Your SlideShare is downloading. ×
Filming Schedule & Editing Schedule   4 D Productions
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Filming Schedule & Editing Schedule 4 D Productions

673
views

Published on

Published in: Art & Photos, Technology

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
673
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
17
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Filming Schedule Filming Schedule Date Planning the days to film 16/12/09 Film first scene – (Subway, 17/12/09 Anchor scenes for beginning of • The first scene of our actor song plus the first verse) entering the subway and setting up will be shot with two cameras and 4 different shots. • A point of view shot • A shot in the mirror • Close up • Long shot. • The filming will begin at 10am • The scenes should be filmed by 1pm. Film anchor scene for end of song 18/12/09 (last verse and actor leaving • The scene of the actor leaving subway) will also be shot with two different cameras and from the 4 shots used for the beginning of the song. This will ensure a similar beginning and ending • The filming will begin at 1pm Chorus scene in subway 18/12/09 • Filming will start at 3.30pm after a break from finishing the above scene. The chorus will be filmed with a: • Close up of actor singing and playing guitar • A mid shot and from two angles. One from the left and one from the right. Scene in Kingsway Bar & 19/12/09 Restaurant • Filming will begin at 11am. 1. Actor getting congratulated • All scenes will be shot from two 2. Actor drinking at the table angles with 2 cameras. One camera filming the actor and one camera filming the location. • Both scenes will be shot from a high angle and low angle with the camera positioned on the left and the right.
  • 2. • Other shots to be included.. • Long shot • Zoom in to bottle • Extreme close up • Establishing shot, allows the audience to see that the location is a bar Scene In office of actor getting 19/12/09 sacked • All filming to start 1pm because of the lighting in mid-day. (good lighting) • Over the shoulder shot from both actor’s perspective. Street scenes 20/12/09 1. Walking towards tree • All filming need to be 2. Walking after tree completed before 4pm due to 3. Drinking scene on park bench lighting outside. (tramp scene) • Filming will be begin at 9:30am • Shots will include – • Point of view • Over the shoulder of actor. Close up of actor. • Mid-shot of actor • Both walking scenes to be shot from the same position.
  • 3. Editing Schedule Editing Schedule Date Planning the days to edit. 27/12/09 Upload and Select final scenes 28/12/09 • All group members begin at 2pm at Malkit’s house. • All scenes will be uploaded onto computer. • Import all scenes into adobe premier pro 2.0. • All scenes to be finalised by 4pm Put all scenes into a timeline 28/12/09 • All scenes into a timeline to see the length of our footage. Change order 29/12/09 • Order of scenes need to be altered in order to suit the song. • Putting all scenes into timeline and ordering into correct order should be completed by 5:30 Check all scenes are into groups 28/12/09 of different scenes in the • 6pm all scenes will checked timeline. A group for street into groupings and should be scenes, anchor scenes, Kingsway completed by 6:30pm. scenes and office scenes. 29/12/09 Import song • Editing will begin at 1pm at Malkit’s house. • The song will be imported to see if the length of our footage is too long, short or just right. Check lip synchronisation 29/12/09 • Ensure all lip sync of scenes and lyrics match. This should be competed by 3pm leaving us to check all transitions and editing techniques that we can use. View all editing techniques and 29/12/09 transitions • From 3pm onwards, all
  • 4. transitions and editing styles will be viewed. Any that that group decide on will be written down in a list to add the next day. All transitions should be viewed by 7pm,, including all video and audio effects Insert all transitions 30/12/09 • Group meet up at Malkit’s at 11am • All transitions and effects chosen from the day before will be finalised as a group and inserted. • All other video and audio effects will be inserted. Insert credits 02/01/10 • Choose fonts and style. • Add credits to the beginning and end of song. • View and get opinions on colour, style, font and positioning of credits by all members of group • Finalise credits. Show Teacher and make 07/01/10 alterations • Show our teacher our video, get opinions and make any alterations. • We added Sepia tone to some scenes and added split screen after talking to our teacher because of the affect it would create to the beginning and end of our music video. Upload final video to Facebook, 12/01/10 YouTube and burn onto a CD.