SlideShare a Scribd company logo
1 of 2
Download to read offline
Kerry Foley
SVP of Sales and Marketing kfoley@enstoa.com +1 (718) 288 1897
A Better Way to Build
SPRINT 0A Modern Approach To Management Consulting
WHAT OUR CLIENTS ARE SAYING
ABOUT THE SPRINT 0
“Enstoa’s Sprint 0 helped us develop a
strategic plan within 2 calendar weeks. We
were amazed to see detailed dashboards
with our own data so quickly.”
- VP of Facilities, Healthcare
IT ALL STARTS WITH SPRINT 0
Prototype dashboards serve as proof of concept and help to
solidify the requirements gathering and performance initiative
mapping.
You need a plan for your information systems, a strategy to
define how IS can support your project goals. Enstoa’s Sprint 0
takes 2 calendar weeks to complete and puts to bed questions
on what should we do and how should we do it. Our experi-
enced team runs
workshops at your
office over a short
period to define
management met-
rics, discover pain
points and bring
light to opportuni-
ties.
“Engaging in major process changes
without mapping out a plan is high risk.
The Sprint 0 mitigates that risk through
Enstoa’s tools, methodology and experi-
enced team. It’s now protocol within our
organization to kick off all projects with a
Sprint 0 workshop.”
- Director of Projects, Energy
“We had worked with several other
consultants in the past but Enstoa was the
first to truly feel like an extension of our
own team. In our Sprint 0, they listened
to what our current processes were
and helped us determine what changes
needed to be made.”
- Director of Project Controls, Education
“Through the Sprint 0, we were able to
identify the origin of several pain points
and determine a detailed plan to alleviate
those problem areas.”
- Project Manager, Retail
Kerry Foley
SVP of Sales and Marketing kfoley@enstoa.com +1 (718) 288 1897
A Better Way to Build
SPRINT 0A Modern Approach To Management Consulting
During the Workshops Enstoa will gather initiatives based on pain
points, best practices and systems review. Rated according to:
Value: Perceived value to client of the initiatives
Complexity: Level of difficulty in deploying the initiative solutions
ROADMAP FOR ENHANCEMENTS
LIST OF PERFORMANCE INITIATIVES
Upon completion of our workshop the client will have identi-
fied the high level requirements for a more robust future state
solution. Enstoa then proceeds to evaluate the existing systems
against initiative goals to produce the strategic technology road-
map.
BENEFITS ANALYSIS
Analysis that identifies opportunity costs and areas for cost re-
duction to assist the client in the justification for future solution
improvements
FUTURE STATE ARCHITECTURE
Enstoa provides high-level current and target systems architec-
ture diagrams in order to provide visibility into the existing gaps
and proposed solutions
CII 10-10 SURVEY REPORT
Enstoa has partnered with the Construction Industry Institute
(CII) and incorporated the 10-10
Performance Assessment Survey results to address:
•	 Project Performance
•	 Team Dynamics
•	 Organizational Relationships
Benefit
Capital Allocation
(underspending)
• Underspending the capital plan results in an
opportunity cost for Com pass Minerals
Underspend:
FY11: 10% | FY12: 25% | FY13: 35%
Hurdle rate (cost of capital): 10%
Assumptions
$4,082,000
annual opportunity
cost
Value
Cash flow volatility
(minimizing the
buffer)
• Reduce borrowing costs
• Tighten project team CF forecast
• Minim ize CF buffer used by finance to cover capital
outflows
Cost due to excess buffer:
FY11: $1.1 | FY12: $1.5 | FY13: $0.8 (Mil) Cost of
borrowing: 5%
$1,184,000
annual cost reduction
I dle capital held up in
budgets and
encumbrances
• Release capital com m itm ents sooner by decreasing
project financial close-out duration and com plexity.
Opportunity cost due to idle capital:
$6.71 m illion for PO’s prior to 2012 yields savings
of $671k
$671,000
one-time opportunity
cost

More Related Content

What's hot

Best crm for architects
Best crm for architectsBest crm for architects
Best crm for architectsseetadevi
 
ARCADIO CAMACARO RESUME FEB 2016 MASTER
ARCADIO CAMACARO RESUME FEB 2016 MASTERARCADIO CAMACARO RESUME FEB 2016 MASTER
ARCADIO CAMACARO RESUME FEB 2016 MASTERArcadio Camacaro, MBA
 
Dennis Hudson Resume 10.26.2015
Dennis Hudson Resume 10.26.2015Dennis Hudson Resume 10.26.2015
Dennis Hudson Resume 10.26.2015Dennis Hudson
 
Capital Spend Forecasting in Anaplan
Capital Spend Forecasting in AnaplanCapital Spend Forecasting in Anaplan
Capital Spend Forecasting in Anaplanrnaramore
 
Business Intelligence on Cloud: A Business Perspective
Business Intelligence on Cloud: A Business PerspectiveBusiness Intelligence on Cloud: A Business Perspective
Business Intelligence on Cloud: A Business Perspectivetdwiindia
 
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham SarsamPMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham SarsamHani
 
PMIGLC CQM Discussion Panel on BIM4CQM-Laura Suter
PMIGLC CQM Discussion Panel on BIM4CQM-Laura SuterPMIGLC CQM Discussion Panel on BIM4CQM-Laura Suter
PMIGLC CQM Discussion Panel on BIM4CQM-Laura SuterHani
 
Nate King Resume 8-2014 AV
Nate King Resume 8-2014 AVNate King Resume 8-2014 AV
Nate King Resume 8-2014 AVNate King
 
Liana Underwood GIS Project Management 16 April 14
Liana Underwood GIS Project Management 16 April 14Liana Underwood GIS Project Management 16 April 14
Liana Underwood GIS Project Management 16 April 14Liana Underwood
 
Growth Management and Development Dashboard
Growth Management and Development DashboardGrowth Management and Development Dashboard
Growth Management and Development DashboardSafe Software
 
Resource Management and Professional Services Automation
Resource Management and Professional Services AutomationResource Management and Professional Services Automation
Resource Management and Professional Services AutomationCA Technologies
 
Build agile business processes
Build agile business processes Build agile business processes
Build agile business processes EvaLowrie
 
project engineer
project engineerproject engineer
project engineerCADISON
 
Engineering & Construction Industry Overview
Engineering & Construction Industry OverviewEngineering & Construction Industry Overview
Engineering & Construction Industry OverviewSouvik Chakraborty
 

What's hot (19)

Best crm for architects
Best crm for architectsBest crm for architects
Best crm for architects
 
ARCADIO CAMACARO RESUME FEB 2016 MASTER
ARCADIO CAMACARO RESUME FEB 2016 MASTERARCADIO CAMACARO RESUME FEB 2016 MASTER
ARCADIO CAMACARO RESUME FEB 2016 MASTER
 
Sai vivek goud
Sai vivek goudSai vivek goud
Sai vivek goud
 
Dennis Hudson Resume 10.26.2015
Dennis Hudson Resume 10.26.2015Dennis Hudson Resume 10.26.2015
Dennis Hudson Resume 10.26.2015
 
Capital Spend Forecasting in Anaplan
Capital Spend Forecasting in AnaplanCapital Spend Forecasting in Anaplan
Capital Spend Forecasting in Anaplan
 
Business Intelligence on Cloud: A Business Perspective
Business Intelligence on Cloud: A Business PerspectiveBusiness Intelligence on Cloud: A Business Perspective
Business Intelligence on Cloud: A Business Perspective
 
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham SarsamPMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
 
PMIGLC CQM Discussion Panel on BIM4CQM-Laura Suter
PMIGLC CQM Discussion Panel on BIM4CQM-Laura SuterPMIGLC CQM Discussion Panel on BIM4CQM-Laura Suter
PMIGLC CQM Discussion Panel on BIM4CQM-Laura Suter
 
Nate King Resume 8-2014 AV
Nate King Resume 8-2014 AVNate King Resume 8-2014 AV
Nate King Resume 8-2014 AV
 
Arness Technologies DataCenter Solution
Arness Technologies DataCenter SolutionArness Technologies DataCenter Solution
Arness Technologies DataCenter Solution
 
Liana Underwood GIS Project Management 16 April 14
Liana Underwood GIS Project Management 16 April 14Liana Underwood GIS Project Management 16 April 14
Liana Underwood GIS Project Management 16 April 14
 
NP_Resume2021
NP_Resume2021NP_Resume2021
NP_Resume2021
 
Growth Management and Development Dashboard
Growth Management and Development DashboardGrowth Management and Development Dashboard
Growth Management and Development Dashboard
 
Resource Management and Professional Services Automation
Resource Management and Professional Services AutomationResource Management and Professional Services Automation
Resource Management and Professional Services Automation
 
Build agile business processes
Build agile business processes Build agile business processes
Build agile business processes
 
Opacity - Product Profile
Opacity - Product ProfileOpacity - Product Profile
Opacity - Product Profile
 
project engineer
project engineerproject engineer
project engineer
 
Core Competencies
Core CompetenciesCore Competencies
Core Competencies
 
Engineering & Construction Industry Overview
Engineering & Construction Industry OverviewEngineering & Construction Industry Overview
Engineering & Construction Industry Overview
 

Similar to Sprint 0

Flyer_Services 2015
Flyer_Services 2015Flyer_Services 2015
Flyer_Services 2015Managility
 
Accenture-Value-Realization-for-SAP
Accenture-Value-Realization-for-SAPAccenture-Value-Realization-for-SAP
Accenture-Value-Realization-for-SAPLionel Vuillemin
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...Aggregage
 
Research project presentation for Managing Global Sourcing
Research project presentation for Managing Global SourcingResearch project presentation for Managing Global Sourcing
Research project presentation for Managing Global Sourcingnipunhanda
 
Composite apps cura-analytics mod march2016
Composite apps cura-analytics mod march2016Composite apps cura-analytics mod march2016
Composite apps cura-analytics mod march2016Norm Katz
 
Management Edge 360 - Case Study
Management Edge 360 - Case StudyManagement Edge 360 - Case Study
Management Edge 360 - Case StudyChuck Coletta
 
Project Report on Employee Management System.docx
Project Report on Employee Management System.docxProject Report on Employee Management System.docx
Project Report on Employee Management System.docxDhineshkumarPrakasam
 
Tim Knudson Resume
Tim Knudson ResumeTim Knudson Resume
Tim Knudson ResumeTim Knudson
 
My singlepoint - Strategy Execution Suite
My singlepoint - Strategy Execution SuiteMy singlepoint - Strategy Execution Suite
My singlepoint - Strategy Execution SuitePHILIPPE CORNETTE
 
Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016Geoffrey Harris
 
Info-Tech Research Group & Boardroom Events Value Prop Presentation
Info-Tech Research Group & Boardroom Events Value Prop PresentationInfo-Tech Research Group & Boardroom Events Value Prop Presentation
Info-Tech Research Group & Boardroom Events Value Prop PresentationHilary Carney Badoian
 
TASSCC Presentation.ppt
TASSCC Presentation.pptTASSCC Presentation.ppt
TASSCC Presentation.pptpkumars
 
Panorama 360 Project Delivery Maturity Assessment Methodology
Panorama 360 Project Delivery Maturity Assessment MethodologyPanorama 360 Project Delivery Maturity Assessment Methodology
Panorama 360 Project Delivery Maturity Assessment MethodologyPierre Gagne
 
PRESTO Continuous Improvement 2018 product profile
PRESTO Continuous Improvement 2018 product profilePRESTO Continuous Improvement 2018 product profile
PRESTO Continuous Improvement 2018 product profileAndrew Lenti
 
Latest CV/resume - Nick Broom
Latest CV/resume - Nick BroomLatest CV/resume - Nick Broom
Latest CV/resume - Nick BroomAviva
 
Continuous Improvement at 360°
Continuous Improvement at 360°Continuous Improvement at 360°
Continuous Improvement at 360°Andrew Lenti
 
2018 product-profile-v01-180220175205
2018 product-profile-v01-1802201752052018 product-profile-v01-180220175205
2018 product-profile-v01-180220175205Maurilio Savoldi
 
Acquity Group Itpt Overview 2009
Acquity Group   Itpt   Overview 2009Acquity Group   Itpt   Overview 2009
Acquity Group Itpt Overview 2009mdouglas
 
1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docxteresehearn
 

Similar to Sprint 0 (20)

Flyer_Services 2015
Flyer_Services 2015Flyer_Services 2015
Flyer_Services 2015
 
Accenture-Value-Realization-for-SAP
Accenture-Value-Realization-for-SAPAccenture-Value-Realization-for-SAP
Accenture-Value-Realization-for-SAP
 
How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...How to Reach Peak Performance With the Product Management Organizational Heal...
How to Reach Peak Performance With the Product Management Organizational Heal...
 
Research project presentation for Managing Global Sourcing
Research project presentation for Managing Global SourcingResearch project presentation for Managing Global Sourcing
Research project presentation for Managing Global Sourcing
 
Composite apps cura-analytics mod march2016
Composite apps cura-analytics mod march2016Composite apps cura-analytics mod march2016
Composite apps cura-analytics mod march2016
 
Management Edge 360 - Case Study
Management Edge 360 - Case StudyManagement Edge 360 - Case Study
Management Edge 360 - Case Study
 
Project Report on Employee Management System.docx
Project Report on Employee Management System.docxProject Report on Employee Management System.docx
Project Report on Employee Management System.docx
 
Tim Knudson Resume
Tim Knudson ResumeTim Knudson Resume
Tim Knudson Resume
 
My singlepoint - Strategy Execution Suite
My singlepoint - Strategy Execution SuiteMy singlepoint - Strategy Execution Suite
My singlepoint - Strategy Execution Suite
 
Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016
 
Info-Tech Research Group & Boardroom Events Value Prop Presentation
Info-Tech Research Group & Boardroom Events Value Prop PresentationInfo-Tech Research Group & Boardroom Events Value Prop Presentation
Info-Tech Research Group & Boardroom Events Value Prop Presentation
 
TASSCC Presentation.ppt
TASSCC Presentation.pptTASSCC Presentation.ppt
TASSCC Presentation.ppt
 
Panorama 360 Project Delivery Maturity Assessment Methodology
Panorama 360 Project Delivery Maturity Assessment MethodologyPanorama 360 Project Delivery Maturity Assessment Methodology
Panorama 360 Project Delivery Maturity Assessment Methodology
 
PRESTO Continuous Improvement 2018 product profile
PRESTO Continuous Improvement 2018 product profilePRESTO Continuous Improvement 2018 product profile
PRESTO Continuous Improvement 2018 product profile
 
Latest CV/resume - Nick Broom
Latest CV/resume - Nick BroomLatest CV/resume - Nick Broom
Latest CV/resume - Nick Broom
 
AnubhavKochhar_Resume
AnubhavKochhar_ResumeAnubhavKochhar_Resume
AnubhavKochhar_Resume
 
Continuous Improvement at 360°
Continuous Improvement at 360°Continuous Improvement at 360°
Continuous Improvement at 360°
 
2018 product-profile-v01-180220175205
2018 product-profile-v01-1802201752052018 product-profile-v01-180220175205
2018 product-profile-v01-180220175205
 
Acquity Group Itpt Overview 2009
Acquity Group   Itpt   Overview 2009Acquity Group   Itpt   Overview 2009
Acquity Group Itpt Overview 2009
 
1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx
 

More from enstoa

Oracle Future of Projects Beijing 2019 by Xin Zhao (Enstoa)
Oracle Future of Projects Beijing 2019 by Xin Zhao (Enstoa)Oracle Future of Projects Beijing 2019 by Xin Zhao (Enstoa)
Oracle Future of Projects Beijing 2019 by Xin Zhao (Enstoa)enstoa
 
Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...
Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...
Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...enstoa
 
Veracia™ by Enstoa: Change control for Oracle Primavera Unifier
Veracia™ by Enstoa: Change control for Oracle Primavera UnifierVeracia™ by Enstoa: Change control for Oracle Primavera Unifier
Veracia™ by Enstoa: Change control for Oracle Primavera Unifierenstoa
 
Adapters by Enstoa: Middleware for construction applications
Adapters by Enstoa: Middleware for construction applicationsAdapters by Enstoa: Middleware for construction applications
Adapters by Enstoa: Middleware for construction applicationsenstoa
 
Jeff Ettenhofer - the future of connected construction
Jeff Ettenhofer - the future of connected constructionJeff Ettenhofer - the future of connected construction
Jeff Ettenhofer - the future of connected constructionenstoa
 
University Affiliated East Coast Medical Center Case Study
University Affiliated East Coast Medical Center Case StudyUniversity Affiliated East Coast Medical Center Case Study
University Affiliated East Coast Medical Center Case Studyenstoa
 
Panoptra for Unifier
Panoptra for UnifierPanoptra for Unifier
Panoptra for Unifierenstoa
 
PCM Converter
PCM ConverterPCM Converter
PCM Converterenstoa
 
Enstoa and Primavera Unifier
Enstoa and Primavera Unifier Enstoa and Primavera Unifier
Enstoa and Primavera Unifier enstoa
 

More from enstoa (9)

Oracle Future of Projects Beijing 2019 by Xin Zhao (Enstoa)
Oracle Future of Projects Beijing 2019 by Xin Zhao (Enstoa)Oracle Future of Projects Beijing 2019 by Xin Zhao (Enstoa)
Oracle Future of Projects Beijing 2019 by Xin Zhao (Enstoa)
 
Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...
Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...
Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...
 
Veracia™ by Enstoa: Change control for Oracle Primavera Unifier
Veracia™ by Enstoa: Change control for Oracle Primavera UnifierVeracia™ by Enstoa: Change control for Oracle Primavera Unifier
Veracia™ by Enstoa: Change control for Oracle Primavera Unifier
 
Adapters by Enstoa: Middleware for construction applications
Adapters by Enstoa: Middleware for construction applicationsAdapters by Enstoa: Middleware for construction applications
Adapters by Enstoa: Middleware for construction applications
 
Jeff Ettenhofer - the future of connected construction
Jeff Ettenhofer - the future of connected constructionJeff Ettenhofer - the future of connected construction
Jeff Ettenhofer - the future of connected construction
 
University Affiliated East Coast Medical Center Case Study
University Affiliated East Coast Medical Center Case StudyUniversity Affiliated East Coast Medical Center Case Study
University Affiliated East Coast Medical Center Case Study
 
Panoptra for Unifier
Panoptra for UnifierPanoptra for Unifier
Panoptra for Unifier
 
PCM Converter
PCM ConverterPCM Converter
PCM Converter
 
Enstoa and Primavera Unifier
Enstoa and Primavera Unifier Enstoa and Primavera Unifier
Enstoa and Primavera Unifier
 

Sprint 0

  • 1. Kerry Foley SVP of Sales and Marketing kfoley@enstoa.com +1 (718) 288 1897 A Better Way to Build SPRINT 0A Modern Approach To Management Consulting WHAT OUR CLIENTS ARE SAYING ABOUT THE SPRINT 0 “Enstoa’s Sprint 0 helped us develop a strategic plan within 2 calendar weeks. We were amazed to see detailed dashboards with our own data so quickly.” - VP of Facilities, Healthcare IT ALL STARTS WITH SPRINT 0 Prototype dashboards serve as proof of concept and help to solidify the requirements gathering and performance initiative mapping. You need a plan for your information systems, a strategy to define how IS can support your project goals. Enstoa’s Sprint 0 takes 2 calendar weeks to complete and puts to bed questions on what should we do and how should we do it. Our experi- enced team runs workshops at your office over a short period to define management met- rics, discover pain points and bring light to opportuni- ties. “Engaging in major process changes without mapping out a plan is high risk. The Sprint 0 mitigates that risk through Enstoa’s tools, methodology and experi- enced team. It’s now protocol within our organization to kick off all projects with a Sprint 0 workshop.” - Director of Projects, Energy “We had worked with several other consultants in the past but Enstoa was the first to truly feel like an extension of our own team. In our Sprint 0, they listened to what our current processes were and helped us determine what changes needed to be made.” - Director of Project Controls, Education “Through the Sprint 0, we were able to identify the origin of several pain points and determine a detailed plan to alleviate those problem areas.” - Project Manager, Retail
  • 2. Kerry Foley SVP of Sales and Marketing kfoley@enstoa.com +1 (718) 288 1897 A Better Way to Build SPRINT 0A Modern Approach To Management Consulting During the Workshops Enstoa will gather initiatives based on pain points, best practices and systems review. Rated according to: Value: Perceived value to client of the initiatives Complexity: Level of difficulty in deploying the initiative solutions ROADMAP FOR ENHANCEMENTS LIST OF PERFORMANCE INITIATIVES Upon completion of our workshop the client will have identi- fied the high level requirements for a more robust future state solution. Enstoa then proceeds to evaluate the existing systems against initiative goals to produce the strategic technology road- map. BENEFITS ANALYSIS Analysis that identifies opportunity costs and areas for cost re- duction to assist the client in the justification for future solution improvements FUTURE STATE ARCHITECTURE Enstoa provides high-level current and target systems architec- ture diagrams in order to provide visibility into the existing gaps and proposed solutions CII 10-10 SURVEY REPORT Enstoa has partnered with the Construction Industry Institute (CII) and incorporated the 10-10 Performance Assessment Survey results to address: • Project Performance • Team Dynamics • Organizational Relationships Benefit Capital Allocation (underspending) • Underspending the capital plan results in an opportunity cost for Com pass Minerals Underspend: FY11: 10% | FY12: 25% | FY13: 35% Hurdle rate (cost of capital): 10% Assumptions $4,082,000 annual opportunity cost Value Cash flow volatility (minimizing the buffer) • Reduce borrowing costs • Tighten project team CF forecast • Minim ize CF buffer used by finance to cover capital outflows Cost due to excess buffer: FY11: $1.1 | FY12: $1.5 | FY13: $0.8 (Mil) Cost of borrowing: 5% $1,184,000 annual cost reduction I dle capital held up in budgets and encumbrances • Release capital com m itm ents sooner by decreasing project financial close-out duration and com plexity. Opportunity cost due to idle capital: $6.71 m illion for PO’s prior to 2012 yields savings of $671k $671,000 one-time opportunity cost