs to be very well-planned right from
the outset, so scope must be as clear and static
as possible.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
History of Lean and Agile
Exhibit 1 – History of Lean and Agile
(Copyright Ennova 2011, Friday, 23 September 2011)
1960 - JIT by Taiichi Ohno 1982 - Lean as a formal approach
1990 - Lean in quality and supply-chain 1993 - Effective scheduling for construction
1998 - Repetitive scheduling method
/ LBMS
1999 – LeAgile for Supply Chain Management
1950 - Line of Balance (LoB), a visual method of construction planning
2000 - Last Planner System
2011 – Agile and Lean for Construction (ENNOVA)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘Lean’ and ‘Agile’ - Similarities & Differences
Lean Agile
Primarily a philosophy A conceptual framework
Focus on customer value Focus on customer satisfaction
Focus on eliminating waste Focus on simplicity
Integrated and collaborative
teams
Self-Organizing teams
Daily and weekly planning Close and daily cooperation
between all parties
Focus on improving task reliability
and reduction of overall duration
Focus on speed and adaption to
changing circumstances
Maximising profitability by
reducing unit cost
Profitable sales maximisation
Exhibit 2 – Comparison of Lean and Agile
(Copyright JACOBS)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Lean and Lean Construction
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Lean Principles Task Groupings
• Specify value
• Identify the value stream
• Flow
• Pull
• Perfection
Womack & Jones (2008)
• Value-added
• Enablers
• Waste
MacAdam (2009)
&
Moujib (2007)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Seven Types of Lean Waste
• Over Production Waste
• Waiting Waste
• Transportation or Conveyance Waste
• Over Processing Waste
• Inventory Waste
• Motion Waste
• Correction or Defects (Repair or Rework) Waste
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Lean A3 Process – What is?
Leads to rapid and effective alignment of
• sponsor,
• key stakeholders, and
• program team
around a
• revised vision,
• strategy,
• objectives and
• resource requirements.
Moreci (2014)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Lean A3 Process – LeAgile Possibility
• Lean A3 process is a possibility of Agile in Lean.
• In a case study it was successfully applied to fix
a troubled program.
• There seems to be an opportunity for
construction projects to use similar combination.
Moreci (2014)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Value & Value Stream
• Value is defined as a capability provided to a
customer at the right time at an appropriate price,
as defined in each case by the customer
(Womack & Jones, 1996, p. 353)
• Value Stream is defined as all the actions, both
value added and non-value added, currently
required to bring a product from raw material to
the arms of the customer or through the design
flow from concept to launch. (Morgan, 2002)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Value Flow
• Make the value flow
• Differentiate between the value-adding
activities, enablers and non-value adding
activities
• By eliminating non-value adding activities we
eliminate waste.
• Once value is created, it is not delivered to
customer until and unless customer needs it and
pulls it on JIT principle.
• The whole process is then perfected by
continuous improvement.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Possibility of Agility in Construction
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Agile Manifesto (2001)
Software Industry
• Individuals and interactions over processes and
tools
• Working software over comprehensive
documentation
• Customer collaboration over contract negotiation
• Responding to change over following a plan
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Agile Manifesto (2001)
• Created for software industry
• Adopted by several other industries
• Possibility for Construction industry
– Change ‘software’ to ‘product’ in 2nd point
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Agile Manifesto – How Can It Apply?
Construction Industry
Individuals and interactions over processes and
tools
• Processes and tools are valued more and status quo
maintained.
• Still Construction industry evolves, innovates and adapt.
• What if we consciously promote creativity
• Give initiatives to team and stakeholders to innovate.
• LBMS where a conventional schedule may not be workable for
all locations, plan separately for each location.
• Start prioritizing individuals and interactions over processes and
tools.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Agile Manifesto – How Can It Apply?
Construction Industry
Working product over comprehensive
documentation.
• Needs a workable product but perfection sought.
• Results in gold-plating and exceeding the basic specification.
• If not for customer’s changing requirement, we are causing
waste and are not even meeting the target of being lean.
• In LP system, the schedule is divided into five layers, only first
being mandatory, and are not detailed or restrictive.
• LPS has already taught us to reduce documentation and take to
the last planner level.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Agile Manifesto – How Can It Apply?
Construction Industry
Customer collaboration over contract negotiation.
• Contract is the binding force in any construction project.
• Engineers will never agree to give priority to customer
collaboration over the contract.
• Contract revisions and changes, anyways, still occur.
• Why can’t we remove this barrier and work as partners?
• In LP system, last planner improves his bottom-level plan due to
feedback of the customer.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Agile Manifesto – How Can It Apply?
Construction Industry
Responding to change over following a plan.
• We must be ready to respond to change as and when it is
needed.
• Make our construction phases smaller in size and iterative in
nature.
• In LP system, Weekly Plans are prepared and collaboration with
customer is promoted.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Can Lean and Agile be used in unison?
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘LPS’ and ‘LBMS’
Common Characteristics
• Both systems are lean by nature
• Both focus on decreasing waste and increasing
productivity.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘LPS’ and ‘Agile’
Similarities
• LPS uses approach similar to agile
• Last Planner is the person actually doing the
work or the lowest level supervisor.
• The planning is not centric and involvement of
this last planner is essential.
• This makes the planning a collaborative effort
and better commitments are achieved.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘LBMS’ and ‘Agile’
Similarities
• LBMS is more of a technical system in which
work flow lines are created for different locations
• Overall plan may be governed by traditional CPM
and PERT methods.
• LBMS makes the buffers of critical chain explicit
• LBMS forecasts future performance based on
statistical projections.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Last Planner System - Phases
Exhibit 3 – Scheduling Levels in Last Planner
(Copyright Ennova 2011, Friday, 23 September 2011)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘LPS Phases’ and ‘Agile’
Phases
• LPS interacts with the customer like Agile and
adjusts and improves the plan based on the
feedback.
• Master schedule is just to define the key
milestones.
• Phase Schedules are slightly more detailed
explicitly defining the handoffs from one phase to
the other.
• Only these two levels are mandatory.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘LPS Phases’ and ‘Agile’
Phases
• Look-Ahead Schedule is optional
• If you have time to forecast or if anything has to
be re-planned, we can use this level.
• Last two levels have similarity to Kanban as well
as Agile.
• Weekly Work Plan may be considered like an
agile iteration
• Progress Tracking may be the feedback loop with
the customer,
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
‘LPS Phases’ and ‘Kanban’
Phases
• Weekly Work plan is something we intend TO
DO.
• Progress Tracking deals with DOING and DONE
of Kanban.
• The missing link between Lean and Agile is
Kanban which has the capacity to bind them
together into LeAgile.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Last Planner in Construction
Exhibit 4 – Last Planner in Construction Management
(Copyright Ennova 2011, Friday, 23 September 2011)
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Proposed application of Lean-Agile
(LeAgile) Project Management in
Construction
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Any Existence of Proposed Application
• No proposed application exists so far
• Discussion to stir up minds to the possibility of
LeAgile
• Some research and white papers exist but none
for construction.
• Lean Construction does exist.
• LeAgility in Construction is not a far-fetched idea.
• LPS and LBMS already hold the key to LeAgility.
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Expected Benefits of LeAgility
• Opposition expected from construction industry
• Opening the floodgates of new possibilities
• Reduce waste in construction projects
• Make them much more efficient and profitable
• Can be fast and flexile
• Saving enormously on time and cost
• Satisfy our stakeholders and
• Be able to sell more
• Making even more profits
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
LeAgile Supply Chain Management
“PMI” is a registered trade and service mark of the Project Management Institute, Inc.
©2012 Permission is granted to PMI for PMI® Marketplace use only.
Leagile Construction System (LCS)
50
• Name: Suhail Iqbal
• Web: http://www.syscompk.com
• Email: suhail@syscompk.com
• Twitter: http://twitter.com/shewal786
• LinkedIn: http://pk.linkedin.com/in/suhail
• Facebook: http://www.facebook.com/suhail.iqbal.54
• Google+: http://plus.google.com/u/0/10456095253363094682
9/posts
Thank you!
To rate my session
Click on my session and
answer the survey questions

More Related Content

What's hot

ArchiMate 3.0: A New Standard for Architecture
ArchiMate 3.0: A New Standard for ArchitectureArchiMate 3.0: A New Standard for Architecture
ArchiMate 3.0: A New Standard for ArchitectureIver Band
 
3 things about EA that TOGAF doesnt say
3 things about EA that TOGAF doesnt say3 things about EA that TOGAF doesnt say
3 things about EA that TOGAF doesnt saycccamericas
 
[SEPG Europe 2012] A Multi-Model Case Study: High Maturity in Development + S...
[SEPG Europe 2012] A Multi-Model Case Study: High Maturity in Development + S...[SEPG Europe 2012] A Multi-Model Case Study: High Maturity in Development + S...
[SEPG Europe 2012] A Multi-Model Case Study: High Maturity in Development + S...Strongstep - Innovation in software quality
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction WebinarBMGI India
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Murali Naidu
 
Seeking value by Michael Ballé at the European Lean IT Summit 2012
Seeking value by Michael Ballé at the European Lean IT Summit 2012Seeking value by Michael Ballé at the European Lean IT Summit 2012
Seeking value by Michael Ballé at the European Lean IT Summit 2012Institut Lean France
 
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...Iver Band
 
Global-i Capabilities Presentation
Global-i Capabilities PresentationGlobal-i Capabilities Presentation
Global-i Capabilities Presentationdaveroy
 
How «Toyota Way» principles guided the architecture of Toyota’s product datah...
How «Toyota Way» principles guided the architecture of Toyota’s product datah...How «Toyota Way» principles guided the architecture of Toyota’s product datah...
How «Toyota Way» principles guided the architecture of Toyota’s product datah...Institut Lean France
 
"Implementing a lean approach in IT operations and infrastructure" by Philipp...
"Implementing a lean approach in IT operations and infrastructure" by Philipp..."Implementing a lean approach in IT operations and infrastructure" by Philipp...
"Implementing a lean approach in IT operations and infrastructure" by Philipp...Institut Lean France
 
Enterprise communication using archiMate
Enterprise communication using archiMateEnterprise communication using archiMate
Enterprise communication using archiMateLouw Labuschagne
 
Managing product development flow across an IT organization
Managing product development flow across an IT organizationManaging product development flow across an IT organization
Managing product development flow across an IT organizationInstitut Lean France
 
Lean New Product Introduction
Lean New Product IntroductionLean New Product Introduction
Lean New Product Introductionguest0631f5e
 
Business Agility is the new competitive advantage!
Business Agility is the new competitive advantage!Business Agility is the new competitive advantage!
Business Agility is the new competitive advantage!NUS-ISS
 
Global IT Service Management Tool Implementation – A PRINCE2® project managem...
Global IT Service Management Tool Implementation – A PRINCE2® project managem...Global IT Service Management Tool Implementation – A PRINCE2® project managem...
Global IT Service Management Tool Implementation – A PRINCE2® project managem...NUS-ISS
 
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013Institut Lean France
 
Enterprise Architecture with the Zachman Framework and the Archimate Language
Enterprise Architecture with the Zachman Framework and the Archimate LanguageEnterprise Architecture with the Zachman Framework and the Archimate Language
Enterprise Architecture with the Zachman Framework and the Archimate LanguageIver Band
 

What's hot (19)

ArchiMate 3.0: A New Standard for Architecture
ArchiMate 3.0: A New Standard for ArchitectureArchiMate 3.0: A New Standard for Architecture
ArchiMate 3.0: A New Standard for Architecture
 
An Introduction to Enterprise Architecture Visual Modeling with The ArchiMate...
An Introduction to Enterprise Architecture Visual Modeling with The ArchiMate...An Introduction to Enterprise Architecture Visual Modeling with The ArchiMate...
An Introduction to Enterprise Architecture Visual Modeling with The ArchiMate...
 
3 things about EA that TOGAF doesnt say
3 things about EA that TOGAF doesnt say3 things about EA that TOGAF doesnt say
3 things about EA that TOGAF doesnt say
 
[SEPG Europe 2012] A Multi-Model Case Study: High Maturity in Development + S...
[SEPG Europe 2012] A Multi-Model Case Study: High Maturity in Development + S...[SEPG Europe 2012] A Multi-Model Case Study: High Maturity in Development + S...
[SEPG Europe 2012] A Multi-Model Case Study: High Maturity in Development + S...
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction Webinar
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016
 
Why Innovation Labs are more relevant than ever
Why Innovation Labs are more relevant than ever Why Innovation Labs are more relevant than ever
Why Innovation Labs are more relevant than ever
 
Seeking value by Michael Ballé at the European Lean IT Summit 2012
Seeking value by Michael Ballé at the European Lean IT Summit 2012Seeking value by Michael Ballé at the European Lean IT Summit 2012
Seeking value by Michael Ballé at the European Lean IT Summit 2012
 
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
 
Global-i Capabilities Presentation
Global-i Capabilities PresentationGlobal-i Capabilities Presentation
Global-i Capabilities Presentation
 
How «Toyota Way» principles guided the architecture of Toyota’s product datah...
How «Toyota Way» principles guided the architecture of Toyota’s product datah...How «Toyota Way» principles guided the architecture of Toyota’s product datah...
How «Toyota Way» principles guided the architecture of Toyota’s product datah...
 
"Implementing a lean approach in IT operations and infrastructure" by Philipp...
"Implementing a lean approach in IT operations and infrastructure" by Philipp..."Implementing a lean approach in IT operations and infrastructure" by Philipp...
"Implementing a lean approach in IT operations and infrastructure" by Philipp...
 
Enterprise communication using archiMate
Enterprise communication using archiMateEnterprise communication using archiMate
Enterprise communication using archiMate
 
Managing product development flow across an IT organization
Managing product development flow across an IT organizationManaging product development flow across an IT organization
Managing product development flow across an IT organization
 
Lean New Product Introduction
Lean New Product IntroductionLean New Product Introduction
Lean New Product Introduction
 
Business Agility is the new competitive advantage!
Business Agility is the new competitive advantage!Business Agility is the new competitive advantage!
Business Agility is the new competitive advantage!
 
Global IT Service Management Tool Implementation – A PRINCE2® project managem...
Global IT Service Management Tool Implementation – A PRINCE2® project managem...Global IT Service Management Tool Implementation – A PRINCE2® project managem...
Global IT Service Management Tool Implementation – A PRINCE2® project managem...
 
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
 
Enterprise Architecture with the Zachman Framework and the Archimate Language
Enterprise Architecture with the Zachman Framework and the Archimate LanguageEnterprise Architecture with the Zachman Framework and the Archimate Language
Enterprise Architecture with the Zachman Framework and the Archimate Language
 

Similar to Na15 agl01 leading construction industry to lean-agile (leagile) project management

Project management and organizational change management
Project management and organizational change managementProject management and organizational change management
Project management and organizational change managementSusan Boyd
 
PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.Michal Raczka
 
An Introduction to Visual Management Systems
An Introduction to Visual Management SystemsAn Introduction to Visual Management Systems
An Introduction to Visual Management SystemsDerek Huether
 
PMI Global Congress 2012 Presentation
PMI Global Congress 2012 PresentationPMI Global Congress 2012 Presentation
PMI Global Congress 2012 PresentationZahidKhan007
 
Managing an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programManaging an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programGottfried Rudorfer
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations Felipe Moreira
 
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?Edunomica
 
PMI-ACP Lesson 01 Nugget 1 Introduction to Agile
PMI-ACP Lesson 01 Nugget 1 Introduction to AgilePMI-ACP Lesson 01 Nugget 1 Introduction to Agile
PMI-ACP Lesson 01 Nugget 1 Introduction to AgileThanh Nguyen
 
DevOps Thinking for the Line of Business
DevOps Thinking for the Line of BusinessDevOps Thinking for the Line of Business
DevOps Thinking for the Line of BusinessSanjeev Sharma
 
Agile certification integrated services faq it 2011 001 0 external version-
Agile certification integrated services faq it 2011 001 0  external version-Agile certification integrated services faq it 2011 001 0  external version-
Agile certification integrated services faq it 2011 001 0 external version-Ihsan Al-Hamoud
 
Business architecture & agile architecture
Business architecture & agile architectureBusiness architecture & agile architecture
Business architecture & agile architectureKrzysztof Tomkiewicz
 
The Product Manager Pathfinder - H. Del Castillo - AIPMM - ProductCamp Boston...
The Product Manager Pathfinder - H. Del Castillo - AIPMM - ProductCamp Boston...The Product Manager Pathfinder - H. Del Castillo - AIPMM - ProductCamp Boston...
The Product Manager Pathfinder - H. Del Castillo - AIPMM - ProductCamp Boston...Hector Del Castillo, CPM, CPMM
 
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012Hector Del Castillo, CPM, CPMM
 
8 reasons to adopt AgilePM
8 reasons to adopt AgilePM8 reasons to adopt AgilePM
8 reasons to adopt AgilePMMark Constable
 
Pmi lebanon conference workshop-initiating proftiable projects-saadi adra
Pmi lebanon conference workshop-initiating proftiable projects-saadi adraPmi lebanon conference workshop-initiating proftiable projects-saadi adra
Pmi lebanon conference workshop-initiating proftiable projects-saadi adraPMILebanonChapter
 
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...Climbing the Ladder Means Letting Go: Attributes that make you good at one le...
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...PM Solutions
 
Scaling agile Principles and Practices
Scaling agile Principles and PracticesScaling agile Principles and Practices
Scaling agile Principles and PracticesJosef Scherer
 

Similar to Na15 agl01 leading construction industry to lean-agile (leagile) project management (20)

PMI Global Congress 2012
PMI Global Congress 2012PMI Global Congress 2012
PMI Global Congress 2012
 
Project management and organizational change management
Project management and organizational change managementProject management and organizational change management
Project management and organizational change management
 
PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.PMI Global Congress North America 2015 - Change the system, not the people.
PMI Global Congress North America 2015 - Change the system, not the people.
 
An Introduction to Visual Management Systems
An Introduction to Visual Management SystemsAn Introduction to Visual Management Systems
An Introduction to Visual Management Systems
 
PMI Global Congress 2012 Presentation
PMI Global Congress 2012 PresentationPMI Global Congress 2012 Presentation
PMI Global Congress 2012 Presentation
 
SMAC and Transforming Innovation
SMAC and Transforming InnovationSMAC and Transforming Innovation
SMAC and Transforming Innovation
 
Managing an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT programManaging an ITIL SaaS implementation IT program
Managing an ITIL SaaS implementation IT program
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
 
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
Scott Ambler: Agile Enterprises are Hybrids, Is Your PMO Ready?
 
PMI-ACP Lesson 01 Nugget 1 Introduction to Agile
PMI-ACP Lesson 01 Nugget 1 Introduction to AgilePMI-ACP Lesson 01 Nugget 1 Introduction to Agile
PMI-ACP Lesson 01 Nugget 1 Introduction to Agile
 
DevOps Thinking for the Line of Business
DevOps Thinking for the Line of BusinessDevOps Thinking for the Line of Business
DevOps Thinking for the Line of Business
 
Agile certification integrated services faq it 2011 001 0 external version-
Agile certification integrated services faq it 2011 001 0  external version-Agile certification integrated services faq it 2011 001 0  external version-
Agile certification integrated services faq it 2011 001 0 external version-
 
Business architecture & agile architecture
Business architecture & agile architectureBusiness architecture & agile architecture
Business architecture & agile architecture
 
The Product Manager Pathfinder - H. Del Castillo - AIPMM - ProductCamp Boston...
The Product Manager Pathfinder - H. Del Castillo - AIPMM - ProductCamp Boston...The Product Manager Pathfinder - H. Del Castillo - AIPMM - ProductCamp Boston...
The Product Manager Pathfinder - H. Del Castillo - AIPMM - ProductCamp Boston...
 
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
The Product Manager Pathfinder - AIPMM Presentation - ProductCamp SV Spring 2012
 
8 reasons to adopt AgilePM
8 reasons to adopt AgilePM8 reasons to adopt AgilePM
8 reasons to adopt AgilePM
 
iCognitive SCOR Model & iCognitive Methodology
iCognitive SCOR Model & iCognitive MethodologyiCognitive SCOR Model & iCognitive Methodology
iCognitive SCOR Model & iCognitive Methodology
 
Pmi lebanon conference workshop-initiating proftiable projects-saadi adra
Pmi lebanon conference workshop-initiating proftiable projects-saadi adraPmi lebanon conference workshop-initiating proftiable projects-saadi adra
Pmi lebanon conference workshop-initiating proftiable projects-saadi adra
 
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...Climbing the Ladder Means Letting Go: Attributes that make you good at one le...
Climbing the Ladder Means Letting Go: Attributes that make you good at one le...
 
Scaling agile Principles and Practices
Scaling agile Principles and PracticesScaling agile Principles and Practices
Scaling agile Principles and Practices
 

Recently uploaded

Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 

Recently uploaded (18)

Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 

Na15 agl01 leading construction industry to lean-agile (leagile) project management

  • 1. Session Title: Leading Construction Industry to Lean- Agile (LeAgile) Project Management Session Code: NA15AGL01 Suhail Iqbal, PE, PfMP, PgMP, PMP, PMI-PBA, PMI-SP, PMI-RMP, PMI-ACP, CAPM SysComp International Private Limited, Pakistan.
  • 2. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Objective To introduce a new concept of Lean-Agile (LeAgile) Project Management for Construction Industry. Not only to highlight the positive need for adoption of agility in construction but also an attempt to marry it up with the lean construction.
  • 3. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Contents • Introduction to Lean and Agile • Lean and Lean Construction • Possibility of Agility in Construction • Can Lean and Agile be used in unison? • Proposed application of Lean-Agile (LeAgile) Project Management in Construction.
  • 4. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Questions Addressed 1. What is LeAgile? Does this term exist already or we just invented it? 2. What is the biggest challenge in introducing agile in construction industry? 3. How do we propose lean and agile approaches can be used in construction industry? 4. Is there any existing methodology or approach which closely resembles the idea of LeAgile in Construction? 5. Will the existence of Lean Construction facilitate the acceptance of LeAgile Construction?
  • 5. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Introduction to Lean and Agile
  • 6. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘Lean’ and ‘Agile’ • ‘Lean’ and ‘Agile’ - two separate approaches • Some identified relationship • Parallel development paths • Some common features and intrusions • Sometimes mistaken to be the same. • Both approaches - distinct and unique in purpose
  • 7. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘Lean’ and ‘Agile’ – What to do? • Find a way how to best utilize them together. • Find the similarities and differences • Try to have the best of the both worlds.
  • 8. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘Lean’ and ‘Agile’ – Construction Industry • Difficult to draw a parallel or clear distinction. • Most organized and well managed industry – still causes a lot of waste – already realised the need to be lean, • Concept of lean construction is already accepted. • Clearer objectives and static scope • Assumed “agile is not for construction”
  • 9. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘Lean’ and ‘Agile’ - LeAgile • If lean and agile can work together in software and other industries, then why not construction? • Construction projects may be few but command larger budgets. • Greatest benefits to reap if agile and lean can work for them together.
  • 10. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘Lean’ and ‘Agile’ – Diverse Views • Many researchers and diverse views – Agile - as a way to do things within the overall perspective of lean – Some debate they cannot work together at all. We will try to establish • Reinforce the commonalities of both and • Smoothen out the jagged edges • Present a fit for construction industry. • Marriage of convenience - LeAgile
  • 11. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Definitions – Lean is Value • “Lean is an approach that identifies the value inherent in specific products, identifies the value stream for each product, supports the flow of value, lets the customer pull value from the producer, and pursues perfection.” (Karkukly, 2013)
  • 12. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Definitions – Lean Doing more with less • “Lean is doing more with less. Use the least amount of effort, energy, equipment, time, facility space, materials, and capital – while giving customers exactly what they want.” (Womack & Jones, 2008)
  • 13. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Definitions - Agile • Agility is the ability to both create and respond to change in order to profit in a turbulent business environment. • Agility is the ability to balance flexibility and stability. (Highsmith, 2002)
  • 14. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Definitions – LeAgile (Lacher View) • Lacher and Bodamer (2009) – Agility in Project Management. – Agile in the perspective of lean. • Lacher and Varisco (2008) – Agile is the implementation of Lean Thinking. – Lean-Agile is a combination of Lean Thinking and Agile disciplines. – Lean is the ‘What’ and Agile is the ‘How’.
  • 15. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Lean Organization – Exact and Precise • Most economical usage of resources - Just-In- Time (JIT). • Manages and maintains flow of all its materials and resources • Eliminates all chances of waste. • Reach a level of precision.
  • 16. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Lean Organization – Managing Projects • Work and only the work required contributing directly to the organizational objectives. • All such effort leading to waste is not taken up. • Highly proactive and experienced with processes. • Be able to forecast and plan very soundly.
  • 17. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Agile Projects • Focus is not on accuracy or precision but on speed and flexibility. • How quickly team can react to the changing requirements • Be able to complete the job in less than expected times.
  • 18. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Agile – How it works? • Distributes whole work in smaller chunks. • Concentrates on one piece at a time. • Remaining work is open to suggestion and change. • Cost effective response to customer demand. • Based on flexibility of design, production and delivery. • Projects with constantly changing scopes. • Delivers the product faster. • Reduces the development cycle considerably.
  • 19. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘Lean’ and ‘Agile’ – Foci & Scope • Lean focuses on reducing waste, • Agile focuses on being alert to opportunities effecting changes in a fast manner. • Agile is for projects with constantly changing scope. • Lean needs to be very well-planned right from the outset, so scope must be as clear and static as possible.
  • 20. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. History of Lean and Agile Exhibit 1 – History of Lean and Agile (Copyright Ennova 2011, Friday, 23 September 2011) 1960 - JIT by Taiichi Ohno 1982 - Lean as a formal approach 1990 - Lean in quality and supply-chain 1993 - Effective scheduling for construction 1998 - Repetitive scheduling method / LBMS 1999 – LeAgile for Supply Chain Management 1950 - Line of Balance (LoB), a visual method of construction planning 2000 - Last Planner System 2011 – Agile and Lean for Construction (ENNOVA)
  • 21. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘Lean’ and ‘Agile’ - Similarities & Differences Lean Agile Primarily a philosophy A conceptual framework Focus on customer value Focus on customer satisfaction Focus on eliminating waste Focus on simplicity Integrated and collaborative teams Self-Organizing teams Daily and weekly planning Close and daily cooperation between all parties Focus on improving task reliability and reduction of overall duration Focus on speed and adaption to changing circumstances Maximising profitability by reducing unit cost Profitable sales maximisation Exhibit 2 – Comparison of Lean and Agile (Copyright JACOBS)
  • 22. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Lean and Lean Construction
  • 23. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Lean Principles Task Groupings • Specify value • Identify the value stream • Flow • Pull • Perfection Womack & Jones (2008) • Value-added • Enablers • Waste MacAdam (2009) & Moujib (2007)
  • 24. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Seven Types of Lean Waste • Over Production Waste • Waiting Waste • Transportation or Conveyance Waste • Over Processing Waste • Inventory Waste • Motion Waste • Correction or Defects (Repair or Rework) Waste
  • 25. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Lean A3 Process – What is? Leads to rapid and effective alignment of • sponsor, • key stakeholders, and • program team around a • revised vision, • strategy, • objectives and • resource requirements. Moreci (2014)
  • 26. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Lean A3 Process – LeAgile Possibility • Lean A3 process is a possibility of Agile in Lean. • In a case study it was successfully applied to fix a troubled program. • There seems to be an opportunity for construction projects to use similar combination. Moreci (2014)
  • 27. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Value & Value Stream • Value is defined as a capability provided to a customer at the right time at an appropriate price, as defined in each case by the customer (Womack & Jones, 1996, p. 353) • Value Stream is defined as all the actions, both value added and non-value added, currently required to bring a product from raw material to the arms of the customer or through the design flow from concept to launch. (Morgan, 2002)
  • 28. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Value Flow • Make the value flow • Differentiate between the value-adding activities, enablers and non-value adding activities • By eliminating non-value adding activities we eliminate waste. • Once value is created, it is not delivered to customer until and unless customer needs it and pulls it on JIT principle. • The whole process is then perfected by continuous improvement.
  • 29. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Possibility of Agility in Construction
  • 30. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Agile Manifesto (2001) Software Industry • Individuals and interactions over processes and tools • Working software over comprehensive documentation • Customer collaboration over contract negotiation • Responding to change over following a plan
  • 31. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Agile Manifesto (2001) • Created for software industry • Adopted by several other industries • Possibility for Construction industry – Change ‘software’ to ‘product’ in 2nd point
  • 32. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Agile Manifesto – How Can It Apply? Construction Industry Individuals and interactions over processes and tools • Processes and tools are valued more and status quo maintained. • Still Construction industry evolves, innovates and adapt. • What if we consciously promote creativity • Give initiatives to team and stakeholders to innovate. • LBMS where a conventional schedule may not be workable for all locations, plan separately for each location. • Start prioritizing individuals and interactions over processes and tools.
  • 33. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Agile Manifesto – How Can It Apply? Construction Industry Working product over comprehensive documentation. • Needs a workable product but perfection sought. • Results in gold-plating and exceeding the basic specification. • If not for customer’s changing requirement, we are causing waste and are not even meeting the target of being lean. • In LP system, the schedule is divided into five layers, only first being mandatory, and are not detailed or restrictive. • LPS has already taught us to reduce documentation and take to the last planner level.
  • 34. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Agile Manifesto – How Can It Apply? Construction Industry Customer collaboration over contract negotiation. • Contract is the binding force in any construction project. • Engineers will never agree to give priority to customer collaboration over the contract. • Contract revisions and changes, anyways, still occur. • Why can’t we remove this barrier and work as partners? • In LP system, last planner improves his bottom-level plan due to feedback of the customer.
  • 35. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Agile Manifesto – How Can It Apply? Construction Industry Responding to change over following a plan. • We must be ready to respond to change as and when it is needed. • Make our construction phases smaller in size and iterative in nature. • In LP system, Weekly Plans are prepared and collaboration with customer is promoted.
  • 36. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Can Lean and Agile be used in unison?
  • 37. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘LPS’ and ‘LBMS’ Common Characteristics • Both systems are lean by nature • Both focus on decreasing waste and increasing productivity.
  • 38. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘LPS’ and ‘Agile’ Similarities • LPS uses approach similar to agile • Last Planner is the person actually doing the work or the lowest level supervisor. • The planning is not centric and involvement of this last planner is essential. • This makes the planning a collaborative effort and better commitments are achieved.
  • 39. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘LBMS’ and ‘Agile’ Similarities • LBMS is more of a technical system in which work flow lines are created for different locations • Overall plan may be governed by traditional CPM and PERT methods. • LBMS makes the buffers of critical chain explicit • LBMS forecasts future performance based on statistical projections.
  • 40. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Last Planner System - Phases Exhibit 3 – Scheduling Levels in Last Planner (Copyright Ennova 2011, Friday, 23 September 2011)
  • 41. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘LPS Phases’ and ‘Agile’ Phases • LPS interacts with the customer like Agile and adjusts and improves the plan based on the feedback. • Master schedule is just to define the key milestones. • Phase Schedules are slightly more detailed explicitly defining the handoffs from one phase to the other. • Only these two levels are mandatory.
  • 42. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘LPS Phases’ and ‘Agile’ Phases • Look-Ahead Schedule is optional • If you have time to forecast or if anything has to be re-planned, we can use this level. • Last two levels have similarity to Kanban as well as Agile. • Weekly Work Plan may be considered like an agile iteration • Progress Tracking may be the feedback loop with the customer,
  • 43. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. ‘LPS Phases’ and ‘Kanban’ Phases • Weekly Work plan is something we intend TO DO. • Progress Tracking deals with DOING and DONE of Kanban. • The missing link between Lean and Agile is Kanban which has the capacity to bind them together into LeAgile.
  • 44. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Last Planner in Construction Exhibit 4 – Last Planner in Construction Management (Copyright Ennova 2011, Friday, 23 September 2011)
  • 45. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Proposed application of Lean-Agile (LeAgile) Project Management in Construction
  • 46. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Any Existence of Proposed Application • No proposed application exists so far • Discussion to stir up minds to the possibility of LeAgile • Some research and white papers exist but none for construction. • Lean Construction does exist. • LeAgility in Construction is not a far-fetched idea. • LPS and LBMS already hold the key to LeAgility.
  • 47. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Expected Benefits of LeAgility • Opposition expected from construction industry • Opening the floodgates of new possibilities • Reduce waste in construction projects • Make them much more efficient and profitable • Can be fast and flexile • Saving enormously on time and cost • Satisfy our stakeholders and • Be able to sell more • Making even more profits
  • 48. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. LeAgile Supply Chain Management
  • 49. “PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Leagile Construction System (LCS)
  • 50. 50 • Name: Suhail Iqbal • Web: http://www.syscompk.com • Email: suhail@syscompk.com • Twitter: http://twitter.com/shewal786 • LinkedIn: http://pk.linkedin.com/in/suhail • Facebook: http://www.facebook.com/suhail.iqbal.54 • Google+: http://plus.google.com/u/0/10456095253363094682 9/posts Thank you! To rate my session Click on my session and answer the survey questions