CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
RE-FINANCE GROUP 1 | Re-finance of a building by disassembly and replacement
1st
2nd
3rd
4th
5th
6th
-1st
Hs
Assignment
Re-finance group 1 is asked to develop a strategy that incorporates the following questions:
• How can Erasmus approach the industry in order to remove their buildings and let it have
a high quality reuse by disassembly and replacement of the building?
• Identify business models to allow reuse?
The proposed strategy should should be approached from different levels of reuse:
• Reuse of entire building
• Reuse of part of the building at once (e.g. three floors)
At the end of the workshop group one is asked to present the findings of both cases in a pitch
of 2-3 minutes to the other groups, see page 5.
2. - 2 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Building Hs
smallest
configuration
largest
configuration
Example reuse scenario configurations
3. - 3 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
installations
small
apartment 4
36 m2
medium
apartment 5
48 m2
medium
apartment 6
48 m2
medium
apartment 7
48 m2
medium
apartment 8
48 m2
medium
apartment 9
54 m2
medium
apartment 10
57 m2small
apartment 3
36 m2
medium
apartment 2
48 m2
Shared terrace/
garden 72 m2
stairs
lift
stairs
toilet
group
installations
classroom 3
72m2
classroom 2
72m2
classroom 4
72m2
classroom 5
72m2
classroom 1
72m2
toilet
group
Atrium
stairs
lift
stairs
School scenario
apartment scenario 1
Example reuse scenario as entire building/ a few floors
4. - 4 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
installations
small
apartment 4
36 m2
medium
apartment 5
48 m2
medium
apartment 6
48 m2
medium
apartment 7
48 m2
medium
apartment 8
48 m2
medium
apartment 9
54 m2
medium
apartment 10
57 m2small
apartment 3
36 m2
medium
apartment 2
48 m2
large
apartment 1
72 m2
BalconyBalconyBalcony
Balcony Balcony Balcony Balcony Balcony Balcony
Balconystairs
lift
stairs
installations
small
apartment 4
36 m2
Atrium
small
apartment 5
36 m2
small
apartment 6
36 m2
small
apartment 7
36 m2
small
apartment 8
36 m2
medium
apartment 9
54 m2
medium
apartment 10
54 m2small
apartment 3
36 m2
small
apartment 2
36 m2
small
apartment 1
54 m2
BalconyBalconyBalcony
Balcony Balcony Balcony Balcony Balcony Balcony
Balconystairs
lift
stairs
apartment scenario 2
apartment scenario 3
Example reuse scenario as entire building/ a few floors
5. - 5 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Reuse of entire building
Reuse of part of the building at once (e.g. three floors)
Strategy
Strategy