SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN UDARA DAN PENGUDARAAN MEKANIKAL
1. SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN UDARA DAN PENGUDARAAN MEKANIKAL UNTUK PENSYARAH-PENSYARAH IKBN SUMMIT HOTEL BUKIT MERTAJAM 20HB -22HB JULAI 2010 DAY 1 PENCERAMAH: Ir. MOHAMED AZMI BIN SALIM (B. Eng Mech, (Hons), MIEM, Qualified SPAN, P. Engr ) CGMP Consult (SA0155424-A)
2. CGMP Consult (SA0155424-A) What is the Air Conditioning System..? Air conditioning is the dehumidification of indoor air for thermal comfort. In a broader sense, the term can refer to any form of cooling and ventilation that modifies the condition of air. Air conditioning is an appliance, system, or machine designed to stabilize the air temperature and humidity within an area.
3. CGMP Consult (SA0155424-A) Types of Air Conditioners There are various types of air conditioning systems. The application of a particular type of system depends upon a number of factors like how large the area is to be cooled, the total heat generated inside the enclosed area, etc. An HVAC designer would consider all the related parameters and suggest the system most suitable for your space.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16. CGMP Consult (SA0155424-A) Mechanical Ventilation Mechanical Ventilation helps to draw out stale and impure air from one area and bring in fresh air, thereby improving the quality of indoor air. Exhaust fans are Mechanical Ventilation device that typically ducted to the exteriors of a building, through which bad indoor air can effectively be removed.
17. CGMP Consult (SA0155424-A) Types Of Mechanical Ventilation Mechanical ventilation are classified into various types, mainly depending on the type of mount and the location where you need to install the fans. The different types are:
23. CGMP Consult (SA0155424-A) Categories of Mechanical Ventilation in Construction - Smoke spill system - Staircase pressurization system - Lobby pressurization system - Car Park Smoke Spill System
26. CGMP Consult (SA0155424-A) 2. Staircase Pressurization System
27. CGMP Consult (SA0155424-A) Staircase Pressurization System
28. CGMP Consult (SA0155424-A) 3. Lobby pressurization system
29. CGMP Consult (SA0155424-A) Lobby pressurization system
30. CGMP Consult (SA0155424-A) 3. Car Park Smoke Spill System
31. CGMP Consult (SA0155424-A) Car Park Smoke Spill System
32. CGMP Consult (SA0155424-A) Discussion a. Suggest other air conditioning system which is not mention in this note. b. Suggest other mechanical ventilation normally use in the building which is not is not mention in this note.
34. SEMINAR PENGENALAN KEPADA SISTEM PENYAMAN UDARA DAN PENGUDARAAN MEKANIKAL DALAM INDUSTRI PEMBINAAN SUMMIT HOTEL BUKIT MERTAJAM 20-22HB. JULAI 2010 DAY 2 PENCERAMAH: Ir. MOHAMED AZMI BIN SALIM (B. Eng Mech, (Hons), MIEM, ACEM, Qualified SPAN, P. Engr ) CGMP Consult (SA0155424-A)
35. CGMP Consult (SA0155424-A) Introduction to ACMV Project Tender Mesyuarat koordinasi ke-2 membincangkan, draft konsep design LA dikeluarkan kepada perunding Mesyuarat penyelarasan projek & ‘project briefing’ Pihak arkitek membentangkan konsep design termasuk susun atur bangunan (draft) kepada client Submit draft to client Komen dan tambahan keperluan dibincangkan supaya ditambah baik konsep rekabentuk tersebut Tender ‘ Client’ mengarahkan pihak konsultan C&S dan M&E menyediakan ‘document’ ‘process tender’ Terlibat: Client, Architect, QS, M&E engineer, Civil engineer A Terlibat: Client, Architect, QS, M&E engineer, Civil engineer Arkitek mengemukakan draft rekabentuk yang telah ditambah baik Diterima Ditolak Kemukakan semula untuk perbincangan Lukisan dalam bentuk ‘softcopy’ dikemukakan kepada C&S engineer dan M&E engineer B Perunding M&E dan C&S mengemukakan draft rekabentuk masing-masing dalam mesyuarat penyelarasan koordinasi Ditolak Kemukakan semula untuk perbincangan Diterima C Ditolak re-do Proceed document tender Diterima
36. CGMP Consult (SA0155424-A) A - Menbincangkan tentang ‘requirement’ daripada pihak ‘client’ seperti terdapat dalam SOA - ‘Client’ akan mengarahkan pihak arkitek menyediakan draft lukisan bangunan dan susunatur dalam jangka masa yang ditetapkan.
37. CGMP Consult (SA0155424-A) B - Proses rekabentuk dijalankan dalam jangkamasa yang ditetapkan oleh pihak ‘client’.
38. CGMP Consult (SA0155424-A) C - ‘Document process tender’ : Lukisan tender Technical Data B.Q Specification Unit Rate Anggaran Harga
39. CGMP Consult (SA0155424-A) Tender Document Preparation and Management of Tender Document The scope of M&E Consultant during the document preparation are as below: - To prepare the ACMV tender drawings.
40. CGMP Consult (SA0155424-A) Tender Document Preparation and Management of Tender Document The scope of M&E Consultant during the document preparation are as below: - To prepare the ACMV tender drawings. - To prepare the Specification of ACMV Services - To prepare the Bill of Quantity (BQ). - To prepare the Schedule of Unit Rates. - To prepare the Technical Data Sheet. - To prepare the Cost Estimation. - To check the design of the system comply with the local authority requirement.