PRESENTATION ON COAL
HANDLING SYSTEMS
PREPARED BY:-
ARNAB CHAKRABORTY
MBA-PM
INTRODUCTION
• Coal handling system or coal handling plant
(CHS or CHP) are plants used for handling coal
from wagon trippler or from stock pile to feed it
to the boiler (main objective).
Contd.....
Coal handling
• Coal needs to be stored at various stages of the
preparation process, and conveyed around the CPP
facilities. Coal handling is part of the larger field of bulk
material handling, and is a complex and vital part of the
CPP.
Contd...
Stockpiles
• Stockpiles provide surge capacity to various parts of the CPP. ROM
coal is delivered with large variations in production rate of tonnes
per hour (tph). A ROM stockpile is used to allow the washplant to be
fed coal at lower, constant rate.
• A simple stockpile is formed by machinery dumping coal into a pile,
either from dump trucks, pushed into heaps with bulldozers or from
conveyor booms. More controlled stockpiles are formed
using stackers to form piles along the length of a conveyor,
and reclaimers to retrieve the coal when required for product
loading, etc.
• Taller and wider stockpiles reduce the land area required to store a
set tonnage of coal. Larger coal stockpiles have a reduced rate of
heat loss, leading to a higher risk of spontaneous combustion.
Stacker/Reclaimer
• Stacker/ reclaimer is used to stack coal in the
stock pile for future use and reclaimer is used to
reclaim the same coal whenever it is required.
• We often do reclaiming when the coal coming
from the belt feeder is not of the quality to be
feed in boilers.
Belt feeder
• It is a conveyor use in carrying coal from the coal
crusher to respective conveyors.
• Crushers:- are used to crush big coals into small
pieces of coal or into standard size (i.e. 50mm
specifically in KSK MAHANADI POWER
PLANT).
Coal crushing system
Ring granulator
28-Feb-15
Interlocking for safety
• In case of any belt trip, entire system behind except
crusher will stop
• Any other belt of pair will not start on the same
discharge belt except 1A&1B
• Corresponding feeder will trip if any belt trips
Cond.....
• Belt & following system except crusher will trip in case of
operation of BSS
• In case of excessive belt slipage, low speed due to over
load or otherwise, belt not running although motor
running, belt snapped than belt and following system
will stop through zeero speed switch
• Overloading of more than 600T/hr
• Motors are protected against over load, short circuit,
single phasing
OPERATION OF CHP
• Check if all the belts are healthy and the indication is
green in SCADA.
• Secondly, check for all possible pull chords manually by
sending field operators.
• Take clearance from them and start the siren.
• After 1 min of the siren give start command.
SCADA USED IN CHS
OPERATION OF PADDLE FEEDER
• The Paddle Feeders feed the coal on the conveyor belt from the
Track hopper at a controlled rate. The paddle blades projected in the
hopper slot scoop the coal from hoppers and discharge it on the
conveyor belt running below.
• The following points need to be checked before taking any paddle
feeder into service.
• a) The paddle arms are free from any obstruction.
• b) There is no leakage at gearboxes and fluid couplings and the oil
levels are correct.
• c) There is no leakage of hydraulic oil, in the case of hydraulically
driven paddle feeders, and the oil levels are correct.
• d) The cable reeling drums for correct winding and unwinding.
• e) The paddle feeder is operating only in interlock mode.
OPERATION OF CONVEYOR
• Various conveyors are provided for transporting the coal from Track hopper
to Bunkers.
• The following precautions are to be taken before taking any conveyor into
service:
• a) There is no oil leakage at gearboxes / fluid couplings and the oil levels are
correct.
• b) The Discharge and Receiving chutes are free from jamming and choking.
• c) The Flap Gates are in correct positions.
• d) All inspection doors are in the closed position.
• e) All pull-cords are reset and the EPB is released and ensure that all
protections are healthy.
• f) The Alarm Siren is in working order.
• g) Communication facility is available.
• h) The lighting is adequate.
• i) No Permit To Work (Isolation) is pending against that conveyor.
OPERATION OF STACKER/RECLAIMER
• The Stacker Reclaimer is provided to stack the excess coal received
from the mines and to reclaim the coal, as and when required.
• The following points need to be checked before returning Stacker
Reclaimer into service:
• a) The track is clear of obstructions.
• b) There is no leakage from gearboxes, fluid couplings & hydraulic
system. The oil levels are correct.
• c) The availability of power supply is checked.
• d) All operations e.g. travel; slewing, luffing etc. are available.
• e) Brakes are clean and functioning correctly.
• f) CRD cable is free from damage and any obstruction and is
tensioned correctly.
28-Feb-15
THANKS
TYPICAL CHP

More Related Content

What's hot (20)

Chp ppt
Chp pptChp ppt
Chp ppt
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
 
Ash handling system
Ash handling systemAsh handling system
Ash handling system
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
NTPC ASH HANDELING
NTPC ASH HANDELING NTPC ASH HANDELING
NTPC ASH HANDELING
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
ASH HANDLING PLANT
ASH HANDLING PLANTASH HANDLING PLANT
ASH HANDLING PLANT
 
Handling of coal in thermal power plant
Handling of coal in thermal power plantHandling of coal in thermal power plant
Handling of coal in thermal power plant
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Ash handeling1
Ash handeling1Ash handeling1
Ash handeling1
 
Steam Power Plant and Coal Handling plant
Steam Power Plant and Coal Handling plantSteam Power Plant and Coal Handling plant
Steam Power Plant and Coal Handling plant
 
THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING
 
Ball & tube mill
Ball & tube millBall & tube mill
Ball & tube mill
 
Ash Handling Power Plant System
Ash Handling Power Plant SystemAsh Handling Power Plant System
Ash Handling Power Plant System
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
 

Similar to Presentation on coal handling systems

Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....Vipul Sinha
 
ritesh final project
ritesh final projectritesh final project
ritesh final project901902
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plantGaurav Kaushik
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam miningSafdar Ali
 
Study of corrosion and erosion in boilers
Study of corrosion and erosion in boilersStudy of corrosion and erosion in boilers
Study of corrosion and erosion in boilersSajeed Mahaboob
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawarKeshav Meena
 
Design and Performance of Highwall Mining
Design and Performance of Highwall MiningDesign and Performance of Highwall Mining
Design and Performance of Highwall MiningShantanu kumar
 
Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coalSafdar Ali
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.pptSafarulhaqueKp
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.pptSafarulhaqueKp
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngSafdar Ali
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptxParulChandna6
 
Report of Cement Industry
Report of Cement Industry Report of Cement Industry
Report of Cement Industry Muhammad Ahmed
 

Similar to Presentation on coal handling systems (20)

Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
Hirakud pWR overview.ppt
Hirakud pWR overview.pptHirakud pWR overview.ppt
Hirakud pWR overview.ppt
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
Boilers
BoilersBoilers
Boilers
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 
ritesh final project
ritesh final projectritesh final project
ritesh final project
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Study of corrosion and erosion in boilers
Study of corrosion and erosion in boilersStudy of corrosion and erosion in boilers
Study of corrosion and erosion in boilers
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar
 
Ash handling
Ash handlingAsh handling
Ash handling
 
Design and Performance of Highwall Mining
Design and Performance of Highwall MiningDesign and Performance of Highwall Mining
Design and Performance of Highwall Mining
 
Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coal
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Nitin
NitinNitin
Nitin
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellng
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Report of Cement Industry
Report of Cement Industry Report of Cement Industry
Report of Cement Industry
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Recently uploaded (20)

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Presentation on coal handling systems

  • 1. PRESENTATION ON COAL HANDLING SYSTEMS PREPARED BY:- ARNAB CHAKRABORTY MBA-PM
  • 2. INTRODUCTION • Coal handling system or coal handling plant (CHS or CHP) are plants used for handling coal from wagon trippler or from stock pile to feed it to the boiler (main objective).
  • 3. Contd..... Coal handling • Coal needs to be stored at various stages of the preparation process, and conveyed around the CPP facilities. Coal handling is part of the larger field of bulk material handling, and is a complex and vital part of the CPP.
  • 4. Contd... Stockpiles • Stockpiles provide surge capacity to various parts of the CPP. ROM coal is delivered with large variations in production rate of tonnes per hour (tph). A ROM stockpile is used to allow the washplant to be fed coal at lower, constant rate. • A simple stockpile is formed by machinery dumping coal into a pile, either from dump trucks, pushed into heaps with bulldozers or from conveyor booms. More controlled stockpiles are formed using stackers to form piles along the length of a conveyor, and reclaimers to retrieve the coal when required for product loading, etc. • Taller and wider stockpiles reduce the land area required to store a set tonnage of coal. Larger coal stockpiles have a reduced rate of heat loss, leading to a higher risk of spontaneous combustion.
  • 5. Stacker/Reclaimer • Stacker/ reclaimer is used to stack coal in the stock pile for future use and reclaimer is used to reclaim the same coal whenever it is required. • We often do reclaiming when the coal coming from the belt feeder is not of the quality to be feed in boilers.
  • 6. Belt feeder • It is a conveyor use in carrying coal from the coal crusher to respective conveyors. • Crushers:- are used to crush big coals into small pieces of coal or into standard size (i.e. 50mm specifically in KSK MAHANADI POWER PLANT).
  • 7. Coal crushing system Ring granulator 28-Feb-15
  • 8. Interlocking for safety • In case of any belt trip, entire system behind except crusher will stop • Any other belt of pair will not start on the same discharge belt except 1A&1B • Corresponding feeder will trip if any belt trips
  • 9. Cond..... • Belt & following system except crusher will trip in case of operation of BSS • In case of excessive belt slipage, low speed due to over load or otherwise, belt not running although motor running, belt snapped than belt and following system will stop through zeero speed switch • Overloading of more than 600T/hr • Motors are protected against over load, short circuit, single phasing
  • 10. OPERATION OF CHP • Check if all the belts are healthy and the indication is green in SCADA. • Secondly, check for all possible pull chords manually by sending field operators. • Take clearance from them and start the siren. • After 1 min of the siren give start command.
  • 12. OPERATION OF PADDLE FEEDER • The Paddle Feeders feed the coal on the conveyor belt from the Track hopper at a controlled rate. The paddle blades projected in the hopper slot scoop the coal from hoppers and discharge it on the conveyor belt running below. • The following points need to be checked before taking any paddle feeder into service. • a) The paddle arms are free from any obstruction. • b) There is no leakage at gearboxes and fluid couplings and the oil levels are correct. • c) There is no leakage of hydraulic oil, in the case of hydraulically driven paddle feeders, and the oil levels are correct. • d) The cable reeling drums for correct winding and unwinding. • e) The paddle feeder is operating only in interlock mode.
  • 13.
  • 14. OPERATION OF CONVEYOR • Various conveyors are provided for transporting the coal from Track hopper to Bunkers. • The following precautions are to be taken before taking any conveyor into service: • a) There is no oil leakage at gearboxes / fluid couplings and the oil levels are correct. • b) The Discharge and Receiving chutes are free from jamming and choking. • c) The Flap Gates are in correct positions. • d) All inspection doors are in the closed position. • e) All pull-cords are reset and the EPB is released and ensure that all protections are healthy. • f) The Alarm Siren is in working order. • g) Communication facility is available. • h) The lighting is adequate. • i) No Permit To Work (Isolation) is pending against that conveyor.
  • 15. OPERATION OF STACKER/RECLAIMER • The Stacker Reclaimer is provided to stack the excess coal received from the mines and to reclaim the coal, as and when required. • The following points need to be checked before returning Stacker Reclaimer into service: • a) The track is clear of obstructions. • b) There is no leakage from gearboxes, fluid couplings & hydraulic system. The oil levels are correct. • c) The availability of power supply is checked. • d) All operations e.g. travel; slewing, luffing etc. are available. • e) Brakes are clean and functioning correctly. • f) CRD cable is free from damage and any obstruction and is tensioned correctly.