A GOVERNMENT OF WEST BENGAL ENTERPRISE 
A PROJECT ON 
LILUAH 132/33/25 KV SUBSTATION 
PRESENTED BY:- PRABHAT KUMAR (EE/11/012) 
ARIJIT DAS (EE/11/015) 
DIPTESH KOLEY (EE/11/033)
-:ACKNOWLEDGEMENT:- 
We had a great pleasure in expressing our sincere gratitude to 
the TPO of our college and Mr. D.Bose, GM(HR & 
A),W.B.S.E.T.C.L for allowing summer training at Liluah 
132/33/25 KV substation. 
We are greatly thankful to Mr. Rakesh Kundu, assistant engineer 
of Liluah transmission(O & M) substation for his immense help 
and suitable guidance during training period. 
We are also thankful to all other staffs of substation for their day 
to day help and assistance.
SINGLE LINE DIAGRAM OF LILUAH 
132/33/25 KV
ELECTRICAL BUSBAR 
ELECTRICAL BUSBAR 
 It is the collector of electrical energy at one location at 
constant voltage 
 Types:- 1. Rigid type: - made up of aluminium alloy tubes of 50 
to 250 mm diameter and supported on post insulator with 
clamps and connector. 
2. Flexible type:- made up of A.C.S.R. conductor and 
supported at both ends by strain insulators clamps and 
conductors. 
 Acts as common point when a number of generator or feeder 
operating at same voltage is to be connected together. 
TYPES OF ARRANGEMENT 
1. Single busbar system 
2. Duplicate busbar system 
3. Triple busbar system
PROTECTIVE SCHEME IN 
POWER SYSTEM 
 The capital investment involved in a power system for the 
generation, transmission & distribution of electrical power is 
so great that proper precaution must be taken to ensure 
that the equipment not only operate as nearly as possible 
to peak efficient but also that it is protected from accident 
. 
 There are two main components of protection scheme: 
1. Protective relay. 
2. Circuit breakers. 
1. Protective relay:- A relay is an automatic device which 
senses an abnormal condition in an electrical circuit 
and closes its contacts. 
There are two operating principle of relay: 
I. Electromagnetic induction. 
II. Electromagnetic attraction.
Relays used for line protection : 
(a) Earth fault relay (b) over current relay (c) distant protection relay 
(d)Zone protection relay 
Relays used for transformer protection: 
(a)Earth fault relay. b) Over current relay. (c) buchholz relay 
(d)differential relay (e)back up earth fault relay (f)restricted earth 
fault relay (g)high temp relay (g)high temp relay (h)supervision relay. 
2.CIRCUIT BREAKER- 
• Isolate the faulty part of the power system in case of abnormal 
condition. 
•A protective relay detects the abnormal condition & sends a tripping 
signal to circuit breaker. After receiving that relay trips the circuit and 
circuit breaker isolates the faulty part 
•In normal condition, the two contacts(fixed and moving) remain in 
closed position 
CLASSIFICATION- 
1. Oil circuit breaker 
2. Air blast CBs 
3. Sulphur hexafluoride CBs 
4. Vacuum CBs
PROTECTION AGAINST LIGHTNING 
The most commonly used devices for protection 
against lightning surges are: 
1. Earthing screen. 
2. Overhead ground wires. 
3. Lightning arrester or surge diverters.
ISOLATOR 
 An Isolator is a disconnecting switch being operated under the condition 
of no load negligible current. 
 Used for disconnecting the circuit breaker from the circuit and to isolate 
the electrical circuit at the time of maintenance work and repair. 
 Interlocking arrangement are generally provided in the isolators. 
TYPES:- 
1. Vertical break type single, double and triple pole insulator 
2. Horizontal two rotating post, centre break insulator 
3. Horizontal break ,centre rotating double break insulator 
4. Extra high voltage column insulator
CAPACITOR BANK 
These capacitors have an important role to investigate the 
behavior of the breaker towards the restricting voltage. 
1. Controls and improves the voltages. 
2. Removes the reactive components of VARS component of the 
power which is not desirable. 
3. Improves power factor. 
Capacitor 
s
POWERLINE CARRIER COMMUNICATION 
(PLCC) 
 Protection signaling, speech and data transmission for 
system operation and control, management information 
system etc. are predominantly met by PLCC . 
 It is the most economical and reliable method of 
communication because of higher mechanical strength 
and insulation of high voltage power-lines which 
contribute to the increased reliability of communication 
and lower attenuation over the longer distances 
involved. 
PLCC Equipments-a) 
Wave trap 
b) Coupling capacitor 
c) Line Matching Unit(LMU) 
d) Protective equipments.
BATTERY 
 Provide unit charge to the entire system & behaves as back-up 
charging system 
 In Liluah 132 KV substation these units provide control voltage of 220 
VOLT DC back-up of entire system. 
 Makers- Amra Raja Make 
 Charging & discharging is needed to keep it healthy. 
Battery Charger: 
SL. No. : 4/2008/2 
AC Input: 415± 10% 
Ph: 50 Hz 
DC Output to charge: 250 V 
AH:110 A 
Cells at quick/boost: 2/2.7 
A.P.L.: 60 A 
Trickle/float: 2.15/2.3 
V.P.C.: 1602 /480 M
EARTH TRANSFORMER 
An Earth Transformer is 
connected in those areas 
where earth point is not 
available like a system 
connected to delta side of 
electrical power 
transformer, an artificial 
neutral point is created 
using earth transformer.
Sl.no Specifications Earthing Transformer 1 Earthing Transformer 2 
1. Makers name GEC GEC 
2. Std IS3151-1982 IS2026-1977 
3. KVA Rating 100 100 
4. Volts at no load HV:33KV,LV:415V HV:33KV,LV:415V 
5. Amperes rating HV:1.75A,LV:139A HV:1.75A,LV:139.3A 
6. Phases 3 3 
7. Types of Cooling ON AN ON AN 
8. Frequency 50 Hz 50 Hz 
9. Vector group ZNyn-11 ZNyn-11 
10. Impedance volt 4.5077% 3.796% 
11. Earth fault current 550 A for 30 sec 287 amp for 30 sec 
12. Year of mfg. 1990 1986
TRACTION TRANSFORMER(132KV/25KV) 
 It is used to supply the Indian Railways. The Railways use 25 KV Single 
phase line, so the Traction Transformer takes 2 phase 132 V Input supply 
and gives 2 phase 25 KV Output out of which one phase is grounded and 
made neutral and other phase is used by the Indian Railways. 
Serial 
no. 
Specifications Traction Transformer 1 & Traction 
Transformer2 
1. Maker’s Name Crompton Greaves Ltd. 
2. MVA Rating 12.5/18.75 
3. MVA (As per I.S) 13.5/20 
4. KV Rating (at no load) H.V=132 KV;L.V=15KV 
5. Line Current(Amps) H.V=102/151.5amp;L.V=500/750amp 
6. Output Phase Single 
7. Frequency(Hz) 50Hz
8. Type of cooling ON AN/ON AF 
9. Total Oil(ltrs/kg) 15300/12900 
10. Total Mass(Kg) 47600 
11. Untanking Mass Core & winding=18900 kg 
Bell tank=4200 kg 
12. Heaviest Package With oil=33500 kg 
Without oil=24800 kg 
13. Hot Spot temperature Ref<1150C 
14. Ambient temperature 45OC 
15. Insulation level (H.V./L.V.) LI650AC275/LI250AC95 
16. Guaranteed temperature rise of oil(0C) 50 
17. Guaranteed temperature rise of winding(0C): 50 
18. Maker’s w.o no.: T8174 
19. Maker’s sl no.: 24749 
20. Customer reference No.: LOI REF PLN/TRACTION/TRANS/491 
21. Year of mfg: 06-04-1987
STATION SERVICE TRANSFORMER 
Station Service Transformer converts HV 33 KV TO 
LV 400KV which is used by the Substation for its own 
needs like to run the air conditioner, fans and to run 
the control panel and relay panel. 
Specifications- 
 Maker’s Name: - Transmake Electrical Pvt. Ltd. 
 STD:- IS2026 & 1180 
 KVA Rating:-100 
 Volts at no load:-HV-33KV & LV-400V 
 Current at no load(A):-HV-1.75 & LV-144.34 
 Phase:-3 
 Diagram:- TW/100/33 
 Sl. No.-94311 
 Type of cooling:- ON AN
Frequency:- 50 Hz 
Impedance:- 4.1% 
Vector Group:- DYn11 
Core & Winding weight:- 430 Kg 
Weight of oil:- 260 Kg 
Total weight:- 930 Kg 
Oil quantity:- 300 Ltrs 
Year Of Mfg:- 12/2002 
Guaranteed Max temp. rise in oil:450C
POWER TRANSFORMER-3 
NAMEPLATE PARTICULARS: 
 Maker’s Name: - Bharat Heavy Electricals Ltd. 
 MVA Rating: - 30/40/50 
 Vector Symbol: - YnD1 
 Phase: - 3 
 Frequency: - 50 Hz 
 Type of cooling: - ON AN/ON AF/OF AF 
 Diagram Drg. no:-14561950473 
 Sl. No.:- 2013511 
 Year of mfg:- 2001 
 OLTC With oil, transport with oil heaviest package:- 50 
Tonnes 
 Complete transformer including oil:- 97 Tonnes 
 Bil: HV:- 550 kvp & LV:-170 kvp 
 Impedance volts(at 750C):- 12.5 ± 13% 
 KV(No load):- HV-132 KV & LV-33 KV 
 Amps:- HV-218.95 & LV-875.81 
 At taps: normal tap(9b)
POWER TRANSFORMER-4 
SPECIFICATION: 
 Maker’s Name:- ABB 
 Ref. Std: IS2026 
 Sl. No.: AAA-003 
 Year of mfg:- 2008 
 Frequency:- 50 Hz 
 Type of cooling:-ON AN/ON AF/OF AF 
 % Impedance Voltage HV/LV: 
 Nominal Power(ON AN/ON AF/OF AF):-30/40/50 MVA 
 Nominal voltage:- HV-132 KV & LV-33 KV 
 OLTC Type:- EASUNMR 
 Rated current:- 350 A 
 Insulation Ground:- 725 KV 
 Step Voltage:- 953 V 
 Control Voltage:- 110 V 
 Variation:- +10% to -10% of HV 
 No. of steps:- 16 
 Temp. rise of oil/winding:- 500C/550C 
 Vector Group:- YDn1 
 Short circuit current(max duration 3 sec):- HV=1.749 KA & 
LV=6.99 KA
•% Impedance Voltage HV/LV: 
Tap No. Guaranteed at N tap Actual (after test) 
Tap 1 
12.5% (± 10%) 
12.14% 
Tap 9b 11.64% 
Tap 17 11.33% 
•Insulation Level:- 
Testing Voltage HV HVN LV 
Um(Highest sys V) 145 36 
AC(Power frequency) 230 38 70 
Lightning Impulse 550 95 170 
•Core & Winding Mass:- 45670 Kg 
•Tank & Fitting Mass:- 12520 Kg 
•Oil Mass:- 17830 kg 
•Total Transformer mass:- 76020 Kg 
•Transformer mass(oil filled):- 68420 kg 
•Total oil quantity:- 20030 litres
Cooling Fans 
MOG 
POWER TRANSFORMER 4 
POWER TRANSFORMER 3 
HV 
Bushings 
Conservator 
Radiator Bank 
Buchholz 
relay 
Oil pump 
Earthing Transformer 
Oil level indicator
industrial training on 132 kv substation

More Related Content

What's hot

Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONSwatantra SwAt
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminarShrikant Bhansali
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training pptsitesh95074
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Rahul Prajapati
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substationEmran Ali
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1anuphowlader1
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.Hemendra Kumar Rajput
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission lineDhananjay Jha
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design) SayanSarkar55
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devicesRahul Aman
 

What's hot (20)

Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substation
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Substation
Substation Substation
Substation
 
132 kv
132 kv132 kv
132 kv
 
Ehv substation
Ehv substationEhv substation
Ehv substation
 
Electrical transmission line
Electrical transmission lineElectrical transmission line
Electrical transmission line
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
 
Power system protection
Power system protectionPower system protection
Power system protection
 

Similar to industrial training on 132 kv substation

industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLsurendra rawat
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)saurabhVEC
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report imkanhaiyalal
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)shovandey07
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxAkshaiSai2
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewAUTHELECTRONIC
 
Report on minor project
Report on minor projectReport on minor project
Report on minor projectAnil Maurya
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protectionRishi Tandon
 
Differential protection
Differential protectionDifferential protection
Differential protectionRishi Tandon
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxSNEHAKANWAR1
 

Similar to industrial training on 132 kv substation (20)

industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 
Heavy maintenance
Heavy maintenanceHeavy maintenance
Heavy maintenance
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
Thermoelectricity
ThermoelectricityThermoelectricity
Thermoelectricity
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
220kv substation
220kv substation220kv substation
220kv substation
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Wapda Engineering Acadmy Report
Wapda Engineering Acadmy ReportWapda Engineering Acadmy Report
Wapda Engineering Acadmy Report
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
 
Report on minor project
Report on minor projectReport on minor project
Report on minor project
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Differential protection
Differential protectionDifferential protection
Differential protection
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
 

Recently uploaded

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 

Recently uploaded (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 

industrial training on 132 kv substation

  • 1. A GOVERNMENT OF WEST BENGAL ENTERPRISE A PROJECT ON LILUAH 132/33/25 KV SUBSTATION PRESENTED BY:- PRABHAT KUMAR (EE/11/012) ARIJIT DAS (EE/11/015) DIPTESH KOLEY (EE/11/033)
  • 2. -:ACKNOWLEDGEMENT:- We had a great pleasure in expressing our sincere gratitude to the TPO of our college and Mr. D.Bose, GM(HR & A),W.B.S.E.T.C.L for allowing summer training at Liluah 132/33/25 KV substation. We are greatly thankful to Mr. Rakesh Kundu, assistant engineer of Liluah transmission(O & M) substation for his immense help and suitable guidance during training period. We are also thankful to all other staffs of substation for their day to day help and assistance.
  • 3. SINGLE LINE DIAGRAM OF LILUAH 132/33/25 KV
  • 4. ELECTRICAL BUSBAR ELECTRICAL BUSBAR  It is the collector of electrical energy at one location at constant voltage  Types:- 1. Rigid type: - made up of aluminium alloy tubes of 50 to 250 mm diameter and supported on post insulator with clamps and connector. 2. Flexible type:- made up of A.C.S.R. conductor and supported at both ends by strain insulators clamps and conductors.  Acts as common point when a number of generator or feeder operating at same voltage is to be connected together. TYPES OF ARRANGEMENT 1. Single busbar system 2. Duplicate busbar system 3. Triple busbar system
  • 5. PROTECTIVE SCHEME IN POWER SYSTEM  The capital investment involved in a power system for the generation, transmission & distribution of electrical power is so great that proper precaution must be taken to ensure that the equipment not only operate as nearly as possible to peak efficient but also that it is protected from accident .  There are two main components of protection scheme: 1. Protective relay. 2. Circuit breakers. 1. Protective relay:- A relay is an automatic device which senses an abnormal condition in an electrical circuit and closes its contacts. There are two operating principle of relay: I. Electromagnetic induction. II. Electromagnetic attraction.
  • 6. Relays used for line protection : (a) Earth fault relay (b) over current relay (c) distant protection relay (d)Zone protection relay Relays used for transformer protection: (a)Earth fault relay. b) Over current relay. (c) buchholz relay (d)differential relay (e)back up earth fault relay (f)restricted earth fault relay (g)high temp relay (g)high temp relay (h)supervision relay. 2.CIRCUIT BREAKER- • Isolate the faulty part of the power system in case of abnormal condition. •A protective relay detects the abnormal condition & sends a tripping signal to circuit breaker. After receiving that relay trips the circuit and circuit breaker isolates the faulty part •In normal condition, the two contacts(fixed and moving) remain in closed position CLASSIFICATION- 1. Oil circuit breaker 2. Air blast CBs 3. Sulphur hexafluoride CBs 4. Vacuum CBs
  • 7. PROTECTION AGAINST LIGHTNING The most commonly used devices for protection against lightning surges are: 1. Earthing screen. 2. Overhead ground wires. 3. Lightning arrester or surge diverters.
  • 8. ISOLATOR  An Isolator is a disconnecting switch being operated under the condition of no load negligible current.  Used for disconnecting the circuit breaker from the circuit and to isolate the electrical circuit at the time of maintenance work and repair.  Interlocking arrangement are generally provided in the isolators. TYPES:- 1. Vertical break type single, double and triple pole insulator 2. Horizontal two rotating post, centre break insulator 3. Horizontal break ,centre rotating double break insulator 4. Extra high voltage column insulator
  • 9. CAPACITOR BANK These capacitors have an important role to investigate the behavior of the breaker towards the restricting voltage. 1. Controls and improves the voltages. 2. Removes the reactive components of VARS component of the power which is not desirable. 3. Improves power factor. Capacitor s
  • 10. POWERLINE CARRIER COMMUNICATION (PLCC)  Protection signaling, speech and data transmission for system operation and control, management information system etc. are predominantly met by PLCC .  It is the most economical and reliable method of communication because of higher mechanical strength and insulation of high voltage power-lines which contribute to the increased reliability of communication and lower attenuation over the longer distances involved. PLCC Equipments-a) Wave trap b) Coupling capacitor c) Line Matching Unit(LMU) d) Protective equipments.
  • 11. BATTERY  Provide unit charge to the entire system & behaves as back-up charging system  In Liluah 132 KV substation these units provide control voltage of 220 VOLT DC back-up of entire system.  Makers- Amra Raja Make  Charging & discharging is needed to keep it healthy. Battery Charger: SL. No. : 4/2008/2 AC Input: 415± 10% Ph: 50 Hz DC Output to charge: 250 V AH:110 A Cells at quick/boost: 2/2.7 A.P.L.: 60 A Trickle/float: 2.15/2.3 V.P.C.: 1602 /480 M
  • 12. EARTH TRANSFORMER An Earth Transformer is connected in those areas where earth point is not available like a system connected to delta side of electrical power transformer, an artificial neutral point is created using earth transformer.
  • 13. Sl.no Specifications Earthing Transformer 1 Earthing Transformer 2 1. Makers name GEC GEC 2. Std IS3151-1982 IS2026-1977 3. KVA Rating 100 100 4. Volts at no load HV:33KV,LV:415V HV:33KV,LV:415V 5. Amperes rating HV:1.75A,LV:139A HV:1.75A,LV:139.3A 6. Phases 3 3 7. Types of Cooling ON AN ON AN 8. Frequency 50 Hz 50 Hz 9. Vector group ZNyn-11 ZNyn-11 10. Impedance volt 4.5077% 3.796% 11. Earth fault current 550 A for 30 sec 287 amp for 30 sec 12. Year of mfg. 1990 1986
  • 14. TRACTION TRANSFORMER(132KV/25KV)  It is used to supply the Indian Railways. The Railways use 25 KV Single phase line, so the Traction Transformer takes 2 phase 132 V Input supply and gives 2 phase 25 KV Output out of which one phase is grounded and made neutral and other phase is used by the Indian Railways. Serial no. Specifications Traction Transformer 1 & Traction Transformer2 1. Maker’s Name Crompton Greaves Ltd. 2. MVA Rating 12.5/18.75 3. MVA (As per I.S) 13.5/20 4. KV Rating (at no load) H.V=132 KV;L.V=15KV 5. Line Current(Amps) H.V=102/151.5amp;L.V=500/750amp 6. Output Phase Single 7. Frequency(Hz) 50Hz
  • 15. 8. Type of cooling ON AN/ON AF 9. Total Oil(ltrs/kg) 15300/12900 10. Total Mass(Kg) 47600 11. Untanking Mass Core & winding=18900 kg Bell tank=4200 kg 12. Heaviest Package With oil=33500 kg Without oil=24800 kg 13. Hot Spot temperature Ref<1150C 14. Ambient temperature 45OC 15. Insulation level (H.V./L.V.) LI650AC275/LI250AC95 16. Guaranteed temperature rise of oil(0C) 50 17. Guaranteed temperature rise of winding(0C): 50 18. Maker’s w.o no.: T8174 19. Maker’s sl no.: 24749 20. Customer reference No.: LOI REF PLN/TRACTION/TRANS/491 21. Year of mfg: 06-04-1987
  • 16. STATION SERVICE TRANSFORMER Station Service Transformer converts HV 33 KV TO LV 400KV which is used by the Substation for its own needs like to run the air conditioner, fans and to run the control panel and relay panel. Specifications-  Maker’s Name: - Transmake Electrical Pvt. Ltd.  STD:- IS2026 & 1180  KVA Rating:-100  Volts at no load:-HV-33KV & LV-400V  Current at no load(A):-HV-1.75 & LV-144.34  Phase:-3  Diagram:- TW/100/33  Sl. No.-94311  Type of cooling:- ON AN
  • 17. Frequency:- 50 Hz Impedance:- 4.1% Vector Group:- DYn11 Core & Winding weight:- 430 Kg Weight of oil:- 260 Kg Total weight:- 930 Kg Oil quantity:- 300 Ltrs Year Of Mfg:- 12/2002 Guaranteed Max temp. rise in oil:450C
  • 18. POWER TRANSFORMER-3 NAMEPLATE PARTICULARS:  Maker’s Name: - Bharat Heavy Electricals Ltd.  MVA Rating: - 30/40/50  Vector Symbol: - YnD1  Phase: - 3  Frequency: - 50 Hz  Type of cooling: - ON AN/ON AF/OF AF  Diagram Drg. no:-14561950473  Sl. No.:- 2013511  Year of mfg:- 2001  OLTC With oil, transport with oil heaviest package:- 50 Tonnes  Complete transformer including oil:- 97 Tonnes  Bil: HV:- 550 kvp & LV:-170 kvp  Impedance volts(at 750C):- 12.5 ± 13%  KV(No load):- HV-132 KV & LV-33 KV  Amps:- HV-218.95 & LV-875.81  At taps: normal tap(9b)
  • 19. POWER TRANSFORMER-4 SPECIFICATION:  Maker’s Name:- ABB  Ref. Std: IS2026  Sl. No.: AAA-003  Year of mfg:- 2008  Frequency:- 50 Hz  Type of cooling:-ON AN/ON AF/OF AF  % Impedance Voltage HV/LV:  Nominal Power(ON AN/ON AF/OF AF):-30/40/50 MVA  Nominal voltage:- HV-132 KV & LV-33 KV  OLTC Type:- EASUNMR  Rated current:- 350 A  Insulation Ground:- 725 KV  Step Voltage:- 953 V  Control Voltage:- 110 V  Variation:- +10% to -10% of HV  No. of steps:- 16  Temp. rise of oil/winding:- 500C/550C  Vector Group:- YDn1  Short circuit current(max duration 3 sec):- HV=1.749 KA & LV=6.99 KA
  • 20. •% Impedance Voltage HV/LV: Tap No. Guaranteed at N tap Actual (after test) Tap 1 12.5% (± 10%) 12.14% Tap 9b 11.64% Tap 17 11.33% •Insulation Level:- Testing Voltage HV HVN LV Um(Highest sys V) 145 36 AC(Power frequency) 230 38 70 Lightning Impulse 550 95 170 •Core & Winding Mass:- 45670 Kg •Tank & Fitting Mass:- 12520 Kg •Oil Mass:- 17830 kg •Total Transformer mass:- 76020 Kg •Transformer mass(oil filled):- 68420 kg •Total oil quantity:- 20030 litres
  • 21. Cooling Fans MOG POWER TRANSFORMER 4 POWER TRANSFORMER 3 HV Bushings Conservator Radiator Bank Buchholz relay Oil pump Earthing Transformer Oil level indicator