SlideShare a Scribd company logo
1 of 24
⇒ CONSULTANTSCONSULTANTS
⇒What? Where? Why? Who?What? Where? Why? Who?
⇒ Consultants vs ContractorsConsultants vs Contractors
⇒ Stages of an assignmentStages of an assignment
⇒ CONTRACTSCONTRACTS
⇒ Contract LawContract Law
⇒ Contract managementContract management
⇒ Contract purpose/coverageContract purpose/coverage
⇒ QUALITYQUALITY
⇒ Why the concern for quality?Why the concern for quality?
⇒ Methods/techniquesMethods/techniques
⇒ Quality management/TickITQuality management/TickIT
CONSULTANTS, CONTRACTS AND QUALITY
WHAT DO CONSULTANTS DO?
The Institute of Management Consultants defines consultancy as:
“the service provided to business, public and other
undertakings by an independent and qualified person or
persons in identifying and investigating problems
concerned with policy, organization, procedure and
methods, recommending appropriate action, and helping
to implement those recommendations”
Normally involves provision of specialist expertise,
impartial advice and help in the analysis and solution of
problems
Occasionally involves software development,
implementation and training
WHERE DO THEY WORK? WHY
ARE THEY USED?
Most areas of IT and most organization types, mainly:
• strategy and planning
• feasibility studies/ system audits
• legal and contractual matters
• staff selection
• requirements analysis
• design
• equipment/software selection
•To provide temporary assistance
•To provide objectivity and independence
•To handle a difficult political situation
•To initiate change
•To meet an expertise gap
•To deal with new technology
•To educate/train users and development staff
(Consultants often act as project managers in a new area to help
to build a team)
WHERE DO THEY WORK? WHY ARE THEY USED?
(Continued)
WHO ARE THEY?
Several types
• self-employed
• groupings of “associates”
• employees of (large) consultancy organizations
• employees providing consultancy services within an organization
People with high level of interpersonal skill
• consensus building
• education and attitude change
• facilitation
• change management
CONSULTANTS vs CONTRACTORS
CONSULTANTS
• Assignments more open-ended
• Operate at a higher level, often alone
• Tend to drive the assignment
• Softer (people-oriented) problems
• Assignment oriented (i.e often short timescale)
• Deliverable usually a report
CONTRACTORS
•Well-defined tasks to perform
•Usually within a team of permanent staff
•Tend to be given specific tasks to do
•Harder (technical) problems
•Usually 6-, 12- or 18- month contract
•Deliverable usually software
CONSULTANTS vs CONTRACTORS(Continued)
STAGES OF AN ASSIGNMENT 1
Starting the assignment
•initial contact
•clarification of tasks, timings and fees
•shared understanding
Terms of Reference
•crucial document, guides the whole activity
•define objectives, deliverables and metrics
•set out framework within which work to be done
•define timescales, personnel, other resources
•must be clear, comprehensive and agreed before proceeding
Planning
•develop a plan, schedule activities and resources
STAGES OF AN ASSIGNMENT 2
Investigation and diagnosis
• focus on environment, technology, people, objectives and methods
• use analytical techniques such as question boxes, charts, grids,
checklists, SWOT analysis, CBA analysis
• differentiate symptoms from causes
Developing proposals/recommendations
• check with client as assignment progresses
• there should be no surprises
• nor should the recommendations be simply what the client wants to
hear
• test any proposals for practicality and measure against metrics
A SWOT
analysis (alternatively SWOT
Matrix) is a
structured planning method used to
evaluate
the strengths, weaknesses, opportun
ities, and threats involved in
a project or in a business venture. A
SWOT analysis can be carried out
for a product, place, industry or
person. It involves specifying the
objective of the business venture or
project and identifying the internal
and external factors that are
favorable and unfavorable to
achieving that objective
STAGES OF AN ASSIGNMENT 3
Preparing the report
•write clearly and intelligibly
•write to persuade
Making a presentation
•formal
•with evaluation
Concluding the assignment
•agree any follow-up
•make self available
•assist with implementation
CONTRACT LAW
There are two main types of contract - for goods and for
services
Sale of Goods Act 1979 requires that “the goods supplied ...
are of satisfactory quality”, “free from minor defects”, and
“fit for purpose”
Supply of Goods and Services Act 1982 requires “reasonable
skill and care” to be exercised in services
Unfair Contract Terms Act 1977 prevents such obligations
from being limited or excluded in the small print of a
contract, except on the grounds of fairness and
reasonableness
The courts have held that, if an organization capable of
looking after itself signs to accept the terms of a contract,
this would be considered fair and reasonable
CONTRACT MANAGEMENT
When you purchase a product, you can usually check its
quality (and are protected by the Sale of Goods Act)
When you deal with consultants/software developers, it is
usually to acquire a service which is non-standard, and
whose requirements will evolve. A carefully drafted and
negotiated contract is an essential safeguard
The contracting cycle should cover:
• supplier evaluation and selection
• request for proposals
• bid submission and evaluation (including negotiation)
• contract writing
Then the contract needs to be managed - regular contact,
regular reviews, up-to-date reports, register of key events
CONTRACT PURPOSE
The contract should:
• define the scope of the relationship
• manage the relationship
• enable effective termination of the relationship
• anticipate and manage problems
This involves:
• all tasks/requirements being identified in advance as far as possible
• roles and responsibilities being defined and understood
• a realistic timescale
• specific project milestones
CONTRACT CONTENTS (often in two parts)
LEGAL ASPECTS, INCLUDING
definition of contracting parties, including addresses
process for specifying deliverables, change control
licences, ownership of intellectual property
access to information, confidentiality and liability
process for resolving disputes, termination
negotiation of changes/amendments
penalties, rights and remedies
terms and conditions
SPECIFICATION OF DELIVERABLES/SERVICE
LEVELS, INCL.
obligations of the parties
project management, milestones and delivery dates
acceptance testing
CONTRACT CONTENTS (often in two parts)
(Continued)
WHY THE CURRENT CONCERN FOR QUALITY?
Legal requirement/costs of litigation for contractual failure
Pressures of competition
Expectations of customers
Costs of poor quality - headlines
• “Wessex Health wastes £10 million”
• “London Ambulance System fails”
• “DSS computers paying more benefit than entitlement”
Quality cannot be added at the end of a process; it must be
there from the beginning
TOTAL QUALITY MANAGEMENT (TQM)
Total Quality Management (TQM) is a concept for improving
efficiency and effectiveness throughout an organisation
It requires a total commitment to a quality culture from
management and employees at all levels
It aims to prevent/reduce failures by every job being carried
out “right first time, every time”
It gives more control to the individual and making him/her
accountable for his/her own performance
It embraces continuous improvement through teamwork,
quality circles, empowerment and employee participation
This quality culture needs standards and procedures within
which the company will operate; BS EN ISO 9001 provides
one set of standards and procedures
BS EN ISO 9001 STANDARD
This title covers the national (formerly BS 5750), European
(formerly EN 29000), and international (formerly ISO 9000)
standards
Provides a set of standards for a Quality Management System
(QMS), based on the specification of procedures and criteria to
ensure that products and services meet customer requirements
Covers how to establish, document and maintain an effective
QMS
Demonstrates to customers how quality needs are supplied
Provides independent measure of company’s QMS through a
certification process, involving regular inspections
REQUIREMENTS OF A QUALITY MANAGEMENT
SYSTEM (QMS)
Objectives are clearly articulated
There are documented procedures for:
• regular review of contract/plan
• design control
• documentation and change control
• product identification and traceability
• inspection, measuring and testing
• identification of non-conformance
• corrective action
• quality audits and records
Staff are trained
Individuals take responsibility
REQUIREMENTS OF A QUALITY MANAGEMENT
SYSTEM (QMS) Continued
• Reliability
• Usability
• Maintainability
• Efficiency
• Portability
• Security
• Flexibility
• Conformance to specification
• Zero Defects
SOFTWARE QUALITY MANAGEMENT (SQM)
Targets
Metrics for each phase
Centralised responsibility for quality (project librarian?)
Method
• Detailed planning before development starts, with checkpoints and
deliverables
• Use of development change control procedures
• Design reviews to highlight and resolve technical issues
• Progress reviews at formal milestones to ensure adequate planning
and resources
• Design traceable to specification and requirements
• Test plan, specifications and records to be kept
SOFTWARE QUALITY MANAGEMENT (SQM)
(Continued)
TickIT
TickIT is a scheme aimed to:
• encourage software companies to achieve ISO9000
• certify this through independent assessment
• monitor the quality management system through visits
• allow the company to display the TickIT logo
BCS has produced a Guidance Manual, which covers:
• introduction to ISO9000 and necessary documentation
• an interpretation of ISO9000 for the software industry
• guidance on what you can expect from a TickIT supplier
• guidance for suppliers on implementation
• guidance for auditors on the assessment process, costs, and benefits

More Related Content

What's hot

Service Process Improvement Project
Service Process Improvement ProjectService Process Improvement Project
Service Process Improvement ProjectPrateek Gupta
 
A Goal-oriented Approach for Business Process Improvement Using Process Wareh...
A Goal-oriented Approach for Business Process Improvement Using Process Wareh...A Goal-oriented Approach for Business Process Improvement Using Process Wareh...
A Goal-oriented Approach for Business Process Improvement Using Process Wareh...M Khurram Shahzad
 
Process Mapping Checklist
Process Mapping ChecklistProcess Mapping Checklist
Process Mapping ChecklistJanet McGreevy
 
Process Measurement - BPM Roundtable QLD
Process Measurement - BPM Roundtable QLDProcess Measurement - BPM Roundtable QLD
Process Measurement - BPM Roundtable QLDLeonardo Consulting
 
Evaluating and improving business process
Evaluating and improving business processEvaluating and improving business process
Evaluating and improving business processdutconsult
 
Process architecture - Part I
Process architecture - Part IProcess architecture - Part I
Process architecture - Part IMarcello La Rosa
 
Requirements Management
Requirements ManagementRequirements Management
Requirements ManagementShwetha-BA
 
CH&Cie - Process Optimization - teaser
CH&Cie - Process Optimization - teaserCH&Cie - Process Optimization - teaser
CH&Cie - Process Optimization - teaserThibault Le Pomellec
 
Requirements Engineering Process Improvement
Requirements Engineering Process ImprovementRequirements Engineering Process Improvement
Requirements Engineering Process ImprovementIan Sommerville
 
Software Selection
Software SelectionSoftware Selection
Software Selectionguest117c0f
 
Process improvement
Process improvementProcess improvement
Process improvementaolrac
 
Transactional Blackbelts are different
Transactional Blackbelts are differentTransactional Blackbelts are different
Transactional Blackbelts are differentreachab7
 
Enterprise Analysis
Enterprise Analysis Enterprise Analysis
Enterprise Analysis Shwetha-BA
 
ITIL - The impact of it services management
ITIL - The impact of it services managementITIL - The impact of it services management
ITIL - The impact of it services managementDanilo Mesquita
 
M1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinM1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinMichele Levasseur
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringManisha Awan
 

What's hot (20)

Service Process Improvement Project
Service Process Improvement ProjectService Process Improvement Project
Service Process Improvement Project
 
A Goal-oriented Approach for Business Process Improvement Using Process Wareh...
A Goal-oriented Approach for Business Process Improvement Using Process Wareh...A Goal-oriented Approach for Business Process Improvement Using Process Wareh...
A Goal-oriented Approach for Business Process Improvement Using Process Wareh...
 
Process Mapping Checklist
Process Mapping ChecklistProcess Mapping Checklist
Process Mapping Checklist
 
Process Measurement - BPM Roundtable QLD
Process Measurement - BPM Roundtable QLDProcess Measurement - BPM Roundtable QLD
Process Measurement - BPM Roundtable QLD
 
CTQ Matrix
CTQ MatrixCTQ Matrix
CTQ Matrix
 
Evaluating and improving business process
Evaluating and improving business processEvaluating and improving business process
Evaluating and improving business process
 
Process architecture - Part I
Process architecture - Part IProcess architecture - Part I
Process architecture - Part I
 
BABOKv3 A Summary v1.00
BABOKv3 A Summary v1.00BABOKv3 A Summary v1.00
BABOKv3 A Summary v1.00
 
Requirements Management
Requirements ManagementRequirements Management
Requirements Management
 
CH&Cie - Process Optimization - teaser
CH&Cie - Process Optimization - teaserCH&Cie - Process Optimization - teaser
CH&Cie - Process Optimization - teaser
 
Requirements Engineering Process Improvement
Requirements Engineering Process ImprovementRequirements Engineering Process Improvement
Requirements Engineering Process Improvement
 
Software Selection
Software SelectionSoftware Selection
Software Selection
 
Process improvement
Process improvementProcess improvement
Process improvement
 
Transactional Blackbelts are different
Transactional Blackbelts are differentTransactional Blackbelts are different
Transactional Blackbelts are different
 
Enterprise Analysis
Enterprise Analysis Enterprise Analysis
Enterprise Analysis
 
Process mapping v2
Process mapping v2Process mapping v2
Process mapping v2
 
ITIL - The impact of it services management
ITIL - The impact of it services managementITIL - The impact of it services management
ITIL - The impact of it services management
 
Quality Assurance in Japanese Construction (Henry Loo)
Quality Assurance in Japanese Construction (Henry Loo)Quality Assurance in Japanese Construction (Henry Loo)
Quality Assurance in Japanese Construction (Henry Loo)
 
M1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedinM1 Refresher Training Master Final Version non client linkedin
M1 Refresher Training Master Final Version non client linkedin
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 

Viewers also liked

Professionalism of teaching
Professionalism of teachingProfessionalism of teaching
Professionalism of teachingqjdv
 
Is he teaching a profession sb final_final_14-4-15
Is he teaching a profession sb final_final_14-4-15Is he teaching a profession sb final_final_14-4-15
Is he teaching a profession sb final_final_14-4-15Stephen Bostock
 
The Future of Teaching: Professionalism, Partnerships and Privatisation
The Future of Teaching: Professionalism, Partnerships and PrivatisationThe Future of Teaching: Professionalism, Partnerships and Privatisation
The Future of Teaching: Professionalism, Partnerships and Privatisationhowardstevenson
 
Teaching_Professionalism,_A_Tale_of_Three_Graduate_Schools
Teaching_Professionalism,_A_Tale_of_Three_Graduate_SchoolsTeaching_Professionalism,_A_Tale_of_Three_Graduate_Schools
Teaching_Professionalism,_A_Tale_of_Three_Graduate_SchoolsJeff Anderson
 
'Professionalism in Teaching' (National Education Conference, 28 May 2009)
'Professionalism in Teaching' (National Education Conference, 28 May 2009)'Professionalism in Teaching' (National Education Conference, 28 May 2009)
'Professionalism in Teaching' (National Education Conference, 28 May 2009)GTC Scotland
 
Professionalism in teacher education
Professionalism in teacher educationProfessionalism in teacher education
Professionalism in teacher educationVijay Grover
 
Supporting Teacher Professionalism Insights From TALIS 2013
Supporting Teacher Professionalism   Insights From TALIS 2013Supporting Teacher Professionalism   Insights From TALIS 2013
Supporting Teacher Professionalism Insights From TALIS 2013EduSkills OECD
 
Teacher professionalism
Teacher professionalismTeacher professionalism
Teacher professionalismJoe Jerles
 

Viewers also liked (10)

Professionalism of teaching
Professionalism of teachingProfessionalism of teaching
Professionalism of teaching
 
Is he teaching a profession sb final_final_14-4-15
Is he teaching a profession sb final_final_14-4-15Is he teaching a profession sb final_final_14-4-15
Is he teaching a profession sb final_final_14-4-15
 
The Future of Teaching: Professionalism, Partnerships and Privatisation
The Future of Teaching: Professionalism, Partnerships and PrivatisationThe Future of Teaching: Professionalism, Partnerships and Privatisation
The Future of Teaching: Professionalism, Partnerships and Privatisation
 
Teaching_Professionalism,_A_Tale_of_Three_Graduate_Schools
Teaching_Professionalism,_A_Tale_of_Three_Graduate_SchoolsTeaching_Professionalism,_A_Tale_of_Three_Graduate_Schools
Teaching_Professionalism,_A_Tale_of_Three_Graduate_Schools
 
Professionalism
ProfessionalismProfessionalism
Professionalism
 
'Professionalism in Teaching' (National Education Conference, 28 May 2009)
'Professionalism in Teaching' (National Education Conference, 28 May 2009)'Professionalism in Teaching' (National Education Conference, 28 May 2009)
'Professionalism in Teaching' (National Education Conference, 28 May 2009)
 
Professionalism in teacher education
Professionalism in teacher educationProfessionalism in teacher education
Professionalism in teacher education
 
Supporting Teacher Professionalism Insights From TALIS 2013
Supporting Teacher Professionalism   Insights From TALIS 2013Supporting Teacher Professionalism   Insights From TALIS 2013
Supporting Teacher Professionalism Insights From TALIS 2013
 
Teacher professionalism
Teacher professionalismTeacher professionalism
Teacher professionalism
 
Professionalism in Education
Professionalism in EducationProfessionalism in Education
Professionalism in Education
 

Similar to Lecture 2

Accountability – Managing the Risks of Innovation Procurement
Accountability – Managing the Risks of Innovation ProcurementAccountability – Managing the Risks of Innovation Procurement
Accountability – Managing the Risks of Innovation Procurementlisaabe
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor managementRaminder Pal Singh
 
QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1Thomas Wilson
 
L8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptL8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptMUST
 
Regulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and ModelsRegulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and ModelsPaul Kuiken
 
Manage Your Organization's Contract Risks Final
Manage Your Organization's Contract Risks FinalManage Your Organization's Contract Risks Final
Manage Your Organization's Contract Risks FinalFred Travis
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assuranceLeola Ramirez
 
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...ssusered96e2
 
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!mwright1
 
Audit Physician Contracts the Smart Way
Audit Physician Contracts the Smart WayAudit Physician Contracts the Smart Way
Audit Physician Contracts the Smart WayMD Ranger, Inc.
 
GROUP-4-PRESENTATION-FINAL.pptx
GROUP-4-PRESENTATION-FINAL.pptxGROUP-4-PRESENTATION-FINAL.pptx
GROUP-4-PRESENTATION-FINAL.pptxArJayTambaoan
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Peter Soetevent
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answerskaranmca
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plantVikram Bakshi
 

Similar to Lecture 2 (20)

Accountability – Managing the Risks of Innovation Procurement
Accountability – Managing the Risks of Innovation ProcurementAccountability – Managing the Risks of Innovation Procurement
Accountability – Managing the Risks of Innovation Procurement
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor management
 
Certified Project Consultant
Certified Project Consultant  Certified Project Consultant
Certified Project Consultant
 
Contract management general
Contract management generalContract management general
Contract management general
 
Credicon Introduction
Credicon  IntroductionCredicon  Introduction
Credicon Introduction
 
QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1
 
L8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptL8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.ppt
 
Regulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and ModelsRegulatory Affairs Outsourcing Considerations and Models
Regulatory Affairs Outsourcing Considerations and Models
 
Manage Your Organization's Contract Risks Final
Manage Your Organization's Contract Risks FinalManage Your Organization's Contract Risks Final
Manage Your Organization's Contract Risks Final
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
 
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
Cost Based Consultant Evaluation and Selection under FIDIC QCBS 1st Edt - Wit...
 
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
 
Audit Physician Contracts the Smart Way
Audit Physician Contracts the Smart WayAudit Physician Contracts the Smart Way
Audit Physician Contracts the Smart Way
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
GROUP-4-PRESENTATION-FINAL.pptx
GROUP-4-PRESENTATION-FINAL.pptxGROUP-4-PRESENTATION-FINAL.pptx
GROUP-4-PRESENTATION-FINAL.pptx
 
Project plan overview
Project plan overviewProject plan overview
Project plan overview
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answers
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plant
 

More from Dom Mike

Mm10lifecycle
Mm10lifecycleMm10lifecycle
Mm10lifecycleDom Mike
 
Lecture ethics
Lecture ethicsLecture ethics
Lecture ethicsDom Mike
 
Lecture 1 prof practices
Lecture 1 prof practicesLecture 1 prof practices
Lecture 1 prof practicesDom Mike
 
Lec51 52 pre and post production
Lec51 52 pre and post productionLec51 52 pre and post production
Lec51 52 pre and post productionDom Mike
 
Lec49 50 digital rights management
Lec49 50 digital rights managementLec49 50 digital rights management
Lec49 50 digital rights managementDom Mike
 
Lec40 45 video conferencing
Lec40 45 video conferencingLec40 45 video conferencing
Lec40 45 video conferencingDom Mike
 
Lec28 29 30 animation
Lec28 29 30 animationLec28 29 30 animation
Lec28 29 30 animationDom Mike
 
Lec14 15 16 text
Lec14 15 16 textLec14 15 16 text
Lec14 15 16 textDom Mike
 
Lec7 8 9_10 coding techniques
Lec7 8 9_10 coding techniquesLec7 8 9_10 coding techniques
Lec7 8 9_10 coding techniquesDom Mike
 
Lec6 compression
Lec6 compressionLec6 compression
Lec6 compressionDom Mike
 
Lec5 interactive multimedia tools
Lec5 interactive multimedia toolsLec5 interactive multimedia tools
Lec5 interactive multimedia toolsDom Mike
 
Lec3 4 mm applications and use
Lec3 4 mm applications and useLec3 4 mm applications and use
Lec3 4 mm applications and useDom Mike
 
Lec1 2 introduction
Lec1 2 introductionLec1 2 introduction
Lec1 2 introductionDom Mike
 
Introduction
IntroductionIntroduction
IntroductionDom Mike
 
Assessing technology landscape
Assessing technology landscapeAssessing technology landscape
Assessing technology landscapeDom Mike
 
Muzafar mohil p.p.muxi
Muzafar mohil p.p.muxiMuzafar mohil p.p.muxi
Muzafar mohil p.p.muxiDom Mike
 

More from Dom Mike (20)

Mm10lifecycle
Mm10lifecycleMm10lifecycle
Mm10lifecycle
 
Lecture ethics
Lecture ethicsLecture ethics
Lecture ethics
 
Lecture 1 prof practices
Lecture 1 prof practicesLecture 1 prof practices
Lecture 1 prof practices
 
Lec51 52 pre and post production
Lec51 52 pre and post productionLec51 52 pre and post production
Lec51 52 pre and post production
 
Lec49 50 digital rights management
Lec49 50 digital rights managementLec49 50 digital rights management
Lec49 50 digital rights management
 
Lec40 45 video conferencing
Lec40 45 video conferencingLec40 45 video conferencing
Lec40 45 video conferencing
 
Lec28 29 30 animation
Lec28 29 30 animationLec28 29 30 animation
Lec28 29 30 animation
 
Lec14 15 16 text
Lec14 15 16 textLec14 15 16 text
Lec14 15 16 text
 
Lec11
Lec11Lec11
Lec11
 
Lec7 8 9_10 coding techniques
Lec7 8 9_10 coding techniquesLec7 8 9_10 coding techniques
Lec7 8 9_10 coding techniques
 
Lec6 compression
Lec6 compressionLec6 compression
Lec6 compression
 
Lec5 interactive multimedia tools
Lec5 interactive multimedia toolsLec5 interactive multimedia tools
Lec5 interactive multimedia tools
 
Lec3 4 mm applications and use
Lec3 4 mm applications and useLec3 4 mm applications and use
Lec3 4 mm applications and use
 
Lec1 2 introduction
Lec1 2 introductionLec1 2 introduction
Lec1 2 introduction
 
Introduction
IntroductionIntroduction
Introduction
 
Ch7
Ch7Ch7
Ch7
 
Ch6
Ch6Ch6
Ch6
 
Assessing technology landscape
Assessing technology landscapeAssessing technology landscape
Assessing technology landscape
 
Uzair ppt
Uzair pptUzair ppt
Uzair ppt
 
Muzafar mohil p.p.muxi
Muzafar mohil p.p.muxiMuzafar mohil p.p.muxi
Muzafar mohil p.p.muxi
 

Recently uploaded

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 

Recently uploaded (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Lecture 2

  • 1. ⇒ CONSULTANTSCONSULTANTS ⇒What? Where? Why? Who?What? Where? Why? Who? ⇒ Consultants vs ContractorsConsultants vs Contractors ⇒ Stages of an assignmentStages of an assignment ⇒ CONTRACTSCONTRACTS ⇒ Contract LawContract Law ⇒ Contract managementContract management ⇒ Contract purpose/coverageContract purpose/coverage ⇒ QUALITYQUALITY ⇒ Why the concern for quality?Why the concern for quality? ⇒ Methods/techniquesMethods/techniques ⇒ Quality management/TickITQuality management/TickIT CONSULTANTS, CONTRACTS AND QUALITY
  • 2. WHAT DO CONSULTANTS DO? The Institute of Management Consultants defines consultancy as: “the service provided to business, public and other undertakings by an independent and qualified person or persons in identifying and investigating problems concerned with policy, organization, procedure and methods, recommending appropriate action, and helping to implement those recommendations” Normally involves provision of specialist expertise, impartial advice and help in the analysis and solution of problems Occasionally involves software development, implementation and training
  • 3. WHERE DO THEY WORK? WHY ARE THEY USED? Most areas of IT and most organization types, mainly: • strategy and planning • feasibility studies/ system audits • legal and contractual matters • staff selection • requirements analysis • design • equipment/software selection
  • 4. •To provide temporary assistance •To provide objectivity and independence •To handle a difficult political situation •To initiate change •To meet an expertise gap •To deal with new technology •To educate/train users and development staff (Consultants often act as project managers in a new area to help to build a team) WHERE DO THEY WORK? WHY ARE THEY USED? (Continued)
  • 5. WHO ARE THEY? Several types • self-employed • groupings of “associates” • employees of (large) consultancy organizations • employees providing consultancy services within an organization People with high level of interpersonal skill • consensus building • education and attitude change • facilitation • change management
  • 6. CONSULTANTS vs CONTRACTORS CONSULTANTS • Assignments more open-ended • Operate at a higher level, often alone • Tend to drive the assignment • Softer (people-oriented) problems • Assignment oriented (i.e often short timescale) • Deliverable usually a report
  • 7. CONTRACTORS •Well-defined tasks to perform •Usually within a team of permanent staff •Tend to be given specific tasks to do •Harder (technical) problems •Usually 6-, 12- or 18- month contract •Deliverable usually software CONSULTANTS vs CONTRACTORS(Continued)
  • 8. STAGES OF AN ASSIGNMENT 1 Starting the assignment •initial contact •clarification of tasks, timings and fees •shared understanding Terms of Reference •crucial document, guides the whole activity •define objectives, deliverables and metrics •set out framework within which work to be done •define timescales, personnel, other resources •must be clear, comprehensive and agreed before proceeding Planning •develop a plan, schedule activities and resources
  • 9. STAGES OF AN ASSIGNMENT 2 Investigation and diagnosis • focus on environment, technology, people, objectives and methods • use analytical techniques such as question boxes, charts, grids, checklists, SWOT analysis, CBA analysis • differentiate symptoms from causes Developing proposals/recommendations • check with client as assignment progresses • there should be no surprises • nor should the recommendations be simply what the client wants to hear • test any proposals for practicality and measure against metrics
  • 10. A SWOT analysis (alternatively SWOT Matrix) is a structured planning method used to evaluate the strengths, weaknesses, opportun ities, and threats involved in a project or in a business venture. A SWOT analysis can be carried out for a product, place, industry or person. It involves specifying the objective of the business venture or project and identifying the internal and external factors that are favorable and unfavorable to achieving that objective
  • 11. STAGES OF AN ASSIGNMENT 3 Preparing the report •write clearly and intelligibly •write to persuade Making a presentation •formal •with evaluation Concluding the assignment •agree any follow-up •make self available •assist with implementation
  • 12. CONTRACT LAW There are two main types of contract - for goods and for services Sale of Goods Act 1979 requires that “the goods supplied ... are of satisfactory quality”, “free from minor defects”, and “fit for purpose” Supply of Goods and Services Act 1982 requires “reasonable skill and care” to be exercised in services Unfair Contract Terms Act 1977 prevents such obligations from being limited or excluded in the small print of a contract, except on the grounds of fairness and reasonableness The courts have held that, if an organization capable of looking after itself signs to accept the terms of a contract, this would be considered fair and reasonable
  • 13. CONTRACT MANAGEMENT When you purchase a product, you can usually check its quality (and are protected by the Sale of Goods Act) When you deal with consultants/software developers, it is usually to acquire a service which is non-standard, and whose requirements will evolve. A carefully drafted and negotiated contract is an essential safeguard The contracting cycle should cover: • supplier evaluation and selection • request for proposals • bid submission and evaluation (including negotiation) • contract writing Then the contract needs to be managed - regular contact, regular reviews, up-to-date reports, register of key events
  • 14. CONTRACT PURPOSE The contract should: • define the scope of the relationship • manage the relationship • enable effective termination of the relationship • anticipate and manage problems This involves: • all tasks/requirements being identified in advance as far as possible • roles and responsibilities being defined and understood • a realistic timescale • specific project milestones
  • 15. CONTRACT CONTENTS (often in two parts) LEGAL ASPECTS, INCLUDING definition of contracting parties, including addresses process for specifying deliverables, change control licences, ownership of intellectual property access to information, confidentiality and liability process for resolving disputes, termination negotiation of changes/amendments penalties, rights and remedies terms and conditions
  • 16. SPECIFICATION OF DELIVERABLES/SERVICE LEVELS, INCL. obligations of the parties project management, milestones and delivery dates acceptance testing CONTRACT CONTENTS (often in two parts) (Continued)
  • 17. WHY THE CURRENT CONCERN FOR QUALITY? Legal requirement/costs of litigation for contractual failure Pressures of competition Expectations of customers Costs of poor quality - headlines • “Wessex Health wastes £10 million” • “London Ambulance System fails” • “DSS computers paying more benefit than entitlement” Quality cannot be added at the end of a process; it must be there from the beginning
  • 18. TOTAL QUALITY MANAGEMENT (TQM) Total Quality Management (TQM) is a concept for improving efficiency and effectiveness throughout an organisation It requires a total commitment to a quality culture from management and employees at all levels It aims to prevent/reduce failures by every job being carried out “right first time, every time” It gives more control to the individual and making him/her accountable for his/her own performance It embraces continuous improvement through teamwork, quality circles, empowerment and employee participation This quality culture needs standards and procedures within which the company will operate; BS EN ISO 9001 provides one set of standards and procedures
  • 19. BS EN ISO 9001 STANDARD This title covers the national (formerly BS 5750), European (formerly EN 29000), and international (formerly ISO 9000) standards Provides a set of standards for a Quality Management System (QMS), based on the specification of procedures and criteria to ensure that products and services meet customer requirements Covers how to establish, document and maintain an effective QMS Demonstrates to customers how quality needs are supplied Provides independent measure of company’s QMS through a certification process, involving regular inspections
  • 20. REQUIREMENTS OF A QUALITY MANAGEMENT SYSTEM (QMS) Objectives are clearly articulated There are documented procedures for: • regular review of contract/plan • design control • documentation and change control • product identification and traceability • inspection, measuring and testing • identification of non-conformance • corrective action • quality audits and records
  • 21. Staff are trained Individuals take responsibility REQUIREMENTS OF A QUALITY MANAGEMENT SYSTEM (QMS) Continued
  • 22. • Reliability • Usability • Maintainability • Efficiency • Portability • Security • Flexibility • Conformance to specification • Zero Defects SOFTWARE QUALITY MANAGEMENT (SQM) Targets
  • 23. Metrics for each phase Centralised responsibility for quality (project librarian?) Method • Detailed planning before development starts, with checkpoints and deliverables • Use of development change control procedures • Design reviews to highlight and resolve technical issues • Progress reviews at formal milestones to ensure adequate planning and resources • Design traceable to specification and requirements • Test plan, specifications and records to be kept SOFTWARE QUALITY MANAGEMENT (SQM) (Continued)
  • 24. TickIT TickIT is a scheme aimed to: • encourage software companies to achieve ISO9000 • certify this through independent assessment • monitor the quality management system through visits • allow the company to display the TickIT logo BCS has produced a Guidance Manual, which covers: • introduction to ISO9000 and necessary documentation • an interpretation of ISO9000 for the software industry • guidance on what you can expect from a TickIT supplier • guidance for suppliers on implementation • guidance for auditors on the assessment process, costs, and benefits