Navigating the Perfect STOrm
The Perfect STOrm
The Perfect STOrm in nature is a weather phenomenon where three systems
converge on each other over the ocean to create havoc, making it nearly
impossible for ocean-going vessels to navigate.
Since our primary focus is on navigating complex, risky and expensive
projects, it’s only fitting that we use this concept to demonstrate how to
avoid, or manage The Perfect STOrm when it arises.
The Perfect STOrm cannot be managed solely by Technology and People. A
Methodology must be established as a guide, which is the primary key to
executing a successful STO project, no matter what the conditions are.
2
Navigating the Perfect STOrm
What makes The Perfect STOrm on a Shutdown, Turnaround or Outage?
Many will tell you that it’s a lack of planning; or poor weather conditions; or
incompetent contractors, to name a few. But the truth is, there are 3 major
forces that come together to create the perfect STOrm, more than any other
on a Shutdown, Turnaround or Outage project:
• Scope Creep
• Work approved after the Workscope/Budget Cut-off Date
• Discovery Work
• Work found when assets have been opened for inspection or overhaul
• Rework
• Work created from non-conformance to QA/QC standards
3
Navigating the Perfect STOrm
4
Scope Creep
• Scope Creep is work approved after the Worklist/Budget Cut-off Date and
before Feed-out
• Scope Creep is a result of:
• Maintenance requirements (unavoidable since the process unit is
operational up to Feed-out)
• A lack of a RAMP (Reliability Asset Management Program) Team using a
formal Risk/Cost Benefit Analysis Program
• Scope Creep can be avoided by:
• Establishing a RAMP Team and using a formal Risk/Cost Benefit Analysis
Program
• Accepting that Outage Work is an OPEX or CAPEX (project) expense
Navigating the Perfect STOrm
5
Discovery Work
• Discovery Work is when additional Activities or longer durations are
added to an existing Work Order Task
• Discovery Work can be expensive, but it should not affect the scheduled
Feed-in date
• Discovery Work is a result of:
• Poor planning or estimating
• Lack of history
• Challenging shutdown plans
• Day-to-day operation
• Discovery Work can be reduced by:
• Strategic ‘what-if’ planning
• Pre-shutdown scanning
Navigating the Perfect STOrm
Rework
• Rework is costly, and in some cases it can delay start-up
• Rework is a result of:
• Poor communication
• Time constraints
• Incompetent workers
• Incorrect material specifications (Quality Assurance)
• Insufficient information/instructions
• Lack of Quality Control
• Rework can be avoided by:
• Training workers
• Establishing QA/QC strategies prior to procurement and contracting
• Creating effective ITP’s (Inspection & Test Plans)
• Creating detailed Planned Job Packages (PJP’s)
• Implementing a Flange-Management Strategy
6
Navigating the Perfect STOrm
Definitions
Establishing standard industry terminology will help to make sharing
knowledge more beneficial:
• Shutdown (STO budget)
• Non-regulatory, process integrity (molecular process systems)
• Turnaround (STO budget)
• Regulatory, asset integrity (piping, pressure vessels, PSV’s, etc.)
• Outage (OPEX / CAPEX budget)
• Maintenance/Project Work Orders requiring systems or equipment to
be off-line
• Maintenance (OPEX budget)
• Maintenance Work Orders that do not require systems or equipment to
be off-line
7
Navigating the Perfect STOrm
The Destination
Many will tell you that the destination (goal) of a STO project is to execute it
On-time and On-budget; that’s not as impressive as it sounds. A STO project
is scheduled in order to support these three manufacturing principles:
• High Process Availability
• Operating at nameplate design with quality, conforming product to
meet customers’ needs
• High Equipment Reliability
• Ensuring equipment can meet its intended purpose when needed
• Low Risk/Cost
• Managing risk (effectiveness) and controlling costs (efficiency)
8
Navigating the Perfect STOrm
Process Availability
100% Process Availability is only achievable if everything is spared; and at a
high cost, which makes it impractical. The balance between required process
availability losses and equipment reliability at the lowest risk/cost requires
the adaptation of a Reliability Asset
9
Management Program Team made
up of:
• Operations,
• Maintenance, and
• Technical
The RAMP Team is accountable for
High Process Availability and High
Equipment Reliability at the Lowest
Risk/Cost
Navigating the Perfect STOrm
Ability to Influence STO Performance
10
Navigating the Perfect STOrm
Effective and Efficient
The RAMP Team is responsible for Work Scope, Budget and Strategic
Planning (Effective), while the STO Project Controls Team is responsible for
Planning, Scheduling and Execution (Efficiency)
• Scope Creep is an Effective opportunity
• Discovery Work is an Effective and Efficiency opportunity
• Rework is an Efficiency opportunity
11
Strategic Planning Phase
Planning & Scheduling Phase
Execution Phase Closure Phase
Navigating the Perfect STOrm
Key Performance Indicators (KPI’s)
The RAMP Team will establish the KPI’s and their related Targets. Navigating
the STO project will be aimed at achieving the KPI Targets.
12
Key Performance
Indicators
Key Performance Targets Phase
Budget / Workscope Based on Risk/Cost Benefit Strategic Planning
Duration Based on Shutdown/Start-up and Longest-path
Planning and
Scheduling
Safety / Environment Zero Incidents Execution
Quality Zero rework, zero leaks Execution
Direct Wrench-time 55% Execution
Navigating the Perfect STOrm
Navigating the Perfect STOrm
The potential for a Perfect STOrm to arise on a Shutdown, Turnaround or
Outage is always a concern. Often you cannot avoid it. But you can learn to
navigate around, or through it by establishing these 3 high-performance
principles:
• Methodology
• Navigational road map
• Technology
• Navigational aids
• People
• Navigators
13
Navigating the Perfect STOrm
Methodology
14
Navigating the Perfect STOrm
Methodology
A navigational road map [business process] designed to convert data input
into a product or service output, efficiently. The methodology is supported
by tools, forms, standards, policies, procedures [best-practices], guidelines,
templates, checklists, controls, tracking, and KPI dashboards.
15
Navigating the Perfect STOrm
Methodology (Navigational Road Map)
16
Navigating the Perfect STOrm
Strategic Planning
Strategic Planning ensures that each Stakeholder [Discipline] contributes to
the achievement of the established KPI Targets for the Execution Phase:
Safety, Quality and Worker Efficiency.
Strategic Planning is accomplished by using a standard template in
conjunction with a Strategy Workshop.
Lesson-learned and Best-practices are the feedstock for each Strategic Plan.
When Safety, Quality and Worker Efficiency Targets are met, your STO
project will be the executed in the shortest duration at the lowest cost.
17
Navigating the Perfect STOrm
Planning & Scheduling
Planning & Scheduling ensures that the STO Project Control Teams has
everything it needs to achieve the established KPI Targets for the Execution
Phase: Safety, Quality and Worker Efficiency.
Planned Job Package (PJP) must be assembled and reviewed by each Key
Stakeholder: Operations, Technical, Safety, Contractor/Execution, etc. to
ensure sufficient information is available to meet the established KPI Targets
for the Execution Phase.
Dynamic Schedule Management (DSM) must be implemented using a
defined Methodology, supported by Technology and competent People.
18
Navigating the Perfect STOrm
Execution Strategy
Execution performance is a result of following a formal Methodology
supported by the best Technology and the most Competent People.
When all Strategic Plans are established, and Planned-Job-Packages are
developed, they combine to create the overall Execution Strategy.
Only then can a Plan be created and optimized to ‘Drive’ the STO project
with a STO Project Controls Team
• Planning & Scheduling
• Cost Management
• Execution Coordination
• Logistics
19
Navigating the Perfect STOrm
Navigating your STO Project
STO projects are dynamic, ever-changing events. You must navigate by
driving, not by monitoring
The most fatal mistakes a STO Project Organization will make are:
• Not having a RAMP Team (model)
• Not following a formal Methodology
• Not implementing Strategic Planning
• Relying too much on Technology and People
• Not optimizing the Plan
• Using Look-ahead Schedules
• Trying to stick to a Plan
20
Cost
Duration Man-hours
Optimize
the Plan
Navigating the Perfect STOrm
The Competency Matrix
People must not only be certified,
but qualified as well
Training & Coaching is vital to
ensure People are competent to
perform their assigned
responsibilities
Training & Coaching cannot exist
in the absence of a formal
Methodology, supported by the
best Technology
21
Navigating the Perfect STOrm
Questions?
Ej Lister
Editor-in-Chief
STONAVIGATOR™
ejlister@stonavigator.com
22

More Related Content

What's hot

Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochureRicky Smith CMRP, CMRT
 
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Pedram Danesh-Mand
 
Project Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaProject Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaPankaj K Sinha
 
Piloting Solutions: The Process
Piloting Solutions: The ProcessPiloting Solutions: The Process
Piloting Solutions: The ProcessMatt Hansen
 
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...p6academy
 
Piloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanPiloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanMatt Hansen
 
Critical Chain Project Management - Training Material Extract of 1 Day Europe...
Critical Chain Project Management - Training Material Extract of 1 Day Europe...Critical Chain Project Management - Training Material Extract of 1 Day Europe...
Critical Chain Project Management - Training Material Extract of 1 Day Europe...MARRIS Consulting
 
Agile IS Risk Management - Agile 2014 - Antifragile
Agile IS Risk Management - Agile 2014 - AntifragileAgile IS Risk Management - Agile 2014 - Antifragile
Agile IS Risk Management - Agile 2014 - AntifragileKen Rubin
 
Developing Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 daysDeveloping Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 daysRicky Smith CMRP, CMRT
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14p6academy
 
Problem management foundation - Lifecycle
Problem management foundation - Lifecycle Problem management foundation - Lifecycle
Problem management foundation - Lifecycle Ronald Bartels
 
Risk management for the Agile world
Risk management for the Agile worldRisk management for the Agile world
Risk management for the Agile worldniksilver
 
Risk Management in Sprint Environment
Risk Management in Sprint EnvironmentRisk Management in Sprint Environment
Risk Management in Sprint EnvironmentMike Wienold
 
Decision and risk analysis
Decision and risk analysisDecision and risk analysis
Decision and risk analysisIndra Biswakarma
 
Risky Business
Risky BusinessRisky Business
Risky Business3gamma
 
DS Crisis Management Foundation - Lifecycle
DS Crisis Management Foundation - LifecycleDS Crisis Management Foundation - Lifecycle
DS Crisis Management Foundation - LifecycleDS
 

What's hot (19)

Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop Brochure
 
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
Schedule Risk Analysis (SRA) by Pedram Daneshmand 14-Jan-2011
 
Project Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaProject Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K Sinha
 
Piloting Solutions: The Process
Piloting Solutions: The ProcessPiloting Solutions: The Process
Piloting Solutions: The Process
 
KPI Users Group - Failure Reports
KPI Users Group - Failure ReportsKPI Users Group - Failure Reports
KPI Users Group - Failure Reports
 
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
Mitigating cost and schedule risk with oracle primavera risk analysis - Oracl...
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Piloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanPiloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot Plan
 
Critical Chain Project Management - Training Material Extract of 1 Day Europe...
Critical Chain Project Management - Training Material Extract of 1 Day Europe...Critical Chain Project Management - Training Material Extract of 1 Day Europe...
Critical Chain Project Management - Training Material Extract of 1 Day Europe...
 
Agile IS Risk Management - Agile 2014 - Antifragile
Agile IS Risk Management - Agile 2014 - AntifragileAgile IS Risk Management - Agile 2014 - Antifragile
Agile IS Risk Management - Agile 2014 - Antifragile
 
Developing Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 daysDeveloping Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 days
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
 
Tarfighter emea
Tarfighter emeaTarfighter emea
Tarfighter emea
 
Problem management foundation - Lifecycle
Problem management foundation - Lifecycle Problem management foundation - Lifecycle
Problem management foundation - Lifecycle
 
Risk management for the Agile world
Risk management for the Agile worldRisk management for the Agile world
Risk management for the Agile world
 
Risk Management in Sprint Environment
Risk Management in Sprint EnvironmentRisk Management in Sprint Environment
Risk Management in Sprint Environment
 
Decision and risk analysis
Decision and risk analysisDecision and risk analysis
Decision and risk analysis
 
Risky Business
Risky BusinessRisky Business
Risky Business
 
DS Crisis Management Foundation - Lifecycle
DS Crisis Management Foundation - LifecycleDS Crisis Management Foundation - Lifecycle
DS Crisis Management Foundation - Lifecycle
 

Similar to Navigating the Perfect STO Project Storm

Why Turnarounds Fail - Best Practices
Why Turnarounds Fail - Best PracticesWhy Turnarounds Fail - Best Practices
Why Turnarounds Fail - Best PracticesDavid Mathews
 
LKG Project Level Presentation FEL in New Energies 2023.ppsx
LKG Project Level Presentation FEL in  New Energies 2023.ppsxLKG Project Level Presentation FEL in  New Energies 2023.ppsx
LKG Project Level Presentation FEL in New Energies 2023.ppsxAngusMacleod18
 
Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityAcumen
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for allSurgyy Design
 
Top Ten Superstream Learnings from 2014
Top Ten Superstream Learnings from 2014Top Ten Superstream Learnings from 2014
Top Ten Superstream Learnings from 2014QMV Super Solutions
 
Brochure PlanningPackage.com
Brochure PlanningPackage.comBrochure PlanningPackage.com
Brochure PlanningPackage.commkhilauria
 
PPTX Corporate Project Presentation FEL in New Energies 2023.ppsx
PPTX Corporate   Project Presentation FEL in  New Energies 2023.ppsxPPTX Corporate   Project Presentation FEL in  New Energies 2023.ppsx
PPTX Corporate Project Presentation FEL in New Energies 2023.ppsxANGUSMACLEOD21
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFPieter van Asten
 
Disciplined Agile:  Past, present, and future. The path to true business agil...
Disciplined Agile:  Past, present, and future. The path to true business agil...Disciplined Agile:  Past, present, and future. The path to true business agil...
Disciplined Agile:  Past, present, and future. The path to true business agil...Bosnia Agile
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best PracticesJeff McClay
 
Operational Readiness Review PowerPoint Presentation Slides
Operational Readiness Review PowerPoint Presentation Slides Operational Readiness Review PowerPoint Presentation Slides
Operational Readiness Review PowerPoint Presentation Slides SlideTeam
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMike Poland, CMRP
 
Best Practices for Implementing Self-Service Analytics
Best Practices for Implementing Self-Service AnalyticsBest Practices for Implementing Self-Service Analytics
Best Practices for Implementing Self-Service AnalyticsMattSaxton5
 
Project Controls Expo 31st October 2012 - INTEGRATED PROJECT CONTROLS SOLUTIO...
Project Controls Expo 31st October 2012 - INTEGRATED PROJECT CONTROLS SOLUTIO...Project Controls Expo 31st October 2012 - INTEGRATED PROJECT CONTROLS SOLUTIO...
Project Controls Expo 31st October 2012 - INTEGRATED PROJECT CONTROLS SOLUTIO...Project Controls Expo
 
PetroSync - Successful Project Cost Estimation & Control
PetroSync - Successful Project Cost Estimation & ControlPetroSync - Successful Project Cost Estimation & Control
PetroSync - Successful Project Cost Estimation & ControlPetroSync
 
PMBok Processes with CCPM Best Practices
PMBok Processes with CCPM Best PracticesPMBok Processes with CCPM Best Practices
PMBok Processes with CCPM Best PracticesRicardo Leite
 
OCS Training - Reliability Centered Maintenance - 5 Days Course
OCS Training - Reliability Centered Maintenance - 5 Days CourseOCS Training - Reliability Centered Maintenance - 5 Days Course
OCS Training - Reliability Centered Maintenance - 5 Days CourseMuanisa Waras
 
Resource Management Maturity - Does Your Resource Management Practice Work Fo...
Resource Management Maturity - Does Your Resource Management Practice Work Fo...Resource Management Maturity - Does Your Resource Management Practice Work Fo...
Resource Management Maturity - Does Your Resource Management Practice Work Fo...Unanet
 

Similar to Navigating the Perfect STO Project Storm (20)

Why Turnarounds Fail - Best Practices
Why Turnarounds Fail - Best PracticesWhy Turnarounds Fail - Best Practices
Why Turnarounds Fail - Best Practices
 
LKG Project Level Presentation FEL in New Energies 2023.ppsx
LKG Project Level Presentation FEL in  New Energies 2023.ppsxLKG Project Level Presentation FEL in  New Energies 2023.ppsx
LKG Project Level Presentation FEL in New Energies 2023.ppsx
 
Cloud Strategy First
 Cloud Strategy First Cloud Strategy First
Cloud Strategy First
 
Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule Quality
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for all
 
Top Ten Superstream Learnings from 2014
Top Ten Superstream Learnings from 2014Top Ten Superstream Learnings from 2014
Top Ten Superstream Learnings from 2014
 
Brochure PlanningPackage.com
Brochure PlanningPackage.comBrochure PlanningPackage.com
Brochure PlanningPackage.com
 
PPTX Corporate Project Presentation FEL in New Energies 2023.ppsx
PPTX Corporate   Project Presentation FEL in  New Energies 2023.ppsxPPTX Corporate   Project Presentation FEL in  New Energies 2023.ppsx
PPTX Corporate Project Presentation FEL in New Energies 2023.ppsx
 
4 Phases of Cloud Optimization
4 Phases of Cloud Optimization4 Phases of Cloud Optimization
4 Phases of Cloud Optimization
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
Disciplined Agile:  Past, present, and future. The path to true business agil...
Disciplined Agile:  Past, present, and future. The path to true business agil...Disciplined Agile:  Past, present, and future. The path to true business agil...
Disciplined Agile:  Past, present, and future. The path to true business agil...
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
 
Operational Readiness Review PowerPoint Presentation Slides
Operational Readiness Review PowerPoint Presentation Slides Operational Readiness Review PowerPoint Presentation Slides
Operational Readiness Review PowerPoint Presentation Slides
 
Merck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCMMerck's West Point Facility Embraces RCM
Merck's West Point Facility Embraces RCM
 
Best Practices for Implementing Self-Service Analytics
Best Practices for Implementing Self-Service AnalyticsBest Practices for Implementing Self-Service Analytics
Best Practices for Implementing Self-Service Analytics
 
Project Controls Expo 31st October 2012 - INTEGRATED PROJECT CONTROLS SOLUTIO...
Project Controls Expo 31st October 2012 - INTEGRATED PROJECT CONTROLS SOLUTIO...Project Controls Expo 31st October 2012 - INTEGRATED PROJECT CONTROLS SOLUTIO...
Project Controls Expo 31st October 2012 - INTEGRATED PROJECT CONTROLS SOLUTIO...
 
PetroSync - Successful Project Cost Estimation & Control
PetroSync - Successful Project Cost Estimation & ControlPetroSync - Successful Project Cost Estimation & Control
PetroSync - Successful Project Cost Estimation & Control
 
PMBok Processes with CCPM Best Practices
PMBok Processes with CCPM Best PracticesPMBok Processes with CCPM Best Practices
PMBok Processes with CCPM Best Practices
 
OCS Training - Reliability Centered Maintenance - 5 Days Course
OCS Training - Reliability Centered Maintenance - 5 Days CourseOCS Training - Reliability Centered Maintenance - 5 Days Course
OCS Training - Reliability Centered Maintenance - 5 Days Course
 
Resource Management Maturity - Does Your Resource Management Practice Work Fo...
Resource Management Maturity - Does Your Resource Management Practice Work Fo...Resource Management Maturity - Does Your Resource Management Practice Work Fo...
Resource Management Maturity - Does Your Resource Management Practice Work Fo...
 

More from Edmund (Ted) Lister (10)

STOworx Petronas Presentation
STOworx Petronas PresentationSTOworx Petronas Presentation
STOworx Petronas Presentation
 
One-page
One-pageOne-page
One-page
 
Dynamic Scheduling Methodology
Dynamic Scheduling MethodologyDynamic Scheduling Methodology
Dynamic Scheduling Methodology
 
Sto 3 Day Course Presentation
Sto 3 Day Course PresentationSto 3 Day Course Presentation
Sto 3 Day Course Presentation
 
Change Management 2
Change Management 2Change Management 2
Change Management 2
 
Human Resources
Human ResourcesHuman Resources
Human Resources
 
Wrench Time
Wrench TimeWrench Time
Wrench Time
 
Kpi Lister Sto 061411
Kpi Lister Sto 061411Kpi Lister Sto 061411
Kpi Lister Sto 061411
 
Dynamic Schedule Management
Dynamic Schedule ManagementDynamic Schedule Management
Dynamic Schedule Management
 
Keynote Lister Sto 061411
Keynote Lister Sto 061411Keynote Lister Sto 061411
Keynote Lister Sto 061411
 

Recently uploaded

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 

Recently uploaded (20)

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 

Navigating the Perfect STO Project Storm

  • 1. Navigating the Perfect STOrm Presented by Ej Lister 1
  • 2. Navigating the Perfect STOrm The Perfect STOrm The Perfect STOrm in nature is a weather phenomenon where three systems converge on each other over the ocean to create havoc, making it nearly impossible for ocean-going vessels to navigate. Since our primary focus is on navigating complex, risky and expensive projects, it’s only fitting that we use this concept to demonstrate how to avoid, or manage The Perfect STOrm when it arises. The Perfect STOrm cannot be managed solely by Technology and People. A Methodology must be established as a guide, which is the primary key to executing a successful STO project, no matter what the conditions are. 2
  • 3. Navigating the Perfect STOrm What makes The Perfect STOrm on a Shutdown, Turnaround or Outage? Many will tell you that it’s a lack of planning; or poor weather conditions; or incompetent contractors, to name a few. But the truth is, there are 3 major forces that come together to create the perfect STOrm, more than any other on a Shutdown, Turnaround or Outage project: • Scope Creep • Work approved after the Workscope/Budget Cut-off Date • Discovery Work • Work found when assets have been opened for inspection or overhaul • Rework • Work created from non-conformance to QA/QC standards 3
  • 4. Navigating the Perfect STOrm 4 Scope Creep • Scope Creep is work approved after the Worklist/Budget Cut-off Date and before Feed-out • Scope Creep is a result of: • Maintenance requirements (unavoidable since the process unit is operational up to Feed-out) • A lack of a RAMP (Reliability Asset Management Program) Team using a formal Risk/Cost Benefit Analysis Program • Scope Creep can be avoided by: • Establishing a RAMP Team and using a formal Risk/Cost Benefit Analysis Program • Accepting that Outage Work is an OPEX or CAPEX (project) expense
  • 5. Navigating the Perfect STOrm 5 Discovery Work • Discovery Work is when additional Activities or longer durations are added to an existing Work Order Task • Discovery Work can be expensive, but it should not affect the scheduled Feed-in date • Discovery Work is a result of: • Poor planning or estimating • Lack of history • Challenging shutdown plans • Day-to-day operation • Discovery Work can be reduced by: • Strategic ‘what-if’ planning • Pre-shutdown scanning
  • 6. Navigating the Perfect STOrm Rework • Rework is costly, and in some cases it can delay start-up • Rework is a result of: • Poor communication • Time constraints • Incompetent workers • Incorrect material specifications (Quality Assurance) • Insufficient information/instructions • Lack of Quality Control • Rework can be avoided by: • Training workers • Establishing QA/QC strategies prior to procurement and contracting • Creating effective ITP’s (Inspection & Test Plans) • Creating detailed Planned Job Packages (PJP’s) • Implementing a Flange-Management Strategy 6
  • 7. Navigating the Perfect STOrm Definitions Establishing standard industry terminology will help to make sharing knowledge more beneficial: • Shutdown (STO budget) • Non-regulatory, process integrity (molecular process systems) • Turnaround (STO budget) • Regulatory, asset integrity (piping, pressure vessels, PSV’s, etc.) • Outage (OPEX / CAPEX budget) • Maintenance/Project Work Orders requiring systems or equipment to be off-line • Maintenance (OPEX budget) • Maintenance Work Orders that do not require systems or equipment to be off-line 7
  • 8. Navigating the Perfect STOrm The Destination Many will tell you that the destination (goal) of a STO project is to execute it On-time and On-budget; that’s not as impressive as it sounds. A STO project is scheduled in order to support these three manufacturing principles: • High Process Availability • Operating at nameplate design with quality, conforming product to meet customers’ needs • High Equipment Reliability • Ensuring equipment can meet its intended purpose when needed • Low Risk/Cost • Managing risk (effectiveness) and controlling costs (efficiency) 8
  • 9. Navigating the Perfect STOrm Process Availability 100% Process Availability is only achievable if everything is spared; and at a high cost, which makes it impractical. The balance between required process availability losses and equipment reliability at the lowest risk/cost requires the adaptation of a Reliability Asset 9 Management Program Team made up of: • Operations, • Maintenance, and • Technical The RAMP Team is accountable for High Process Availability and High Equipment Reliability at the Lowest Risk/Cost
  • 10. Navigating the Perfect STOrm Ability to Influence STO Performance 10
  • 11. Navigating the Perfect STOrm Effective and Efficient The RAMP Team is responsible for Work Scope, Budget and Strategic Planning (Effective), while the STO Project Controls Team is responsible for Planning, Scheduling and Execution (Efficiency) • Scope Creep is an Effective opportunity • Discovery Work is an Effective and Efficiency opportunity • Rework is an Efficiency opportunity 11 Strategic Planning Phase Planning & Scheduling Phase Execution Phase Closure Phase
  • 12. Navigating the Perfect STOrm Key Performance Indicators (KPI’s) The RAMP Team will establish the KPI’s and their related Targets. Navigating the STO project will be aimed at achieving the KPI Targets. 12 Key Performance Indicators Key Performance Targets Phase Budget / Workscope Based on Risk/Cost Benefit Strategic Planning Duration Based on Shutdown/Start-up and Longest-path Planning and Scheduling Safety / Environment Zero Incidents Execution Quality Zero rework, zero leaks Execution Direct Wrench-time 55% Execution
  • 13. Navigating the Perfect STOrm Navigating the Perfect STOrm The potential for a Perfect STOrm to arise on a Shutdown, Turnaround or Outage is always a concern. Often you cannot avoid it. But you can learn to navigate around, or through it by establishing these 3 high-performance principles: • Methodology • Navigational road map • Technology • Navigational aids • People • Navigators 13
  • 14. Navigating the Perfect STOrm Methodology 14
  • 15. Navigating the Perfect STOrm Methodology A navigational road map [business process] designed to convert data input into a product or service output, efficiently. The methodology is supported by tools, forms, standards, policies, procedures [best-practices], guidelines, templates, checklists, controls, tracking, and KPI dashboards. 15
  • 16. Navigating the Perfect STOrm Methodology (Navigational Road Map) 16
  • 17. Navigating the Perfect STOrm Strategic Planning Strategic Planning ensures that each Stakeholder [Discipline] contributes to the achievement of the established KPI Targets for the Execution Phase: Safety, Quality and Worker Efficiency. Strategic Planning is accomplished by using a standard template in conjunction with a Strategy Workshop. Lesson-learned and Best-practices are the feedstock for each Strategic Plan. When Safety, Quality and Worker Efficiency Targets are met, your STO project will be the executed in the shortest duration at the lowest cost. 17
  • 18. Navigating the Perfect STOrm Planning & Scheduling Planning & Scheduling ensures that the STO Project Control Teams has everything it needs to achieve the established KPI Targets for the Execution Phase: Safety, Quality and Worker Efficiency. Planned Job Package (PJP) must be assembled and reviewed by each Key Stakeholder: Operations, Technical, Safety, Contractor/Execution, etc. to ensure sufficient information is available to meet the established KPI Targets for the Execution Phase. Dynamic Schedule Management (DSM) must be implemented using a defined Methodology, supported by Technology and competent People. 18
  • 19. Navigating the Perfect STOrm Execution Strategy Execution performance is a result of following a formal Methodology supported by the best Technology and the most Competent People. When all Strategic Plans are established, and Planned-Job-Packages are developed, they combine to create the overall Execution Strategy. Only then can a Plan be created and optimized to ‘Drive’ the STO project with a STO Project Controls Team • Planning & Scheduling • Cost Management • Execution Coordination • Logistics 19
  • 20. Navigating the Perfect STOrm Navigating your STO Project STO projects are dynamic, ever-changing events. You must navigate by driving, not by monitoring The most fatal mistakes a STO Project Organization will make are: • Not having a RAMP Team (model) • Not following a formal Methodology • Not implementing Strategic Planning • Relying too much on Technology and People • Not optimizing the Plan • Using Look-ahead Schedules • Trying to stick to a Plan 20 Cost Duration Man-hours Optimize the Plan
  • 21. Navigating the Perfect STOrm The Competency Matrix People must not only be certified, but qualified as well Training & Coaching is vital to ensure People are competent to perform their assigned responsibilities Training & Coaching cannot exist in the absence of a formal Methodology, supported by the best Technology 21
  • 22. Navigating the Perfect STOrm Questions? Ej Lister Editor-in-Chief STONAVIGATOR™ ejlister@stonavigator.com 22