SlideShare a Scribd company logo
1 of 2
As posted on JobsDB.com




PT. INAMCO VARIA JASA specializes in the supply, management and development of
workforces for the Indonesian mining, energy, and infrastructure development sectors.

We have more than two decades of experience supplying complete workforces or selected
work groups to meet the short and long term employment requirements of Major Indonesian
and International clients on projects and operations throughout Indonesia.

Our Client, a Leading Mining Company in Papua, urgently requires the following position:

                          PLANNING and SCHEDULING ENGINEER

Scope of Work:

          •   Supervise, organize and control all scheduling activities, schedule and report
              development and maintenance to ensure all schedule are develop appropriately
              to support better project development to achieve engineering and procurement
              target on time.
          •   Organize the preparation and development of manpower engineering scheduling
              (resource leveling) based on approved capital project list as optimize and
              effective manpower and utilization justification for additional/reduction
              resources, and to schedule capital project implementation.
          •   Prioritize and coordinate for drawings delivery and progress drawings issue and
              material take off schedule to support construction completed on time.
          •   Organize the preparation of material delivery schedule by coordinating with
              Technical Services, LIP Fabrication shop, NOLA and Material Management to
              proceed PO requisition, steel delivery, and material delivery to ensure all delivery
              of material are made as schedule and in the line with construction schedule.
          •   Determine and evaluate at the end of each year engineering and procurement
              including construction projects which not completed in the particular year and
              should be extended in the next following year “carry – over project” in order to
              corporate with next year approved project for preparation of manpower.
          •   Develop and maintenance “target” engineering, procurement schedule required
              resources for every SIB capital project and discuss with project engineer and end
              user to get their approval.
          •   Organize the preparation of “S- Curve Target” for every approved schedule as a
              tool to monitor and control engineering performance, compare with the actual
              performance, analyze variance and give feedback to project engineer to improve
              performance to achieve project completion ahead or on schedule.
          •   Control and organize the preparation of 3 month rolling schedule based on
              engineering manpower availability.
As posted on JobsDB.com


          •     Organize, determine, review and evaluate monthly QURR (earned man –hours)
                engineering as a standard for bonus calculation.
          •     Organize and prepare kick off meeting engineering projects and publish the result
                meeting each meeting.
          •     Communicate target and motivate responsible person for activity, which apper
                behind schedule to follow schedule and will not affect other activities.

Qualification:
          • S-1 degree in Civil/Mechanical/Electrical Engineering with minimum GPA 2.75.
          • Have minimum 3 years working experience in scheduling for engineering and
             procurement activities.
          • Able to read and review technical drawing and Material Take-Off (MTO)
          • Understand the function of philosophy and scheduling principal, especially for
             engineering scheduling/EPC Schedule.
          • Familiar to operate the software of AutoCAD, Microsoft (Ms. Excel, Ms. Word,
             Ms. Access, Ms. Power Point, Visio, Ms. Project, Internet and Primavera Project
             Planner.
          • Able to set up meeting and conduct the presentation in English and Indonesian
             languages for expatriate end user.
          • Language proficiency verbal and written English.

Deliverables:
          •     Monthly report of manpower engineering scheduling (resource leveling).
          •     Bi – weekly report of drawings delivery and progress drawings issues and material
                take off schedule.
          •     Monthly target of engineering and procurement schedules required resources for
                every SIB (Stay In Business) Capital projects.
          •     Bi – weekly “S – Curve Target” for monitoring and controlling the engineering
                performance and compare between planning and actual performance.
          •     Monthly report of engineering manpower availability (engineers & draftsmen) for
                monthly, 3 months ahead, 1 year ahead and 5 years ahead.
          •     Monthly QURR report for earned man hours engineering.
          •     Minutes of meeting (MoM) for all of kick off meeting Engineering projects.

Interested applicants have to be ready to be assigned in Papua area, please kindly send in
detailed resume stating expected salary and availability to:

                                           APPLY TO :
                          taufik_waris@inamcomanpower.co.id or [.com]
                             luther@inamcomanpower.co.id or [.com]
                              asep@inamcomanpower.co.id or [.com]
                                  rahmat@inamcomanpower.com

More Related Content

Viewers also liked

Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planningmfarbstein
 
Managing Project Resources
Managing Project ResourcesManaging Project Resources
Managing Project ResourcesToyin Osunlaja
 
The 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projectsThe 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projectsTorsten Koerting
 
Project Management using MS Project 2010
Project Management using MS Project 2010Project Management using MS Project 2010
Project Management using MS Project 2010Abdul Ghaffar, PMP
 
Getting started with MS Project 2010
Getting started with MS Project 2010Getting started with MS Project 2010
Getting started with MS Project 2010Monica Di Bratto
 
Software project management
Software project managementSoftware project management
Software project managementR A Akerkar
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management pptAndreea Usatenco
 
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT SummaryPMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT SummaryYudha Pratama, PMP
 
Utilizing SharePoint for Project Management
Utilizing SharePoint for Project ManagementUtilizing SharePoint for Project Management
Utilizing SharePoint for Project ManagementGregory Zelfond
 
Microsoft Office Project 2007 Tutorial
Microsoft Office Project 2007 TutorialMicrosoft Office Project 2007 Tutorial
Microsoft Office Project 2007 TutorialAnil Purushothaman
 

Viewers also liked (13)

Identifying a project in trouble and re-planning
Identifying a project in trouble and re-planningIdentifying a project in trouble and re-planning
Identifying a project in trouble and re-planning
 
Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
 
SharePoint 2013 Pros and Cons
SharePoint 2013 Pros and ConsSharePoint 2013 Pros and Cons
SharePoint 2013 Pros and Cons
 
Managing Project Resources
Managing Project ResourcesManaging Project Resources
Managing Project Resources
 
The 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projectsThe 5 Phases of a Project TurnAround - How to rescue troubled projects
The 5 Phases of a Project TurnAround - How to rescue troubled projects
 
Project Management using MS Project 2010
Project Management using MS Project 2010Project Management using MS Project 2010
Project Management using MS Project 2010
 
Anemia
AnemiaAnemia
Anemia
 
Getting started with MS Project 2010
Getting started with MS Project 2010Getting started with MS Project 2010
Getting started with MS Project 2010
 
Software project management
Software project managementSoftware project management
Software project management
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management ppt
 
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT SummaryPMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
PMBOK 5th Edition - Chapter 6 PROJECT TIME MANAGEMENT Summary
 
Utilizing SharePoint for Project Management
Utilizing SharePoint for Project ManagementUtilizing SharePoint for Project Management
Utilizing SharePoint for Project Management
 
Microsoft Office Project 2007 Tutorial
Microsoft Office Project 2007 TutorialMicrosoft Office Project 2007 Tutorial
Microsoft Office Project 2007 Tutorial
 

More from mtwaris at Inamco (20)

Farewell INAMCO
Farewell INAMCOFarewell INAMCO
Farewell INAMCO
 
Sep - Inst/Elec Drafter
Sep - Inst/Elec DrafterSep - Inst/Elec Drafter
Sep - Inst/Elec Drafter
 
Sep - Man.Geology
Sep - Man.GeologySep - Man.Geology
Sep - Man.Geology
 
Aug - Material Tracker
Aug - Material TrackerAug - Material Tracker
Aug - Material Tracker
 
Aug - Mill Area Scheduler
Aug - Mill Area SchedulerAug - Mill Area Scheduler
Aug - Mill Area Scheduler
 
Aug - Man.Regional Exploration
Aug - Man.Regional ExplorationAug - Man.Regional Exploration
Aug - Man.Regional Exploration
 
Aug - Man.Geology
Aug - Man.GeologyAug - Man.Geology
Aug - Man.Geology
 
Aug - Cost Est & Piping Constr
Aug - Cost Est & Piping ConstrAug - Cost Est & Piping Constr
Aug - Cost Est & Piping Constr
 
Aug - Data Administrasi
Aug - Data AdministrasiAug - Data Administrasi
Aug - Data Administrasi
 
Jul - Soil Technician
Jul - Soil TechnicianJul - Soil Technician
Jul - Soil Technician
 
Jul - Mine Engineer Spdt
Jul - Mine Engineer SpdtJul - Mine Engineer Spdt
Jul - Mine Engineer Spdt
 
Jul - Geology Exploration Spdt
Jul - Geology Exploration SpdtJul - Geology Exploration Spdt
Jul - Geology Exploration Spdt
 
Jul - HD Mechanics
Jul - HD MechanicsJul - HD Mechanics
Jul - HD Mechanics
 
Jun - Mining Engineer
Jun - Mining EngineerJun - Mining Engineer
Jun - Mining Engineer
 
May - Operators Heavy Equipment
May - Operators Heavy EquipmentMay - Operators Heavy Equipment
May - Operators Heavy Equipment
 
May - Foreman Heavy Equipment Operation
May - Foreman Heavy Equipment OperationMay - Foreman Heavy Equipment Operation
May - Foreman Heavy Equipment Operation
 
May - Project Mechanical
May - Project MechanicalMay - Project Mechanical
May - Project Mechanical
 
Inamco Recruiters Team
Inamco Recruiters TeamInamco Recruiters Team
Inamco Recruiters Team
 
Newmont - Principal Client
Newmont - Principal ClientNewmont - Principal Client
Newmont - Principal Client
 
Heavy Equipments
Heavy EquipmentsHeavy Equipments
Heavy Equipments
 

May - Planning and Scheduling

  • 1. As posted on JobsDB.com PT. INAMCO VARIA JASA specializes in the supply, management and development of workforces for the Indonesian mining, energy, and infrastructure development sectors. We have more than two decades of experience supplying complete workforces or selected work groups to meet the short and long term employment requirements of Major Indonesian and International clients on projects and operations throughout Indonesia. Our Client, a Leading Mining Company in Papua, urgently requires the following position: PLANNING and SCHEDULING ENGINEER Scope of Work: • Supervise, organize and control all scheduling activities, schedule and report development and maintenance to ensure all schedule are develop appropriately to support better project development to achieve engineering and procurement target on time. • Organize the preparation and development of manpower engineering scheduling (resource leveling) based on approved capital project list as optimize and effective manpower and utilization justification for additional/reduction resources, and to schedule capital project implementation. • Prioritize and coordinate for drawings delivery and progress drawings issue and material take off schedule to support construction completed on time. • Organize the preparation of material delivery schedule by coordinating with Technical Services, LIP Fabrication shop, NOLA and Material Management to proceed PO requisition, steel delivery, and material delivery to ensure all delivery of material are made as schedule and in the line with construction schedule. • Determine and evaluate at the end of each year engineering and procurement including construction projects which not completed in the particular year and should be extended in the next following year “carry – over project” in order to corporate with next year approved project for preparation of manpower. • Develop and maintenance “target” engineering, procurement schedule required resources for every SIB capital project and discuss with project engineer and end user to get their approval. • Organize the preparation of “S- Curve Target” for every approved schedule as a tool to monitor and control engineering performance, compare with the actual performance, analyze variance and give feedback to project engineer to improve performance to achieve project completion ahead or on schedule. • Control and organize the preparation of 3 month rolling schedule based on engineering manpower availability.
  • 2. As posted on JobsDB.com • Organize, determine, review and evaluate monthly QURR (earned man –hours) engineering as a standard for bonus calculation. • Organize and prepare kick off meeting engineering projects and publish the result meeting each meeting. • Communicate target and motivate responsible person for activity, which apper behind schedule to follow schedule and will not affect other activities. Qualification: • S-1 degree in Civil/Mechanical/Electrical Engineering with minimum GPA 2.75. • Have minimum 3 years working experience in scheduling for engineering and procurement activities. • Able to read and review technical drawing and Material Take-Off (MTO) • Understand the function of philosophy and scheduling principal, especially for engineering scheduling/EPC Schedule. • Familiar to operate the software of AutoCAD, Microsoft (Ms. Excel, Ms. Word, Ms. Access, Ms. Power Point, Visio, Ms. Project, Internet and Primavera Project Planner. • Able to set up meeting and conduct the presentation in English and Indonesian languages for expatriate end user. • Language proficiency verbal and written English. Deliverables: • Monthly report of manpower engineering scheduling (resource leveling). • Bi – weekly report of drawings delivery and progress drawings issues and material take off schedule. • Monthly target of engineering and procurement schedules required resources for every SIB (Stay In Business) Capital projects. • Bi – weekly “S – Curve Target” for monitoring and controlling the engineering performance and compare between planning and actual performance. • Monthly report of engineering manpower availability (engineers & draftsmen) for monthly, 3 months ahead, 1 year ahead and 5 years ahead. • Monthly QURR report for earned man hours engineering. • Minutes of meeting (MoM) for all of kick off meeting Engineering projects. Interested applicants have to be ready to be assigned in Papua area, please kindly send in detailed resume stating expected salary and availability to: APPLY TO : taufik_waris@inamcomanpower.co.id or [.com] luther@inamcomanpower.co.id or [.com] asep@inamcomanpower.co.id or [.com] rahmat@inamcomanpower.com