SlideShare a Scribd company logo
1 of 1
Download to read offline
Door Pillar
SCALE 1:10
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
CLIENT
DESIGNER
CONTRACTOR
REVISIONS TABLE
SYM. DESCRIPTION DATE APPROVED
GENERAL NOTES
DRAWING NAME DRAWING NO.
SCALE.
SIZE.
A 3
CONSTR. CONTR. NO.
DESIGNED BY:
REV.
CHECKED BY
1
SHEET DATE
Dutco McConnell Dowell ME LLC
Oceanic Engineering Works W.L.L
Oceanic Engineering Works W.L.L
Detailed Description
Steel:
All prime grade mild steel (S275 / A36 or
Similar)
Body:
5mm base, 5mm headboard, 3mm sides,
3mm door. All plate fully outside and stitch
welded Inside Uprights 11 no. UPN 100, Mild
steel fully welded to side plates Top Rail UPN
160.
Headboard:
A Frame UPN 160 with 10mm reinforcing
plates, RND 65mm hook bar with deflector
plate
Underframe:
Main Runners IPN 180 with 10 mm wear
plate- 11 no - UPN 100 Twin Rollers- 229mm
x 229mm heavy duty rollers with maintenance
free oil lite bearings
Door:
Thickness' - 5mm mild steel plate Single Door
- reinforced with RHS 80mm x 80mm.
Reinforced with UPN 100.
Door Pillars:
RHS160mm x 80mm x 4mm.
Hinges:
All fully welded (all with maintenance free oil
lite bearings. All doors with primary and
secondary locking.
Painting:
Inside - One coat primer + Two coat RAL
Paint Outside One coat primer + Two coat of
RAL Paint.
20 Cbm RoRo Container Skip
Frame Construction RSK-003
1:20Oceanic Engineering Works W.L.L
3 0f 8 17 JUNE
2013
Nizam Moideen
UPN (DIN 1026 - U 160 - 6400)
QTY. 2
UPN (DIN 1026 - U 160 - 2345)
UPN (DIN 1026 - U 100 - 2000)
QTY. 22
REINFORCING WEB
QTY. 44
5 400
400
UPN (DIN 1026 U 100 - 2215)
QTY. 12
65
45
7.50
45 45
2345
6400
IPN (DIN 1025 - I 180 6600)
QTY. 2
60
30
6655
180
RHS (160 x 80 x 4) - 2200
QTY. 2Cap Plate
QTY.2
144
64
R4
Wear Plate
10 mm
6239
82
10
2200
2
2145
Door Lock Pin
25
53
50
70
25
30

More Related Content

What's hot

Operation Overlord (D-Day) and Canada's Role
Operation Overlord (D-Day) and Canada's RoleOperation Overlord (D-Day) and Canada's Role
Operation Overlord (D-Day) and Canada's RoleMr. Finnie
 
Detailed design of portal frames
Detailed design of portal framesDetailed design of portal frames
Detailed design of portal frameskaran prabhakar
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
Major canadian battles in ww1
Major canadian battles in ww1Major canadian battles in ww1
Major canadian battles in ww1dave865
 
Stainless steel pipe and tube manufacturing process at a glance
Stainless steel pipe and tube manufacturing process at a glanceStainless steel pipe and tube manufacturing process at a glance
Stainless steel pipe and tube manufacturing process at a glanceHeavy Metal & Tubes
 
Rebar coupler as an alternative of column splices
Rebar coupler as an alternative of column splicesRebar coupler as an alternative of column splices
Rebar coupler as an alternative of column splicesKunal Bhadane
 
Estimating seminar
Estimating seminarEstimating seminar
Estimating seminarwendyteosy
 
Sec 5N Hist (Elec) Chapter 11: End of Cold War
Sec 5N Hist (Elec) Chapter 11: End of Cold WarSec 5N Hist (Elec) Chapter 11: End of Cold War
Sec 5N Hist (Elec) Chapter 11: End of Cold WarWeng Lun Ho
 
Welding visual inspection
Welding visual inspectionWelding visual inspection
Welding visual inspectionbusinespartner
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanksbernard347
 
CAMBRIDGE A2 HISTORY: NUCLEAR DIPLOMACY
CAMBRIDGE A2 HISTORY: NUCLEAR DIPLOMACYCAMBRIDGE A2 HISTORY: NUCLEAR DIPLOMACY
CAMBRIDGE A2 HISTORY: NUCLEAR DIPLOMACYGeorge Dumitrache
 
fermacell special fire protection with cross laminated timber (clt)
fermacell special fire protection with cross laminated timber (clt)fermacell special fire protection with cross laminated timber (clt)
fermacell special fire protection with cross laminated timber (clt)Fermacell BV
 
Lecture slides rise of stalin and impact (2016) updated-1703_gedits
Lecture slides   rise of stalin and impact (2016) updated-1703_geditsLecture slides   rise of stalin and impact (2016) updated-1703_gedits
Lecture slides rise of stalin and impact (2016) updated-1703_geditsGerald Pang
 

What's hot (20)

Operation Overlord (D-Day) and Canada's Role
Operation Overlord (D-Day) and Canada's RoleOperation Overlord (D-Day) and Canada's Role
Operation Overlord (D-Day) and Canada's Role
 
Detailed design of portal frames
Detailed design of portal framesDetailed design of portal frames
Detailed design of portal frames
 
September 11 slides
September 11 slidesSeptember 11 slides
September 11 slides
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
SMARTDEK-Brochure
SMARTDEK-BrochureSMARTDEK-Brochure
SMARTDEK-Brochure
 
Designing with-eurocodes
Designing with-eurocodesDesigning with-eurocodes
Designing with-eurocodes
 
Major canadian battles in ww1
Major canadian battles in ww1Major canadian battles in ww1
Major canadian battles in ww1
 
Stainless steel pipe and tube manufacturing process at a glance
Stainless steel pipe and tube manufacturing process at a glanceStainless steel pipe and tube manufacturing process at a glance
Stainless steel pipe and tube manufacturing process at a glance
 
Rebar coupler as an alternative of column splices
Rebar coupler as an alternative of column splicesRebar coupler as an alternative of column splices
Rebar coupler as an alternative of column splices
 
Estimating seminar
Estimating seminarEstimating seminar
Estimating seminar
 
Sec 5N Hist (Elec) Chapter 11: End of Cold War
Sec 5N Hist (Elec) Chapter 11: End of Cold WarSec 5N Hist (Elec) Chapter 11: End of Cold War
Sec 5N Hist (Elec) Chapter 11: End of Cold War
 
Welding visual inspection
Welding visual inspectionWelding visual inspection
Welding visual inspection
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanks
 
Welding Processes
Welding ProcessesWelding Processes
Welding Processes
 
Berlin wall
Berlin wallBerlin wall
Berlin wall
 
Reasons for the Defeat of Germany in WWII
Reasons for the Defeat of Germany in WWIIReasons for the Defeat of Germany in WWII
Reasons for the Defeat of Germany in WWII
 
CAMBRIDGE A2 HISTORY: NUCLEAR DIPLOMACY
CAMBRIDGE A2 HISTORY: NUCLEAR DIPLOMACYCAMBRIDGE A2 HISTORY: NUCLEAR DIPLOMACY
CAMBRIDGE A2 HISTORY: NUCLEAR DIPLOMACY
 
Baseplate
BaseplateBaseplate
Baseplate
 
fermacell special fire protection with cross laminated timber (clt)
fermacell special fire protection with cross laminated timber (clt)fermacell special fire protection with cross laminated timber (clt)
fermacell special fire protection with cross laminated timber (clt)
 
Lecture slides rise of stalin and impact (2016) updated-1703_gedits
Lecture slides   rise of stalin and impact (2016) updated-1703_geditsLecture slides   rise of stalin and impact (2016) updated-1703_gedits
Lecture slides rise of stalin and impact (2016) updated-1703_gedits
 

Similar to RORO Skip 3

4968_DD 9001_C_INTERIORS COST PLAN INFO_WALLS
4968_DD 9001_C_INTERIORS COST PLAN INFO_WALLS4968_DD 9001_C_INTERIORS COST PLAN INFO_WALLS
4968_DD 9001_C_INTERIORS COST PLAN INFO_WALLSLee Yung Anchor
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio ShortNick Ivill
 
Trailers dry freight_strick101
Trailers dry freight_strick101Trailers dry freight_strick101
Trailers dry freight_strick101Anjer Inc
 
Filtro y
Filtro yFiltro y
Filtro yREAL
 
TudeluOrderForm3B
TudeluOrderForm3BTudeluOrderForm3B
TudeluOrderForm3BLily Su
 
Standard type prefabricated housing (projects and technical spesification)
Standard type prefabricated housing (projects and technical spesification)Standard type prefabricated housing (projects and technical spesification)
Standard type prefabricated housing (projects and technical spesification)Uğur Güray
 
Drafting service sample, residential house, Australia
Drafting service sample, residential house, AustraliaDrafting service sample, residential house, Australia
Drafting service sample, residential house, AustraliaAlexeyRyabchenko
 
American Metal Presentation Updated Aug19
American Metal Presentation Updated Aug19American Metal Presentation Updated Aug19
American Metal Presentation Updated Aug19Tony Giordano
 
American Metal Presentation updated aug19
American Metal Presentation updated aug19American Metal Presentation updated aug19
American Metal Presentation updated aug19Tony Giordano
 
Beyond Basics: Designing aluminum extrusion to meet product challenges
Beyond Basics: Designing aluminum extrusion to meet product challengesBeyond Basics: Designing aluminum extrusion to meet product challenges
Beyond Basics: Designing aluminum extrusion to meet product challengesDesign World
 
Beyond Basics: Designing aluminum extrusion to meet product challenges
Beyond Basics: Designing aluminum extrusion to meet product challengesBeyond Basics: Designing aluminum extrusion to meet product challenges
Beyond Basics: Designing aluminum extrusion to meet product challengesDesign World
 
3D Drafting Collection - Letter Size
3D Drafting Collection - Letter Size3D Drafting Collection - Letter Size
3D Drafting Collection - Letter SizeNick Taylor
 

Similar to RORO Skip 3 (20)

4968_DD 9001_C_INTERIORS COST PLAN INFO_WALLS
4968_DD 9001_C_INTERIORS COST PLAN INFO_WALLS4968_DD 9001_C_INTERIORS COST PLAN INFO_WALLS
4968_DD 9001_C_INTERIORS COST PLAN INFO_WALLS
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio Short
 
Trailers dry freight_strick101
Trailers dry freight_strick101Trailers dry freight_strick101
Trailers dry freight_strick101
 
Filtro y
Filtro yFiltro y
Filtro y
 
Sectional Door System
Sectional Door SystemSectional Door System
Sectional Door System
 
TudeluOrderForm3B
TudeluOrderForm3BTudeluOrderForm3B
TudeluOrderForm3B
 
Standard type prefabricated housing (projects and technical spesification)
Standard type prefabricated housing (projects and technical spesification)Standard type prefabricated housing (projects and technical spesification)
Standard type prefabricated housing (projects and technical spesification)
 
Punch_Die_Drawing1-8
Punch_Die_Drawing1-8Punch_Die_Drawing1-8
Punch_Die_Drawing1-8
 
Sectional Door Systems - THERMOSPAN
Sectional Door Systems - THERMOSPANSectional Door Systems - THERMOSPAN
Sectional Door Systems - THERMOSPAN
 
12777 coastal single pages part61
12777  coastal single pages part6112777  coastal single pages part61
12777 coastal single pages part61
 
Drafting service sample, residential house, Australia
Drafting service sample, residential house, AustraliaDrafting service sample, residential house, Australia
Drafting service sample, residential house, Australia
 
American Metal Presentation Updated Aug19
American Metal Presentation Updated Aug19American Metal Presentation Updated Aug19
American Metal Presentation Updated Aug19
 
American Metal Presentation updated aug19
American Metal Presentation updated aug19American Metal Presentation updated aug19
American Metal Presentation updated aug19
 
All drawings
All drawingsAll drawings
All drawings
 
24491-00
24491-0024491-00
24491-00
 
Beyond Basics: Designing aluminum extrusion to meet product challenges
Beyond Basics: Designing aluminum extrusion to meet product challengesBeyond Basics: Designing aluminum extrusion to meet product challenges
Beyond Basics: Designing aluminum extrusion to meet product challenges
 
Beyond Basics: Designing aluminum extrusion to meet product challenges
Beyond Basics: Designing aluminum extrusion to meet product challengesBeyond Basics: Designing aluminum extrusion to meet product challenges
Beyond Basics: Designing aluminum extrusion to meet product challenges
 
3D Drafting Collection - Letter Size
3D Drafting Collection - Letter Size3D Drafting Collection - Letter Size
3D Drafting Collection - Letter Size
 
Food line Equipments
Food line EquipmentsFood line Equipments
Food line Equipments
 
TYE71000 Series Rev A
TYE71000 Series Rev ATYE71000 Series Rev A
TYE71000 Series Rev A
 

More from Wafik Zakhary

D-005 Iso Container Frame
D-005 Iso Container FrameD-005 Iso Container Frame
D-005 Iso Container FrameWafik Zakhary
 
D-001 Tank General Assembly
D-001 Tank General AssemblyD-001 Tank General Assembly
D-001 Tank General AssemblyWafik Zakhary
 
MS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CAMS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CAWafik Zakhary
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2Wafik Zakhary
 
Pipe Insulation System
Pipe Insulation SystemPipe Insulation System
Pipe Insulation SystemWafik Zakhary
 

More from Wafik Zakhary (6)

D-005 Iso Container Frame
D-005 Iso Container FrameD-005 Iso Container Frame
D-005 Iso Container Frame
 
D-001 Tank General Assembly
D-001 Tank General AssemblyD-001 Tank General Assembly
D-001 Tank General Assembly
 
MS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CAMS0002 - SUPPORT CW. HW. CA
MS0002 - SUPPORT CW. HW. CA
 
Pipe Insulation System_2
Pipe Insulation System_2Pipe Insulation System_2
Pipe Insulation System_2
 
Pipe Insulation System
Pipe Insulation SystemPipe Insulation System
Pipe Insulation System
 
AICI - PRE-CON
AICI - PRE-CONAICI - PRE-CON
AICI - PRE-CON
 

RORO Skip 3

  • 1. Door Pillar SCALE 1:10 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D CLIENT DESIGNER CONTRACTOR REVISIONS TABLE SYM. DESCRIPTION DATE APPROVED GENERAL NOTES DRAWING NAME DRAWING NO. SCALE. SIZE. A 3 CONSTR. CONTR. NO. DESIGNED BY: REV. CHECKED BY 1 SHEET DATE Dutco McConnell Dowell ME LLC Oceanic Engineering Works W.L.L Oceanic Engineering Works W.L.L Detailed Description Steel: All prime grade mild steel (S275 / A36 or Similar) Body: 5mm base, 5mm headboard, 3mm sides, 3mm door. All plate fully outside and stitch welded Inside Uprights 11 no. UPN 100, Mild steel fully welded to side plates Top Rail UPN 160. Headboard: A Frame UPN 160 with 10mm reinforcing plates, RND 65mm hook bar with deflector plate Underframe: Main Runners IPN 180 with 10 mm wear plate- 11 no - UPN 100 Twin Rollers- 229mm x 229mm heavy duty rollers with maintenance free oil lite bearings Door: Thickness' - 5mm mild steel plate Single Door - reinforced with RHS 80mm x 80mm. Reinforced with UPN 100. Door Pillars: RHS160mm x 80mm x 4mm. Hinges: All fully welded (all with maintenance free oil lite bearings. All doors with primary and secondary locking. Painting: Inside - One coat primer + Two coat RAL Paint Outside One coat primer + Two coat of RAL Paint. 20 Cbm RoRo Container Skip Frame Construction RSK-003 1:20Oceanic Engineering Works W.L.L 3 0f 8 17 JUNE 2013 Nizam Moideen UPN (DIN 1026 - U 160 - 6400) QTY. 2 UPN (DIN 1026 - U 160 - 2345) UPN (DIN 1026 - U 100 - 2000) QTY. 22 REINFORCING WEB QTY. 44 5 400 400 UPN (DIN 1026 U 100 - 2215) QTY. 12 65 45 7.50 45 45 2345 6400 IPN (DIN 1025 - I 180 6600) QTY. 2 60 30 6655 180 RHS (160 x 80 x 4) - 2200 QTY. 2Cap Plate QTY.2 144 64 R4 Wear Plate 10 mm 6239 82 10 2200 2 2145 Door Lock Pin 25 53 50 70 25 30