SlideShare a Scribd company logo
1 of 3
Knitting Production Report


Reports Outline Following Ahead
1.   Knitting Production Report
2.   Date wise Production Report ( From date to Date)
3.   Date wise Production Summary (From date to date)
4.   Shift and Operator Wise Production Summary (From date)
5.   Shift and Item Wise Production Summary (From date)
6.   Hall and item wise Production Summary (From date)
7.   Operator Efficiency (From date To date)


Additional Reports Demanded By Knitting Departments


1.   Shift and Machine Wise Production
2.   Hall wise Reports like a Hall Shift A, B and C article wise
     summary like a Hall shift A, B, and C.
3.   All Hall shift A,B and c wise summary
4.   24 hours article wise Production summary and purchase order
     status
5.   Total order & article wise & date wise Production, Efficiency
     and wastage summary
6.   All halls and Shifts operator wise and average efficiency and
     wastage summary.
ADDITIONAL REPORT


1.      Total order and article wise & date wise Production Efficiency
     and wastage %.
2.      All Halls shift wise Summary A,B and C.
3.      Hall Shift and article wise Summary K1,K2 and k3.
4.      Shift & Machine wise Production Report.



Reforms of Reports

1.      Reports rectification is required.
2.      Name of reports is wrongly mentioned over reports.
3.      Some reports columns ascending and descending problems in
     which included columns and some reports missing wastage %age
     column.
4.      Operator Efficiency is also wrongly mentioned in % efficiency
     column by reports.
5.      One article mentioned completely report since running of this
     article.
6.      Some changes replaceable
7.      Reports display the foreman and shift in charge
8.      Reports mentioned 12 hrs and 24 hrs basis reports.
9.      Operator efficiency report should display the total efficiency
     column also.
Knitting production report

More Related Content

What's hot

A comprehensive study on interlock circular knitting machine.
A comprehensive study on interlock circular knitting machine.A comprehensive study on interlock circular knitting machine.
A comprehensive study on interlock circular knitting machine.Hasanuzzaman Hasan
 
Study On Stop Device In Weaving Loom
Study On Stop Device In Weaving LoomStudy On Stop Device In Weaving Loom
Study On Stop Device In Weaving LoomMd Rakibul Hassan
 
Process control in weaving
Process control in weavingProcess control in weaving
Process control in weavingVijay Babu Gaur
 
Recent developments in speed frame
Recent developments in speed frame Recent developments in speed frame
Recent developments in speed frame Harsh Kumar
 
"Warping method in a Textile Weaving Technology"
 "Warping method in a Textile Weaving Technology" "Warping method in a Textile Weaving Technology"
"Warping method in a Textile Weaving Technology"Md Abul Hossain
 
Terry fabric
Terry fabricTerry fabric
Terry fabric毅 陈
 
HVI (High Volume Instrument )
HVI (High Volume Instrument )HVI (High Volume Instrument )
HVI (High Volume Instrument )Nayeem Pub
 
Modern developments in weaving
Modern developments in weavingModern developments in weaving
Modern developments in weavingAzmir Latif Beg
 
Multi phase and circular loom by Vignesh Dhanabalan
Multi phase and circular loom by Vignesh DhanabalanMulti phase and circular loom by Vignesh Dhanabalan
Multi phase and circular loom by Vignesh DhanabalanVignesh Dhanabalan
 
Blending of textile fibre (tcp)
Blending of textile fibre (tcp)Blending of textile fibre (tcp)
Blending of textile fibre (tcp)Ajit Kumar Sahoo
 
Electronic controls in knitting
Electronic controls in knittingElectronic controls in knitting
Electronic controls in knittingdrskathirrvelu
 

What's hot (20)

A comprehensive study on interlock circular knitting machine.
A comprehensive study on interlock circular knitting machine.A comprehensive study on interlock circular knitting machine.
A comprehensive study on interlock circular knitting machine.
 
Pile fabrics
Pile fabricsPile fabrics
Pile fabrics
 
Study On Stop Device In Weaving Loom
Study On Stop Device In Weaving LoomStudy On Stop Device In Weaving Loom
Study On Stop Device In Weaving Loom
 
Rotor spinning
Rotor spinningRotor spinning
Rotor spinning
 
Warping process
Warping process Warping process
Warping process
 
Process control in weaving
Process control in weavingProcess control in weaving
Process control in weaving
 
Tricot Warp Knitting Machine
Tricot Warp Knitting MachineTricot Warp Knitting Machine
Tricot Warp Knitting Machine
 
Recent developments in speed frame
Recent developments in speed frame Recent developments in speed frame
Recent developments in speed frame
 
"Warping method in a Textile Weaving Technology"
 "Warping method in a Textile Weaving Technology" "Warping method in a Textile Weaving Technology"
"Warping method in a Textile Weaving Technology"
 
Terry fabric
Terry fabricTerry fabric
Terry fabric
 
HVI- High Volume Instrument
HVI- High Volume InstrumentHVI- High Volume Instrument
HVI- High Volume Instrument
 
HVI (High Volume Instrument )
HVI (High Volume Instrument )HVI (High Volume Instrument )
HVI (High Volume Instrument )
 
Take up mechanism
Take up mechanismTake up mechanism
Take up mechanism
 
Process control of weaving
Process control of weaving Process control of weaving
Process control of weaving
 
Modern developments in weaving
Modern developments in weavingModern developments in weaving
Modern developments in weaving
 
Finishing process and parameters
Finishing process  and parametersFinishing process  and parameters
Finishing process and parameters
 
Multi phase and circular loom by Vignesh Dhanabalan
Multi phase and circular loom by Vignesh DhanabalanMulti phase and circular loom by Vignesh Dhanabalan
Multi phase and circular loom by Vignesh Dhanabalan
 
Blending of textile fibre (tcp)
Blending of textile fibre (tcp)Blending of textile fibre (tcp)
Blending of textile fibre (tcp)
 
Electronic controls in knitting
Electronic controls in knittingElectronic controls in knitting
Electronic controls in knitting
 
Stenter
StenterStenter
Stenter
 

Viewers also liked

Tesla ERP - Tanıtım [2016]
Tesla ERP - Tanıtım [2016]Tesla ERP - Tanıtım [2016]
Tesla ERP - Tanıtım [2016]Tesla ERP
 
Textile Internship Report (Part-1)
Textile Internship Report (Part-1)Textile Internship Report (Part-1)
Textile Internship Report (Part-1)Sayakh Mahmud
 
Industrial attachment of padma poly cotton knit fabrics limited
Industrial attachment of padma poly cotton knit fabrics limitedIndustrial attachment of padma poly cotton knit fabrics limited
Industrial attachment of padma poly cotton knit fabrics limitedMd. Mazadul Hasan Shishir
 
Industrial attachment of niagara textile ltd
Industrial attachment  of niagara textile ltdIndustrial attachment  of niagara textile ltd
Industrial attachment of niagara textile ltdMd. Mazadul Hasan Shishir
 
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...Bangladesh University of Textiles (BUTEX)
 
internship report YTM
internship report YTMinternship report YTM
internship report YTMAsim Aslam
 
Different parts of knitting machine and parameter
Different parts of knitting machine and parameterDifferent parts of knitting machine and parameter
Different parts of knitting machine and parameterAzmir Latif Beg
 
Industrial attachment of fakhruddin textile mills limited
Industrial  attachment  of fakhruddin textile mills limitedIndustrial  attachment  of fakhruddin textile mills limited
Industrial attachment of fakhruddin textile mills limitedMd. Mazadul Hasan Shishir
 
The Project Management Process - Week 7 Managing Teams
The Project Management Process - Week 7   Managing TeamsThe Project Management Process - Week 7   Managing Teams
The Project Management Process - Week 7 Managing TeamsCraig Brown
 
Enterprise resource planning
Enterprise resource planningEnterprise resource planning
Enterprise resource planningAmit Singh
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIsQuang Ngoc
 
Tracxn Research - ERP Landscape, February 2017
Tracxn Research - ERP Landscape, February 2017Tracxn Research - ERP Landscape, February 2017
Tracxn Research - ERP Landscape, February 2017Tracxn
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 LeadershipCraig Brown
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project managementRahul Dubey
 

Viewers also liked (20)

Tesla ERP - Tanıtım [2016]
Tesla ERP - Tanıtım [2016]Tesla ERP - Tanıtım [2016]
Tesla ERP - Tanıtım [2016]
 
Bbrsoa Lean Sigma V4
Bbrsoa Lean Sigma V4Bbrsoa Lean Sigma V4
Bbrsoa Lean Sigma V4
 
Practica 14
Practica 14Practica 14
Practica 14
 
Textile Internship Report (Part-1)
Textile Internship Report (Part-1)Textile Internship Report (Part-1)
Textile Internship Report (Part-1)
 
Industrial attachment of padma poly cotton knit fabrics limited
Industrial attachment of padma poly cotton knit fabrics limitedIndustrial attachment of padma poly cotton knit fabrics limited
Industrial attachment of padma poly cotton knit fabrics limited
 
Industrial attachment of knit concern group
Industrial  attachment  of knit concern groupIndustrial  attachment  of knit concern group
Industrial attachment of knit concern group
 
Industrial attachment of niagara textile ltd
Industrial attachment  of niagara textile ltdIndustrial attachment  of niagara textile ltd
Industrial attachment of niagara textile ltd
 
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
Industrial Attachment of Square Knit Fabrics Limited by Milon, Mamun ,Plabon ...
 
Tua ha composite textile ltd.
Tua ha composite textile ltd.Tua ha composite textile ltd.
Tua ha composite textile ltd.
 
internship report YTM
internship report YTMinternship report YTM
internship report YTM
 
Different parts of knitting machine and parameter
Different parts of knitting machine and parameterDifferent parts of knitting machine and parameter
Different parts of knitting machine and parameter
 
Industrial attachment of fakhruddin textile mills limited
Industrial  attachment  of fakhruddin textile mills limitedIndustrial  attachment  of fakhruddin textile mills limited
Industrial attachment of fakhruddin textile mills limited
 
The Project Management Process - Week 7 Managing Teams
The Project Management Process - Week 7   Managing TeamsThe Project Management Process - Week 7   Managing Teams
The Project Management Process - Week 7 Managing Teams
 
Enterprise resource planning
Enterprise resource planningEnterprise resource planning
Enterprise resource planning
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 
What is ERP
What is ERPWhat is ERP
What is ERP
 
Tracxn Research - ERP Landscape, February 2017
Tracxn Research - ERP Landscape, February 2017Tracxn Research - ERP Landscape, February 2017
Tracxn Research - ERP Landscape, February 2017
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 Leadership
 
Cadena de valor
Cadena de valorCadena de valor
Cadena de valor
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 

Similar to Knitting production report

SSRS BI Project
SSRS BI ProjectSSRS BI Project
SSRS BI Projectpencarver
 
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewMaximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewHelen Fisher
 
LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1George Bowman
 
Andrew Chant\'s CanWEA O & M Presentation
Andrew Chant\'s CanWEA  O  & M  PresentationAndrew Chant\'s CanWEA  O  & M  Presentation
Andrew Chant\'s CanWEA O & M Presentationmtingle
 
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET Journal
 
Simulation of production systems- final report
Simulation of production systems- final reportSimulation of production systems- final report
Simulation of production systems- final reportSatheesh Kumar Chandran
 
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdfKioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdfbengqiyuehe231
 
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdfbengqiyuehe231
 
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdfbengqiyuehe231
 
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdfKioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdfbengqiyuehe231
 
Kioti Daedong DK45S Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45S Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK45S Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45S Tractor Parts Catalogue Manual 1.pdfbengqiyuehe231
 
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdfbengqiyuehe231
 
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdflusirang14681
 
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdfKioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdflusirang14681
 
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdfKioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdflusirang14681
 
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdflusirang14681
 
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdflusirang14681
 

Similar to Knitting production report (20)

SSRS BI Project
SSRS BI ProjectSSRS BI Project
SSRS BI Project
 
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewMaximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
 
LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1
 
Andrew Chant\'s CanWEA O & M Presentation
Andrew Chant\'s CanWEA  O  & M  PresentationAndrew Chant\'s CanWEA  O  & M  Presentation
Andrew Chant\'s CanWEA O & M Presentation
 
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
 
Procedures
ProceduresProcedures
Procedures
 
2014-2015 rotation
2014-2015 rotation2014-2015 rotation
2014-2015 rotation
 
Simulation of production systems- final report
Simulation of production systems- final reportSimulation of production systems- final report
Simulation of production systems- final report
 
Materials management
Materials managementMaterials management
Materials management
 
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdfKioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
 
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
 
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
 
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdfKioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
 
Kioti Daedong DK45S Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45S Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK45S Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45S Tractor Parts Catalogue Manual 1.pdf
 
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
 
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK45SC Tractor Parts Catalogue Manual 1.pdf
 
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdfKioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501 Tractor Parts Catalogue Manual.pdf
 
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdfKioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
Kioti Daedong DK501C Tractor Parts Catalogue Manual.pdf
 
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451C Tractor Parts Catalogue Manual 1.pdf
 
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdfKioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
Kioti Daedong DK451 Tractor Parts Catalogue Manual 1.pdf
 

Recently uploaded

Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 

Recently uploaded (20)

Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 

Knitting production report

  • 1. Knitting Production Report Reports Outline Following Ahead 1. Knitting Production Report 2. Date wise Production Report ( From date to Date) 3. Date wise Production Summary (From date to date) 4. Shift and Operator Wise Production Summary (From date) 5. Shift and Item Wise Production Summary (From date) 6. Hall and item wise Production Summary (From date) 7. Operator Efficiency (From date To date) Additional Reports Demanded By Knitting Departments 1. Shift and Machine Wise Production 2. Hall wise Reports like a Hall Shift A, B and C article wise summary like a Hall shift A, B, and C. 3. All Hall shift A,B and c wise summary 4. 24 hours article wise Production summary and purchase order status 5. Total order & article wise & date wise Production, Efficiency and wastage summary 6. All halls and Shifts operator wise and average efficiency and wastage summary.
  • 2. ADDITIONAL REPORT 1. Total order and article wise & date wise Production Efficiency and wastage %. 2. All Halls shift wise Summary A,B and C. 3. Hall Shift and article wise Summary K1,K2 and k3. 4. Shift & Machine wise Production Report. Reforms of Reports 1. Reports rectification is required. 2. Name of reports is wrongly mentioned over reports. 3. Some reports columns ascending and descending problems in which included columns and some reports missing wastage %age column. 4. Operator Efficiency is also wrongly mentioned in % efficiency column by reports. 5. One article mentioned completely report since running of this article. 6. Some changes replaceable 7. Reports display the foreman and shift in charge 8. Reports mentioned 12 hrs and 24 hrs basis reports. 9. Operator efficiency report should display the total efficiency column also.