Business Model Canvas (BMC)- A new venture concept
Lean Six Sigma Tools Arsenal
1. MY LEAN SIX SIGMA TOOLS ARSENAL
Benchmarking
Best Practices
Brainstorming / Breakthrough – Out-of-the-box Thinking
Cause and Effect Fishbone/Ishikawa Diagramming
Continuous Flow 1 pc. , minimal work-in-process concept
Continuous / Process Improvement
Design of Experiment (DOE)
Design For Manufacturability (DFSS)
DMAIC Define, Measure, Analyze, Improve, Control
FMEA Failure Modes & Effects Analysis Tools
FBI (Finding Better Ideas) principles
Kaizen Events
Kanban Pull System
Muda (Waste Elimination of Overproduction, Defects,
Time, Transport, Processing, Waste, Inventory Waste
and Excessive Motion.
Mura Focusing on implementing and/or eliminating
fluctuations in quality, volume, etc.
Muri (Flow) Highlights unreasonable working elements
and workplace requirements
OEE (Overall Equipment Effectiveness)
Pareto Charting
Poka Yoking (Error / Mistake Proofing)
Process Mapping / Flow Charting
PSDM Problem Solving and Decision Making
Reproducibility and Repeatability /Metrology
Scientific Method
SMED Single Minute Exchange of Dies (Setup Reduction)
SPC Statistical Process Control
Takt Time
2. TPM Total Productive Maintenance
Value-added, non-value added or value-enabling analysis
VSM Value Stream Mapping System to analyze every
waste or every process relative to quality, downtime,
personnel development, cross training, capacity
bottlenecks, or for anything to affect profits, safety,
metrics, morale, etc.
Work Cells
5S Visual controls
5 Ms Machine, Man, Method, Measurement & Materials
Lean Approach For Problem Resolution
What happened?
Where did it occur?
When did it occur? How often is it occurring?
Who did it happen to?
Why did it happen?
What approach will solve the problem?
Will that solution address the issue?
What will the situation look like when the
problem is completely resolved?
What step(s) would be required to achieve this
problem’(s) solution?
What systems or processes in the company should be
addressed or changed to remedy future similar
issues?
What resources will be needed ( people, money and
facilities)?
Who will be responsible to implement the solution(s)?
What time frame will be required?
Who will communicate the progress to all key
party’s involved with overall process?