SlideShare a Scribd company logo
1 of 1
Cheerios Production
Daily Production Schedule – Monday 17th September

12am
1am
2am
3am
4am
5am
6am
7am
8am
9am
10am                                           Make sure before we leave we have the scripts
                                               printed out, storyboards and have the kit ready.
11am                                           Go to location in Bolton and film what we can at
                                               Crompton Lodgers. Film the swings scene.Scene
                                               3, shot 1- 21
12pm                                           Move on to filming the lake scenes. Scene 3 shot
                                               21
1pm                                            Have a break at one.
2pm                                            Carry on filming
3pm                                            Finish filming for the day and make our way back
                                               to college.
4pm
5pm
6pm
7pm
8pm
9pm
10pm
11pm

More Related Content

What's hot (19)

Fs youth fiddle:guitar schedule 2015
Fs youth fiddle:guitar schedule 2015Fs youth fiddle:guitar schedule 2015
Fs youth fiddle:guitar schedule 2015
 
Scouting
ScoutingScouting
Scouting
 
Location and Floor Plan
Location and Floor Plan Location and Floor Plan
Location and Floor Plan
 
Teapot Valley Kelle
Teapot Valley KelleTeapot Valley Kelle
Teapot Valley Kelle
 
Sophie And The Plinth
Sophie And The PlinthSophie And The Plinth
Sophie And The Plinth
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Location reece
Location reeceLocation reece
Location reece
 
Teapot Valley Camp Albie
Teapot Valley Camp AlbieTeapot Valley Camp Albie
Teapot Valley Camp Albie
 
Timetable
TimetableTimetable
Timetable
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Location reece
Location reeceLocation reece
Location reece
 
Daily Production Schedule Steampunk Productions
Daily Production Schedule Steampunk ProductionsDaily Production Schedule Steampunk Productions
Daily Production Schedule Steampunk Productions
 
Sow and tell
Sow and tellSow and tell
Sow and tell
 
Diary of a Day of Shooting – Day 1
Diary of a Day of Shooting – Day 1Diary of a Day of Shooting – Day 1
Diary of a Day of Shooting – Day 1
 
Shooting Schedule 2
Shooting Schedule 2Shooting Schedule 2
Shooting Schedule 2
 
Boe Cafe Opening
Boe Cafe OpeningBoe Cafe Opening
Boe Cafe Opening
 
eEvaluation
eEvaluationeEvaluation
eEvaluation
 
Location floor plan
Location floor planLocation floor plan
Location floor plan
 
Slideshow
SlideshowSlideshow
Slideshow
 

Viewers also liked (7)

Computer ethics
Computer ethicsComputer ethics
Computer ethics
 
A.Ragheb_ Graduation Certificate
A.Ragheb_ Graduation CertificateA.Ragheb_ Graduation Certificate
A.Ragheb_ Graduation Certificate
 
Joshua Mahase Updated By - Wayne
Joshua Mahase Updated By - WayneJoshua Mahase Updated By - Wayne
Joshua Mahase Updated By - Wayne
 
Resume - Help Desk Technician
Resume - Help Desk TechnicianResume - Help Desk Technician
Resume - Help Desk Technician
 
Lesson 3 shot types handout
Lesson 3 shot types handoutLesson 3 shot types handout
Lesson 3 shot types handout
 
my resume
my resumemy resume
my resume
 
Conclusiones del plagio
Conclusiones del plagioConclusiones del plagio
Conclusiones del plagio
 

More from Mystifyingproductions (20)

Fourth recreation – toothpaste photo
Fourth recreation – toothpaste photoFourth recreation – toothpaste photo
Fourth recreation – toothpaste photo
 
Iron man
Iron manIron man
Iron man
 
Emily Davis Production Log
Emily Davis Production LogEmily Davis Production Log
Emily Davis Production Log
 
Magazine Evaluation PowerPoint
Magazine Evaluation PowerPointMagazine Evaluation PowerPoint
Magazine Evaluation PowerPoint
 
Iron man 3 script
Iron man 3 scriptIron man 3 script
Iron man 3 script
 
Iron man 3
Iron man 3Iron man 3
Iron man 3
 
Pitch
PitchPitch
Pitch
 
Editing butlins photo
Editing butlins photoEditing butlins photo
Editing butlins photo
 
Editing my pictures
Editing my picturesEditing my pictures
Editing my pictures
 
Editing my pictures
Editing my picturesEditing my pictures
Editing my pictures
 
Third recreation – black and white picture
Third recreation – black and white pictureThird recreation – black and white picture
Third recreation – black and white picture
 
Third recreation – black and white picture
Third recreation – black and white pictureThird recreation – black and white picture
Third recreation – black and white picture
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Second Recreation Editing Butlins Photo
Second Recreation Editing Butlins PhotoSecond Recreation Editing Butlins Photo
Second Recreation Editing Butlins Photo
 
Wedding Picture Editing Process
Wedding Picture Editing Process Wedding Picture Editing Process
Wedding Picture Editing Process
 
Wedding Picture Editing Process
Wedding Picture Editing Process Wedding Picture Editing Process
Wedding Picture Editing Process
 
Portrait Shoot PowerPoint
Portrait Shoot PowerPointPortrait Shoot PowerPoint
Portrait Shoot PowerPoint
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Me and My Movies
Me and My MoviesMe and My Movies
Me and My Movies
 

Cheerios production daily production schedule

  • 1. Cheerios Production Daily Production Schedule – Monday 17th September 12am 1am 2am 3am 4am 5am 6am 7am 8am 9am 10am Make sure before we leave we have the scripts printed out, storyboards and have the kit ready. 11am Go to location in Bolton and film what we can at Crompton Lodgers. Film the swings scene.Scene 3, shot 1- 21 12pm Move on to filming the lake scenes. Scene 3 shot 21 1pm Have a break at one. 2pm Carry on filming 3pm Finish filming for the day and make our way back to college. 4pm 5pm 6pm 7pm 8pm 9pm 10pm 11pm