Reliability Engineering
Fred Schenkelberg
fms@fmsreliability.com
Introduction
• Reliability is about time to
failure
• Maintenance is about
restoring equipment and
processes to operation
• Engineering is finding the
right balance between cost
and action
MAXIMIZING POTENTIAL BENEFITS
OF MAINTENANCE ACTIVITIES
Session 2
Objectives
• Reduce operating cost while boosting
productivity though equipment maintenance
• Analyzing equipment failures for
proactive, predictive & preventative
maintenance
• Selecting the appropriate maintenance
approach
• Developing a maintenance program
Cost of Maintenance
• Spares
• Labor
• Training
• Diagnostic Equipment
• It takes an investment
Cost of Downtime
• Loss production
• Restart Costs
• Loss of Revenue
• Opportunity Costs
• Unscheduled downtime
Benefit of Operating
• Revenue
• Production
• Efficiency
• Uptime
• Less downtime means
More uptime and value
Discussion & Questions
Reliability
• Common
Understanding
• Function
• Environment/Use
• Duration
• Probability
Availability
• Common
Understanding
• Inherent – ideal
• Achieved – PM & CM
included
• Operational – actual
with all downtime
Maintainability
• Two elements
• Design for
maintainability
• Effectiveness of repairs
– Good as new
– Bad as old
– Somewhere between
Uptime
• Operating when it
should be operating
• Who defines and how is
this defined?
Discussion & Questions
Equipment Failure
• Provides guide to
maintenance approach
• What are the results of
failure?
• What is known about
failure modes and
mechanisms?
Types of Failures
• A range
• Nobody cares
• Degradation
• Shut down
Failure Impact
• A range of impacts
• Nobody cares (why is
the equipment here?)
• Degraded operation
• Major repair/restart
Failure Signs
• Is there a warning?
• Measured and
predicted
• Slow degradation of
throughput or quality
• Sudden and unforeseen
Discussion & Questions
Reactive
Consider for
• Small items
• Non-critical
• Inconsequential
• Unlikely to fail
• Redundant
Preventive
Consider if
• Subject to wear out
• Consumable
replacement
• Failure pattern known
Predictive
Consider when
• Random failure pattern
• Not subject to wear
• PM induce failures
Proactive
Consider with
• Root Cause Failure
Analysis
• Age Exploration
• FMEA
Discussion & Questions
Interval v. Conditional
Interval or time based
• Fixed schedule
• Assumes wear or
predictable time to
failure
• Easy to manage and
plan
Condition based
• Focus on failure
mechanisms
• Consider cost of failure
• May require health
monitoring
• Cost effective
How to decide an approach
Ask these questions:
• Nature of failures?
• Able to detect ?
• Predictable?
• Indicators?
• Cost of failure?
• Cost of maintenance?
Approaches
• Reactive
• Preventive
• Predictive
• Proactive
Discussion & Questions
Get the data
• Data, Data, Data
• Convert to information
• Do the math
• Look for Stability and
Exceptions
Where to start
• Use data you have to
start – build case for
better data collection
• Run experiments to get
better data
• Next focus on high
value areas
Build a program
• Maintenance
procedures
• Tools and training
• Engineering
– Design, Reliability &
Operations
• Connect to business
Metrics
• Not MTBF
• Business metrics
– Revenue, throughput, et
c.
• Time to failure
– Mean Cumulative
Function or Life
Distributions
Discussion & Questions
Summary
• Value – do what adds value
• Understand failure
mechanisms
• Time to failure &
Environmental data
• Breadth of Maintenance
Engineering
Maximize potential benefits of
maintenance activities

More Related Content

What's hot

Neotys PAC - Stephen Townshend
Neotys PAC - Stephen TownshendNeotys PAC - Stephen Townshend
Neotys PAC - Stephen TownshendNeotys_Partner
 
5 Things to Look for in Corrective Action Software Solutions
5 Things to Look for in Corrective Action Software Solutions5 Things to Look for in Corrective Action Software Solutions
5 Things to Look for in Corrective Action Software SolutionsEtQ, Inc.
 
6 methods for CAPAs effectiveness verification
6 methods for CAPAs effectiveness verification6 methods for CAPAs effectiveness verification
6 methods for CAPAs effectiveness verificationPaolo Croce
 
T19 performance testing effort - estimation or guesstimation revised
T19   performance testing effort - estimation or guesstimation revisedT19   performance testing effort - estimation or guesstimation revised
T19 performance testing effort - estimation or guesstimation revisedTEST Huddle
 
Root Cause Analysis By Deepak
Root Cause Analysis By DeepakRoot Cause Analysis By Deepak
Root Cause Analysis By DeepakDEEPAK SAHOO
 
Cause and-effect diagram
Cause and-effect diagramCause and-effect diagram
Cause and-effect diagramYasoda Kumar
 
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVODo iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVOKiran Vairagkar
 
Effective quality improvement paths for manufacturing
Effective quality improvement paths for manufacturingEffective quality improvement paths for manufacturing
Effective quality improvement paths for manufacturingFrank Rzeznikiewicz
 
Workshop 1 (analysis and Presenting)
Workshop 1 (analysis and Presenting)Workshop 1 (analysis and Presenting)
Workshop 1 (analysis and Presenting)Sónia
 
Process plant troubleshooting
Process plant troubleshootingProcess plant troubleshooting
Process plant troubleshootingAnand Mishra
 
Electrical engineering control plans building on a valid control framework -...
Electrical engineering control plans  building on a valid control framework -...Electrical engineering control plans  building on a valid control framework -...
Electrical engineering control plans building on a valid control framework -...NSW Environment and Planning
 
Practical Software Development Metrics
Practical Software Development MetricsPractical Software Development Metrics
Practical Software Development MetricsJari Kuusisto
 
DaKiRY_BAQ2016_QADay_Mateusz Holewski "Disaster Recovery Testing"
DaKiRY_BAQ2016_QADay_Mateusz Holewski "Disaster Recovery Testing"DaKiRY_BAQ2016_QADay_Mateusz Holewski "Disaster Recovery Testing"
DaKiRY_BAQ2016_QADay_Mateusz Holewski "Disaster Recovery Testing"Dakiry
 
Closed Loop Corrective Action
Closed Loop Corrective ActionClosed Loop Corrective Action
Closed Loop Corrective ActionLee Hanxue
 
What is software Engineering!
What is software Engineering!What is software Engineering!
What is software Engineering!Ali Haider
 
RCA Root Cause Analysis
RCA Root Cause AnalysisRCA Root Cause Analysis
RCA Root Cause Analysiswaleed sayed
 

What's hot (20)

Neotys PAC - Stephen Townshend
Neotys PAC - Stephen TownshendNeotys PAC - Stephen Townshend
Neotys PAC - Stephen Townshend
 
5 Things to Look for in Corrective Action Software Solutions
5 Things to Look for in Corrective Action Software Solutions5 Things to Look for in Corrective Action Software Solutions
5 Things to Look for in Corrective Action Software Solutions
 
Ch12
Ch12Ch12
Ch12
 
Template
TemplateTemplate
Template
 
6 methods for CAPAs effectiveness verification
6 methods for CAPAs effectiveness verification6 methods for CAPAs effectiveness verification
6 methods for CAPAs effectiveness verification
 
Planning stage 1 v3
Planning stage 1   v3Planning stage 1   v3
Planning stage 1 v3
 
T19 performance testing effort - estimation or guesstimation revised
T19   performance testing effort - estimation or guesstimation revisedT19   performance testing effort - estimation or guesstimation revised
T19 performance testing effort - estimation or guesstimation revised
 
Root Cause Analysis By Deepak
Root Cause Analysis By DeepakRoot Cause Analysis By Deepak
Root Cause Analysis By Deepak
 
Cause and-effect diagram
Cause and-effect diagramCause and-effect diagram
Cause and-effect diagram
 
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVODo iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVO
 
Effective quality improvement paths for manufacturing
Effective quality improvement paths for manufacturingEffective quality improvement paths for manufacturing
Effective quality improvement paths for manufacturing
 
Workshop 1 (analysis and Presenting)
Workshop 1 (analysis and Presenting)Workshop 1 (analysis and Presenting)
Workshop 1 (analysis and Presenting)
 
Process plant troubleshooting
Process plant troubleshootingProcess plant troubleshooting
Process plant troubleshooting
 
Electrical engineering control plans building on a valid control framework -...
Electrical engineering control plans  building on a valid control framework -...Electrical engineering control plans  building on a valid control framework -...
Electrical engineering control plans building on a valid control framework -...
 
Introduction to SPC
Introduction to SPCIntroduction to SPC
Introduction to SPC
 
Practical Software Development Metrics
Practical Software Development MetricsPractical Software Development Metrics
Practical Software Development Metrics
 
DaKiRY_BAQ2016_QADay_Mateusz Holewski "Disaster Recovery Testing"
DaKiRY_BAQ2016_QADay_Mateusz Holewski "Disaster Recovery Testing"DaKiRY_BAQ2016_QADay_Mateusz Holewski "Disaster Recovery Testing"
DaKiRY_BAQ2016_QADay_Mateusz Holewski "Disaster Recovery Testing"
 
Closed Loop Corrective Action
Closed Loop Corrective ActionClosed Loop Corrective Action
Closed Loop Corrective Action
 
What is software Engineering!
What is software Engineering!What is software Engineering!
What is software Engineering!
 
RCA Root Cause Analysis
RCA Root Cause AnalysisRCA Root Cause Analysis
RCA Root Cause Analysis
 

Viewers also liked

Successful Career in Reliability Engineering
Successful Career in Reliability EngineeringSuccessful Career in Reliability Engineering
Successful Career in Reliability EngineeringAccendo Reliability
 
Reliability Growth Planning: Its Concept, Applications, and Challenges
Reliability Growth Planning: Its Concept, Applications, and Challenges Reliability Growth Planning: Its Concept, Applications, and Challenges
Reliability Growth Planning: Its Concept, Applications, and Challenges ASQ Reliability Division
 
Reducing Product Development Risk with Reliability Engineering Methods
Reducing Product Development Risk with Reliability Engineering MethodsReducing Product Development Risk with Reliability Engineering Methods
Reducing Product Development Risk with Reliability Engineering MethodsWilde Analysis Ltd.
 
Quality management of hrd
Quality management of hrdQuality management of hrd
Quality management of hrdshabana batool
 
Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3ASQ Reliability Division
 
Reliability for Total Quality Management (TQM)
Reliability for Total Quality Management (TQM)Reliability for Total Quality Management (TQM)
Reliability for Total Quality Management (TQM)Lavinia Layson
 
Unit 1. quality, total quality, tqm
Unit 1. quality, total quality, tqmUnit 1. quality, total quality, tqm
Unit 1. quality, total quality, tqmShekhar Mallur
 

Viewers also liked (10)

Successful Career in Reliability Engineering
Successful Career in Reliability EngineeringSuccessful Career in Reliability Engineering
Successful Career in Reliability Engineering
 
Reliability Growth Planning: Its Concept, Applications, and Challenges
Reliability Growth Planning: Its Concept, Applications, and Challenges Reliability Growth Planning: Its Concept, Applications, and Challenges
Reliability Growth Planning: Its Concept, Applications, and Challenges
 
Reducing Product Development Risk with Reliability Engineering Methods
Reducing Product Development Risk with Reliability Engineering MethodsReducing Product Development Risk with Reliability Engineering Methods
Reducing Product Development Risk with Reliability Engineering Methods
 
Quality management of hrd
Quality management of hrdQuality management of hrd
Quality management of hrd
 
Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3
 
Reliability for Total Quality Management (TQM)
Reliability for Total Quality Management (TQM)Reliability for Total Quality Management (TQM)
Reliability for Total Quality Management (TQM)
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Unit 1. quality, total quality, tqm
Unit 1. quality, total quality, tqmUnit 1. quality, total quality, tqm
Unit 1. quality, total quality, tqm
 
Tqm
TqmTqm
Tqm
 
VALUE ANALYSIS
VALUE ANALYSISVALUE ANALYSIS
VALUE ANALYSIS
 

Similar to Reliability Maintenance Engineering 1 - 2 Max Benefits

Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring MaintainabilityReliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring MaintainabilityAccendo Reliability
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxFaith Youngsville, NC
 
Operational Excellence.pptx
Operational Excellence.pptxOperational Excellence.pptx
Operational Excellence.pptxArvindGarg40
 
Miliken Performance system.pdf
Miliken Performance system.pdfMiliken Performance system.pdf
Miliken Performance system.pdfEkoSarwono5
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptxDevenJally1
 
Code Yellow: Helping operations top-heavy teams the smart way
Code Yellow: Helping operations top-heavy teams the smart wayCode Yellow: Helping operations top-heavy teams the smart way
Code Yellow: Helping operations top-heavy teams the smart wayMichael Kehoe
 
Meet up Continuous delivery
Meet up Continuous deliveryMeet up Continuous delivery
Meet up Continuous deliverySamuel RETIERE
 
Helping operations top-heavy teams the smart way
Helping operations top-heavy teams the smart wayHelping operations top-heavy teams the smart way
Helping operations top-heavy teams the smart wayMichael Kehoe
 
Lean Practices For Software Development
Lean Practices For Software DevelopmentLean Practices For Software Development
Lean Practices For Software DevelopmentSandeep Yadav
 
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...Jens Gunnars
 
Code Yellow: Helping Operations Top-Heavy Teams the Smart Way
Code Yellow: Helping Operations Top-Heavy Teams the Smart WayCode Yellow: Helping Operations Top-Heavy Teams the Smart Way
Code Yellow: Helping Operations Top-Heavy Teams the Smart WayTodd Palino
 
Helping operations top-heavy teams the smart way
Helping operations top-heavy teams the smart wayHelping operations top-heavy teams the smart way
Helping operations top-heavy teams the smart wayMichael Kehoe
 
Top Devops bottlenecks, constraints and best practices
Top Devops bottlenecks, constraints and best practicesTop Devops bottlenecks, constraints and best practices
Top Devops bottlenecks, constraints and best practicesMike Kavis
 
Focus your investments in innovations
Focus your investments in innovationsFocus your investments in innovations
Focus your investments in innovationsKobi Vider
 
Beating the product credit crunch
Beating the product credit crunchBeating the product credit crunch
Beating the product credit crunchStephen Williams
 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochureRicky Smith CMRP, CMRT
 
Maintenance-Planning-and-Scheduling-Overview.pptx
Maintenance-Planning-and-Scheduling-Overview.pptxMaintenance-Planning-and-Scheduling-Overview.pptx
Maintenance-Planning-and-Scheduling-Overview.pptxTun Lin Oo
 

Similar to Reliability Maintenance Engineering 1 - 2 Max Benefits (20)

Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring MaintainabilityReliability Maintenance Engineering 2 - 3 Measuring Maintainability
Reliability Maintenance Engineering 2 - 3 Measuring Maintainability
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptx
 
Operational Excellence.pptx
Operational Excellence.pptxOperational Excellence.pptx
Operational Excellence.pptx
 
Miliken Performance system.pdf
Miliken Performance system.pdfMiliken Performance system.pdf
Miliken Performance system.pdf
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptx
 
Method Study
Method Study Method Study
Method Study
 
Code Yellow: Helping operations top-heavy teams the smart way
Code Yellow: Helping operations top-heavy teams the smart wayCode Yellow: Helping operations top-heavy teams the smart way
Code Yellow: Helping operations top-heavy teams the smart way
 
Meet up Continuous delivery
Meet up Continuous deliveryMeet up Continuous delivery
Meet up Continuous delivery
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
OM.pdf
OM.pdfOM.pdf
OM.pdf
 
Helping operations top-heavy teams the smart way
Helping operations top-heavy teams the smart wayHelping operations top-heavy teams the smart way
Helping operations top-heavy teams the smart way
 
Lean Practices For Software Development
Lean Practices For Software DevelopmentLean Practices For Software Development
Lean Practices For Software Development
 
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
 
Code Yellow: Helping Operations Top-Heavy Teams the Smart Way
Code Yellow: Helping Operations Top-Heavy Teams the Smart WayCode Yellow: Helping Operations Top-Heavy Teams the Smart Way
Code Yellow: Helping Operations Top-Heavy Teams the Smart Way
 
Helping operations top-heavy teams the smart way
Helping operations top-heavy teams the smart wayHelping operations top-heavy teams the smart way
Helping operations top-heavy teams the smart way
 
Top Devops bottlenecks, constraints and best practices
Top Devops bottlenecks, constraints and best practicesTop Devops bottlenecks, constraints and best practices
Top Devops bottlenecks, constraints and best practices
 
Focus your investments in innovations
Focus your investments in innovationsFocus your investments in innovations
Focus your investments in innovations
 
Beating the product credit crunch
Beating the product credit crunchBeating the product credit crunch
Beating the product credit crunch
 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop Brochure
 
Maintenance-Planning-and-Scheduling-Overview.pptx
Maintenance-Planning-and-Scheduling-Overview.pptxMaintenance-Planning-and-Scheduling-Overview.pptx
Maintenance-Planning-and-Scheduling-Overview.pptx
 

More from Accendo Reliability

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfAccendo Reliability
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdfAccendo Reliability
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdfAccendo Reliability
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdfAccendo Reliability
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdfAccendo Reliability
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdfAccendo Reliability
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdfAccendo Reliability
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdfAccendo Reliability
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdfAccendo Reliability
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdfAccendo Reliability
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdfAccendo Reliability
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyerAccendo Reliability
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life TestAccendo Reliability
 

More from Accendo Reliability (20)

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdf
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdf
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdf
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf
 
13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf
 
11-RCM is like a diet.pdf
11-RCM is like a diet.pdf11-RCM is like a diet.pdf
11-RCM is like a diet.pdf
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 

Recently uploaded

FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKJago de Vreede
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAnitaRaj43
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)Samir Dash
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard37
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 

Recently uploaded (20)

FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 

Reliability Maintenance Engineering 1 - 2 Max Benefits

Editor's Notes

  1. Value iamge – intro to each task has to create value – tied to that idea,
  2. Balance between investment and value
  3. Background intro to terms and concepts
  4. Balance between investment and value
  5. Analysis of equipment failure as preparation for different types of maintenance programs
  6. Balance between investment and value
  7. Image to open Maintenance approaches
  8. Balance between investment and value
  9. Image for maintenance approaches
  10. How to build a program
  11. Balance between investment and value
  12. Balance between investment and value