9. Cristo Rey High School
AutoCad drafting and Photoshop
Academic Portfolio
10. Cristo Rey High School
AutoCad drafting, Photoshop, & SketchUp
Academic Portfolio (right) Hand sketching and watercolor
11. PROJECT DESCRIPTION:
A new airport in Santa
Barbara, California.
ROLES AND
RESPONSIBILITIES:
• Created color
rendering for public
display and use at city
council meetings.
• Designed
complimentary
architectural elements.
(ie bus stops, parking
ticket booths, etc.)
• Created graphic
design elements for
signage in the airport.
Santa Barbara Airport
Color rendering in water color
Professional Work Design and drafting by Fred Sweeney, PMSM Architects
12. PROJECT DESCRIPTION:
Thirty million dolar
renovation and addition
to an existing Chicago
public high school. The
project included a new
competition gymnasium
and swimming pool.
ROLES AND
RESPONSIBILITIES:
• Served as part of the
production staff from
DD 60% though bidding
addenda.
• Assisted in the
development of various
construction details.
• Picked up permit
revisions and helped
respond to multiple
stages of review
comments.
Chicago Public High School
Rendering by others
Professional Work
13. PROJECT DESCRIPTION:
A planned multi-family
residential development
on the south side of
Chicago.
ROLES AND
RESPONSIBILITIES:
• Aided in the
investigative and urban
planning dimension of
the project.
• Developed schematic
3D massing models of
the site and the planned
development.
• Presented to the
development team.
• Created initial facade
studies.
Multi-family Residential Development
Massing model in SketchUp
Professional Work Facade in AutoCad
14. PROJECT DESCRIPTION:
The renovation of two
existing rooms in a
public health laboratory
building.
ROLES AND
RESPONSIBILITIES:
• Served as Project
Manager.
• Worked with Client
(Capital Development Board
of Illinois) and the End
User (Illinois Department
of Public Health) to create
an acceptable design
solution within budget.
• Created bid documents
and oversaw bidding
process.
• Remained Project
Manager for the
Construction
Administration phase
and reviewed all
submittals and shop
drawings.
Public Health Laboratory
Photograph of existing conditions
Professional Work
15. PROJECT DESCRIPTION:
Five buildings in a
multi-family residential
development which
covered two city blocks.
ROLES AND
RESPONSIBILITIES:
• Led Construction
Administration team.
• Produced bi-monthly
field reports over the
course of construciton.
• Reviewed and processed
submittals and RFIs.
• Acted as my firm’s
representative at weekly
Owner/Architect/
Contractor field
meetings.
• Reviewed pencil draws
and PCOs.
• Coordinated with the
site superintendent
to troubleshoot
construction issues.
• Regularly produced
field sketches to better
explain problems and/
or solutions to the
construction team.
Multi-family Residential Development
Photograph of site mid-construction
Professional Work & field sketch