CONTENT




• Data centre market trends
• Symbiosis
• Parthenon One
• Benefits




                              2
                              SLIDE 2
                              SLIDE 2
Market trends




                SLIDE 3
                SLIDE 3
MARKET TRENDS

                 Steep growth in the demand for data centre space and power
                  –   Increasing demand for data traffic and storage
Demand
                        •   Growing IP network traffic (IPTV, on-demand video traffic, VoIP, e-commerce,
                            household broadband penetration)
                        •   Increasing number of companies outsource their server farm to data centres
                        •   Increased central hosting of enterprise applications


                Increasing technical requirements (power, cooling)
Technology             High density equipment, blade servers
requirements           Server virtualisation
                       Required power density approaching 5 kW/m2
                            Previous generation (1999/2000) engineered at ~ 500 W/m2



Environmental   Increasing environmental requirements
requirements




                                                                                                   SLIDE 4
                                                                                                   SLIDE 4
ENVIRONMENTAL REQUIREMENTS


ICT has become one of the most energy consuming
industries with around 7.5 % of the electricity consumption
in the Netherlands


ICT carbon footprint comparable with aviation industry


ICT energy consumption doubles every 5 -6 years


Strong environmental pressure to design with maximum
energy efficiency (e.g. use of free air cooling)




                                                              5
                                                              SLIDE 5
                                                              SLIDE 5
SYMBIOSIS




            SLIDE 6
            SLIDE 6
SYMBIOSIS


                                       Parthenon Data Centre
                   Heat/cold




               Ground storage
                                          20 kV
Heat

CO2
       20 kV
                               Trafo




Heat                    Onderstation          150 kV Tennet
CO2    20 kV

                                                               SLIDE 7
                                                               SLIDE 7
HEAT AND COLD STORAGE




Datacentre


Koude vraag




                                SLIDE 8
                                SLIDE 8
SYMBIOSIS

•   Ultimate green operation
                                                                     CO2 Heat Electrical Power
     – Residual heat harvested for greenhouse growing
     – CO2 fully used to grow the greenhouse plants
                                                                     CO2 Heat Electrical Power
     – Heat/cold storage in the ground to decouple heat
         supply and usage
•   Data centre can also operate stand-alone (not                    CO2 Heat Electrical Power

    depending on the greenhouse farming)
•   12200 Ton annual carbon savings (Royal Haskoning)         Greenhouses                   Data Centre
•   Growers have their own electricity company ECW;
    electrical infrastructure is ready and available
•   Electricity purchasing under agreement with electricity
    management company for farmers
     – Purchasing on OTC
     – No supplier lock-in
•   Second substation connected to Tennet high voltage
    network in 2011

                                                                                                 SLIDE 9
                                                                                                 SLIDE 9
PARTHENON ONE




                                             Kwekerij
                                       40 ha (55ha) paprika
                      WKK 3+3 MWe                              WKK 3+3 MWe



                                     10 ha          10 ha
                                    Onbelicht      Onbelicht

                    WKK 3+4 MWe
                                     10 ha          10 ha
                                    Onbelicht       Belicht
                                                                WKK 3+3 MWe

                                     Nieuw
                                                  Nieuw
Datacenter                           10 ha
                                                   5 ha
                          Geen WKK                       Geen WKK


        1000meter


                                                                              SLIDE 10
                                                                              SLIDE 10
PARTHENON ONE

Amsterdam is one of the largest internet
connectivity-concentration points in the world
(AMS-IX)
Site in Wieringermeer less than 45 km distance
from Amsterdam AMS-IX
An area of new economic activity hosting an
ambitious greenhouse expansion project
Three diversely routed optical networks to AMS-IX.
Design contract with Royal Haskoning
Permits by Royal Haskoning and Grontmij
Supported by:
      Municipality mayor
      Province deputy
      Minister of agriculture
      Green-IT Amsterdam




                                                     SLIDE 11
                                                     SLIDE 11
PARTHENON ONE




                SLIDE 12
                SLIDE 12
PARTHENON ONE
•   10,000 m2 net customer space with
    4,200 racks
•   Total max site power: 60 MW
•   Average 5,000 Watt/m2
•   Eight data floors / phases
•   24x7 security & support
•   Tier 3+ design
•   3 redundant optical networks to AMS-IX
•   State of the art SLAs
•   Carbon neutral operation by means of
    Symbiosis
•   EUE of better than 1.2
•   European Code of Conduct compliant
•   Construction starts 1st quarter 2010


                                             SLIDE 13
                                             SLIDE 13
AVERAGE PUE - RESULTING EUE of 1.19




                                      SLIDE 14
                                      SLIDE 14
BENEFITS PARTHENON ONE

Ultimate green implementation, “Green by design”
Symbiosis, energy optimisation across ICT and greenhouse growing
Near 100% data centre energy reuse
Total of 12200 ton annual carbon savings
Excellent power efficiency, EUE < 1.2, excluding Symbiosis
Large power density
         Ready for high density blade servers
         Ready for virtualised servers
Ample power supply by existing transformers
Short time to market due to existing electrical infrastructure
Unique electricity procurement
Inherent low opex cost structure
CHP (WKK) units as additional electrical power source
3 redundant optical networks to AMS-IX

                                                                   SLIDE 15
                                                                   SLIDE 15
PARTHENON DATA CENTRES BV

Initiative started in January 2008
Established as a company in October 2008
Investment by a real estate giant
Management team
          Pieter Duijves
          Kevin Burton
Advisory board
          Anwar Osseyran
          Marc van der Heijden
          Peter Oei
Financial advise – Royal Bank of Scotland
Legal advise – SBHR advocaten
Design contract Parthenon One – Royal Haskoning



                                                  SLIDE 16
                                                  SLIDE 16

More Related Content

Viewers also liked

Viewers also liked (6)

Florida Heat Pump Project
Florida Heat Pump ProjectFlorida Heat Pump Project
Florida Heat Pump Project
 
Pr Branding[2]
Pr Branding[2]Pr Branding[2]
Pr Branding[2]
 
CalSTRS SocialSecurityInfo2
CalSTRS SocialSecurityInfo2CalSTRS SocialSecurityInfo2
CalSTRS SocialSecurityInfo2
 
PERS
PERSPERS
PERS
 
Liquidity Risk offer
Liquidity Risk offerLiquidity Risk offer
Liquidity Risk offer
 
Arduino Labs
Arduino LabsArduino Labs
Arduino Labs
 

Similar to Parthenon Dc Dynamics Conferentie24nov2009[1]

Palestra Fuel Cell and Trigeneration Case Study
Palestra Fuel Cell and Trigeneration Case StudyPalestra Fuel Cell and Trigeneration Case Study
Palestra Fuel Cell and Trigeneration Case StudyLogan Energy Ltd
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
Holistic approaches to green it gregynog colloquium - june 2011
Holistic approaches to green it   gregynog colloquium - june 2011Holistic approaches to green it   gregynog colloquium - june 2011
Holistic approaches to green it gregynog colloquium - june 2011gregynog
 
Dock It Customer Intro 14 Aug 09
Dock It Customer Intro 14 Aug 09Dock It Customer Intro 14 Aug 09
Dock It Customer Intro 14 Aug 09DockIT
 
BACnet Forum London 2011
BACnet Forum London 2011BACnet Forum London 2011
BACnet Forum London 2011neudecker
 
District Cooling Jenny Dahlberg, Fortum
District Cooling   Jenny Dahlberg, FortumDistrict Cooling   Jenny Dahlberg, Fortum
District Cooling Jenny Dahlberg, FortumNiklas Johnsson
 
Case Study: Maximising the Total Value of your Demand-Side Flexibility
Case Study: Maximising the Total Value of your Demand-Side FlexibilityCase Study: Maximising the Total Value of your Demand-Side Flexibility
Case Study: Maximising the Total Value of your Demand-Side FlexibilityEMEX
 
Cio Summit 2010 Presentation On Pue And Datacenter Optimisation
Cio Summit 2010 Presentation On Pue And Datacenter OptimisationCio Summit 2010 Presentation On Pue And Datacenter Optimisation
Cio Summit 2010 Presentation On Pue And Datacenter Optimisationbslaager
 
CSC Modular Datacenter
CSC Modular DatacenterCSC Modular Datacenter
CSC Modular DatacenterPeter Jenkins
 
Chapter 6 : Smart District heating/cooling, Summer Course, AUST 2015
Chapter 6 : Smart District heating/cooling, Summer Course, AUST 2015Chapter 6 : Smart District heating/cooling, Summer Course, AUST 2015
Chapter 6 : Smart District heating/cooling, Summer Course, AUST 2015Isam Shahrour
 
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT ProgramOPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT ProgramMaRS Discovery District
 
Designing Next Generation Data Centres
Designing Next Generation Data CentresDesigning Next Generation Data Centres
Designing Next Generation Data CentresSam Wood
 

Similar to Parthenon Dc Dynamics Conferentie24nov2009[1] (20)

10 fn s34
10 fn s3410 fn s34
10 fn s34
 
10 fn s34
10 fn s3410 fn s34
10 fn s34
 
Palestra Fuel Cell and Trigeneration Case Study
Palestra Fuel Cell and Trigeneration Case StudyPalestra Fuel Cell and Trigeneration Case Study
Palestra Fuel Cell and Trigeneration Case Study
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
Energy efficiency
Energy efficiencyEnergy efficiency
Energy efficiency
 
Holistic approaches to green it gregynog colloquium - june 2011
Holistic approaches to green it   gregynog colloquium - june 2011Holistic approaches to green it   gregynog colloquium - june 2011
Holistic approaches to green it gregynog colloquium - june 2011
 
Dock It Customer Intro 14 Aug 09
Dock It Customer Intro 14 Aug 09Dock It Customer Intro 14 Aug 09
Dock It Customer Intro 14 Aug 09
 
BACnet Forum London 2011
BACnet Forum London 2011BACnet Forum London 2011
BACnet Forum London 2011
 
District Cooling Jenny Dahlberg, Fortum
District Cooling   Jenny Dahlberg, FortumDistrict Cooling   Jenny Dahlberg, Fortum
District Cooling Jenny Dahlberg, Fortum
 
Green Networking With Blade
Green Networking With BladeGreen Networking With Blade
Green Networking With Blade
 
Modern gas-fueled power generation
Modern gas-fueled power generationModern gas-fueled power generation
Modern gas-fueled power generation
 
Case Study: Maximising the Total Value of your Demand-Side Flexibility
Case Study: Maximising the Total Value of your Demand-Side FlexibilityCase Study: Maximising the Total Value of your Demand-Side Flexibility
Case Study: Maximising the Total Value of your Demand-Side Flexibility
 
Cio Summit 2010 Presentation On Pue And Datacenter Optimisation
Cio Summit 2010 Presentation On Pue And Datacenter OptimisationCio Summit 2010 Presentation On Pue And Datacenter Optimisation
Cio Summit 2010 Presentation On Pue And Datacenter Optimisation
 
CSC Modular Datacenter
CSC Modular DatacenterCSC Modular Datacenter
CSC Modular Datacenter
 
Chapter 6 : Smart District heating/cooling, Summer Course, AUST 2015
Chapter 6 : Smart District heating/cooling, Summer Course, AUST 2015Chapter 6 : Smart District heating/cooling, Summer Course, AUST 2015
Chapter 6 : Smart District heating/cooling, Summer Course, AUST 2015
 
Green ICT
Green ICTGreen ICT
Green ICT
 
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT ProgramOPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
 
Designing Next Generation Data Centres
Designing Next Generation Data CentresDesigning Next Generation Data Centres
Designing Next Generation Data Centres
 

Parthenon Dc Dynamics Conferentie24nov2009[1]

  • 1. Bits&Bytes and…. …..Paprika’s Pieter Duijves Parthenon Data Centres Managing Director Datacenter Dynamics Amsterdam, November 24th, 2009 SLIDE 1 SLIDE 1
  • 2. CONTENT • Data centre market trends • Symbiosis • Parthenon One • Benefits 2 SLIDE 2 SLIDE 2
  • 3. Market trends SLIDE 3 SLIDE 3
  • 4. MARKET TRENDS Steep growth in the demand for data centre space and power – Increasing demand for data traffic and storage Demand • Growing IP network traffic (IPTV, on-demand video traffic, VoIP, e-commerce, household broadband penetration) • Increasing number of companies outsource their server farm to data centres • Increased central hosting of enterprise applications Increasing technical requirements (power, cooling) Technology High density equipment, blade servers requirements Server virtualisation Required power density approaching 5 kW/m2 Previous generation (1999/2000) engineered at ~ 500 W/m2 Environmental Increasing environmental requirements requirements SLIDE 4 SLIDE 4
  • 5. ENVIRONMENTAL REQUIREMENTS ICT has become one of the most energy consuming industries with around 7.5 % of the electricity consumption in the Netherlands ICT carbon footprint comparable with aviation industry ICT energy consumption doubles every 5 -6 years Strong environmental pressure to design with maximum energy efficiency (e.g. use of free air cooling) 5 SLIDE 5 SLIDE 5
  • 6. SYMBIOSIS SLIDE 6 SLIDE 6
  • 7. SYMBIOSIS Parthenon Data Centre Heat/cold Ground storage 20 kV Heat CO2 20 kV Trafo Heat Onderstation 150 kV Tennet CO2 20 kV SLIDE 7 SLIDE 7
  • 8. HEAT AND COLD STORAGE Datacentre Koude vraag SLIDE 8 SLIDE 8
  • 9. SYMBIOSIS • Ultimate green operation CO2 Heat Electrical Power – Residual heat harvested for greenhouse growing – CO2 fully used to grow the greenhouse plants CO2 Heat Electrical Power – Heat/cold storage in the ground to decouple heat supply and usage • Data centre can also operate stand-alone (not CO2 Heat Electrical Power depending on the greenhouse farming) • 12200 Ton annual carbon savings (Royal Haskoning) Greenhouses Data Centre • Growers have their own electricity company ECW; electrical infrastructure is ready and available • Electricity purchasing under agreement with electricity management company for farmers – Purchasing on OTC – No supplier lock-in • Second substation connected to Tennet high voltage network in 2011 SLIDE 9 SLIDE 9
  • 10. PARTHENON ONE Kwekerij 40 ha (55ha) paprika WKK 3+3 MWe WKK 3+3 MWe 10 ha 10 ha Onbelicht Onbelicht WKK 3+4 MWe 10 ha 10 ha Onbelicht Belicht WKK 3+3 MWe Nieuw Nieuw Datacenter 10 ha 5 ha Geen WKK Geen WKK 1000meter SLIDE 10 SLIDE 10
  • 11. PARTHENON ONE Amsterdam is one of the largest internet connectivity-concentration points in the world (AMS-IX) Site in Wieringermeer less than 45 km distance from Amsterdam AMS-IX An area of new economic activity hosting an ambitious greenhouse expansion project Three diversely routed optical networks to AMS-IX. Design contract with Royal Haskoning Permits by Royal Haskoning and Grontmij Supported by: Municipality mayor Province deputy Minister of agriculture Green-IT Amsterdam SLIDE 11 SLIDE 11
  • 12. PARTHENON ONE SLIDE 12 SLIDE 12
  • 13. PARTHENON ONE • 10,000 m2 net customer space with 4,200 racks • Total max site power: 60 MW • Average 5,000 Watt/m2 • Eight data floors / phases • 24x7 security & support • Tier 3+ design • 3 redundant optical networks to AMS-IX • State of the art SLAs • Carbon neutral operation by means of Symbiosis • EUE of better than 1.2 • European Code of Conduct compliant • Construction starts 1st quarter 2010 SLIDE 13 SLIDE 13
  • 14. AVERAGE PUE - RESULTING EUE of 1.19 SLIDE 14 SLIDE 14
  • 15. BENEFITS PARTHENON ONE Ultimate green implementation, “Green by design” Symbiosis, energy optimisation across ICT and greenhouse growing Near 100% data centre energy reuse Total of 12200 ton annual carbon savings Excellent power efficiency, EUE < 1.2, excluding Symbiosis Large power density Ready for high density blade servers Ready for virtualised servers Ample power supply by existing transformers Short time to market due to existing electrical infrastructure Unique electricity procurement Inherent low opex cost structure CHP (WKK) units as additional electrical power source 3 redundant optical networks to AMS-IX SLIDE 15 SLIDE 15
  • 16. PARTHENON DATA CENTRES BV Initiative started in January 2008 Established as a company in October 2008 Investment by a real estate giant Management team Pieter Duijves Kevin Burton Advisory board Anwar Osseyran Marc van der Heijden Peter Oei Financial advise – Royal Bank of Scotland Legal advise – SBHR advocaten Design contract Parthenon One – Royal Haskoning SLIDE 16 SLIDE 16