SlideShare a Scribd company logo
1 of 15
Cutover strategy discussion
Jan 22, 2016
Cutover Strategy Decision
Go Live on April, 2016 with initial balance Jan 2016
Timeline Go Live on April 2016 with initial balance Jan 2016
Risk of Go Live on April, 2016 with initial balance Jan 2016 and
backlog with detail per transaction all module
Pro Cons
1. All data transaction from
Jan 2016, recorded on
system
1. During manual transaction (recording data transaction Jan – March),
Users will face the difficulties on recording data transaction that will be
input as back log data since SAP master data not yet finalized and sign-
off, and system not yet tested (UAT not yet done).
2. Go live on April take lower
risk than Go Live on march
2. Manual transaction period is long i.e. 1 Jan until 14 March 2016, and will
bring risk to not possible to key-in all the data into SAP system within
the backlog period (14 Mar-25 April)
3. Potential discrepancy of financial statement and inventory report
between non-SAP system and SAP system after backlog data posted into
SAP. For example: backlog data inventory-related must be posted with
correct sequence into SAP, otherwise will give different amount.
Adjustment will be required to get financial report the same.
4. different structure of data from old vs new SAP system. This may yield
different position of financial statement from old vs new system. E.g.
Old system does not recognize GL accounts as many as new GL accounts
in SAP system. Asset
Initial Balance preparation
1. Every line item must has local currency, group currency, document currency
2. Initial balance AP and AR is per invoice
3. Inventory balance uses cut off date currency
4. Inventory balance is detail stock quantity per material master times by unit price
5. Inventory balance value must be differentiate per valuation type (condition of goods)
6. Additional account : conversion account for initial balance migration (GL, AR, AP, Asset,
Inventory)
7. Maintain exchange rate from cut off date
8. Initial balance Asset must also contain information acquisition value, depreciation with
ongoing year and depreciation accumulation in local currency and group currency
(according to the depreciation area or ledger that maintain by GOKPL)
1. Ledger SKK Migas -> declining balance
2. Ledger IFRS Genting HO -> unit of production method
3. Ledger straight line
9. Abyor will give IB template one week after UAT
Initial Balance important note
1. Manual form is not provided
2. Project provide user manual, master data list for user input data
back log
3. User use existing hard document as reference to entry transaction
back log into SAP
Manual transaction recording
Detail Plan
Master Data Migration
Target date
Migration
status
No
Modu
le
Master Data Tools PIC
Cleansing
status (%)
Collection
status (%)
Submit to Abyor
(date)
Sign off Upload to QA Upload to Prod
1 FI GL Account LSMW
Jacky
8 Feb & 11 Mar 11 Mar
2 FI Bank Master LSMW 8 Feb & 11 Mar 11 Mar
3 FI
Asset
Master
LSMW 8 Feb & 11 Mar 11 Mar
4 FI
Customer
Master
LSMW 8 Feb & 11 Mar 11 Mar
5
FI
MM
Vendor
Master Data
LSMW
Jacky,
Tami
8 Feb & 11 Mar 11 Mar
6 CO
Cost
Element
LSMW
Jacky
8 Feb & 11 Mar 11 Mar
7 CO Cost Center LSMW 8 Feb & 11 Mar 11 Mar
8 CO Profit Center LSMW 8 Feb & 11 Mar 11 Mar
9 CO
Internal
Order
LSMW 8 Feb & 11 Mar 11 Mar
10 CO
Statistical
Key Figure
(SKF)
LSMW 8 Feb & 11 Mar 11 Mar
11 CO
Allocation
cycle
LSMW 8 Feb & 11 Mar 11 Mar
12 MM
Material
Master
LSMW Linda 8 Feb & 11 Mar 11 Mar
13 PS
Project
Deficnition
Program
Wahyu
8 Feb & 11 Mar 11 Mar
14 PS WBS Program 8 Feb & 11 Mar 11 Mar
modul IB Tool
FI -Initial Balance GL
-Initial balance special GL
- Initial Balance AR
- Initial balance AP
-Initial Balance Asset
-Initial Balance PL
LSMW
MM Intial balance inventory LSMW
PS Initial Balance budget Program
Initial Balance migration tools
Next meeting
Report development
- Detail discussion report design and development will be after Go Live
Agenda Date
Account determination for Good Issue,
GL Migration, Price different, stock
opname
Monday, Feb 1, 2016
Target Date Project
Milestone
Milestone
No Milestone Tanggal PIC
1 Key User Training 18 Jan – 2 Feb Key user GOKPL, Abyor
Functional, CM
2 System Integration Test on QA 10-19 Feb Abyor
3 Master Data collection batch-1 submit to Abyor
(For UAT)
8 – 12 Feb GOKPL
4 Master Data migration for UAT 15 – 19 Feb Abyor
5 Genting Prepare data transaction to be tested
on SAP User Acceptence Test
13 Feb – 19 Feb GOKPL
6 SAP User Acceptance Test (Standard, Form and
enhancement)
22 – 4 Maret Key user GOKPL, Abyor
Functional
7 Master Data collection batch-2 submit to Abyor
(For Go Live)
8 Maret GOKPL
8 Production server installation 4 Maret Abyor Basis
9 Master Data Migration to Production system 11 – 15 Maret Key user GOKPL, Abyor
Functional
10 Report discussion & Func spec for Report 7 – 18 Maret Key user GOKPL, Abyor
Functional
11 End User Training FI CO PS 16 – 24 Maret Key user GOKPL, Abyor
Functional, CM
12 End User Training MM 21 Maret – 1 April Key user GOKPL, Abyor
Functional, CM
13 Authorization test 4 – 8 April Abyor
14 Prepare Initial Balance 7 Maret – 11 April GOKPL
Milestone
No Milestone Tanggal PIC
15 Migrasi data Initial Balance 12-15 April Key user GOKPL, Abyor
Functional
16 Report Development & Test 21 Mar – 9 Mei Abyor
17 Go Live 18 April all
18 On site Support after Go Live 18 April – 30 Juni Abyor
19 UAT Report 16 Mei – 3 Juni Abyor
20 On site support year end closing 28 Des 2016 – 9
Jan 2017
Abyor
21 On call support 1 Juli 2016 - 28
Feb 2017
Abyor
example of SAP Cut over strategy FI CO MM PS module

More Related Content

What's hot

Fiori app for sales distribution module
Fiori app for sales  distribution moduleFiori app for sales  distribution module
Fiori app for sales distribution moduleMandeep SINGH
 
SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Documentsapdocs. info
 
Presentation on resource related billing
Presentation on resource related billingPresentation on resource related billing
Presentation on resource related billingAmlan Sarkar
 
SAP FICO overview
SAP FICO overviewSAP FICO overview
SAP FICO overviewPeter Ezzat
 
Fico interview questions and answers
Fico interview questions and answersFico interview questions and answers
Fico interview questions and answersProcessweaver Hr
 
SAP CO-PA (Controlling-Profitability Analysis)
SAP CO-PA (Controlling-Profitability Analysis)SAP CO-PA (Controlling-Profitability Analysis)
SAP CO-PA (Controlling-Profitability Analysis)Stridely Solutions
 
A guide to functional areas and cost of sales P&L reporting in the SAP® Gener...
A guide to functional areas and cost of sales P&L reporting in the SAP® Gener...A guide to functional areas and cost of sales P&L reporting in the SAP® Gener...
A guide to functional areas and cost of sales P&L reporting in the SAP® Gener...John Jordan
 
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptGV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptCarlosRodriguez703287
 
SAP S4HANA Migration Cockpit.pdf
SAP S4HANA Migration Cockpit.pdfSAP S4HANA Migration Cockpit.pdf
SAP S4HANA Migration Cockpit.pdfKrishnaAkula4
 
S4 HANA New GL Configuration
S4 HANA New GL Configuration S4 HANA New GL Configuration
S4 HANA New GL Configuration Pradeep Hota
 
Copa configuration
Copa configurationCopa configuration
Copa configurationMithun Roy
 
SAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationSAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationBluefin Solutions
 

What's hot (20)

Fiori app for sales distribution module
Fiori app for sales  distribution moduleFiori app for sales  distribution module
Fiori app for sales distribution module
 
Account based COPA in SAP
Account based COPA in SAPAccount based COPA in SAP
Account based COPA in SAP
 
FS for FICO
FS for FICOFS for FICO
FS for FICO
 
SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Document
 
Presentation on resource related billing
Presentation on resource related billingPresentation on resource related billing
Presentation on resource related billing
 
SAP FICO overview
SAP FICO overviewSAP FICO overview
SAP FICO overview
 
Fico interview questions and answers
Fico interview questions and answersFico interview questions and answers
Fico interview questions and answers
 
SAP CO-PA (Controlling-Profitability Analysis)
SAP CO-PA (Controlling-Profitability Analysis)SAP CO-PA (Controlling-Profitability Analysis)
SAP CO-PA (Controlling-Profitability Analysis)
 
A guide to functional areas and cost of sales P&L reporting in the SAP® Gener...
A guide to functional areas and cost of sales P&L reporting in the SAP® Gener...A guide to functional areas and cost of sales P&L reporting in the SAP® Gener...
A guide to functional areas and cost of sales P&L reporting in the SAP® Gener...
 
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptGV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
 
SAP FICO Overview
SAP FICO OverviewSAP FICO Overview
SAP FICO Overview
 
SAP ECC to S/4HANA Move
SAP ECC to S/4HANA MoveSAP ECC to S/4HANA Move
SAP ECC to S/4HANA Move
 
SAP Fiori ppt
SAP Fiori pptSAP Fiori ppt
SAP Fiori ppt
 
SAP S4HANA Migration Cockpit.pdf
SAP S4HANA Migration Cockpit.pdfSAP S4HANA Migration Cockpit.pdf
SAP S4HANA Migration Cockpit.pdf
 
SAP FI Module
SAP FI ModuleSAP FI Module
SAP FI Module
 
Bank reconciliation ff67
Bank reconciliation ff67Bank reconciliation ff67
Bank reconciliation ff67
 
S4 HANA New GL Configuration
S4 HANA New GL Configuration S4 HANA New GL Configuration
S4 HANA New GL Configuration
 
Copa configuration
Copa configurationCopa configuration
Copa configuration
 
SAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationSAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementation
 
SAP IS-U
SAP IS-USAP IS-U
SAP IS-U
 

Similar to example of SAP Cut over strategy FI CO MM PS module

ASUG82313 - Preparing to Migrate Data to SAP S4HANA Finance.pptx
ASUG82313 - Preparing to Migrate Data to SAP S4HANA Finance.pptxASUG82313 - Preparing to Migrate Data to SAP S4HANA Finance.pptx
ASUG82313 - Preparing to Migrate Data to SAP S4HANA Finance.pptxVSKrishnaAchanta
 
MWR12GlobalReleaseLearnings
MWR12GlobalReleaseLearningsMWR12GlobalReleaseLearnings
MWR12GlobalReleaseLearningsMark White
 
Infocost solutions pvt ltd -Costing in SAP
Infocost solutions pvt ltd -Costing in SAPInfocost solutions pvt ltd -Costing in SAP
Infocost solutions pvt ltd -Costing in SAPSaratAgrawal1
 
D:\Gopi\Note\Stocks\So Ps
D:\Gopi\Note\Stocks\So PsD:\Gopi\Note\Stocks\So Ps
D:\Gopi\Note\Stocks\So Psguest124340
 
Open sap s4h15_week_2_unit_2_finchange_presentation
Open sap s4h15_week_2_unit_2_finchange_presentationOpen sap s4h15_week_2_unit_2_finchange_presentation
Open sap s4h15_week_2_unit_2_finchange_presentationJacek9
 
Data Pipelines -Big Data Meets Salesforce
Data Pipelines -Big Data Meets SalesforceData Pipelines -Big Data Meets Salesforce
Data Pipelines -Big Data Meets SalesforceCarolEnLaNube
 
Capfy09 Presentation V12
Capfy09 Presentation V12Capfy09 Presentation V12
Capfy09 Presentation V12scottsbiz
 
Aa imagine ny19_stant-040219_nb
Aa imagine ny19_stant-040219_nbAa imagine ny19_stant-040219_nb
Aa imagine ny19_stant-040219_nbTracy Gibson
 
Automation Anywhere - Imagine New York 2019 - Stant
Automation Anywhere - Imagine New York 2019 - StantAutomation Anywhere - Imagine New York 2019 - Stant
Automation Anywhere - Imagine New York 2019 - StantAutomation Anywhere
 
SAP Smart Financials 1.0
SAP Smart Financials 1.0SAP Smart Financials 1.0
SAP Smart Financials 1.0bigsomar
 
SAP s/4 HANA - sFIN Accelerated Implementation, Upgrade & Migration
SAP s/4 HANA - sFIN Accelerated Implementation, Upgrade & MigrationSAP s/4 HANA - sFIN Accelerated Implementation, Upgrade & Migration
SAP s/4 HANA - sFIN Accelerated Implementation, Upgrade & MigrationJothi Periasamy
 
Section iii mis - formats
Section iii   mis - formatsSection iii   mis - formats
Section iii mis - formatsspandane
 
S4 Financials Powered By HANA-Purna
S4 Financials Powered By HANA-PurnaS4 Financials Powered By HANA-Purna
S4 Financials Powered By HANA-PurnaChandar Pokala
 

Similar to example of SAP Cut over strategy FI CO MM PS module (20)

ASUG82313 - Preparing to Migrate Data to SAP S4HANA Finance.pptx
ASUG82313 - Preparing to Migrate Data to SAP S4HANA Finance.pptxASUG82313 - Preparing to Migrate Data to SAP S4HANA Finance.pptx
ASUG82313 - Preparing to Migrate Data to SAP S4HANA Finance.pptx
 
MWR12GlobalReleaseLearnings
MWR12GlobalReleaseLearningsMWR12GlobalReleaseLearnings
MWR12GlobalReleaseLearnings
 
Infocost solutions pvt ltd -Costing in SAP
Infocost solutions pvt ltd -Costing in SAPInfocost solutions pvt ltd -Costing in SAP
Infocost solutions pvt ltd -Costing in SAP
 
D:\Gopi\Note\Stocks\So Ps
D:\Gopi\Note\Stocks\So PsD:\Gopi\Note\Stocks\So Ps
D:\Gopi\Note\Stocks\So Ps
 
Inventory
InventoryInventory
Inventory
 
Open sap s4h15_week_2_unit_2_finchange_presentation
Open sap s4h15_week_2_unit_2_finchange_presentationOpen sap s4h15_week_2_unit_2_finchange_presentation
Open sap s4h15_week_2_unit_2_finchange_presentation
 
Venkat-08-2016
Venkat-08-2016Venkat-08-2016
Venkat-08-2016
 
Data Pipelines -Big Data Meets Salesforce
Data Pipelines -Big Data Meets SalesforceData Pipelines -Big Data Meets Salesforce
Data Pipelines -Big Data Meets Salesforce
 
Capfy09 Presentation V12
Capfy09 Presentation V12Capfy09 Presentation V12
Capfy09 Presentation V12
 
Sandeep_Damle
Sandeep_DamleSandeep_Damle
Sandeep_Damle
 
Aa imagine ny19_stant-040219_nb
Aa imagine ny19_stant-040219_nbAa imagine ny19_stant-040219_nb
Aa imagine ny19_stant-040219_nb
 
Automation Anywhere - Imagine New York 2019 - Stant
Automation Anywhere - Imagine New York 2019 - StantAutomation Anywhere - Imagine New York 2019 - Stant
Automation Anywhere - Imagine New York 2019 - Stant
 
CV Arenare_En_Logica_08
CV Arenare_En_Logica_08CV Arenare_En_Logica_08
CV Arenare_En_Logica_08
 
SAP Smart Financials 1.0
SAP Smart Financials 1.0SAP Smart Financials 1.0
SAP Smart Financials 1.0
 
SAP for Indonesia.pptx
SAP for Indonesia.pptxSAP for Indonesia.pptx
SAP for Indonesia.pptx
 
SAP s/4 HANA - sFIN Accelerated Implementation, Upgrade & Migration
SAP s/4 HANA - sFIN Accelerated Implementation, Upgrade & MigrationSAP s/4 HANA - sFIN Accelerated Implementation, Upgrade & Migration
SAP s/4 HANA - sFIN Accelerated Implementation, Upgrade & Migration
 
Ali_Resume_new
Ali_Resume_newAli_Resume_new
Ali_Resume_new
 
Ali_Resume_new
Ali_Resume_newAli_Resume_new
Ali_Resume_new
 
Section iii mis - formats
Section iii   mis - formatsSection iii   mis - formats
Section iii mis - formats
 
S4 Financials Powered By HANA-Purna
S4 Financials Powered By HANA-PurnaS4 Financials Powered By HANA-Purna
S4 Financials Powered By HANA-Purna
 

Recently uploaded

Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...OnePlan Solutions
 
Ahmed Motair CV April 2024 (Senior SW Developer)
Ahmed Motair CV April 2024 (Senior SW Developer)Ahmed Motair CV April 2024 (Senior SW Developer)
Ahmed Motair CV April 2024 (Senior SW Developer)Ahmed Mater
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEEVICTOR MAESTRE RAMIREZ
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Velvetech LLC
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanyChristoph Pohl
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Andreas Granig
 
Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesŁukasz Chruściel
 
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in NoidaBuds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in Noidabntitsolutionsrishis
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odishasmiwainfosol
 
What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...Technogeeks
 
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...confluent
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based projectAnoyGreter
 
How to submit a standout Adobe Champion Application
How to submit a standout Adobe Champion ApplicationHow to submit a standout Adobe Champion Application
How to submit a standout Adobe Champion ApplicationBradBedford3
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Cizo Technology Services
 
How to Track Employee Performance A Comprehensive Guide.pdf
How to Track Employee Performance A Comprehensive Guide.pdfHow to Track Employee Performance A Comprehensive Guide.pdf
How to Track Employee Performance A Comprehensive Guide.pdfLivetecs LLC
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
SpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at RuntimeSpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at Runtimeandrehoraa
 

Recently uploaded (20)

Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
 
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
 
Ahmed Motair CV April 2024 (Senior SW Developer)
Ahmed Motair CV April 2024 (Senior SW Developer)Ahmed Motair CV April 2024 (Senior SW Developer)
Ahmed Motair CV April 2024 (Senior SW Developer)
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEE
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...Software Project Health Check: Best Practices and Techniques for Your Product...
Software Project Health Check: Best Practices and Techniques for Your Product...
 
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte GermanySuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
SuccessFactors 1H 2024 Release - Sneak-Peek by Deloitte Germany
 
Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024Automate your Kamailio Test Calls - Kamailio World 2024
Automate your Kamailio Test Calls - Kamailio World 2024
 
Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New Features
 
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in NoidaBuds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
 
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company OdishaBalasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
Balasore Best It Company|| Top 10 IT Company || Balasore Software company Odisha
 
What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...What is Advanced Excel and what are some best practices for designing and cre...
What is Advanced Excel and what are some best practices for designing and cre...
 
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based project
 
How to submit a standout Adobe Champion Application
How to submit a standout Adobe Champion ApplicationHow to submit a standout Adobe Champion Application
How to submit a standout Adobe Champion Application
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
Global Identity Enrolment and Verification Pro Solution - Cizo Technology Ser...
 
How to Track Employee Performance A Comprehensive Guide.pdf
How to Track Employee Performance A Comprehensive Guide.pdfHow to Track Employee Performance A Comprehensive Guide.pdf
How to Track Employee Performance A Comprehensive Guide.pdf
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
SpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at RuntimeSpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at Runtime
 

example of SAP Cut over strategy FI CO MM PS module

  • 2. Cutover Strategy Decision Go Live on April, 2016 with initial balance Jan 2016
  • 3. Timeline Go Live on April 2016 with initial balance Jan 2016
  • 4. Risk of Go Live on April, 2016 with initial balance Jan 2016 and backlog with detail per transaction all module Pro Cons 1. All data transaction from Jan 2016, recorded on system 1. During manual transaction (recording data transaction Jan – March), Users will face the difficulties on recording data transaction that will be input as back log data since SAP master data not yet finalized and sign- off, and system not yet tested (UAT not yet done). 2. Go live on April take lower risk than Go Live on march 2. Manual transaction period is long i.e. 1 Jan until 14 March 2016, and will bring risk to not possible to key-in all the data into SAP system within the backlog period (14 Mar-25 April) 3. Potential discrepancy of financial statement and inventory report between non-SAP system and SAP system after backlog data posted into SAP. For example: backlog data inventory-related must be posted with correct sequence into SAP, otherwise will give different amount. Adjustment will be required to get financial report the same. 4. different structure of data from old vs new SAP system. This may yield different position of financial statement from old vs new system. E.g. Old system does not recognize GL accounts as many as new GL accounts in SAP system. Asset
  • 6. 1. Every line item must has local currency, group currency, document currency 2. Initial balance AP and AR is per invoice 3. Inventory balance uses cut off date currency 4. Inventory balance is detail stock quantity per material master times by unit price 5. Inventory balance value must be differentiate per valuation type (condition of goods) 6. Additional account : conversion account for initial balance migration (GL, AR, AP, Asset, Inventory) 7. Maintain exchange rate from cut off date 8. Initial balance Asset must also contain information acquisition value, depreciation with ongoing year and depreciation accumulation in local currency and group currency (according to the depreciation area or ledger that maintain by GOKPL) 1. Ledger SKK Migas -> declining balance 2. Ledger IFRS Genting HO -> unit of production method 3. Ledger straight line 9. Abyor will give IB template one week after UAT Initial Balance important note
  • 7. 1. Manual form is not provided 2. Project provide user manual, master data list for user input data back log 3. User use existing hard document as reference to entry transaction back log into SAP Manual transaction recording
  • 9. Target date Migration status No Modu le Master Data Tools PIC Cleansing status (%) Collection status (%) Submit to Abyor (date) Sign off Upload to QA Upload to Prod 1 FI GL Account LSMW Jacky 8 Feb & 11 Mar 11 Mar 2 FI Bank Master LSMW 8 Feb & 11 Mar 11 Mar 3 FI Asset Master LSMW 8 Feb & 11 Mar 11 Mar 4 FI Customer Master LSMW 8 Feb & 11 Mar 11 Mar 5 FI MM Vendor Master Data LSMW Jacky, Tami 8 Feb & 11 Mar 11 Mar 6 CO Cost Element LSMW Jacky 8 Feb & 11 Mar 11 Mar 7 CO Cost Center LSMW 8 Feb & 11 Mar 11 Mar 8 CO Profit Center LSMW 8 Feb & 11 Mar 11 Mar 9 CO Internal Order LSMW 8 Feb & 11 Mar 11 Mar 10 CO Statistical Key Figure (SKF) LSMW 8 Feb & 11 Mar 11 Mar 11 CO Allocation cycle LSMW 8 Feb & 11 Mar 11 Mar 12 MM Material Master LSMW Linda 8 Feb & 11 Mar 11 Mar 13 PS Project Deficnition Program Wahyu 8 Feb & 11 Mar 11 Mar 14 PS WBS Program 8 Feb & 11 Mar 11 Mar
  • 10. modul IB Tool FI -Initial Balance GL -Initial balance special GL - Initial Balance AR - Initial balance AP -Initial Balance Asset -Initial Balance PL LSMW MM Intial balance inventory LSMW PS Initial Balance budget Program Initial Balance migration tools
  • 11. Next meeting Report development - Detail discussion report design and development will be after Go Live Agenda Date Account determination for Good Issue, GL Migration, Price different, stock opname Monday, Feb 1, 2016
  • 13. Milestone No Milestone Tanggal PIC 1 Key User Training 18 Jan – 2 Feb Key user GOKPL, Abyor Functional, CM 2 System Integration Test on QA 10-19 Feb Abyor 3 Master Data collection batch-1 submit to Abyor (For UAT) 8 – 12 Feb GOKPL 4 Master Data migration for UAT 15 – 19 Feb Abyor 5 Genting Prepare data transaction to be tested on SAP User Acceptence Test 13 Feb – 19 Feb GOKPL 6 SAP User Acceptance Test (Standard, Form and enhancement) 22 – 4 Maret Key user GOKPL, Abyor Functional 7 Master Data collection batch-2 submit to Abyor (For Go Live) 8 Maret GOKPL 8 Production server installation 4 Maret Abyor Basis 9 Master Data Migration to Production system 11 – 15 Maret Key user GOKPL, Abyor Functional 10 Report discussion & Func spec for Report 7 – 18 Maret Key user GOKPL, Abyor Functional 11 End User Training FI CO PS 16 – 24 Maret Key user GOKPL, Abyor Functional, CM 12 End User Training MM 21 Maret – 1 April Key user GOKPL, Abyor Functional, CM 13 Authorization test 4 – 8 April Abyor 14 Prepare Initial Balance 7 Maret – 11 April GOKPL
  • 14. Milestone No Milestone Tanggal PIC 15 Migrasi data Initial Balance 12-15 April Key user GOKPL, Abyor Functional 16 Report Development & Test 21 Mar – 9 Mei Abyor 17 Go Live 18 April all 18 On site Support after Go Live 18 April – 30 Juni Abyor 19 UAT Report 16 Mei – 3 Juni Abyor 20 On site support year end closing 28 Des 2016 – 9 Jan 2017 Abyor 21 On call support 1 Juli 2016 - 28 Feb 2017 Abyor

Editor's Notes

  1. harus melengkapi nilai akusisi, depresiasi tahun berjalan dan akumulasi depresiasi dalam local currency dan group currency (sesuai dengan depreciation area)
  2. Status migrasi ke QA Status migrasi ke Prod
  3. Outstanding PR PO kontrak program