TIME AND WORK
Work from Days
If A can do a piece of work in n days,
then A's 1 day's work = 1 .
n
• Days from Work:
• If A's 1 day's work = 1 , then A can finish the
n
work in n days.
Ratio
• If A is thrice as good a workman as B, then:
Ratio of work done by A and B = 3 : 1.
Ratio of times taken by A and B to finish a
work = 1 : 3.
Question
• Worker A takes 8 hours to do a job.
Worker B takes 10 hours to do the same
job. How long should it take both A and B,
working together but independently, to do
the same job?
• A. 4 2/9 days
• B. 4 4/9 days
• C. 4 5/9 days
• D. 4 7/9 days
• Answer: Option B
• Explanation:
• A’s 1 hour’s work = 1/8
• B’s 1 hour’s work = 1/10
• (A+B)’s 1 hour’s work = (1/8+1/10) = 9/40
• Both A and B will finish the work in 40/9= 4 4/9
days
Question
• Rohan can do a piece of work in 36 days
but with the help of Mohan he can
complete the work in 24 days. Find the no
of days in which Mohan alone can
complete the work?
• A 80 days
• B 84 days
• C 72 days
• D 74 days
C 72 days
• Total work done by Rohan and
Mohan=L.C.M of 36 & 24= 72 days
• Work rate of Rohan= 72/36=2
• Combine work rate(R+M)=72/24=3
• Work rate of Mohan=3-2=1
• No.of days required by Mohan=72/1
=72 days
Question
• A and B together can complete a piece of
work in 4 days. If A alone can complete
the same work in 12 days, in how many
days can B alone complete that work?
• A. 6 days
• B. 4 days
• C. 8 days
• D. 9 days
• Answer: Option A
• Explanation:
• (A+B)’s 1 day’s work = ¼
• A’s 1 day’s work = 1/12
• B’s 1 day’s work = ¼ - 1/12 = 1/6
• B alone can complete the work in 6 days.
Question
• A and B can do a work in 25 days and 20
days. Both together work for 5 days and
then A leaves off. How many days B take
to finish the remaining work?
• A 16 days
• B 11 days
• C 12 days
• D 14 days
B 11 days
• A can finish work in 25 days & B can finish
the work in 20 days
• Total work done=100(L.C.M of 25&20)
• A’s Contribution=100/25=4
• B’s Contribution =100/20=5
• First we need to calculate 5 days
work=9x5=45
• Remaining work=100-45=55
• B require No.of days=55/5=11 days
Question
• A is twice as good a workman as B and
together they finish a piece of work in 18
days. In how many days will A alone finish
the work?
• A. 27 days
• B. 24 days
• C. 28 days
• D. 29 days
• Answer: Option A
• Explanation:
• (A’s 1 day’s work) : (B’s 1 day’s work) = 2 : 1
• (A+B)’s 1 day’s work = 1/18
• Divide 1/18 in the ratio 2 : 1
• A’s 1 days work = 1/18 x 2/3 = 1/27
• So, A alone can finish the work in 27 days.
Question
• A can finish a work in 24 days. B in 9 days
and C in 12 days. B and C start the work
but are forced to leave after 3 days. The
remaining work was done by A in
• A 9 days
• B 10 days
• C 11 days
• D 12 days
B 10 days
• Total work done= L.C.M of 24,9,8=72
• Work rate of A =72/24=8
• Work rate of B= 72/9=8
• Work rate of C=72/12=6
• In 3 days B & C can complete
work=14x3=42 part
• Remaining work= 72-42=30(A’s Work)
• No of days required by A= 30/3= 10 days
Question
• A and B working separately can do a piece
of work in 9 and 12 days respectively. If
they work for a day alternately, A
beginning, in how many days, the work will
be completed?
• A. 10 ¼ days
• B. 10 ½ days
• C. 8 ¼ days
• D. 8 ½ days
• Answer: Option A
• Explanation:
• (A+B)’s 2 day’s work = 1/9+1/12 = 7/36
• Work done in 5 pairs of days = 5x7/36=35/36
• Remaining work = 1 – 35/36 = 1/36
• On 11th day, it is A’s turn.
• 1/9 work done by him in 1 day.
• 1/36 work done by him in (9x1/36) = ¼ days.
• Total time taken = 10 + ¼ = 10 ¼ days.
Question
• A and B can do a piece of work in 20 days
and 12 days resp. A alone started the
work and then after 4 days B joined him till
the completion of work. How long did the
work last?
• A 10 days
• B 12 days
• C 13 days
• D 11 days
A 10 days
• Total Work Done by A & B =L.C.M OF
20&12 =60
• Work done by A=60/20=3 part
• Work done by B =60/12=5 part
• In 4 days work done= 4x3=12
• Remaining work=60-12=48
• Combine work rate=A+B=3+5=8
• No.of days both A&B work=48/8=6
• Total no.of days work last=6+4=10 days
Question
• 45 men can complete a work in 16 days.
Six days after they started working, 30
more men joined them. How many days
will they now take to complete the
remaining work?
• A. 6 days
• B. 4 days
• C. 8 days
• D. 9 days
• Answer: Option A
• Explanation:
• 45 men can complete the work in 16 days.
• (45x16) men can complete the work in 1 day.
• 1 man’s 1 day’s work = 1/720
• 45 men’s 6 day’s work = 45/720 x 6 = 3/8
• Remaining work = 1 – 3/8 = 5/8
• 75 men’s 1 day’s work = 75/720 = 5/48.
• Now, 5/48 work is done by them in 1 day.
• So, 5/8 work is done by them in 48/5 x 5/8 = 6 days
QUESTION
• IF 5 MEN OR 19 WOMEN CAN DO A
PIECE OF WORK IN 19 DAYS. IN HOW
MANY DAYS CAN 3 MEN AND 6
WOMEN WILL DO THE SAME WORK?
• A 10
• B 15
• C 18
• D 20
B-15 DAYS
• 5M/9W Can do work in 19 days.3M & 6W
=d2(find)
• 5MX 19=(3M+6W)d2
• 1W=5/9M, 6W=5/9X6=10/3M
• 5MX19=(3M+6W)d2
• 5MX19=(3M+10/3M)d2
• 5X19=(3+10/3)d2
• d2= 15 days
Question
• Sachin can do a piece of work in 10 days
while Rahul can do it in 15 days. They
work together for 5 days and the rest work
is done by Virat in 2 days. If they get Rs
4500 for the whole work what is the share
of Virat?
• A 700 Rs
• B 780 Rs
• C 800 Rs
• D 750 Rs
D 750 Rs
• Sachin Work= 10 , Rahul Work=15
• Total work done by both= 30
• Work rate of Sachin= 30/10=3
• Work rate of Rahul=30/15=2
• One day Sachin & Rahul can complete
3+2=5 piece of work
• In 5 days work complete=5(sachin & rahul
work)x 5(no.of days)=25
• S & R: V=25:5=5:1
• Virat Share=4500/6x 1=750 Rs
THANK YOU

More Related Content

What's hot

GYANOME: NCERT 6th Mathematics Chapter 1 - Knowing our numbers
GYANOME: NCERT 6th Mathematics Chapter 1 - Knowing our numbers GYANOME: NCERT 6th Mathematics Chapter 1 - Knowing our numbers
GYANOME: NCERT 6th Mathematics Chapter 1 - Knowing our numbers Swapnil Deopurkar
 
Squares & square roots - class 8th
Squares & square roots -  class 8th Squares & square roots -  class 8th
Squares & square roots - class 8th sanarajar786
 
factorisation maths PPT by kanishk schdeva class 8th
factorisation maths PPT by kanishk schdeva class 8th factorisation maths PPT by kanishk schdeva class 8th
factorisation maths PPT by kanishk schdeva class 8th kanishk sachdeva
 
Class 5th(maths) how many squares ppt
Class 5th(maths) how many squares pptClass 5th(maths) how many squares ppt
Class 5th(maths) how many squares pptShankartwoa
 
Properties of rational number explained
Properties of rational number explainedProperties of rational number explained
Properties of rational number explainedShivani Sharma
 
Linear equtions with one variable
Linear equtions with one variableLinear equtions with one variable
Linear equtions with one variableANKIT SAHOO
 
Clocks(quantitative aptitude)
Clocks(quantitative aptitude)Clocks(quantitative aptitude)
Clocks(quantitative aptitude)Pawan Mishra
 
Chapter-1 Rational numbers Class 8th
Chapter-1 Rational numbers Class 8th Chapter-1 Rational numbers Class 8th
Chapter-1 Rational numbers Class 8th Abhishek Mishra
 
Vedic mathematics ALL
Vedic mathematics ALLVedic mathematics ALL
Vedic mathematics ALLRajesh Singh
 
Addition subtraction pd
Addition subtraction pdAddition subtraction pd
Addition subtraction pdmattonz
 
Knowing our numbers
Knowing our numbersKnowing our numbers
Knowing our numbersAvneet Singh
 
Linear Equation in one variable - Class 8 th Maths
Linear Equation in one variable - Class 8 th MathsLinear Equation in one variable - Class 8 th Maths
Linear Equation in one variable - Class 8 th MathsAmit Choube
 
Algebraic expressions
Algebraic expressionsAlgebraic expressions
Algebraic expressionsChristie Harp
 

What's hot (20)

GYANOME: NCERT 6th Mathematics Chapter 1 - Knowing our numbers
GYANOME: NCERT 6th Mathematics Chapter 1 - Knowing our numbers GYANOME: NCERT 6th Mathematics Chapter 1 - Knowing our numbers
GYANOME: NCERT 6th Mathematics Chapter 1 - Knowing our numbers
 
Squares & square roots - class 8th
Squares & square roots -  class 8th Squares & square roots -  class 8th
Squares & square roots - class 8th
 
Ratio & proportion
Ratio & proportionRatio & proportion
Ratio & proportion
 
averages
averagesaverages
averages
 
Factors and multiples
Factors and multiplesFactors and multiples
Factors and multiples
 
Factorization
Factorization Factorization
Factorization
 
Aptitude Problems on Trains
Aptitude Problems on TrainsAptitude Problems on Trains
Aptitude Problems on Trains
 
factorisation maths PPT by kanishk schdeva class 8th
factorisation maths PPT by kanishk schdeva class 8th factorisation maths PPT by kanishk schdeva class 8th
factorisation maths PPT by kanishk schdeva class 8th
 
Class 5th(maths) how many squares ppt
Class 5th(maths) how many squares pptClass 5th(maths) how many squares ppt
Class 5th(maths) how many squares ppt
 
Properties of rational number explained
Properties of rational number explainedProperties of rational number explained
Properties of rational number explained
 
Linear equtions with one variable
Linear equtions with one variableLinear equtions with one variable
Linear equtions with one variable
 
Clocks(quantitative aptitude)
Clocks(quantitative aptitude)Clocks(quantitative aptitude)
Clocks(quantitative aptitude)
 
Chapter-1 Rational numbers Class 8th
Chapter-1 Rational numbers Class 8th Chapter-1 Rational numbers Class 8th
Chapter-1 Rational numbers Class 8th
 
Vedic mathematics ALL
Vedic mathematics ALLVedic mathematics ALL
Vedic mathematics ALL
 
Addition subtraction pd
Addition subtraction pdAddition subtraction pd
Addition subtraction pd
 
Knowing our numbers
Knowing our numbersKnowing our numbers
Knowing our numbers
 
Linear Equation in one variable - Class 8 th Maths
Linear Equation in one variable - Class 8 th MathsLinear Equation in one variable - Class 8 th Maths
Linear Equation in one variable - Class 8 th Maths
 
Algebraic expressions
Algebraic expressionsAlgebraic expressions
Algebraic expressions
 
Enlargement
EnlargementEnlargement
Enlargement
 
Roman numbers
Roman numbersRoman numbers
Roman numbers
 

Similar to Time and work

3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxMRUNALSHETHIYA1
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.pptDeependra46
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptxgoud10
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...SOURAV DAS
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfRishabRoy10
 
Aptitude time and work
Aptitude time and workAptitude time and work
Aptitude time and workMaria Yesudass
 

Similar to Time and work (20)

TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
 
Doc
DocDoc
Doc
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
Qa01 time and work
Qa01 time and workQa01 time and work
Qa01 time and work
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdf
 
Time and work ea #2
Time and work  ea #2Time and work  ea #2
Time and work ea #2
 
Timeandwork
TimeandworkTimeandwork
Timeandwork
 
Time and work
Time and workTime and work
Time and work
 
3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
 
Time and work standard level
Time and work standard levelTime and work standard level
Time and work standard level
 
Time and work rbi
Time and work rbiTime and work rbi
Time and work rbi
 
Aptitude time and work
Aptitude time and workAptitude time and work
Aptitude time and work
 
TRW
TRWTRW
TRW
 

Recently uploaded

(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...gurkirankumar98700
 
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdfreStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdfKen Fuller
 
Call Girls Hosur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hosur Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hosur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hosur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Get To Know About "Lauren Prophet-Bryant''
Get To Know About "Lauren Prophet-Bryant''Get To Know About "Lauren Prophet-Bryant''
Get To Know About "Lauren Prophet-Bryant''Lauren Prophet-Bryant
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineBruce Bennett
 
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Delhi Call Girls Munirka 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Munirka 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Munirka 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Munirka 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen DatingDubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Datingkojalkojal131
 
Dark Dubai Call Girls O525547819 Skin Call Girls Dubai
Dark Dubai Call Girls O525547819 Skin Call Girls DubaiDark Dubai Call Girls O525547819 Skin Call Girls Dubai
Dark Dubai Call Girls O525547819 Skin Call Girls Dubaikojalkojal131
 
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...ranjana rawat
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girlsshivangimorya083
 
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service 🧳
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service  🧳CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service  🧳
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service 🧳anilsa9823
 
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Madekojalkojal131
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterHector Del Castillo, CPM, CPMM
 
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...poojakaurpk09
 
Top Rated Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated  Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Top Rated  Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
(Call Girls) in Lucknow Real photos of Female Escorts 👩🏼‍❤️‍💋‍👩🏻 8923113531 ➝...
 
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdfreStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
 
Call Girls Hosur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hosur Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hosur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hosur Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Get To Know About "Lauren Prophet-Bryant''
Get To Know About "Lauren Prophet-Bryant''Get To Know About "Lauren Prophet-Bryant''
Get To Know About "Lauren Prophet-Bryant''
 
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
 
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Patparganj 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Delhi 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Delhi Call Girls Munirka 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Munirka 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Munirka 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Munirka 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen DatingDubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
Dubai Call Girls Starlet O525547819 Call Girls Dubai Showen Dating
 
Dark Dubai Call Girls O525547819 Skin Call Girls Dubai
Dark Dubai Call Girls O525547819 Skin Call Girls DubaiDark Dubai Call Girls O525547819 Skin Call Girls Dubai
Dark Dubai Call Girls O525547819 Skin Call Girls Dubai
 
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls South Ex 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
 
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service 🧳
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service  🧳CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service  🧳
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service 🧳
 
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring Chapter
 
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
 
Top Rated Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated  Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Top Rated  Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
 

Time and work

  • 2. Work from Days If A can do a piece of work in n days, then A's 1 day's work = 1 . n • Days from Work: • If A's 1 day's work = 1 , then A can finish the n work in n days.
  • 3. Ratio • If A is thrice as good a workman as B, then: Ratio of work done by A and B = 3 : 1. Ratio of times taken by A and B to finish a work = 1 : 3.
  • 4. Question • Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same job. How long should it take both A and B, working together but independently, to do the same job? • A. 4 2/9 days • B. 4 4/9 days • C. 4 5/9 days • D. 4 7/9 days
  • 5. • Answer: Option B • Explanation: • A’s 1 hour’s work = 1/8 • B’s 1 hour’s work = 1/10 • (A+B)’s 1 hour’s work = (1/8+1/10) = 9/40 • Both A and B will finish the work in 40/9= 4 4/9 days
  • 6. Question • Rohan can do a piece of work in 36 days but with the help of Mohan he can complete the work in 24 days. Find the no of days in which Mohan alone can complete the work? • A 80 days • B 84 days • C 72 days • D 74 days
  • 7. C 72 days • Total work done by Rohan and Mohan=L.C.M of 36 & 24= 72 days • Work rate of Rohan= 72/36=2 • Combine work rate(R+M)=72/24=3 • Work rate of Mohan=3-2=1 • No.of days required by Mohan=72/1 =72 days
  • 8. Question • A and B together can complete a piece of work in 4 days. If A alone can complete the same work in 12 days, in how many days can B alone complete that work? • A. 6 days • B. 4 days • C. 8 days • D. 9 days
  • 9. • Answer: Option A • Explanation: • (A+B)’s 1 day’s work = ¼ • A’s 1 day’s work = 1/12 • B’s 1 day’s work = ¼ - 1/12 = 1/6 • B alone can complete the work in 6 days.
  • 10. Question • A and B can do a work in 25 days and 20 days. Both together work for 5 days and then A leaves off. How many days B take to finish the remaining work? • A 16 days • B 11 days • C 12 days • D 14 days
  • 11. B 11 days • A can finish work in 25 days & B can finish the work in 20 days • Total work done=100(L.C.M of 25&20) • A’s Contribution=100/25=4 • B’s Contribution =100/20=5 • First we need to calculate 5 days work=9x5=45 • Remaining work=100-45=55 • B require No.of days=55/5=11 days
  • 12. Question • A is twice as good a workman as B and together they finish a piece of work in 18 days. In how many days will A alone finish the work? • A. 27 days • B. 24 days • C. 28 days • D. 29 days
  • 13. • Answer: Option A • Explanation: • (A’s 1 day’s work) : (B’s 1 day’s work) = 2 : 1 • (A+B)’s 1 day’s work = 1/18 • Divide 1/18 in the ratio 2 : 1 • A’s 1 days work = 1/18 x 2/3 = 1/27 • So, A alone can finish the work in 27 days.
  • 14. Question • A can finish a work in 24 days. B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in • A 9 days • B 10 days • C 11 days • D 12 days
  • 15. B 10 days • Total work done= L.C.M of 24,9,8=72 • Work rate of A =72/24=8 • Work rate of B= 72/9=8 • Work rate of C=72/12=6 • In 3 days B & C can complete work=14x3=42 part • Remaining work= 72-42=30(A’s Work) • No of days required by A= 30/3= 10 days
  • 16. Question • A and B working separately can do a piece of work in 9 and 12 days respectively. If they work for a day alternately, A beginning, in how many days, the work will be completed? • A. 10 ¼ days • B. 10 ½ days • C. 8 ¼ days • D. 8 ½ days
  • 17. • Answer: Option A • Explanation: • (A+B)’s 2 day’s work = 1/9+1/12 = 7/36 • Work done in 5 pairs of days = 5x7/36=35/36 • Remaining work = 1 – 35/36 = 1/36 • On 11th day, it is A’s turn. • 1/9 work done by him in 1 day. • 1/36 work done by him in (9x1/36) = ¼ days. • Total time taken = 10 + ¼ = 10 ¼ days.
  • 18. Question • A and B can do a piece of work in 20 days and 12 days resp. A alone started the work and then after 4 days B joined him till the completion of work. How long did the work last? • A 10 days • B 12 days • C 13 days • D 11 days
  • 19. A 10 days • Total Work Done by A & B =L.C.M OF 20&12 =60 • Work done by A=60/20=3 part • Work done by B =60/12=5 part • In 4 days work done= 4x3=12 • Remaining work=60-12=48 • Combine work rate=A+B=3+5=8 • No.of days both A&B work=48/8=6 • Total no.of days work last=6+4=10 days
  • 20. Question • 45 men can complete a work in 16 days. Six days after they started working, 30 more men joined them. How many days will they now take to complete the remaining work? • A. 6 days • B. 4 days • C. 8 days • D. 9 days
  • 21. • Answer: Option A • Explanation: • 45 men can complete the work in 16 days. • (45x16) men can complete the work in 1 day. • 1 man’s 1 day’s work = 1/720 • 45 men’s 6 day’s work = 45/720 x 6 = 3/8 • Remaining work = 1 – 3/8 = 5/8 • 75 men’s 1 day’s work = 75/720 = 5/48. • Now, 5/48 work is done by them in 1 day. • So, 5/8 work is done by them in 48/5 x 5/8 = 6 days
  • 22. QUESTION • IF 5 MEN OR 19 WOMEN CAN DO A PIECE OF WORK IN 19 DAYS. IN HOW MANY DAYS CAN 3 MEN AND 6 WOMEN WILL DO THE SAME WORK? • A 10 • B 15 • C 18 • D 20
  • 23. B-15 DAYS • 5M/9W Can do work in 19 days.3M & 6W =d2(find) • 5MX 19=(3M+6W)d2 • 1W=5/9M, 6W=5/9X6=10/3M • 5MX19=(3M+6W)d2 • 5MX19=(3M+10/3M)d2 • 5X19=(3+10/3)d2 • d2= 15 days
  • 24. Question • Sachin can do a piece of work in 10 days while Rahul can do it in 15 days. They work together for 5 days and the rest work is done by Virat in 2 days. If they get Rs 4500 for the whole work what is the share of Virat? • A 700 Rs • B 780 Rs • C 800 Rs • D 750 Rs
  • 25. D 750 Rs • Sachin Work= 10 , Rahul Work=15 • Total work done by both= 30 • Work rate of Sachin= 30/10=3 • Work rate of Rahul=30/15=2 • One day Sachin & Rahul can complete 3+2=5 piece of work • In 5 days work complete=5(sachin & rahul work)x 5(no.of days)=25 • S & R: V=25:5=5:1 • Virat Share=4500/6x 1=750 Rs