The document outlines the steps involved in constructing an accessory dwelling unit (ADU) from start to finish over a period of 5 months, including:
1) Excavation and pouring of the concrete foundation walls and slab, installing utilities like sewer, water, electrical, and gas.
2) Framing of the structure, installing windows, doors, roof, sheathing, and mechanical systems like plumbing and HVAC.
3) Adding insulation, drywall, siding, floors, tiles, cabinets, and finish work.
4) Obtaining occupancy permit and modifications thereafter.
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
ADU construction
1. to reduce the energy footprint of a home’s occupants:
Walkability
Siting on the lot
The three most significant factors
Home size
Building envelope and systems
Air Sealing Insulation
Heating & Cooling
system
Location
Microneighborhood
4. Integrated
Design
Process
For an ADU, the IDP should ideally include people who play the following roles:
homeowner, architect, builder, plumber, electrician, mechanical, landscaper
15. Utilities: Electrical
Electric varies: sometimes you may add a subpanel to the
main house to serve the ADU. Sometime, you’ll have to add a
new “service drop” directly from the street to serve to the ADU
16. Utilities: Gas
For gas, your gas company will add a 2nd meter and you’ll
have to run a new gas line from it to serve the ADU
Excavation
Gravel
Rigid Foam
Water Barrier
Foundation
Concrete Forms
Concrete Pour
Foundation Wall
Rigid Foam
Slab
Utilities
Sewer, Electrical, Water, Gas
Framing
Balloon Framing
Thermal Bridging, Advanced Framing
Sheathing
Roof
Stairs
Windows
Roofing
Weather Resistant Barrier
Rain Screen
Rough Plumbing
Mechanical
Radon mitigation
Lighting and Electrical
Air Sealing
Insulation
Foam, Blown in Insulation, Batts
Drywall
Sheetrock, Mudding, Sanding, Primer
Siding
Flooring
Tiling
Painting
Cabinets, Shelving
Finish Plumbing
Finish Electrical and Lighting
Certificate of Occupancy
Modifications
Moving In
Brainstorm with other funder/executors
Talk to City Planner
Rough sketch some ideas with executors/friends
Interview architects (test them with some questions from today)
What are a couple things that you would do to make this space feel and act bigger?
(tall ceilings, join living/dining room, high windows, cutting out hallways, coupling functionality)
Find builders and subs (ideally, you want to have identified a builder, plumber, mechanical, electrical subcontractor)
Architect draws up schematics for consideration
Have meeting- talk through design goals
Schematic refinement
3D model
Develop drawing for City
Permit process- 10 days for New construction, then another 10 days for corrections