Examples of Project Prioritization
Criteria


Ricardo Viana Vargas, MSc, IPMA-B, PMP
ricardo.vargas@macrosolutions.com.br

                  © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Ricardo Viana Vargas, MSc, IPMA-B, PMP
Ricardo Viana Vargas is a project, portfolio and risk management specialist. During the past 15 years, he has been responsible
for over 80 major projects in various countries in the areas of
petroleum, energy, infrastructure, telecommunications, information technology and finances, comprising an investment
portfolio of over 18 billion dollars.

He was the first Latin American volunteer to be elected Chairman of the Board for the Project Management Institute (PMI),
the largest project management organization in the world with close to 500,000 members and certified professionals in 175
countries.

Ricardo Vargas has written ten books on project management, published in Portuguese and English, which have sold over
200,000 copies throughout the world. In 2005 he received the PMI Distinguished Award for his contribution to the
development of project management and the PMI Professional Development Product of the Year award for the PMDome®
workshop, considered the best project management training solution in the world.

He is a project management professor for various MBA courses, and actively participates on editorial boards for specialized
journals in Brazil and the United States. Vargas is a recognized reviewer of the PMBOK Guide, the most important reference in
the world for project management, and also chaired the official translation of PMBOK into Portuguese.

He is a chemical engineer and holds a master’s degree in Industrial Engineering from UFMG (Federal University of Minas
Gerais). Ricardo Vargas also holds a Master Certificate in Project Management from George Washington University and is
certified both as a Project Management Professional (PMP) by PMI and as IPMA-B by the International Project Management
Association. He attended the Program on Negotiation for Executives at Harvard Law School.

Over an eleven year timeframe, which began in 1995, Ricardo, in conjunction with two partners, established one of the most
solid Brazilian businesses in the area of technology, project management and outsourcing, which had a staff of 4,000
collaborators and an annual income of 50 million dollars in 2006, when Ricardo Vargas sold his share of the company to
dedicate himself on a fulltime basis to the internationalization of his project management activities.

He is a member of the Association for Advancement of Cost Engineering (AACE), the American Management Association
(AMA), the International Project Management Association (IPMA), the Institute for Global Ethics and the Professional Risk
Management International Association (PRMIA).

                                                                                                                                 2
                      © BY MACROSOLUTIONS SA. TODOS OS DIREITOS RESERVADOS
Prioritization of Projects

  Prioritization of projects means
      selecting the efforts and
  projects to be executed by the
       corporation based on a
  complete and detailed analysis
    of all possible and available
               projects.

        © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Reasons to Prioritize Projects

   Effort concentration

   • There’s no time and resource availability for everything
   • Increases the focus
   • Synergy

   Costs

   • The right investment in the adequate product/service
   • Better financial management

   Strategy

   • Direct link to the strategic plan
   • Increase in strategic alignment (business objectives)



           © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Criteria Examples

                                               Execution
            Total cost
                                                 Time


          Complexity                         Profitability



                          Predictability


       © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Criteria Examples

           Exposure to                         Human
              risks                          qualification

              Human
             resource                           Cash flow
            availability


                               Logistics


       © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Criteria Examples

                                                 Synergia
             Executive
                                                  amont
              support
                                                 projects

             Scope                              Suppliers
            magnitude                          availability


                               Natural
                              resources


       © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Criteria Examples

                                           Buying market
        Buying market
                                             tendenciy

                                             Competition
                                                 and
         Exchange rate
                                             concurrence

                              Necessary
                               efforts


       © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Visit
   www.ricardo-vargas.com
        to access other
presentations, podcasts, videos
  and technical content about
   project , risk and portfolio
         management.

           © BY MACROSOLUTIONS SA

More Related Content

What's hot

PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.ppt
AhmadTawfigAlRadaide
 

What's hot (20)

Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.ppt
 
Step by step guide on project risk management
Step by step guide on project risk managementStep by step guide on project risk management
Step by step guide on project risk management
 
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksStrategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
 
Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | Edureka
 
Project Management
Project ManagementProject Management
Project Management
 
S&OP RFP 101: Evaluating Your ERP Vendor’s Solution vs. the Best-of-Breed
S&OP RFP 101: Evaluating Your ERP Vendor’s Solution vs. the Best-of-BreedS&OP RFP 101: Evaluating Your ERP Vendor’s Solution vs. the Best-of-Breed
S&OP RFP 101: Evaluating Your ERP Vendor’s Solution vs. the Best-of-Breed
 
Project management methodology pmo example (short sanitised)
Project management methodology pmo example (short sanitised)Project management methodology pmo example (short sanitised)
Project management methodology pmo example (short sanitised)
 
Having a PMO with agile flavor
Having a PMO with agile flavorHaving a PMO with agile flavor
Having a PMO with agile flavor
 
Presentation on Project Risk Management
Presentation on Project Risk ManagementPresentation on Project Risk Management
Presentation on Project Risk Management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project management structures
Project management structuresProject management structures
Project management structures
 
Project quality management (1)
Project quality management (1)Project quality management (1)
Project quality management (1)
 
Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)Introduction to Project Portfolio Management (PPM)
Introduction to Project Portfolio Management (PPM)
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5
 
Pmi rmp-2020 - v6
Pmi rmp-2020 - v6Pmi rmp-2020 - v6
Pmi rmp-2020 - v6
 
It portfolio management case study presentation
It portfolio management case study presentationIt portfolio management case study presentation
It portfolio management case study presentation
 
PRINCE2 Process Model
PRINCE2 Process ModelPRINCE2 Process Model
PRINCE2 Process Model
 
Project integration management
Project  integration managementProject  integration management
Project integration management
 

Viewers also liked

A Consulting Model - Strategic Digital marketing
A Consulting Model - Strategic Digital marketingA Consulting Model - Strategic Digital marketing
A Consulting Model - Strategic Digital marketing
Saurabh Kaushik
 
Déroulement d'une mission d'audit
Déroulement d'une mission d'auditDéroulement d'une mission d'audit
Déroulement d'une mission d'audit
BRAHIM MELLOUL
 

Viewers also liked (7)

Situational Process Training, Coaching, Consulting, Support Model
Situational Process Training, Coaching, Consulting, Support ModelSituational Process Training, Coaching, Consulting, Support Model
Situational Process Training, Coaching, Consulting, Support Model
 
A Consulting Model - Strategic Digital marketing
A Consulting Model - Strategic Digital marketingA Consulting Model - Strategic Digital marketing
A Consulting Model - Strategic Digital marketing
 
Strategic Digital Marketing Planning Framework
Strategic Digital Marketing Planning FrameworkStrategic Digital Marketing Planning Framework
Strategic Digital Marketing Planning Framework
 
Déroulement d'une mission d'audit
Déroulement d'une mission d'auditDéroulement d'une mission d'audit
Déroulement d'une mission d'audit
 
Conduite d'une mission d'audit interne
Conduite d'une mission d'audit interneConduite d'une mission d'audit interne
Conduite d'une mission d'audit interne
 
les Fondamentaux de l'audit interne
les Fondamentaux de l'audit interneles Fondamentaux de l'audit interne
les Fondamentaux de l'audit interne
 
The Business Model of Consulting is Dead
The Business Model of Consulting is DeadThe Business Model of Consulting is Dead
The Business Model of Consulting is Dead
 

Similar to Examples of Project Prioritization Criteria

Similar to Examples of Project Prioritization Criteria (20)

Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
Ethics in Contracts
Ethics in ContractsEthics in Contracts
Ethics in Contracts
 
Skills and Characteristics of a Project Manager
Skills and Characteristics of a Project ManagerSkills and Characteristics of a Project Manager
Skills and Characteristics of a Project Manager
 
Portfolio Management – Basic Concepts
Portfolio Management – Basic ConceptsPortfolio Management – Basic Concepts
Portfolio Management – Basic Concepts
 
Types of Cost in Projects
Types of Cost in ProjectsTypes of Cost in Projects
Types of Cost in Projects
 
The Subdivision of Project Scope
The Subdivision of Project ScopeThe Subdivision of Project Scope
The Subdivision of Project Scope
 
Why Communications Management?
Why Communications Management?Why Communications Management?
Why Communications Management?
 
Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)
 
3 Basic Tips for PMO Success
3  Basic Tips for  PMO Success3  Basic Tips for  PMO Success
3 Basic Tips for PMO Success
 
Pert Analysis in Projects
Pert Analysis in ProjectsPert Analysis in Projects
Pert Analysis in Projects
 
How will the PMO at the Future be like?
How will the PMO at the Future be like?How will the PMO at the Future be like?
How will the PMO at the Future be like?
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and Differences
 
Implementing a Project Office Management
Implementing a Project Office ManagementImplementing a Project Office Management
Implementing a Project Office Management
 
Project, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonProject, Program and Portfolio Comparison
Project, Program and Portfolio Comparison
 
LINKIES. NEWS II / 2009
LINKIES. NEWS II / 2009LINKIES. NEWS II / 2009
LINKIES. NEWS II / 2009
 
Basic Risk Identification Techniques
Basic Risk Identification TechniquesBasic Risk Identification Techniques
Basic Risk Identification Techniques
 
The Project's Network Diagram
The Project's Network DiagramThe Project's Network Diagram
The Project's Network Diagram
 
Quality Control Tools
Quality Control ToolsQuality Control Tools
Quality Control Tools
 
Leadership in Projects
Leadership in ProjectsLeadership in Projects
Leadership in Projects
 
The Development of Risk Responses
The Development of Risk ResponsesThe Development of Risk Responses
The Development of Risk Responses
 

More from Ricardo Viana Vargas

More from Ricardo Viana Vargas (20)

PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª EdiçãoFluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª Edição
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
 
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
 
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
 
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
 
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish RelationsScheduling Optimization with Line of Balance and Start-to-Finish Relations
Scheduling Optimization with Line of Balance and Start-to-Finish Relations
 
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS CaseSustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
 
Milestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos BásicosMilestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos Básicos
 
Milestones Trend Analysis (MTA) - Fundamentals
Milestones Trend Analysis (MTA) - FundamentalsMilestones Trend Analysis (MTA) - Fundamentals
Milestones Trend Analysis (MTA) - Fundamentals
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en FrançaisDiagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiéeDiagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in ItalianoDiagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
 
Ricardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_esRicardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_es
 
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificadaFlujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf DeutschAblaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
 
Lessons from 40 PPM Experts on Making the Transition from Project Management ...
Lessons from 40 PPM Experts on Making the Transition from Project Management ...Lessons from 40 PPM Experts on Making the Transition from Project Management ...
Lessons from 40 PPM Experts on Making the Transition from Project Management ...
 

Recently uploaded

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 

Recently uploaded (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Examples of Project Prioritization Criteria

  • 1. Examples of Project Prioritization Criteria Ricardo Viana Vargas, MSc, IPMA-B, PMP ricardo.vargas@macrosolutions.com.br © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 2. Ricardo Viana Vargas, MSc, IPMA-B, PMP Ricardo Viana Vargas is a project, portfolio and risk management specialist. During the past 15 years, he has been responsible for over 80 major projects in various countries in the areas of petroleum, energy, infrastructure, telecommunications, information technology and finances, comprising an investment portfolio of over 18 billion dollars. He was the first Latin American volunteer to be elected Chairman of the Board for the Project Management Institute (PMI), the largest project management organization in the world with close to 500,000 members and certified professionals in 175 countries. Ricardo Vargas has written ten books on project management, published in Portuguese and English, which have sold over 200,000 copies throughout the world. In 2005 he received the PMI Distinguished Award for his contribution to the development of project management and the PMI Professional Development Product of the Year award for the PMDome® workshop, considered the best project management training solution in the world. He is a project management professor for various MBA courses, and actively participates on editorial boards for specialized journals in Brazil and the United States. Vargas is a recognized reviewer of the PMBOK Guide, the most important reference in the world for project management, and also chaired the official translation of PMBOK into Portuguese. He is a chemical engineer and holds a master’s degree in Industrial Engineering from UFMG (Federal University of Minas Gerais). Ricardo Vargas also holds a Master Certificate in Project Management from George Washington University and is certified both as a Project Management Professional (PMP) by PMI and as IPMA-B by the International Project Management Association. He attended the Program on Negotiation for Executives at Harvard Law School. Over an eleven year timeframe, which began in 1995, Ricardo, in conjunction with two partners, established one of the most solid Brazilian businesses in the area of technology, project management and outsourcing, which had a staff of 4,000 collaborators and an annual income of 50 million dollars in 2006, when Ricardo Vargas sold his share of the company to dedicate himself on a fulltime basis to the internationalization of his project management activities. He is a member of the Association for Advancement of Cost Engineering (AACE), the American Management Association (AMA), the International Project Management Association (IPMA), the Institute for Global Ethics and the Professional Risk Management International Association (PRMIA). 2 © BY MACROSOLUTIONS SA. TODOS OS DIREITOS RESERVADOS
  • 3. Prioritization of Projects Prioritization of projects means selecting the efforts and projects to be executed by the corporation based on a complete and detailed analysis of all possible and available projects. © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 4. Reasons to Prioritize Projects Effort concentration • There’s no time and resource availability for everything • Increases the focus • Synergy Costs • The right investment in the adequate product/service • Better financial management Strategy • Direct link to the strategic plan • Increase in strategic alignment (business objectives) © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 5. Criteria Examples Execution Total cost Time Complexity Profitability Predictability © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 6. Criteria Examples Exposure to Human risks qualification Human resource Cash flow availability Logistics © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 7. Criteria Examples Synergia Executive amont support projects Scope Suppliers magnitude availability Natural resources © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 8. Criteria Examples Buying market Buying market tendenciy Competition and Exchange rate concurrence Necessary efforts © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 9. Visit www.ricardo-vargas.com to access other presentations, podcasts, videos and technical content about project , risk and portfolio management. © BY MACROSOLUTIONS SA