Your SlideShare is downloading. ×
Just in time
Just in time
Just in time
Just in time
Just in time
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Just in time

710

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
710
On Slideshare
0
From Embeds
0
Number of Embeds
7
Actions
Shares
0
Downloads
16
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. JUST IN TIME Er.Sartaj Singh Bajwa
  • 2. Just-in-Time Inventory Control
    • To achieve greater efficiency in the production process, organizations have tried to have less in-process inventory on hand
    • This is known as JIT inventory
    • The inventory arrives just in time to be used during the manufacturing process
    Er.Sartaj Singh Bajwa
  • 3. Pre-Requisites Of JIT
    • Main objective is to reduce WIP
    • To reduce lead time
    • Successful only in repetitive manufacturing companies in which material flow is continuous
    • Accurate sales forecast need to be there
    • Standardized products are manufactured to reduce time and cost
    • Reliable vendors who can deliver quality material on time
    Er.Sartaj Singh Bajwa
  • 4. Elements Of JIT
    • Eliminating the waste
    • Enforced problem solving and continuous improvement
    • TQM
    • Parallel processing
    • JIT Purchasing
    • Reduce inventory
    Er.Sartaj Singh Bajwa
  • 5. Points to be kept in mind before implementing JIT manufacturing
    • Creating uniform work load on all work centers
    • Reduce lot sizes
    • Reduce lead time
    • Preventive maintenance
    • Flexible workforce
    • Require supplier quality assurance
    • Small lots
    Er.Sartaj Singh Bajwa

×