Bts3900 cabinet cascade installation guide

  1. 1. For Mobilink swap project, if the BTS3900 only has 1 cabinet, then the RF cable installation should as the picture attached below:
  2. 2. The RF cable should be laid from the two side of the cabinet. If the BTS3900 has 2 cabinets, then use the stacked installation mode. The RF cable installation is mentioned as below:

×