HEAT RATE-THE PULSE RATE OF POWER PLANT
                                                                      PDMV Prasad ,

                                                                      P Koteswara Rao

                      Truth is ever to be found in simplicity…Sir Isaac Newton.

The following are the facts which make the understanding on heat rate simple and make
engineers feel the practicality and ensure team preparation for achieving what is possible.

Operating Heat Rate depends on three significant factors: Firing Boiler range coal, maintaining
high Loading factor and Operating the plant at design parameters.

Heat rate in simplicity is ratio between heat input and energy output. There are four
definitions.

       1. Unit heat rate: - Heat input to boiler / gross electrical generation.

       2. Net unit heat rate: - Heat input to boiler/net electrical generation
          (Aux consumption must be subtracted from gross generation).

       3. Actual unit heat rate :-Total heat input to boiler/ actual net generation of the period
          ( Including fuel burnt in unit offline period)

       4. Design unit heat rate: - Design heat rate is the heat rate anticipated at the design
          parameters at specific load like MCR (maximum continuous rating), VWO (valve wide
          open operation) etc. with design efficiencies of equipments.

Now let us examine the order of significance in a power plant operation and performance.

       1. Legal compliance. 2. Life of the plant. 3. Output of the plant. 4. Efficiency.

Firstly legal and environmental compliance is very important for continuing operations.
Secondly life of plant equipment is very important for it to live design expected life and thus
capable of producing power for its life time. Thirdly output is very important for sustaining
operations and ensuring accomplishment of purpose of plant. Efficiency comes in fourth
position and it will decide how well a power unit is performing in converting coal energy to
electrical energy. This order is written for guidance. For example, if life of plant is going to
decrease by operations as derived from efficiency lessons then higher life is to be preferred. For
example, if a reheater coil outlet metal temperature is going high reheater spray is to be given
even if reheater temperature is going to reduce below design temperature. Subsequently
problem is to be studied why such phenomenon is taking place in the unit.
Design Heat rate broadly depends on Rankine cycle –parameters of the unit and Design of
equipments and capacities.

Heat rate deviation occurs due to some or more of the following Equipment degradation /
ageing, Parameter deviations, Process Deviations and change in input conditions like fuel, CW
water etc.

RANKINE CYCLE

In selection of the unit various options are available which are dependent on Rankine Cycle
with variety of sets of parameters.




The higher the temperature and pressure parameters of main steam and reheat steam the
higher the cycle efficiency. The fixed cost of unit on per MW basis increases as higher
parameters are chosen due to usage of costlier metals for withstanding higher parameters. So
once design parameters are selected the heat rate limit is getting decided.

Design of equipments and capacities make the selected rankine cycle reality .The turbine
efficiency and condenser design, the boiler efficiency of heat absorption and converting into
steam etc achieved by designers and manufacturers decide the performance of equipment. The
designs are supposed to achieve the Rankine Cycle parameters, output etc.
The lapses in design cannot be covered up by operations on the plant. In design the heat rate is
not a static figure and not a constant for the unit. It is dependent on at what load unit is
operating. Design heat rate value is for 100% load operation. Once designs are completed and
equipments are supplied there is very little that can be done after unit is commissioned.
Knowing about cycle parameters and design of equipments is very important to operate
equipment correctly for getting primarily longer life and secondarily design heat rate.

Loading factor decides the upper limit of heat rate once a unit is in operation. For a selected
design set of parameters a unit gives power at different heat rates at different loads.

                                                       Turbine      Boiler
                             MS       Steam                                      Unit Heat
Sl.No Operation           MW                           Heat         Efficienc
                             Pressure Flow                                       Rate
                                                       Rate         y
                                 MPa         TPH       kCal/kWh     %            kCal/kWh
1       VWO               643    16.67       2028      1933.25      87.8         2201.88
2       T MCR             600    16.67       1866      1943.06      87           2233.40
        LOAD
3       80%sliding        480    14.82       1465      1978.71      87.6         2258.80
        LOAD
4       60%sliding        360    11.11       1099      2052.87      86.8         2365.06
        LOAD
5       40%sliding        240    7.41        752       2190.19      86.6         2529.09




 At this time it is also to be noted that in our country general tariff conditions cover up to 6.5%
deterioration from design heat rate which happens at 60% loading factor. The loading factor is
so important that a super critical unit operating at 70%loading factor will be no better than a
subcritical unit operating at 100% loading factor. Once a power unit is established coal input to
plant, distributing capacities and customers indirectly decide loading factor. This has influence
on achievable heat rate.

COAL GCV IN BOILER FIRING RANGE

Here it is pertinent to mention that the quantity of coal to be fired for full load is a function of
coal quality i.e., GCV. But it does not mean that boiler can accommodate limitless quantity of
coal flow to meet load demand. Boiler is designed for a given range of coal between worst coal
and best coal. The boiler heat loading, heat absorption patterns, flue gas velocity patterns etc.
are designed in between the best and worst coal range. Generally the boiler and auxiliaries are
designed for BMCR condition with worst coal. The minimum amount of coal that can be fired is
corresponding to the best coal and the maximum amount is decided by the worst coal.
Therefore it is always advisable to fire coal within the range (in between worst and best coals).
However if the moisture content is more than design moisture, then by coal quantity,
equivalent to the difference in moisture can be increased. For example if a boiler is designed for
229 TPH with worst coal at 15% moisture and the actual moisture is say 18%, then without
exceeding the boiler heat loading we can feed 3% more coal, i.e. 235 TPH provided that margins
exist in mills, fans, ESP etc.

OPERATING AT NEAR DESIGN PARAMETERS

The last but most important controllable parameters come under “operations at design
parameters”. Please refer Annexure at the end for appreciating importance of operating at
design parameters. For deviation in parameters like main steam pressure, main steam
temperature, reheat steam temperature, condenser vacuum etc. heat rate deteriorates. So
design margins are essential for achieving condenser vacuum in all the life time. So condenser
on line tube cleaning system is very important. The other parameters are already limited due to
consideration of long life of equipment due to metallurgy considerations.

The O&M Employees of power plant shall ensure parameters at design value as far as possible
by appropriate operations suitable to the unit. For example Burner tilt, SH RH gas dampers
operation, RH spray, SH spray, soot blowing etc. The mapping of more than 50 parameters of
design and actual in operating unit and comparing them continuously will give guidance for
operations. For example, even the best boiler manufacturers can not design soot blower
frequency of operation or even the blowers to be operated. It depends strongly on soot
formation after combustion depending on coal. Whenever soot is formed these blowers need
to be operated at the required frequency. Spray indications are guiding factors. A power unit `s
continuous long run operations broadly indicate whether operations are matching to plant
equipment. Every parameter and every equipment has it`s own importance and has it`s own
influence on heat rate. So the mapping of parameters and continuous monitoring and
controlling bring out the best possible heat rate of the unit. The maintenance works like steam
leakage arresting, maintaining heaters availability, soot blower`s availability, high energy drains
passing elimination etc are of high importance in reaching the targeted performance of heat
rate. Some maintenance works are long term planning oriented like HIP turbine module
efficiency, LP turbine module efficiency etc which can be restored at best to design values in
long time overhauls.

AUXILIARY POWER CONSUMPTION AND NET HEATRATE

The net unit heat rate is an efficiency measure considering the auxiliary power consumption. In
a unit if auxiliary power consumption is reduced the output to customer increases for the same
fuel input to the unit. Since the tariff covers normative consumption any performance better
than normative consumption will result in substantial savings. The first level of achievement
shall be running only the minimum auxiliaries required to be running and only for required
time. More efficient drives will give less aux consumption which reflects in net heat rate, please
note that the features of design like cooling towers design IDCT/NDCT , motor driven boiler
feed pumps/turbo driven boiler feed pumps are factored in tariff systems. The cost of better
efficient technology is factored in fixed cost and in return on fixed cost recovery, the accepted
inefficient operating technology is factored in variable cost so that variable cost covers the cost
of design. Any performance better than design plus tolerance is benefit to plant and any
performance beyond tolerance limit has negative influence. Aux consumption is strong function
of loading factor. The design aux consumption is a percentage figure for unit operating at rated
load. The fans and pumps are designed for high performance at full load. In the unit operating
at partial load these equipments consume power disproportionately at higher levels, so aux
consumption will be higher. Reducing number of outages will not only reduce specific oil
consumption but also aux consumption considerably.

HEAT RATE CALCULATION SMETHODS

   1. Direct Heat Rate 2. Loss method 3. Parameter deviation method.

Direct heat rate method uses coal quantity consumed, GCV and units generated. Coal quantity
consumed is accurately measured by gravimetric feeders within the specified accuracy. GCV is
measured by sampling coal at bunker inlet or feeder inlet however the coal overtime in a day
also is not homogeneous due to various blending operations in coal yard.

Sometimes coal is directly sent into bunkers without storage in open stock yards and
sometimes it is stored for a longtime in stock yard where coal loses calorific value due to
smoldering fires. Water is sprayed to control smoldering. Rains in rainy season will increase
moisture in coal. Feeder’s weighment increases with moisture in coal due to rains. The moisture
in coal will take away part of useful heat while flowing through boiler. There will be losses due
to wind and transportation. So total coal weighment does not exactly match with the coal
received by power station. So CERC provides for 0.2% loss of coal quantity for pithead power
stations and 0.8% for non-pit head stations. GCV of sampled coal also will not match with GCV
of dispatched coal from mines due to deterioration in the coal yard. So heat rate based on as
received GCV will be higher in kCal/kWh when compared to as fired GCV based heat rate (So
CERC norms on as fired GCV). So it can be concluded that performance assessment of power
station reflected by heat rate of fired coal and not of receipt coal.

Gross heat rate by loss method is calculated from turbine heat rate and boiler efficiency found
by loss method. The loss method heat rate depends on measured GCV and on high accuracy PG
test instrumentation for evaluating turbine heat rate. The big advantage is that the calculation
is on unit basis i.e.: for 1 kg of coal. This eliminates any inaccuracies in flow measurements. Air
and gas quantities are determined on theoretical basis (Stochiometry) and from laboratory
analysis of the fuel. This is more accurate than the field flow meters. Since each loss is
separately calculated it is easy to identify problem areas. This method is used to demonstrate
equipment performance capabilities under defined conditions by equipment suppliers to
equipment customers. This is special testing method universally standardized for handing over
of the equipment to customers with assuring performance.

Controlling of parameters at design values will bring best performance out of the equipment
installed in the plant. So parameters deviations method is considered as the best method for
operating the plant efficiently. Equipment’s efficiency determination tests will help in
maintaining the equipment over long periods of time. Regarding calorific value of coal flowing
into the boiler at the instant ,a fair judgment can be given by operation department by
considering the coal flow (tons/hour)being fired for achieving the targeted load and they will
vary the coal flow to reach targeted load within boiler operation range. Similarly automation
also assesses calorific value and adjusts automatic response for calorific value changes from
time to time in a day. Offline calorific value measurements in labs for the coal received in
power station will help in coal customer confidence in the coal supplied by coal mines.

 So, conclusively it can be said that team work of O&M can try to get highest possible
performance of the unit by microscopic identification parameter wise and improving it to meet
the heat rate design value. Please note that coal based power technology had been in
continuous development all over the world in the last 125 years, hence operating better than
design heat rate is almost impossible.

The heat rate evaluation methods are direct heat rate method (with as fired GCV) best suited
for commercial purposes. However it has high uncertainty due to less accuracy in coal GCV
measurement (1%approx) and coal flow measurement (0.25% to 0.5%).The tariff systems take
as fired GCV measured value and estimate coal consumption for giving reimbursement of coal
purchase. This is based on heat rate norm of the unit which is presently 1.065 times design
value generally. GCV measurement accuracy is less however it has facility of cross checking at
different times by different agencies for confidence. Mass flow measurement by gravimetric
feeders is measurement with integration in time continuously. So cross checking is not
generally possible except flow rate calibration. Any water sprayed for coal fire quenching in the
yard can increase mass measurement in feeders. This will reduce coal combustion heat to boiler
also. So direct heat rate measured value can increase. This does not mean financial loss because
coal stock remains in the yard .While stock reconciliation mass balancing is generally done. For
mass loss norm is provided as 0.2%to 0.8%. Here it is important to note that there is no
compensation norm for coal quality degradation in the coal stock yard. It is by experience learnt
that coal coming from the mines which directly reaches the bunkers gives better heat rate than
the coal used after stocking two months in the yard. The thumb rule for coal firing is, the fresh
coal received must reach coal bunkers first for firing in the boiler.

The heat rate by parameters deviation method is the best method for controlling the process,
understanding the maintenance required for the equipment on day to day basis and to achieve
best performance from the plant. This method assumes machines efficiency at guaranteed
value.

CONCLUSION

This write up on heat rate is for engineers for beginning of a continuous journey and for
overview of heat rate. As sir Isaac Newton wrote one will find truth in simplicity, for better
contribution for heat rate from any engineer needs identification of self with any parameter
and continuously try to meet design performance. Many books and codes can be referred for in
depth understanding of every equipment performance. So in simplicity it can be concluded that
operational parameters maintaining will be responsibility of operation department through
automation and maintaining equipments efficiency is responsibility of maintenance
departments. Thus heat rate in simplicity a team performance of men and machines.



                                     ANNEXURE
   A. HEAT RATE DEVIATIONS WITH PARAMETER DEVIATIONS

       1) MAIN STEAM PRESSURE - 14.54 kCal/kWh for 1 Mpa

       2) MAIN STEAM TEMPERATURE - 0.38 kCal/kWh for 10C
3) REHEAT STEAM TEMPERATURE - 0.38 kCal/kWh for 10C

   4) VACUUM – Standard – 89.50 Kpa

          89 Kpa – 27.15 kCal/kWh

          88 Kpa – 46.54 kCal/kWh

          87 Kpa – 60.12 kCal/kWh

          86 kpa – 75.63 kCal/kWh

          85 kpa –89.21 kCal/kWh

          93.85 Kpa – Improvement of 34.91 kCal/kWh

   5) SUPERHEATER SPRAY - 0.28 kCal/kWh FOR 10 TONS

   6) REHEATER SPRAY - 0.18 kCal/kWh FOR 1 TON

   7) MAKE UP - 0.16 kCal/kWh FOR 1TPH

   8) CONDENSER SUBCOOLING – 0.89 kCal/kWh FOR 10C

   9) HPH HEATER TTD DEVIATION – 1.8 kCal/kWh FOR 10C

   10) HPH HEATER DCA DEVIATION – 0.25 kCal/kWh FOR 10C

   11) HP HEATER -1 OUT OF SERVICE – 23 kCal/kWh

   12) HP HEATER -2 OUT OF SERVICE - 17 kCal/kWh

   13) HP HEATER -3 OUT OF SERVICE - 17 kCal/kWh

   14) HP/IP TURBINE CYLINDER EFFICIENCY 4 kcal/ %

   15) EXCESS AIR IN BOILER – 7 kCal/kWh

   16) COAL MOISTURE         – 2-3 kCal/kWh

   17) BOILER EFFICIENCY     – 22 kCal/kWh

   18) UNBURNT CARBON / % - 10 – 15 kCal/kWh

B. COST OF HEAT RATE LOSS

   Heat Rate Increase by 1 kcal/kwh
Total Generation in a day at 90 % PLF = 14.4 x 0.9 x 10 6 kWh   = 12960000 kWh

So total extra coal consumed per day @ 4300 kCal/kg GCV         = 3.013 MT

So cost of this extra coal per day @ Rs 6000/MT                 = Rs 18081

Cost per month = 18081 x 30                                     = Rs 5.4 Lacs PM.
Total Generation in a day at 90 % PLF = 14.4 x 0.9 x 10 6 kWh   = 12960000 kWh

So total extra coal consumed per day @ 4300 kCal/kg GCV         = 3.013 MT

So cost of this extra coal per day @ Rs 6000/MT                 = Rs 18081

Cost per month = 18081 x 30                                     = Rs 5.4 Lacs PM.

More Related Content

What's hot

Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
Kongkiert Tankayura
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
Nitin Mahalle
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
SHIVAJI CHOUDHURY
 

What's hot (20)

steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
MILL performance.ppt
MILL performance.pptMILL performance.ppt
MILL performance.ppt
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesAir Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
turbine governing oil system
turbine governing oil systemturbine governing oil system
turbine governing oil system
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
200 mw FSSS
200 mw FSSS200 mw FSSS
200 mw FSSS
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergencies
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoring
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 

Similar to Heat rate of coal fired power plant

96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine
manojg1990
 
Steamturbine 140203094808-phpapp01
Steamturbine 140203094808-phpapp01Steamturbine 140203094808-phpapp01
Steamturbine 140203094808-phpapp01
arvind singh rathore
 
Paper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmizationPaper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmization
CANDHARE
 
Cogeneration: regional experiences
Cogeneration: regional experiencesCogeneration: regional experiences
Cogeneration: regional experiences
D.Pawan Kumar
 
Article_Power Plant_ISO 50001
Article_Power Plant_ISO 50001Article_Power Plant_ISO 50001
Article_Power Plant_ISO 50001
Avijit Choudhury
 
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
IJERA Editor
 

Similar to Heat rate of coal fired power plant (20)

Heat rate- pulse rate of power plant
Heat rate-  pulse rate of power plantHeat rate-  pulse rate of power plant
Heat rate- pulse rate of power plant
 
Analysis of Process Parameters to Improve Power Plant Efficiency
Analysis of Process Parameters to Improve Power Plant EfficiencyAnalysis of Process Parameters to Improve Power Plant Efficiency
Analysis of Process Parameters to Improve Power Plant Efficiency
 
96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine
 
1q05 performancemonitoring
1q05 performancemonitoring1q05 performancemonitoring
1q05 performancemonitoring
 
Training presentation
Training presentation Training presentation
Training presentation
 
IRJET- IC Engine Waste Heat Recovery Systems
IRJET- IC Engine Waste Heat Recovery SystemsIRJET- IC Engine Waste Heat Recovery Systems
IRJET- IC Engine Waste Heat Recovery Systems
 
Cooling system by Bhanupratap Niranjan IIT kanpur
Cooling system by Bhanupratap Niranjan IIT kanpurCooling system by Bhanupratap Niranjan IIT kanpur
Cooling system by Bhanupratap Niranjan IIT kanpur
 
Energy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantEnergy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plant
 
Steamturbine 140203094808-phpapp01
Steamturbine 140203094808-phpapp01Steamturbine 140203094808-phpapp01
Steamturbine 140203094808-phpapp01
 
IRJET - IC Engine Waste Heat Recovery Systems
IRJET -  	  IC Engine Waste Heat Recovery SystemsIRJET -  	  IC Engine Waste Heat Recovery Systems
IRJET - IC Engine Waste Heat Recovery Systems
 
Unit_No_6.pptx
Unit_No_6.pptxUnit_No_6.pptx
Unit_No_6.pptx
 
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
 
Energy audit & conservation studies for industries
Energy audit & conservation studies for industriesEnergy audit & conservation studies for industries
Energy audit & conservation studies for industries
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power Plant
 
Paper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmizationPaper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmization
 
Cogeneration: regional experiences
Cogeneration: regional experiencesCogeneration: regional experiences
Cogeneration: regional experiences
 
Article_Power Plant_ISO 50001
Article_Power Plant_ISO 50001Article_Power Plant_ISO 50001
Article_Power Plant_ISO 50001
 
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
 
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
 
IRJET- Design and Thermal Analysis of Steam Turbine Blade
IRJET- Design and Thermal Analysis of Steam Turbine BladeIRJET- Design and Thermal Analysis of Steam Turbine Blade
IRJET- Design and Thermal Analysis of Steam Turbine Blade
 

Recently uploaded

Recently uploaded (20)

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 

Heat rate of coal fired power plant

  • 1. HEAT RATE-THE PULSE RATE OF POWER PLANT PDMV Prasad , P Koteswara Rao Truth is ever to be found in simplicity…Sir Isaac Newton. The following are the facts which make the understanding on heat rate simple and make engineers feel the practicality and ensure team preparation for achieving what is possible. Operating Heat Rate depends on three significant factors: Firing Boiler range coal, maintaining high Loading factor and Operating the plant at design parameters. Heat rate in simplicity is ratio between heat input and energy output. There are four definitions. 1. Unit heat rate: - Heat input to boiler / gross electrical generation. 2. Net unit heat rate: - Heat input to boiler/net electrical generation (Aux consumption must be subtracted from gross generation). 3. Actual unit heat rate :-Total heat input to boiler/ actual net generation of the period ( Including fuel burnt in unit offline period) 4. Design unit heat rate: - Design heat rate is the heat rate anticipated at the design parameters at specific load like MCR (maximum continuous rating), VWO (valve wide open operation) etc. with design efficiencies of equipments. Now let us examine the order of significance in a power plant operation and performance. 1. Legal compliance. 2. Life of the plant. 3. Output of the plant. 4. Efficiency. Firstly legal and environmental compliance is very important for continuing operations. Secondly life of plant equipment is very important for it to live design expected life and thus capable of producing power for its life time. Thirdly output is very important for sustaining operations and ensuring accomplishment of purpose of plant. Efficiency comes in fourth position and it will decide how well a power unit is performing in converting coal energy to electrical energy. This order is written for guidance. For example, if life of plant is going to decrease by operations as derived from efficiency lessons then higher life is to be preferred. For example, if a reheater coil outlet metal temperature is going high reheater spray is to be given even if reheater temperature is going to reduce below design temperature. Subsequently problem is to be studied why such phenomenon is taking place in the unit.
  • 2. Design Heat rate broadly depends on Rankine cycle –parameters of the unit and Design of equipments and capacities. Heat rate deviation occurs due to some or more of the following Equipment degradation / ageing, Parameter deviations, Process Deviations and change in input conditions like fuel, CW water etc. RANKINE CYCLE In selection of the unit various options are available which are dependent on Rankine Cycle with variety of sets of parameters. The higher the temperature and pressure parameters of main steam and reheat steam the higher the cycle efficiency. The fixed cost of unit on per MW basis increases as higher parameters are chosen due to usage of costlier metals for withstanding higher parameters. So once design parameters are selected the heat rate limit is getting decided. Design of equipments and capacities make the selected rankine cycle reality .The turbine efficiency and condenser design, the boiler efficiency of heat absorption and converting into steam etc achieved by designers and manufacturers decide the performance of equipment. The designs are supposed to achieve the Rankine Cycle parameters, output etc.
  • 3. The lapses in design cannot be covered up by operations on the plant. In design the heat rate is not a static figure and not a constant for the unit. It is dependent on at what load unit is operating. Design heat rate value is for 100% load operation. Once designs are completed and equipments are supplied there is very little that can be done after unit is commissioned. Knowing about cycle parameters and design of equipments is very important to operate equipment correctly for getting primarily longer life and secondarily design heat rate. Loading factor decides the upper limit of heat rate once a unit is in operation. For a selected design set of parameters a unit gives power at different heat rates at different loads. Turbine Boiler MS Steam Unit Heat Sl.No Operation MW Heat Efficienc Pressure Flow Rate Rate y MPa TPH kCal/kWh % kCal/kWh 1 VWO 643 16.67 2028 1933.25 87.8 2201.88 2 T MCR 600 16.67 1866 1943.06 87 2233.40 LOAD 3 80%sliding 480 14.82 1465 1978.71 87.6 2258.80 LOAD 4 60%sliding 360 11.11 1099 2052.87 86.8 2365.06 LOAD 5 40%sliding 240 7.41 752 2190.19 86.6 2529.09 At this time it is also to be noted that in our country general tariff conditions cover up to 6.5% deterioration from design heat rate which happens at 60% loading factor. The loading factor is so important that a super critical unit operating at 70%loading factor will be no better than a
  • 4. subcritical unit operating at 100% loading factor. Once a power unit is established coal input to plant, distributing capacities and customers indirectly decide loading factor. This has influence on achievable heat rate. COAL GCV IN BOILER FIRING RANGE Here it is pertinent to mention that the quantity of coal to be fired for full load is a function of coal quality i.e., GCV. But it does not mean that boiler can accommodate limitless quantity of coal flow to meet load demand. Boiler is designed for a given range of coal between worst coal and best coal. The boiler heat loading, heat absorption patterns, flue gas velocity patterns etc. are designed in between the best and worst coal range. Generally the boiler and auxiliaries are designed for BMCR condition with worst coal. The minimum amount of coal that can be fired is corresponding to the best coal and the maximum amount is decided by the worst coal. Therefore it is always advisable to fire coal within the range (in between worst and best coals). However if the moisture content is more than design moisture, then by coal quantity, equivalent to the difference in moisture can be increased. For example if a boiler is designed for 229 TPH with worst coal at 15% moisture and the actual moisture is say 18%, then without exceeding the boiler heat loading we can feed 3% more coal, i.e. 235 TPH provided that margins exist in mills, fans, ESP etc. OPERATING AT NEAR DESIGN PARAMETERS The last but most important controllable parameters come under “operations at design parameters”. Please refer Annexure at the end for appreciating importance of operating at design parameters. For deviation in parameters like main steam pressure, main steam temperature, reheat steam temperature, condenser vacuum etc. heat rate deteriorates. So design margins are essential for achieving condenser vacuum in all the life time. So condenser on line tube cleaning system is very important. The other parameters are already limited due to consideration of long life of equipment due to metallurgy considerations. The O&M Employees of power plant shall ensure parameters at design value as far as possible by appropriate operations suitable to the unit. For example Burner tilt, SH RH gas dampers operation, RH spray, SH spray, soot blowing etc. The mapping of more than 50 parameters of design and actual in operating unit and comparing them continuously will give guidance for operations. For example, even the best boiler manufacturers can not design soot blower frequency of operation or even the blowers to be operated. It depends strongly on soot formation after combustion depending on coal. Whenever soot is formed these blowers need to be operated at the required frequency. Spray indications are guiding factors. A power unit `s continuous long run operations broadly indicate whether operations are matching to plant equipment. Every parameter and every equipment has it`s own importance and has it`s own
  • 5. influence on heat rate. So the mapping of parameters and continuous monitoring and controlling bring out the best possible heat rate of the unit. The maintenance works like steam leakage arresting, maintaining heaters availability, soot blower`s availability, high energy drains passing elimination etc are of high importance in reaching the targeted performance of heat rate. Some maintenance works are long term planning oriented like HIP turbine module efficiency, LP turbine module efficiency etc which can be restored at best to design values in long time overhauls. AUXILIARY POWER CONSUMPTION AND NET HEATRATE The net unit heat rate is an efficiency measure considering the auxiliary power consumption. In a unit if auxiliary power consumption is reduced the output to customer increases for the same fuel input to the unit. Since the tariff covers normative consumption any performance better than normative consumption will result in substantial savings. The first level of achievement shall be running only the minimum auxiliaries required to be running and only for required time. More efficient drives will give less aux consumption which reflects in net heat rate, please note that the features of design like cooling towers design IDCT/NDCT , motor driven boiler feed pumps/turbo driven boiler feed pumps are factored in tariff systems. The cost of better efficient technology is factored in fixed cost and in return on fixed cost recovery, the accepted inefficient operating technology is factored in variable cost so that variable cost covers the cost of design. Any performance better than design plus tolerance is benefit to plant and any performance beyond tolerance limit has negative influence. Aux consumption is strong function of loading factor. The design aux consumption is a percentage figure for unit operating at rated load. The fans and pumps are designed for high performance at full load. In the unit operating at partial load these equipments consume power disproportionately at higher levels, so aux consumption will be higher. Reducing number of outages will not only reduce specific oil consumption but also aux consumption considerably. HEAT RATE CALCULATION SMETHODS 1. Direct Heat Rate 2. Loss method 3. Parameter deviation method. Direct heat rate method uses coal quantity consumed, GCV and units generated. Coal quantity consumed is accurately measured by gravimetric feeders within the specified accuracy. GCV is measured by sampling coal at bunker inlet or feeder inlet however the coal overtime in a day also is not homogeneous due to various blending operations in coal yard. Sometimes coal is directly sent into bunkers without storage in open stock yards and sometimes it is stored for a longtime in stock yard where coal loses calorific value due to smoldering fires. Water is sprayed to control smoldering. Rains in rainy season will increase
  • 6. moisture in coal. Feeder’s weighment increases with moisture in coal due to rains. The moisture in coal will take away part of useful heat while flowing through boiler. There will be losses due to wind and transportation. So total coal weighment does not exactly match with the coal received by power station. So CERC provides for 0.2% loss of coal quantity for pithead power stations and 0.8% for non-pit head stations. GCV of sampled coal also will not match with GCV of dispatched coal from mines due to deterioration in the coal yard. So heat rate based on as received GCV will be higher in kCal/kWh when compared to as fired GCV based heat rate (So CERC norms on as fired GCV). So it can be concluded that performance assessment of power station reflected by heat rate of fired coal and not of receipt coal. Gross heat rate by loss method is calculated from turbine heat rate and boiler efficiency found by loss method. The loss method heat rate depends on measured GCV and on high accuracy PG test instrumentation for evaluating turbine heat rate. The big advantage is that the calculation is on unit basis i.e.: for 1 kg of coal. This eliminates any inaccuracies in flow measurements. Air and gas quantities are determined on theoretical basis (Stochiometry) and from laboratory analysis of the fuel. This is more accurate than the field flow meters. Since each loss is separately calculated it is easy to identify problem areas. This method is used to demonstrate equipment performance capabilities under defined conditions by equipment suppliers to equipment customers. This is special testing method universally standardized for handing over of the equipment to customers with assuring performance. Controlling of parameters at design values will bring best performance out of the equipment installed in the plant. So parameters deviations method is considered as the best method for operating the plant efficiently. Equipment’s efficiency determination tests will help in maintaining the equipment over long periods of time. Regarding calorific value of coal flowing into the boiler at the instant ,a fair judgment can be given by operation department by considering the coal flow (tons/hour)being fired for achieving the targeted load and they will vary the coal flow to reach targeted load within boiler operation range. Similarly automation also assesses calorific value and adjusts automatic response for calorific value changes from time to time in a day. Offline calorific value measurements in labs for the coal received in power station will help in coal customer confidence in the coal supplied by coal mines. So, conclusively it can be said that team work of O&M can try to get highest possible performance of the unit by microscopic identification parameter wise and improving it to meet the heat rate design value. Please note that coal based power technology had been in continuous development all over the world in the last 125 years, hence operating better than design heat rate is almost impossible. The heat rate evaluation methods are direct heat rate method (with as fired GCV) best suited for commercial purposes. However it has high uncertainty due to less accuracy in coal GCV
  • 7. measurement (1%approx) and coal flow measurement (0.25% to 0.5%).The tariff systems take as fired GCV measured value and estimate coal consumption for giving reimbursement of coal purchase. This is based on heat rate norm of the unit which is presently 1.065 times design value generally. GCV measurement accuracy is less however it has facility of cross checking at different times by different agencies for confidence. Mass flow measurement by gravimetric feeders is measurement with integration in time continuously. So cross checking is not generally possible except flow rate calibration. Any water sprayed for coal fire quenching in the yard can increase mass measurement in feeders. This will reduce coal combustion heat to boiler also. So direct heat rate measured value can increase. This does not mean financial loss because coal stock remains in the yard .While stock reconciliation mass balancing is generally done. For mass loss norm is provided as 0.2%to 0.8%. Here it is important to note that there is no compensation norm for coal quality degradation in the coal stock yard. It is by experience learnt that coal coming from the mines which directly reaches the bunkers gives better heat rate than the coal used after stocking two months in the yard. The thumb rule for coal firing is, the fresh coal received must reach coal bunkers first for firing in the boiler. The heat rate by parameters deviation method is the best method for controlling the process, understanding the maintenance required for the equipment on day to day basis and to achieve best performance from the plant. This method assumes machines efficiency at guaranteed value. CONCLUSION This write up on heat rate is for engineers for beginning of a continuous journey and for overview of heat rate. As sir Isaac Newton wrote one will find truth in simplicity, for better contribution for heat rate from any engineer needs identification of self with any parameter and continuously try to meet design performance. Many books and codes can be referred for in depth understanding of every equipment performance. So in simplicity it can be concluded that operational parameters maintaining will be responsibility of operation department through automation and maintaining equipments efficiency is responsibility of maintenance departments. Thus heat rate in simplicity a team performance of men and machines. ANNEXURE A. HEAT RATE DEVIATIONS WITH PARAMETER DEVIATIONS 1) MAIN STEAM PRESSURE - 14.54 kCal/kWh for 1 Mpa 2) MAIN STEAM TEMPERATURE - 0.38 kCal/kWh for 10C
  • 8. 3) REHEAT STEAM TEMPERATURE - 0.38 kCal/kWh for 10C 4) VACUUM – Standard – 89.50 Kpa 89 Kpa – 27.15 kCal/kWh 88 Kpa – 46.54 kCal/kWh 87 Kpa – 60.12 kCal/kWh 86 kpa – 75.63 kCal/kWh 85 kpa –89.21 kCal/kWh 93.85 Kpa – Improvement of 34.91 kCal/kWh 5) SUPERHEATER SPRAY - 0.28 kCal/kWh FOR 10 TONS 6) REHEATER SPRAY - 0.18 kCal/kWh FOR 1 TON 7) MAKE UP - 0.16 kCal/kWh FOR 1TPH 8) CONDENSER SUBCOOLING – 0.89 kCal/kWh FOR 10C 9) HPH HEATER TTD DEVIATION – 1.8 kCal/kWh FOR 10C 10) HPH HEATER DCA DEVIATION – 0.25 kCal/kWh FOR 10C 11) HP HEATER -1 OUT OF SERVICE – 23 kCal/kWh 12) HP HEATER -2 OUT OF SERVICE - 17 kCal/kWh 13) HP HEATER -3 OUT OF SERVICE - 17 kCal/kWh 14) HP/IP TURBINE CYLINDER EFFICIENCY 4 kcal/ % 15) EXCESS AIR IN BOILER – 7 kCal/kWh 16) COAL MOISTURE – 2-3 kCal/kWh 17) BOILER EFFICIENCY – 22 kCal/kWh 18) UNBURNT CARBON / % - 10 – 15 kCal/kWh B. COST OF HEAT RATE LOSS Heat Rate Increase by 1 kcal/kwh
  • 9. Total Generation in a day at 90 % PLF = 14.4 x 0.9 x 10 6 kWh = 12960000 kWh So total extra coal consumed per day @ 4300 kCal/kg GCV = 3.013 MT So cost of this extra coal per day @ Rs 6000/MT = Rs 18081 Cost per month = 18081 x 30 = Rs 5.4 Lacs PM.
  • 10. Total Generation in a day at 90 % PLF = 14.4 x 0.9 x 10 6 kWh = 12960000 kWh So total extra coal consumed per day @ 4300 kCal/kg GCV = 3.013 MT So cost of this extra coal per day @ Rs 6000/MT = Rs 18081 Cost per month = 18081 x 30 = Rs 5.4 Lacs PM.