ECONOMICECONOMIC ASPECTSASPECTS OFOF MITIGATIONMITIGATION OFOF
SEISMICSEISMIC RISKRISK ININ THETHE URBANURBAN ANDAND
CONSTRUCTIVECONSTRUCTIVE STRUCTURESTRUCTURE
Maria BOSTENARU DAN
Diana MENDES
 Literature review
 Comparative analyses
 Modelling
LITERATURELITERATURE REVIEWREVIEW
 Rehabilitation of historical centres
 New theories in multicriteria analysis
 Similar approaches (Caterino)
 Game theory
 Drama theory
 Climate change
 Useful software
 Support through computer software
 Agent based modelling
REREHABILITATIONHABILITATION OFOF HISTORICALHISTORICAL CENTRESCENTRES
 Terje Nypan (2003), Xavier Greffe (1990),
Donovan Rypkema (2005)
 European platforms
 The Economic Value of Cultural Heritage
(EVoCH)
 ICOMOS ISCEC
 Conservation economics
NNEWEW THEORIESTHEORIES ININ MULTICRITERIAMULTICRITERIA ANALYSISANALYSIS
 Game theory
 City building games
 SimCity
 Board games – the narrative in novel, film, game
 cooperative games (Ken Follett) and conflict based games
(Habitat) – the financial aspect has a key role
 SIREN project of development of some games for the conflict
situation
 Participative element in games – public politics (Markov populations)
 To design a new game
 Drama theory
 Computer software: confrontation manager
 Translating from building scale to urban scale
 old: utility-value
ANALYTICAL HIERARCHY BUILDINGANALYTICAL HIERARCHY BUILDING
BUILDINGBUILDING -- ACTORSACTORS
 Architect
 Civil
engineer
 Social -
inhabitant
 Economic -
investor
ACTORS IN WHEACTORS IN WHE
 Architect
 Civil engineer
 Socio-economic
aspects
 Proiect
management
EXEMPLEEXEMPLE OF INTERWAR BUILDING WHEOF INTERWAR BUILDING WHE
 WHE
INDICATORSINDICATORS
BUILDINGBUILDING
ACTORACTORSS
BUILDING ONTOLOGY > ITBUILDING ONTOLOGY > IT
VUWIKIVUWIKI -- ONTOLOGONTOLOGYY
Introducing the studies until now in the VUWIKI database of social
vulnerability
http://www.globalquakemodel.org/what/phy
sical-integrated-risk/socio-economic-
vulnerability/
COMPUTERCOMPUTER GAMEGAME
JOC DE SOCIETATEJOC DE SOCIETATE
CONFRONTATION MANAGERCONFRONTATION MANAGER -- IDEASCIENCESIDEASCIENCES
What if
see pattern language (Christopher Alexander) – also for games
http://www.ideasciences.com/products/conf
rontationmanager/screenshots.php
SUSUPPORTPPORT THROUGHTHROUGH COMPUTERCOMPUTER SOFTWARESOFTWARE
 Exploitable foreground in the reintegration
grant
 Ontology of zoning – facility management
 Semantics – from applyied philosophy
 Building Information Modelling – in
restoration, archiCAD
 Relationships in the architectural layout –
software Space Syntax
OUROUR APPROACHAPPROACH PROPOSEDPROPOSED ININ ZZÜRICHÜRICH
See the other presentation
Passing from 3D survey to costs
GIS concept at building level
BIMBIM SYSTEMSYSTEM STARTSTART
CASA MONDRIANCASA MONDRIAN
Economic computation in Bursa construcţiilor will follow
The house has the green space characteristics of which we will talk
JAMES O DONNELLJAMES O DONNELL –– LINKED DATALINKED DATA
Dependence of energy consumption of function – in our case costs
depend on function
SPACE SYNTAXSPACE SYNTAX –– URBAGRAMM.NETURBAGRAMM.NET
Adaptable also for the system of streets – see agent based modelling
COMPARATIVECOMPARATIVE ANALYSESANALYSES
 Agent based modelling – our multicriteria
approach – new approaches (drama theory and
game theory regarding the conflict)
 Our theory, supported by BIM, is more suitable
for the earthquake, while GIS and the other
theories are for linear actions (ex. flood,
tsunami, red mud, for which we have case
studies)
 Ressource allocation (people and materials)
 Monte-Carlo analysis for the comparison with
real methods
MODELMODELLINGLING
 Case study: Lisbon
 Conclusions for Bucharest
 Disaster as occasion for a new reconstruction
 Urban 3D model
 Ontology of structure (WHE)
 The ontology of decision has to be adapted from the
modelling of the facility management/energy aspects
(in preliminary research ontology also in the
archiCAD BIM ones) to the structural ones
 Regression building scale – urban scale
HALF TIMBERED POMBALINAHALF TIMBERED POMBALINA
LISBON IN GOOGLE EARTHLISBON IN GOOGLE EARTH
INDICATORS IN WHEINDICATORS IN WHE
 Taxonomy in progress
http://www.world-housing.net/gem-building-
taxonomy-testing-and-evaluation-create-a-
report-using-taxt
ECONOMICECONOMIC COMPUTATIONSCOMPUTATIONS
Based on the space surfaces in a building
Flächen- und Raumerfassung Raumlage und Bemerkungen
Liegenschaft Straße Mihai Eminescu
PLZ Ort Bucuresti
Projekt Bez. „Eminescu"
Raum# Fläche ±Faktor Länge Tiefe Höhe Volumen Kopf Typ Schlüssel ID ID Raum-Beziehungen
[Pos.-Nr.] [m2] [m] [m] [m] [m3] [Kopf] [Typ] [RC] [abc] lfd. Nr. Zone Raum Raumgr. Ebene Bereich Abschnitt Gebäude Projekt links oben Bemerkung
UG Bruttogrundrißfläche
4,00 27,7 (= 0,95 x 5,40 x 5,40 )x 2,88 = 79,782 4 7630 a U1 1 UG HEIZUNG Wärmeversorgung
5,00 140,2 (= 0,95 x 6,00 x 24,60 )x 2,88 = 403,834 4 4110 a U2 1 UG LAGER Lagerräume allgemein
6,00 352,3 (= 0,95 x 6,00 x 61,80 )x 2,88 = 1.014,50 4 7410 a U3 1 UG PARKEN Kraftfahrzeugabstellflächen allgemein
7,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 4 9240 a U4 1 UG TREPPE Fluchttreppe
8,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 4 9310 a U5 1 UG AUFZUG Schächte für Personenaufzüge
9,00 13,7 (= 0,95 x 6,00 x 2,40 )x 2,88 = 39,398 1 8200 a U6 1 UG WASSER Wasserversorgung
10,00 146,7 (= 0,95 x 7,80 x 19,80 )x 2,88 = 422,54 1 12 4520 a U7 1 UG LADEN Ladenräume
EG
11,00 41,0 (= 0,95 x 12,00 x 3,60 )x 2,88 = 118,19 2 7410 a E1 1 UG PARKEN Kraftfahrzeugabstellflächen allgemein
12,00 205,2 (= 0,95 x 18,00 x 12,00 )x 2,88 = 590,97 4 a E2 1 UG TERASSE
13,00 27,4 (= 0,95 x 6,00 x 4,80 )x 2,88 = 78,797 4 9110 a E3 1 UG FLUR Flure allgemein
14,00 34,2 (= 0,95 x 6,00 x 6,00 )x 2,88 = 98,496 1 4520 a E4 1 EG LADEN Ladenräume
15,00 13,7 (= 0,95 x 6,00 x 2,40 )x 2,88 = 39,398 1 4110 a E5 Fahrräder 1 EG LAGER 1 Lagerräume allgemein
16,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 1 4110 a E6 Müll 1 EG LAGER 2 Lagerräume allgemein
17,00 34,2 (= 0,95 x 6,00 x 6,00 )x 2,88 = 98,496 13 2160 a E7 1 EG BÜRO Einzelarbeitsplätze
18,00 136,8 (= 0,95 x 6,00 x 24,00 )x 2,88 = 393,98 3 13 2160 a E8 1 EG BÜROS Einzelarbeitsplätze
19,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 5 9240 a E9 1 EG TREPPE Fluchttreppe
20,00 90,3 (= 0,95 x 14,40 x 6,60 )x 2,88 = 260,02 5 9310 a E10 1 EG AUFZUG Schächte für Personenaufzüge
1 OG
21,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 1O1 1 EG TREPPE Fluchttreppe
22,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 1O2 1 EG AUFZUG Schächte für Personenaufzüge
23,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 1O3 1 EG EINZIMMERWOHNUNG V
24,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 13 1111 a 1O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V
25,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 1O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V
2 OG
26,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 2O1 1 EG TREPPE Fluchttreppe
27,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 2O2 1 EG AUFZUG Schächte für Personenaufzüge
28,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 2O3 1 EG EINZIMMERWOHNUNG V
29,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 1111 a 2O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V
30,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 2O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V
3 OG
31,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 3O1 1 EG TREPPE Fluchttreppe
32,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 3O2 1 EG AUFZUG Schächte für Personenaufzüge
33,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 3O3 1 EG EINZIMMERWOHNUNG V
34,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 1111 a 3O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V
35,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 3O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V
4 OG
36,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 2 9240 a 4O1 1 2 OG TREPPE Fluchttreppe
37,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 2 9310 a 4O2 1 2 OG AUFZUG Schächte für Personenaufzüge
38,00 85,5 (= 0,95 x 12,00 x 7,50 )x 2,88 = 246,24 1 4210 a 4O3 1 2 OG TERRASSE
39,00 266,8 (= 1,42 x 15,60 x 12,00 )x 2,88 = 768,26 5 1111 a 4O4 zur Strasse 1 2 OG MEHRZIMMERWOHNUNG 1 V
40,00 95,8 (= 0,95 x 12,00 x 8,40 )x 2,88 = 275,78 1 1111 a 4O5 zum Hof 1 2 OG MEHRZIMMERWOHNUNG 2 V
5 OG
41,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 1 9310 a 5O1 1 2 OG AUFZUG Schächte für Personenaufzüge
42,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 1 9240 a 5O2 1 2 OG TREPPE Fluchttreppe
43,00 75,2 (= 0,95 x 12,00 x 6,60 )x 2,88 = 216,69 1 1111 a 5O3 zum Hof 1 2 OG MEHRZIMMERWOHNUNG V
Flächen- und Raumerfassung Raumlage und Bemerkungen
Liegenschaft Straße Mihai Eminescu
PLZ Ort Bucuresti
Projekt Bez. „Eminescu"
Raum# Fläche ±Faktor Länge Tiefe Höhe Volumen Kopf Typ Schlüssel ID ID Raum-Beziehungen
[Pos.-Nr.] [m2] [m] [m] [m] [m3] [Kopf] [Typ] [RC] [abc] lfd. Nr. Zone Raum Raumgr. Ebene Bereich Abschnitt Gebäude Projekt links oben Bemerkung
UG Bruttogrundrißfläche
4,00 27,7 (= 0,95 x 5,40 x 5,40 )x 2,88 = 79,782 4 7630 a U1 1 UG HEIZUNG Wärmeversorgung
5,00 140,2 (= 0,95 x 6,00 x 24,60 )x 2,88 = 403,834 4 4110 a U2 1 UG LAGER Lagerräume allgemein
6,00 352,3 (= 0,95 x 6,00 x 61,80 )x 2,88 = 1.014,50 4 7410 a U3 1 UG PARKEN Kraftfahrzeugabstellflächen allgemein
7,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 4 9240 a U4 1 UG TREPPE Fluchttreppe
8,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 4 9310 a U5 1 UG AUFZUG Schächte für Personenaufzüge
9,00 13,7 (= 0,95 x 6,00 x 2,40 )x 2,88 = 39,398 1 8200 a U6 1 UG WASSER Wasserversorgung
10,00 146,7 (= 0,95 x 7,80 x 19,80 )x 2,88 = 422,54 1 12 4520 a U7 1 UG LADEN Ladenräume
EG
11,00 41,0 (= 0,95 x 12,00 x 3,60 )x 2,88 = 118,19 2 7410 a E1 1 UG PARKEN Kraftfahrzeugabstellflächen allgemein
12,00 205,2 (= 0,95 x 18,00 x 12,00 )x 2,88 = 590,97 4 a E2 1 UG TERASSE
13,00 27,4 (= 0,95 x 6,00 x 4,80 )x 2,88 = 78,797 4 9110 a E3 1 UG FLUR Flure allgemein
14,00 34,2 (= 0,95 x 6,00 x 6,00 )x 2,88 = 98,496 1 4520 a E4 1 EG LADEN Ladenräume
15,00 13,7 (= 0,95 x 6,00 x 2,40 )x 2,88 = 39,398 1 4110 a E5 Fahrräder 1 EG LAGER 1 Lagerräume allgemein
16,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 1 4110 a E6 Müll 1 EG LAGER 2 Lagerräume allgemein
17,00 34,2 (= 0,95 x 6,00 x 6,00 )x 2,88 = 98,496 13 2160 a E7 1 EG BÜRO Einzelarbeitsplätze
18,00 136,8 (= 0,95 x 6,00 x 24,00 )x 2,88 = 393,98 3 13 2160 a E8 1 EG BÜROS Einzelarbeitsplätze
19,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 5 9240 a E9 1 EG TREPPE Fluchttreppe
20,00 90,3 (= 0,95 x 14,40 x 6,60 )x 2,88 = 260,02 5 9310 a E10 1 EG AUFZUG Schächte für Personenaufzüge
1 OG
21,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 1O1 1 EG TREPPE Fluchttreppe
22,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 1O2 1 EG AUFZUG Schächte für Personenaufzüge
23,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 1O3 1 EG EINZIMMERWOHNUNG V
24,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 13 1111 a 1O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V
25,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 1O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V
2 OG
26,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 2O1 1 EG TREPPE Fluchttreppe
27,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 2O2 1 EG AUFZUG Schächte für Personenaufzüge
28,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 2O3 1 EG EINZIMMERWOHNUNG V
29,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 1111 a 2O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V
30,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 2O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V
3 OG
31,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 3O1 1 EG TREPPE Fluchttreppe
32,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 3O2 1 EG AUFZUG Schächte für Personenaufzüge
33,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 3O3 1 EG EINZIMMERWOHNUNG V
34,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 1111 a 3O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V
35,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 3O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V
4 OG
36,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 2 9240 a 4O1 1 2 OG TREPPE Fluchttreppe
37,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 2 9310 a 4O2 1 2 OG AUFZUG Schächte für Personenaufzüge
38,00 85,5 (= 0,95 x 12,00 x 7,50 )x 2,88 = 246,24 1 4210 a 4O3 1 2 OG TERRASSE
39,00 266,8 (= 1,42 x 15,60 x 12,00 )x 2,88 = 768,26 5 1111 a 4O4 zur Strasse 1 2 OG MEHRZIMMERWOHNUNG 1 V
40,00 95,8 (= 0,95 x 12,00 x 8,40 )x 2,88 = 275,78 1 1111 a 4O5 zum Hof 1 2 OG MEHRZIMMERWOHNUNG 2 V
5 OG
41,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 1 9310 a 5O1 1 2 OG AUFZUG Schächte für Personenaufzüge
42,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 1 9240 a 5O2 1 2 OG TREPPE Fluchttreppe
43,00 75,2 (= 0,95 x 12,00 x 6,60 )x 2,88 = 216,69 1 1111 a 5O3 zum Hof 1 2 OG MEHRZIMMERWOHNUNG V
ECONOMICECONOMIC ASSESSMENTASSESSMENT
KFA 1 1.103 1.416 Basisjahr Stichtag 2.393,04 1 0,78
KFA 2 1.796 2.206 1980 13.06.96 3.728,14 2 0,81
KFA 3 2.051 3.491 Basisindex Neuer Index 5.899,79 3 0,59
KFA 4 2.703 5.324 100 169 = 1,69 8.997,56 4 0,51
KFA 5 3.071 8.429 14.245,01 5 0,36
KFA 6 4.510 12.164 20.557,16 6 0,37
RBK, Teil 1, Ausgabe: 2.88 BKK[DM] SBK[DM/m2] Ber. a [m2] SBK [DM] [%] [%]
seitl. umschlossen räuml. umschlossen Anteil BKK SBK
+ Wohnen u. Aufenthalt 1.291.800,51 2.393,0 * 693,0 = 1.658.376,72 78 80
+ Büroarbeit 0,00 * 0,0 = 0,00 0 0
+ Produktion, Hand- u. Maschinen… 215.300,09 2.393,0 * 115,5 = 276.396,12 78 13
+ Lagern, Verteilen, Verkaufen 107.650,04 2.393,0 * 57,8 = 138.198,06 78 7
+ Bildung, Unterricht und Kultur 0,00 * 0,0 = 0,00 0 0
+ Heilen und Pflegen 0,00 * 0,0 = 0,00 0 0
= Hauptnutzfläche HNF 2.393,0 * 866,3 = 2.072.970,90
+ Sonstige Nutzungen (NNF) NNF 0,00 * 0,0 = 0,00 0 0
= Nutzfläche NF 1.614.750,64 2.393,0 * 866,3 = 2.072.970,90
+ Betriebstechnische Anlagen FF Kostenmäßig in anderen Flächen erfaßt
+ Verkehrserschl. u. -sicherung VF Kostenmäßig in anderen Flächen erfaßt
Nicht erfaßte Flächen 0,00 2.393,0 0,0 = 0,00 70 0
Ø [DM/m2] gewählt
Zuschläge 0,00 * = 0,00 70 0
Kostenschätzung BKK (KGR. 300) TKK (KGR. 400) SBK (KGR. 300+400)
Bruttokosten 1.614.750,64 458.220,26 2.072.970,90 incl. MWST.
./. Mehrwertsteuer 210.619,65 59.767,86 15 % 270.387,51
Nettokosten 1.404.130,99 398.452,40 1.802.583,39
Aufrundung der Nettosumme auf x-Stellen… 3 416,61
Gesamtkosten 1.803.000,00 excl. MWST.
15 % 270.450,00 MWSt.
2.073.450,00 incl. MWST.
KFA 1 1.103 1.416 Basisjahr Stichtag 2.393,04 1 0,78
KFA 2 1.796 2.206 1980 13.06.96 3.728,14 2 0,81
KFA 3 2.051 3.491 Basisindex Neuer Index 5.899,79 3 0,59
KFA 4 2.703 5.324 100 169 = 1,69 8.997,56 4 0,51
KFA 5 3.071 8.429 14.245,01 5 0,36
KFA 6 4.510 12.164 20.557,16 6 0,37
RBK, Teil 1, Ausgabe: 2.88 BKK[DM] SBK[DM/m2] Ber. a [m2] SBK [DM] [%] [%]
seitl. umschlossen räuml. umschlossen Anteil BKK SBK
+ Wohnen u. Aufenthalt 1.291.800,51 2.393,0 * 693,0 = 1.658.376,72 78 80
+ Büroarbeit 0,00 * 0,0 = 0,00 0 0
+ Produktion, Hand- u. Maschinen… 215.300,09 2.393,0 * 115,5 = 276.396,12 78 13
+ Lagern, Verteilen, Verkaufen 107.650,04 2.393,0 * 57,8 = 138.198,06 78 7
+ Bildung, Unterricht und Kultur 0,00 * 0,0 = 0,00 0 0
+ Heilen und Pflegen 0,00 * 0,0 = 0,00 0 0
= Hauptnutzfläche HNF 2.393,0 * 866,3 = 2.072.970,90
+ Sonstige Nutzungen (NNF) NNF 0,00 * 0,0 = 0,00 0 0
= Nutzfläche NF 1.614.750,64 2.393,0 * 866,3 = 2.072.970,90
+ Betriebstechnische Anlagen FF Kostenmäßig in anderen Flächen erfaßt
+ Verkehrserschl. u. -sicherung VF Kostenmäßig in anderen Flächen erfaßt
Nicht erfaßte Flächen 0,00 2.393,0 0,0 = 0,00 70 0
Ø [DM/m2] gewählt
Zuschläge 0,00 * = 0,00 70 0
Kostenschätzung BKK (KGR. 300) TKK (KGR. 400) SBK (KGR. 300+400)
Bruttokosten 1.614.750,64 458.220,26 2.072.970,90 incl. MWST.
./. Mehrwertsteuer 210.619,65 59.767,86 15 % 270.387,51
Nettokosten 1.404.130,99 398.452,40 1.802.583,39
Aufrundung der Nettosumme auf x-Stellen… 3 416,61
Gesamtkosten 1.803.000,00 excl. MWST.
15 % 270.450,00 MWSt.
2.073.450,00 incl. MWST.
INTERDEPENDENCE STRUCTURALINTERDEPENDENCE STRUCTURAL ––
SOCIOSOCIO--ECONOMICECONOMIC
Otpt No: 73 Time= 9,3360, spallig reached. Elm: Cb51ba. Unc Conc Strain = -0.002173 - G.p.(b)
Otpt No: 73 Time= 9,3360, spallig reached. Elm: Cb2051a. Unc Conc Strain = -0.002116 - G.p.(b)
Otpt No: 73 Time= 9,3360, spallig reached. Elm: C2031a. Unc Conc Strain = -0.002198 - G.p.(b)
Otpt No: 73 Time= 9,3360, yield reached. Elm: C11bb. Steel Strain = 0.002502 - G.p.(a)
Otpt No: 73 Time= 9,3360, yield reached. Elm: C2011a. Steel Strain = 0.002633 - G.p.(b)
Otpt No: 73 Time= 9,3360, fracture reached. Elm: C2011b. Steel Strain = 0.069858 - G.p.(a)
Otpt No: 73 Time= 9,3360, fracture reached. Elm: C2011b. Steel Strain = 0.109096 - G.p.(b)
Otpt No: 73 Time= 9,3360, crush reached. Elm: C2011b. Conf Conc Strain = -0.007241 - G.p.(a)
Otpt No: 73 Time= 9,3360, crush reached. Elm: C2011b. Conf Conc Strain = -0.04781 - G.p.(b)
Otpt No: 73 Time= 9,3360, yield reached. Elm: C5011b. Steel Strain = 0.005749 - G.p.(a)
Typical log-file output
Otpt No: Time= reached Elm: Mat 1 Mat 2 Strain = Gauss point
1 0.1500, crack_cover bmz3412. Unc Conc 0.000107 G.p.(b)
1 0.1500, crack_core bmz2511. Conf Conc 0.000101 G.p.(a)
1 0.1500, crack_cover bmz2511. Unc Conc 0.000113 G.p.(a)
1 0.1500, crack_core bmz2512. Conf Conc 0.000108 G.p.(b)
1 0.1500, crack_cover bmz2512. Unc Conc 0.000122 G.p.(b)
1 0.1500, crack_cover bmz4411. Unc Conc 0.000101 G.p.(a)
1 0.1500, crack_cover bmz4412. Unc Conc 0.000109 G.p.(b)
1 0.1500, crack_core bmz3511. Conf Conc 0.000104 G.p.(a)
1 0.1500, crack_cover bmz3511. Unc Conc 0.000116 G.p.(a)
1 0.1500, crack_core bmz3512. Conf Conc 0.000111 G.p.(b)
Log-file output imported in MS Excell
ID Otpt No: Time= reached Elm: Mat 1 Mat 2 Strain = Gauss point
1 1 0.1500, crack_cover bmz3412. Unc Conc 0.000107 G.p.(b)
2 1 0.1500, crack_core bmz2511. Conf Conc 0.000101 G.p.(a)
3 1 0.1500, crack_cover bmz2511. Unc Conc 0.000113 G.p.(a)
4 1 0.1500, crack_core bmz2512. Conf Conc 0.000108 G.p.(b)
5 1 0.1500, crack_cover bmz2512. Unc Conc 0.000122 G.p.(b)
6 1 0.1500, crack_cover bmz4411. Unc Conc 0.000101 G.p.(a)
7 1 0.1500, crack_cover bmz4412. Unc Conc 0.000109 G.p.(b)
8 1 0.1500, crack_core bmz3511. Conf Conc 0.000104 G.p.(a)
9 1 0.1500, crack_cover bmz3511. Unc Conc 0.000116 G.p.(a)
10 1 0.1500, crack_core bmz3512. Conf Conc 0.000111 G.p.(b)
Log-file imported in MS Access
Gesamtsumme von ID yield crush spall crack_core crack_cover element
15 4 1 2 4 4 bmx121
14 4 2 4 4 bmx122
14 4 2 4 4 bmx133
14 4 2 4 4 bmx141
14 4 2 4 4 bmx142
10 2 4 4 bmx152
10 2 4 4 bmx153
10 2 4 4 bmx154
8 4 4 bmx161
8 4 4 bmx162
MS Access query
URBAN ONTOLOGY (COST TU0801 TRAININGURBAN ONTOLOGY (COST TU0801 TRAINING
SCHOOL)SCHOOL)
 Sisi
MODELMODELLINGLING
 Link between architecture and economic
aspects: in the future link with the role of
green spaces in reconstruction and economic
elements,
 see Woinaroschi (historical archive study)
 See games
 Enhancing the value of the land through the vicinity of
the green space
 Construction of greenhouses out of ressource elements
 Future case study: the village and the church
– game: Devecser and Corbeni
DEVECSERDEVECSER
CORBENICORBENI
SIM CITY SOCIALSIM CITY SOCIAL
Valoarea adaugată a parcului cu lac
CITY BUILDING GAMESCITY BUILDING GAMES -- GREENHOUSEGREENHOUSE
Elemente de management al resurselor
ACKNOWLEDGEMENTSACKNOWLEDGEMENTS
 COST Action IS1105
 STSM at ISCTE-IUL, Lisbon, Portugal,
march-april 2013

More Related Content

More from Maria Bostenaru

More from Maria Bostenaru (20)

Simpozion CSAU bostenaru
Simpozion CSAU bostenaruSimpozion CSAU bostenaru
Simpozion CSAU bostenaru
 
Budapest eurodoc
Budapest eurodocBudapest eurodoc
Budapest eurodoc
 
The beginnings of reinforced concrete
The beginnings of reinforced concreteThe beginnings of reinforced concrete
The beginnings of reinforced concrete
 
Padurea din oras Carei si Karlsruhe
Padurea din oras Carei si KarlsruhePadurea din oras Carei si Karlsruhe
Padurea din oras Carei si Karlsruhe
 
COST Madrid
COST MadridCOST Madrid
COST Madrid
 
PIANO final report
PIANO final reportPIANO final report
PIANO final report
 
Hamburg 2012
Hamburg 2012Hamburg 2012
Hamburg 2012
 
Architecture and urban planning (3 d) representation
Architecture and urban planning (3 d) representationArchitecture and urban planning (3 d) representation
Architecture and urban planning (3 d) representation
 
Uzina de apa Suceava
Uzina de apa SuceavaUzina de apa Suceava
Uzina de apa Suceava
 
Water Junior sumitt Stresa
Water Junior sumitt StresaWater Junior sumitt Stresa
Water Junior sumitt Stresa
 
Living walls - romana
Living walls - romanaLiving walls - romana
Living walls - romana
 
Economics and retrofit
Economics and retrofitEconomics and retrofit
Economics and retrofit
 
Historical network research
Historical network researchHistorical network research
Historical network research
 
MCFA Eurodoc
MCFA EurodocMCFA Eurodoc
MCFA Eurodoc
 
Presentation FARO stsm NeDiMAH workshop
Presentation FARO stsm NeDiMAH workshopPresentation FARO stsm NeDiMAH workshop
Presentation FARO stsm NeDiMAH workshop
 
Ned imah
Ned imahNed imah
Ned imah
 
ESF conference Spain
ESF conference SpainESF conference Spain
ESF conference Spain
 
COST meeting Riga
COST meeting RigaCOST meeting Riga
COST meeting Riga
 
INCERC conference
INCERC conferenceINCERC conference
INCERC conference
 
Budapest conference
Budapest conferenceBudapest conference
Budapest conference
 

NED COST IS1104

  • 1. ECONOMICECONOMIC ASPECTSASPECTS OFOF MITIGATIONMITIGATION OFOF SEISMICSEISMIC RISKRISK ININ THETHE URBANURBAN ANDAND CONSTRUCTIVECONSTRUCTIVE STRUCTURESTRUCTURE Maria BOSTENARU DAN Diana MENDES
  • 2.  Literature review  Comparative analyses  Modelling
  • 3. LITERATURELITERATURE REVIEWREVIEW  Rehabilitation of historical centres  New theories in multicriteria analysis  Similar approaches (Caterino)  Game theory  Drama theory  Climate change  Useful software  Support through computer software  Agent based modelling
  • 4. REREHABILITATIONHABILITATION OFOF HISTORICALHISTORICAL CENTRESCENTRES  Terje Nypan (2003), Xavier Greffe (1990), Donovan Rypkema (2005)  European platforms  The Economic Value of Cultural Heritage (EVoCH)  ICOMOS ISCEC  Conservation economics
  • 5. NNEWEW THEORIESTHEORIES ININ MULTICRITERIAMULTICRITERIA ANALYSISANALYSIS  Game theory  City building games  SimCity  Board games – the narrative in novel, film, game  cooperative games (Ken Follett) and conflict based games (Habitat) – the financial aspect has a key role  SIREN project of development of some games for the conflict situation  Participative element in games – public politics (Markov populations)  To design a new game  Drama theory  Computer software: confrontation manager  Translating from building scale to urban scale  old: utility-value
  • 7. BUILDINGBUILDING -- ACTORSACTORS  Architect  Civil engineer  Social - inhabitant  Economic - investor
  • 8. ACTORS IN WHEACTORS IN WHE  Architect  Civil engineer  Socio-economic aspects  Proiect management
  • 9. EXEMPLEEXEMPLE OF INTERWAR BUILDING WHEOF INTERWAR BUILDING WHE  WHE
  • 12. BUILDING ONTOLOGY > ITBUILDING ONTOLOGY > IT
  • 13. VUWIKIVUWIKI -- ONTOLOGONTOLOGYY Introducing the studies until now in the VUWIKI database of social vulnerability http://www.globalquakemodel.org/what/phy sical-integrated-risk/socio-economic- vulnerability/
  • 15. JOC DE SOCIETATEJOC DE SOCIETATE
  • 16. CONFRONTATION MANAGERCONFRONTATION MANAGER -- IDEASCIENCESIDEASCIENCES What if see pattern language (Christopher Alexander) – also for games http://www.ideasciences.com/products/conf rontationmanager/screenshots.php
  • 17. SUSUPPORTPPORT THROUGHTHROUGH COMPUTERCOMPUTER SOFTWARESOFTWARE  Exploitable foreground in the reintegration grant  Ontology of zoning – facility management  Semantics – from applyied philosophy  Building Information Modelling – in restoration, archiCAD  Relationships in the architectural layout – software Space Syntax
  • 18. OUROUR APPROACHAPPROACH PROPOSEDPROPOSED ININ ZZÜRICHÜRICH See the other presentation Passing from 3D survey to costs GIS concept at building level
  • 20.
  • 21. CASA MONDRIANCASA MONDRIAN Economic computation in Bursa construcţiilor will follow The house has the green space characteristics of which we will talk
  • 22. JAMES O DONNELLJAMES O DONNELL –– LINKED DATALINKED DATA Dependence of energy consumption of function – in our case costs depend on function
  • 23. SPACE SYNTAXSPACE SYNTAX –– URBAGRAMM.NETURBAGRAMM.NET Adaptable also for the system of streets – see agent based modelling
  • 24. COMPARATIVECOMPARATIVE ANALYSESANALYSES  Agent based modelling – our multicriteria approach – new approaches (drama theory and game theory regarding the conflict)  Our theory, supported by BIM, is more suitable for the earthquake, while GIS and the other theories are for linear actions (ex. flood, tsunami, red mud, for which we have case studies)  Ressource allocation (people and materials)  Monte-Carlo analysis for the comparison with real methods
  • 25. MODELMODELLINGLING  Case study: Lisbon  Conclusions for Bucharest  Disaster as occasion for a new reconstruction  Urban 3D model  Ontology of structure (WHE)  The ontology of decision has to be adapted from the modelling of the facility management/energy aspects (in preliminary research ontology also in the archiCAD BIM ones) to the structural ones  Regression building scale – urban scale
  • 26.
  • 27. HALF TIMBERED POMBALINAHALF TIMBERED POMBALINA
  • 28. LISBON IN GOOGLE EARTHLISBON IN GOOGLE EARTH
  • 29. INDICATORS IN WHEINDICATORS IN WHE  Taxonomy in progress http://www.world-housing.net/gem-building- taxonomy-testing-and-evaluation-create-a- report-using-taxt
  • 30. ECONOMICECONOMIC COMPUTATIONSCOMPUTATIONS Based on the space surfaces in a building Flächen- und Raumerfassung Raumlage und Bemerkungen Liegenschaft Straße Mihai Eminescu PLZ Ort Bucuresti Projekt Bez. „Eminescu" Raum# Fläche ±Faktor Länge Tiefe Höhe Volumen Kopf Typ Schlüssel ID ID Raum-Beziehungen [Pos.-Nr.] [m2] [m] [m] [m] [m3] [Kopf] [Typ] [RC] [abc] lfd. Nr. Zone Raum Raumgr. Ebene Bereich Abschnitt Gebäude Projekt links oben Bemerkung UG Bruttogrundrißfläche 4,00 27,7 (= 0,95 x 5,40 x 5,40 )x 2,88 = 79,782 4 7630 a U1 1 UG HEIZUNG Wärmeversorgung 5,00 140,2 (= 0,95 x 6,00 x 24,60 )x 2,88 = 403,834 4 4110 a U2 1 UG LAGER Lagerräume allgemein 6,00 352,3 (= 0,95 x 6,00 x 61,80 )x 2,88 = 1.014,50 4 7410 a U3 1 UG PARKEN Kraftfahrzeugabstellflächen allgemein 7,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 4 9240 a U4 1 UG TREPPE Fluchttreppe 8,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 4 9310 a U5 1 UG AUFZUG Schächte für Personenaufzüge 9,00 13,7 (= 0,95 x 6,00 x 2,40 )x 2,88 = 39,398 1 8200 a U6 1 UG WASSER Wasserversorgung 10,00 146,7 (= 0,95 x 7,80 x 19,80 )x 2,88 = 422,54 1 12 4520 a U7 1 UG LADEN Ladenräume EG 11,00 41,0 (= 0,95 x 12,00 x 3,60 )x 2,88 = 118,19 2 7410 a E1 1 UG PARKEN Kraftfahrzeugabstellflächen allgemein 12,00 205,2 (= 0,95 x 18,00 x 12,00 )x 2,88 = 590,97 4 a E2 1 UG TERASSE 13,00 27,4 (= 0,95 x 6,00 x 4,80 )x 2,88 = 78,797 4 9110 a E3 1 UG FLUR Flure allgemein 14,00 34,2 (= 0,95 x 6,00 x 6,00 )x 2,88 = 98,496 1 4520 a E4 1 EG LADEN Ladenräume 15,00 13,7 (= 0,95 x 6,00 x 2,40 )x 2,88 = 39,398 1 4110 a E5 Fahrräder 1 EG LAGER 1 Lagerräume allgemein 16,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 1 4110 a E6 Müll 1 EG LAGER 2 Lagerräume allgemein 17,00 34,2 (= 0,95 x 6,00 x 6,00 )x 2,88 = 98,496 13 2160 a E7 1 EG BÜRO Einzelarbeitsplätze 18,00 136,8 (= 0,95 x 6,00 x 24,00 )x 2,88 = 393,98 3 13 2160 a E8 1 EG BÜROS Einzelarbeitsplätze 19,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 5 9240 a E9 1 EG TREPPE Fluchttreppe 20,00 90,3 (= 0,95 x 14,40 x 6,60 )x 2,88 = 260,02 5 9310 a E10 1 EG AUFZUG Schächte für Personenaufzüge 1 OG 21,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 1O1 1 EG TREPPE Fluchttreppe 22,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 1O2 1 EG AUFZUG Schächte für Personenaufzüge 23,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 1O3 1 EG EINZIMMERWOHNUNG V 24,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 13 1111 a 1O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V 25,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 1O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V 2 OG 26,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 2O1 1 EG TREPPE Fluchttreppe 27,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 2O2 1 EG AUFZUG Schächte für Personenaufzüge 28,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 2O3 1 EG EINZIMMERWOHNUNG V 29,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 1111 a 2O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V 30,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 2O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V 3 OG 31,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 3O1 1 EG TREPPE Fluchttreppe 32,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 3O2 1 EG AUFZUG Schächte für Personenaufzüge 33,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 3O3 1 EG EINZIMMERWOHNUNG V 34,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 1111 a 3O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V 35,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 3O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V 4 OG 36,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 2 9240 a 4O1 1 2 OG TREPPE Fluchttreppe 37,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 2 9310 a 4O2 1 2 OG AUFZUG Schächte für Personenaufzüge 38,00 85,5 (= 0,95 x 12,00 x 7,50 )x 2,88 = 246,24 1 4210 a 4O3 1 2 OG TERRASSE 39,00 266,8 (= 1,42 x 15,60 x 12,00 )x 2,88 = 768,26 5 1111 a 4O4 zur Strasse 1 2 OG MEHRZIMMERWOHNUNG 1 V 40,00 95,8 (= 0,95 x 12,00 x 8,40 )x 2,88 = 275,78 1 1111 a 4O5 zum Hof 1 2 OG MEHRZIMMERWOHNUNG 2 V 5 OG 41,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 1 9310 a 5O1 1 2 OG AUFZUG Schächte für Personenaufzüge 42,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 1 9240 a 5O2 1 2 OG TREPPE Fluchttreppe 43,00 75,2 (= 0,95 x 12,00 x 6,60 )x 2,88 = 216,69 1 1111 a 5O3 zum Hof 1 2 OG MEHRZIMMERWOHNUNG V Flächen- und Raumerfassung Raumlage und Bemerkungen Liegenschaft Straße Mihai Eminescu PLZ Ort Bucuresti Projekt Bez. „Eminescu" Raum# Fläche ±Faktor Länge Tiefe Höhe Volumen Kopf Typ Schlüssel ID ID Raum-Beziehungen [Pos.-Nr.] [m2] [m] [m] [m] [m3] [Kopf] [Typ] [RC] [abc] lfd. Nr. Zone Raum Raumgr. Ebene Bereich Abschnitt Gebäude Projekt links oben Bemerkung UG Bruttogrundrißfläche 4,00 27,7 (= 0,95 x 5,40 x 5,40 )x 2,88 = 79,782 4 7630 a U1 1 UG HEIZUNG Wärmeversorgung 5,00 140,2 (= 0,95 x 6,00 x 24,60 )x 2,88 = 403,834 4 4110 a U2 1 UG LAGER Lagerräume allgemein 6,00 352,3 (= 0,95 x 6,00 x 61,80 )x 2,88 = 1.014,50 4 7410 a U3 1 UG PARKEN Kraftfahrzeugabstellflächen allgemein 7,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 4 9240 a U4 1 UG TREPPE Fluchttreppe 8,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 4 9310 a U5 1 UG AUFZUG Schächte für Personenaufzüge 9,00 13,7 (= 0,95 x 6,00 x 2,40 )x 2,88 = 39,398 1 8200 a U6 1 UG WASSER Wasserversorgung 10,00 146,7 (= 0,95 x 7,80 x 19,80 )x 2,88 = 422,54 1 12 4520 a U7 1 UG LADEN Ladenräume EG 11,00 41,0 (= 0,95 x 12,00 x 3,60 )x 2,88 = 118,19 2 7410 a E1 1 UG PARKEN Kraftfahrzeugabstellflächen allgemein 12,00 205,2 (= 0,95 x 18,00 x 12,00 )x 2,88 = 590,97 4 a E2 1 UG TERASSE 13,00 27,4 (= 0,95 x 6,00 x 4,80 )x 2,88 = 78,797 4 9110 a E3 1 UG FLUR Flure allgemein 14,00 34,2 (= 0,95 x 6,00 x 6,00 )x 2,88 = 98,496 1 4520 a E4 1 EG LADEN Ladenräume 15,00 13,7 (= 0,95 x 6,00 x 2,40 )x 2,88 = 39,398 1 4110 a E5 Fahrräder 1 EG LAGER 1 Lagerräume allgemein 16,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 1 4110 a E6 Müll 1 EG LAGER 2 Lagerräume allgemein 17,00 34,2 (= 0,95 x 6,00 x 6,00 )x 2,88 = 98,496 13 2160 a E7 1 EG BÜRO Einzelarbeitsplätze 18,00 136,8 (= 0,95 x 6,00 x 24,00 )x 2,88 = 393,98 3 13 2160 a E8 1 EG BÜROS Einzelarbeitsplätze 19,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 5 9240 a E9 1 EG TREPPE Fluchttreppe 20,00 90,3 (= 0,95 x 14,40 x 6,60 )x 2,88 = 260,02 5 9310 a E10 1 EG AUFZUG Schächte für Personenaufzüge 1 OG 21,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 1O1 1 EG TREPPE Fluchttreppe 22,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 1O2 1 EG AUFZUG Schächte für Personenaufzüge 23,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 1O3 1 EG EINZIMMERWOHNUNG V 24,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 13 1111 a 1O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V 25,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 1O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V 2 OG 26,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 2O1 1 EG TREPPE Fluchttreppe 27,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 2O2 1 EG AUFZUG Schächte für Personenaufzüge 28,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 2O3 1 EG EINZIMMERWOHNUNG V 29,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 1111 a 2O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V 30,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 2O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V 3 OG 31,00 102,6 (= 4,75 x 6,00 x 3,60 )x 2,88 = 295,48 1 9240 a 3O1 1 EG TREPPE Fluchttreppe 32,00 15,4 (= 4,75 x 1,80 x 1,80 )x 2,88 = 44,323 1 9310 a 3O2 1 EG AUFZUG Schächte für Personenaufzüge 33,00 57,5 (= 0,95 x 8,40 x 7,20 )x 2,88 = 165,47 4 1140 a 3O3 1 EG EINZIMMERWOHNUNG V 34,00 143,6 (= 0,95 x 12,00 x 12,60 )x 2,88 = 413,68 2 1111 a 3O4 zur Strasse 1 EG MEHRZIMMERWOHNUNG 1 V 35,00 136,8 (= 0,95 x 12,00 x 12,00 )x 2,88 = 393,98 1 1111 a 3O5 zum Hof 1 EG MEHRZIMMERWOHNUNG 2 V 4 OG 36,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 2 9240 a 4O1 1 2 OG TREPPE Fluchttreppe 37,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 2 9310 a 4O2 1 2 OG AUFZUG Schächte für Personenaufzüge 38,00 85,5 (= 0,95 x 12,00 x 7,50 )x 2,88 = 246,24 1 4210 a 4O3 1 2 OG TERRASSE 39,00 266,8 (= 1,42 x 15,60 x 12,00 )x 2,88 = 768,26 5 1111 a 4O4 zur Strasse 1 2 OG MEHRZIMMERWOHNUNG 1 V 40,00 95,8 (= 0,95 x 12,00 x 8,40 )x 2,88 = 275,78 1 1111 a 4O5 zum Hof 1 2 OG MEHRZIMMERWOHNUNG 2 V 5 OG 41,00 3,1 (= 0,95 x 1,80 x 1,80 )x 2,88 = 8,865 1 9310 a 5O1 1 2 OG AUFZUG Schächte für Personenaufzüge 42,00 20,5 (= 0,95 x 6,00 x 3,60 )x 2,88 = 59,098 1 9240 a 5O2 1 2 OG TREPPE Fluchttreppe 43,00 75,2 (= 0,95 x 12,00 x 6,60 )x 2,88 = 216,69 1 1111 a 5O3 zum Hof 1 2 OG MEHRZIMMERWOHNUNG V
  • 31. ECONOMICECONOMIC ASSESSMENTASSESSMENT KFA 1 1.103 1.416 Basisjahr Stichtag 2.393,04 1 0,78 KFA 2 1.796 2.206 1980 13.06.96 3.728,14 2 0,81 KFA 3 2.051 3.491 Basisindex Neuer Index 5.899,79 3 0,59 KFA 4 2.703 5.324 100 169 = 1,69 8.997,56 4 0,51 KFA 5 3.071 8.429 14.245,01 5 0,36 KFA 6 4.510 12.164 20.557,16 6 0,37 RBK, Teil 1, Ausgabe: 2.88 BKK[DM] SBK[DM/m2] Ber. a [m2] SBK [DM] [%] [%] seitl. umschlossen räuml. umschlossen Anteil BKK SBK + Wohnen u. Aufenthalt 1.291.800,51 2.393,0 * 693,0 = 1.658.376,72 78 80 + Büroarbeit 0,00 * 0,0 = 0,00 0 0 + Produktion, Hand- u. Maschinen… 215.300,09 2.393,0 * 115,5 = 276.396,12 78 13 + Lagern, Verteilen, Verkaufen 107.650,04 2.393,0 * 57,8 = 138.198,06 78 7 + Bildung, Unterricht und Kultur 0,00 * 0,0 = 0,00 0 0 + Heilen und Pflegen 0,00 * 0,0 = 0,00 0 0 = Hauptnutzfläche HNF 2.393,0 * 866,3 = 2.072.970,90 + Sonstige Nutzungen (NNF) NNF 0,00 * 0,0 = 0,00 0 0 = Nutzfläche NF 1.614.750,64 2.393,0 * 866,3 = 2.072.970,90 + Betriebstechnische Anlagen FF Kostenmäßig in anderen Flächen erfaßt + Verkehrserschl. u. -sicherung VF Kostenmäßig in anderen Flächen erfaßt Nicht erfaßte Flächen 0,00 2.393,0 0,0 = 0,00 70 0 Ø [DM/m2] gewählt Zuschläge 0,00 * = 0,00 70 0 Kostenschätzung BKK (KGR. 300) TKK (KGR. 400) SBK (KGR. 300+400) Bruttokosten 1.614.750,64 458.220,26 2.072.970,90 incl. MWST. ./. Mehrwertsteuer 210.619,65 59.767,86 15 % 270.387,51 Nettokosten 1.404.130,99 398.452,40 1.802.583,39 Aufrundung der Nettosumme auf x-Stellen… 3 416,61 Gesamtkosten 1.803.000,00 excl. MWST. 15 % 270.450,00 MWSt. 2.073.450,00 incl. MWST. KFA 1 1.103 1.416 Basisjahr Stichtag 2.393,04 1 0,78 KFA 2 1.796 2.206 1980 13.06.96 3.728,14 2 0,81 KFA 3 2.051 3.491 Basisindex Neuer Index 5.899,79 3 0,59 KFA 4 2.703 5.324 100 169 = 1,69 8.997,56 4 0,51 KFA 5 3.071 8.429 14.245,01 5 0,36 KFA 6 4.510 12.164 20.557,16 6 0,37 RBK, Teil 1, Ausgabe: 2.88 BKK[DM] SBK[DM/m2] Ber. a [m2] SBK [DM] [%] [%] seitl. umschlossen räuml. umschlossen Anteil BKK SBK + Wohnen u. Aufenthalt 1.291.800,51 2.393,0 * 693,0 = 1.658.376,72 78 80 + Büroarbeit 0,00 * 0,0 = 0,00 0 0 + Produktion, Hand- u. Maschinen… 215.300,09 2.393,0 * 115,5 = 276.396,12 78 13 + Lagern, Verteilen, Verkaufen 107.650,04 2.393,0 * 57,8 = 138.198,06 78 7 + Bildung, Unterricht und Kultur 0,00 * 0,0 = 0,00 0 0 + Heilen und Pflegen 0,00 * 0,0 = 0,00 0 0 = Hauptnutzfläche HNF 2.393,0 * 866,3 = 2.072.970,90 + Sonstige Nutzungen (NNF) NNF 0,00 * 0,0 = 0,00 0 0 = Nutzfläche NF 1.614.750,64 2.393,0 * 866,3 = 2.072.970,90 + Betriebstechnische Anlagen FF Kostenmäßig in anderen Flächen erfaßt + Verkehrserschl. u. -sicherung VF Kostenmäßig in anderen Flächen erfaßt Nicht erfaßte Flächen 0,00 2.393,0 0,0 = 0,00 70 0 Ø [DM/m2] gewählt Zuschläge 0,00 * = 0,00 70 0 Kostenschätzung BKK (KGR. 300) TKK (KGR. 400) SBK (KGR. 300+400) Bruttokosten 1.614.750,64 458.220,26 2.072.970,90 incl. MWST. ./. Mehrwertsteuer 210.619,65 59.767,86 15 % 270.387,51 Nettokosten 1.404.130,99 398.452,40 1.802.583,39 Aufrundung der Nettosumme auf x-Stellen… 3 416,61 Gesamtkosten 1.803.000,00 excl. MWST. 15 % 270.450,00 MWSt. 2.073.450,00 incl. MWST.
  • 32. INTERDEPENDENCE STRUCTURALINTERDEPENDENCE STRUCTURAL –– SOCIOSOCIO--ECONOMICECONOMIC Otpt No: 73 Time= 9,3360, spallig reached. Elm: Cb51ba. Unc Conc Strain = -0.002173 - G.p.(b) Otpt No: 73 Time= 9,3360, spallig reached. Elm: Cb2051a. Unc Conc Strain = -0.002116 - G.p.(b) Otpt No: 73 Time= 9,3360, spallig reached. Elm: C2031a. Unc Conc Strain = -0.002198 - G.p.(b) Otpt No: 73 Time= 9,3360, yield reached. Elm: C11bb. Steel Strain = 0.002502 - G.p.(a) Otpt No: 73 Time= 9,3360, yield reached. Elm: C2011a. Steel Strain = 0.002633 - G.p.(b) Otpt No: 73 Time= 9,3360, fracture reached. Elm: C2011b. Steel Strain = 0.069858 - G.p.(a) Otpt No: 73 Time= 9,3360, fracture reached. Elm: C2011b. Steel Strain = 0.109096 - G.p.(b) Otpt No: 73 Time= 9,3360, crush reached. Elm: C2011b. Conf Conc Strain = -0.007241 - G.p.(a) Otpt No: 73 Time= 9,3360, crush reached. Elm: C2011b. Conf Conc Strain = -0.04781 - G.p.(b) Otpt No: 73 Time= 9,3360, yield reached. Elm: C5011b. Steel Strain = 0.005749 - G.p.(a) Typical log-file output Otpt No: Time= reached Elm: Mat 1 Mat 2 Strain = Gauss point 1 0.1500, crack_cover bmz3412. Unc Conc 0.000107 G.p.(b) 1 0.1500, crack_core bmz2511. Conf Conc 0.000101 G.p.(a) 1 0.1500, crack_cover bmz2511. Unc Conc 0.000113 G.p.(a) 1 0.1500, crack_core bmz2512. Conf Conc 0.000108 G.p.(b) 1 0.1500, crack_cover bmz2512. Unc Conc 0.000122 G.p.(b) 1 0.1500, crack_cover bmz4411. Unc Conc 0.000101 G.p.(a) 1 0.1500, crack_cover bmz4412. Unc Conc 0.000109 G.p.(b) 1 0.1500, crack_core bmz3511. Conf Conc 0.000104 G.p.(a) 1 0.1500, crack_cover bmz3511. Unc Conc 0.000116 G.p.(a) 1 0.1500, crack_core bmz3512. Conf Conc 0.000111 G.p.(b) Log-file output imported in MS Excell ID Otpt No: Time= reached Elm: Mat 1 Mat 2 Strain = Gauss point 1 1 0.1500, crack_cover bmz3412. Unc Conc 0.000107 G.p.(b) 2 1 0.1500, crack_core bmz2511. Conf Conc 0.000101 G.p.(a) 3 1 0.1500, crack_cover bmz2511. Unc Conc 0.000113 G.p.(a) 4 1 0.1500, crack_core bmz2512. Conf Conc 0.000108 G.p.(b) 5 1 0.1500, crack_cover bmz2512. Unc Conc 0.000122 G.p.(b) 6 1 0.1500, crack_cover bmz4411. Unc Conc 0.000101 G.p.(a) 7 1 0.1500, crack_cover bmz4412. Unc Conc 0.000109 G.p.(b) 8 1 0.1500, crack_core bmz3511. Conf Conc 0.000104 G.p.(a) 9 1 0.1500, crack_cover bmz3511. Unc Conc 0.000116 G.p.(a) 10 1 0.1500, crack_core bmz3512. Conf Conc 0.000111 G.p.(b) Log-file imported in MS Access Gesamtsumme von ID yield crush spall crack_core crack_cover element 15 4 1 2 4 4 bmx121 14 4 2 4 4 bmx122 14 4 2 4 4 bmx133 14 4 2 4 4 bmx141 14 4 2 4 4 bmx142 10 2 4 4 bmx152 10 2 4 4 bmx153 10 2 4 4 bmx154 8 4 4 bmx161 8 4 4 bmx162 MS Access query
  • 33.
  • 34.
  • 35. URBAN ONTOLOGY (COST TU0801 TRAININGURBAN ONTOLOGY (COST TU0801 TRAINING SCHOOL)SCHOOL)  Sisi
  • 36. MODELMODELLINGLING  Link between architecture and economic aspects: in the future link with the role of green spaces in reconstruction and economic elements,  see Woinaroschi (historical archive study)  See games  Enhancing the value of the land through the vicinity of the green space  Construction of greenhouses out of ressource elements  Future case study: the village and the church – game: Devecser and Corbeni
  • 39. SIM CITY SOCIALSIM CITY SOCIAL Valoarea adaugată a parcului cu lac
  • 40. CITY BUILDING GAMESCITY BUILDING GAMES -- GREENHOUSEGREENHOUSE Elemente de management al resurselor
  • 41. ACKNOWLEDGEMENTSACKNOWLEDGEMENTS  COST Action IS1105  STSM at ISCTE-IUL, Lisbon, Portugal, march-april 2013