Module 3
Design of Reinforced Concrete Deep Beams
Introduction – Minimum thickness -Steps of Designing Deep beams – design by IS 456 - Detailing of Deep beams.
Two Span Continuous
Deep Beam with Two
Point Loading
1. Deep Beam Definition - IS 456
RC deep beams have useful applications in
• tall buildings,
• offshore structures and foundations
2. Deep Beam Application
A deep beam is having a depth comparable to the span
TRANSFER GIRDER
RIBBED MAT FOUNDATION
3. Deep Beam – Types
• Simply Supported or Continuous
• Rectangular or Flanged Beams
• Top or Bottom or Side Loaded
• with or without openings
4. Behaviour of Deep Beams
• The elementary theory of bending for simple beams may not be applicable to deep beams even
under the linear elastic assumption.
• A deep beam is in fact a vertical plate subjected to loading in its own plane. The strain or stress
distribution across the depth is no longer a straight line, and the variation is mainly dependent on
the aspect ratio of the beam.
• The analysis of a deep beam should therefore be treated as a two dimensional plane stress
problem, and two-dimensional stress analysis methods should be used in order to obtain a realistic
stress distribution in deep beams even for a linear elastic solution.
2m
4m
COMPRESSION
TENSION
4m
4m
TENSION
COMPRESSION
FE RESULTS
L/D  2
L/D < 1
• Following approximations are suggested for design
purposes to compute the lever arm Z
Z
Z
5. Compressive force path concept
• The load-carrying capacity of an RC structural member is
associated with the strength of concrete in the region of the
paths along which compressive forces are transmitted to the
supports.
• The path of a compressive force may be visualized as a flow
of compressive stresses with varying sections perpendicular
to the path direction and with the compressive force,
representing the stress resultant at each section.
• Failure is considered to be related to the development of
tensile stresses in the region of the path that may develop
due to a number of causes, the main ones being ;
• Changes in the path direction
• Varying intensity of compressive stress field along
path Stress increase at the tip of inclined cracks
• Bond failure
6. Arch and tie action
• Mode of failure is not associated with beam
action.
• The variation in bending moment along the
beam span is mainly effected by a change of
the lever arm rather than the magnitude of the
internal horizontal actions.
• Such behaviour has been found to result from
the fact that the force sustained by the tension
reinforcement of a deep beam at its ultimate
limit state is constant throughout the beam
span.
• RC deep beam at its ultimate limit state cannot
rely on beam action to sustain the shear
forces, it would have to behave as a tied arch.
COMPRESSION
TENSION
TENSION
COMPRESSION
7. Deep beam behaviour at ultimate limit state
Behaviour of a deep RC beam with a rectangular cross section and without shear
reinforcement may be divided into two types of behaviour depending on
• either a/d, for beams subjected to two-point loading,
• or L/d, for beams under UDL
• The Figure indicates that the mode of failure is
characterized by a deep inclined crack which
appears to have formed within the shear span
independently of the flexural cracks.
• The inclined crack initiates at the bottom face of the
beam close to the support, extends towards the top
face of the beam in the region of the load point.
Case 1:Deep beam without web reinforcement subjected to two-point loading with a / d=1.5
• Eventually causes failure of the compressive zone in the middle zone of the beam.
• The causes of failure should therefore be sought within the middle, rather than the shear
span of such beams
• Failure is associated with a large reduction of the size of the compressive
zone of the cross-section coinciding with the tip of the main inclined crack.
• This type of failure may be prevented either by providing transverse
reinforcement that would sustain the tensile stresses that cannot be
sustained by concrete alone, or by reducing the compressive stresses.
• Transverse reinforcement only within the shear span can be equally effective.
• Such reinforcement reduces the compressive stresses that develop in the
cross-section which coincides with the tip of the inclined crack, as it sustains
a portion of the bending moment developing in that section.
• However, the presence of transverse reinforcement beyond the critical
section is essential, as with stirrups only to the critical section does not
safeguard against brittle failure.
• This type of failure may be prevented by extending the transverse
reinforcement beyond the critical section to a distance approximately equal
to the depth of the compressive zone.
Case 2 ; Deep beam, without shear reinforcement, under two point loading with a/d = 1.0
• This mode of failure is characterized by a deep inclined
crack which appears to have formed within the shear
span independently of the flexural cracks.
• Inclined crack almost coincides with the line joining
the load point and the support.
• It usually starts within the beam web, almost half way
between the loading and support points, at a load
level significantly lower than the beam load-carrying
capacity, and propagates simultaneously towards
these points with increasing load.
• Eventually, collapse of the beam occurs owing to a
sudden extension of the inclined crack towards the top
and bottom face of the beam in the regions of the load
point and support, respectively, within the shear span.
• Such a mode of failure is usually referred to as
‘diagonal- splitting’
Diagonal Splitting
• Due to the large compressive forces carried by deep beams, it is unlikely
that, the presence of conventional web reinforcement in the form of
vertical stirrups considerably improves load-carrying capacity.
• Such reinforcement may delay the cracking process but may give only a
small increase in load-carrying capacity.
• Web reinforcement is provided in order to prevent splitting of the
inclined portion of the compressive force path (diagonal splitting).
8. Rebar Detailing
A. SS BEAMS
NOTE:
Anchorage of positive reinforcement may be achieved by bending of the bars in a horizontal
plane
B. CONTINUOUS BEAMS
C. Web Reinforcement in Deep Beams
CASE 1: TOP LOADED DEEP BEAMS
• Load is resisted by ARCH action as it is stiffer than
Truss action
• Stirrups are not necessary as they do not cross the
cracks
• A minimum reinforcement placed in both vertical
and horizontal directions as in RC walls is adequate.
Failure
Pattern in
TOP LOADED
DEEP BEAMS
• In continuous beams half
the flexural reinforcement
(horizontal) provided over
the supports may be part
of this
• Near the supports,
additional bars of the
same size used for web
reinforcement should be
introduced as shown
CASE 2: BOTTOM LOADED DEEP BEAMS
Failure
Pattern in
BOTTOM
LOADED
DEEP BEAMS
• Load is resisted mainly by vertical or inclined tension
towards the supports
• To enable the compression arch to develop, the whole
of the suspended load must be transferred by means
of vertical reinforcement into the compression zone of
the beam.
• Suspender Stirrups should completely surround the
bottom flexural reinforcement and extend into the
compression zone of the beam.
• Spacing should not exceed 150 mm
Example 1 – Simply Supported Deep Beam
A transfer girder 5.25 m length supports two columns located at 1.75 m from each end.
Column loads = 3750 kN . Total depth of the beam = 4.2m and width of support = 520mm.
Concrete Grade = M40, Fe 415 steel.
Design and Detail the girder.
Leff
1. C/C distance between supports
2. 1.15 x clear span whichever is less
Step 1: Check for bearing capacity at support
• Let B = Beam width
• Allowable stress = 0.45 x 40 = 18MPa
• Support width = 520 mm
• Effective width of support = 0.2x Clear Span
= 0.2x(5250 - 2x520) = 842 mm
• Adopt 520 mm
• 18 = 1.5 x 3750 x 103 / (520 x B); B = 600 mm
• Leff = 5250 - 520 = 4730 mm or 1.15 x (5250 – 2 x520) = 4841 mm ; Leff = 4730 mm CL 29.2
• D/b < 25 or L/b < 50 : 4200/600 = 7 ; 4730/600 = 7.88
• L/D = 4730/4200 = 1.13 > 1 and < 2 ; Deep Beam category CL 29.1
Step 2 : Factored Moments, Ast
• Mu = 1. 5 x ( 3750 x 1.49) = 8382 kNm
• Lever arm Z = 0.2 (Leff + 2D) = 0.2 x (4730 + 2 x 4200) = 2626mm CL 29.2 (a)
• Ast = Mu/(0.87fy Z) = 8382 x106 /(0.87 x 415 x 2626) = 8841 mm2
• Ast min = 0.85 x b x D /415 = 0.85 x 600 x 4200 /415 = 5161 mm2 cl 26.5.1.1
• Adopt 18 - #25 , Ast = 8836 mm2
Step 3: Detailing of Rebars
CL 29.3.1
• Tension Zone Depth = 0.25 D – 0.05Leff = 0.25 x 4200 –
0.05 x 4730 = 814 mm
Assume Clear bottom and side cover = 40 mm
• Arrange bars in 6 rows in a depth = 814 mm
814
39
155
600
Step 4: Detailing of Vertical Rebars: CL 32.5
• Ast min / m length = 0.0012 x 600 x 1000 = 720 mm2/m
• Provide on each face : 360 mm2/m
• Spacing of #12 rebars = 1000 x 113/360= 313 mm < 450 mm
• Adopt #12@300 mm c/c
Step 5: Detailing of Horizontal Rebars
29.3.4 Side Face Reinforcement
Side face reinforcement shall comply with requirements of minimum
reinforcement of walls
• Ast min / m length = 0.002 x 600 x 1000 = 1200 mm2/m
• Provide on each face : 600 mm2/m
• Spacing of #16 rebars = 1000 x 201/600 = 335 mm < 450 mm
• Adopt #16@300 mm c/c
Dia 50 Dia
Anchorage value
Ld 0.8Ld
With 900 Bend
8dia*
With 1800 Hook
16 dia** * ** * **
25 1250 -200 -400 1050 850 840 680
16 800 -128 -256 672 544 540 435
End Anchorage as per CL 29.3.1(b)
40
520
355
5dia
(125)
485
• For #25 - middle bars Corner bars
ELEVATION
40
520
3555dia
(125)
Support Face
PLAN
40
40
600(BeamWidth)
325
1
1
2
2
814
Tension Zone
CL 29.3.1
Compression Zone
3386 mm
5250
520
#12@300 ; cl 32.5 (a)
Vertical Stirrups
#16@300;cl32.5(c) 18-#25 in
6 Rows
#12@300
Vertical additional rebars
near support CL 32.5 (a)
#16@300 additional rebars near support (horizontal)
adequately anchored as per CL 32.5(c)
1260
2100
TYP
Example 2 – Simply Supported Deep Beam ; M20, Fe415
Step 1: Check for bearing capacity at support
• Allowable stress = 0.45 x 20 = 9MPa
• Support width = 500 mm
• Effective width of support = 0.2x Clear Span
= 0.2 x 5000 = 1000 mm
• Adopt 500 mm
• Total Load W = 0.25 x 3.5 x 6 x 25 + 200 x 6 = 1332 kN
• Reaction at each support = W/2 =666 kN
• Bearing Pressure = 1.5 x 666 x 103 / (500 x 250) = 8 MPa < 9 MPa OK
• Leff = 5500 mm or 1.15 x 5000 = 5750 mm ; Leff = 5500 mm CL 29.2
• D/b = 14 ; < 25 or L/b=22; < 50
• L/D = 5500/3500 = 1.57 > 1 and < 2 ; Deep Beam category CL 29.1
Step 2 : Factored Moments, Ast
• w(kN/m) = 1332/6 = 222 kN/m
• Mu = 1. 5 x 222 x 5.52/8 = 1260 kNm
• Lever arm Z = 0.2 (Leff+ 2D) = 0.2 x (5500 + 2 x 3500) = 2500mm CL 29.2 (a)
• Ast = Mu/(0.87fy Z) = 1260 x 106 /(0.87 x 415 x 2500) = 1396 mm2
• Ast min = 0.85 x b x D /415 = 0.85 x 250 x 3500 /415 = 1792 mm2 CL 26.5.1.1
• Adopt 10 - #16 , Ast = 2010 mm2
Step 3: Detailing of Rebars
CL 29.3.1
• Tension Zone Depth = 0.25 D – 0.05Leff = 0.25 x 3500 – 0.05 x 5500 = 600 mm
• Assume Clear bottom and side cover = 40 mm
• Arrange bars in 5 rows in a depth = 600 mm
600
40
140
140
140
250
140
Step 4: Detailing of Vertical Rebars: CL 32.5
• Ast min / m length = 0.0012 x 250 x 1000 = 300 mm2/m
• Provide on each face : 150 mm2/m
• Spacing of #10 rebars = 1000 x 78.5/150= 523 mm > 450 mm
• Adopt #10@450 mm c/c
Step 5: Detailing of Horizontal Rebars
29.3.4 Side Face Reinforcement
Side face reinforcement shall comply with requirements of minimum
reinforcement of walls
• Ast min / m length = 0.002 x 250 x 1000 = 500 mm2/m
• Provide on each face : 250 mm2/m
• Spacing of #12 rebars = 1000 x 113/250 = 452 mm > 450 mm
• Adopt #12@450 mm c/c
Dia 50 Dia
With 1800 Bend
Anchorage
value = 16dia
Ld 0.8Ld
12 600 -192 408 326
16 800 -256 544 435
End Anchorage as per CL 29.3.1(b)
• For #16 in all rows
40
500
3805dia
(80)
Support Face
PLAN
40
40
250(BeamWidth)
64 (min = 4dia)
1
1
2
2
Rebars are embedded into the support by extending it to
a maximum possible length and then providing 1800
hook which project along the width of the beam
600
Tension Zone
CL 29.2.1
Compression Zone
2900 mm
6000
500
#10@450 ; cl 32.5 (a)
Vertical Stirrups
#12@450
cl32.5(c)
10 -#16 in
5 Rows
#10@450
Vertical additional rebars
near support CL 32.5 (a)
#12@450 additional rebars near support (horizontal)
adequately anchored as per CL 32.5(c)
1050
1750
TYP
1050
Example 3 : Fixed ends and continuous Deep Beam
Step 1: Check for bearing capacity at support
• Concrete Grade = M35
• Allowable stress = 0.45 x 35 = 15.75 MPa CL 34.4
• Support width = 500 mm
• Effective width of support = 0.2x Clear Span
= 0.2 x 5000 = 1000 mm
• Adopt 500 mm
• Total Load W = 0.25 x 3 x 11.5 x 25 + 200 x11.5 = 2515.625 kN
• Reaction at Interior support = W = 2515.625/2 =1257.81 kN
• Bearing Pressure = 1.5 x 1257.81 x 103 / (500 x 250)
= 15 MPa < 15.75 MPa OK
• Leff = 5500 mm or 1.15 x 5000 = 5750 mm
• Adopt Leff = 5500 mm CL 29.2
• D/b = 12 < 25 or L/b=22; < 50
• L/D = 5500/3000 = 1.83 > 1 and < 2.5
• Deep Beam category CL 29.1
Step 2 : Factored Moments, Ast
w(kN/m) = 2515.625 /11.5 = 218.75 kN/m
Span Moment
• Mu = 1. 5 x 218.75 x 5.52/24 = 413.6 kNm
• Lever arm Z = 0.2 (Leff + 1.5D) = 0.2 x (5500 + 1.5 x 3000) = 2000mm CL 29.2 (b)
• Ast = Mu/(0.87fy Z) = 413.6 x 106 /(0.87 x 415 x 2000) = 573 mm2
• Ast min = 0.85 x b x D /415 = 0.85 x 250 x 3000 /415 = 1536 mm2 CL 26.5.1.1
• Adopt 8 - #16 , Ast = 1608 mm2
Support Moment
• Mu = 1. 5 x 218.75 x 5.52/12 = 827 kNm
• Lever arm Z = 0.2 (Leff + 1.5D) = 0.2 x (5500 + 1.5 x 3000) = 2000mm CL 29.2 (b)
• Ast = Mu/(0.87fy Z) = 827 x 106 /(0.87 x 415 x 2000) = 1145 mm2
• Ast min = 0.85 x b x D /415 = 0.85 x 250 x 3000 /415 = 1536 mm2 CL 26.5.1.1
• Adopt Ast = 1536 mm2
Step 3: Detailing of Rebars in Span region
CL 29.3.1
• Tension Zone Depth = 0.25 D – 0.05Leff = 0.25 x 3000 – 0.05 x 5500 = 475 mm
• Assume Clear bottom and side cover = 40 mm
• Arrange bars in 4 rows in a depth = 475 mm 475
40
145
145
145
250
Step 4: Detailing of Rebars in Support region CL 29.3.2
• Clear Span / D = 5000 / 3000 = 1.67 > 1 and < 2.5
• Rebars are placed in two zones CL 29.3.2 (b)
• Ast = 1536 mm2
• Zone1
• Depth = 0.2D = 0.2 x 3000 = 600 mm
• Ast1 = 1536 x 0.5 x (1.67 – 0.5) = 900 mm2
• Adopt 6 - #16 – 1206 mm2 in three rows
• Zone2
• Depth = 0.3D = 0.3 x 3000 = 900 mm on both sides of mid depth
• Ast1 = (1536 – 900) = 636 mm2
• Adopt 6 - #12 – 678 mm2 in three rows
Step 5: Detailing of Vertical Rebars: CL 32.5
• Ast min / m length = 0.0012 x 250 x 1000 = 300 mm2/m
• Provide on each face : 150 mm2/m
• Spacing of #10 rebars = 1000 x 78.5/150= 523 mm > 450 mm
• Adopt #10@450 mm c/c (stirrups)
Step 6: Detailing of Horizontal Rebars
29.3.4 Side Face Reinforcement
Side face reinforcement shall comply with requirements of minimum
reinforcement of walls
• Ast min / m length = 0.002 x 250 x 1000 = 500 mm2/m
• Provide on each face : 250 mm2/m
• Spacing of #12 rebars = 1000 x 113/250 = 452 mm > 450 mm
• Adopt #12@450 mm c/c
Dia 50 Dia
With 1800 Bend
Anchorage
value = 16dia
Ld 0.8Ld
12 600 -192 408 326
16 800 -256 544 435
End Anchorage as per CL 29.3.1(b)
• For #16 in all rows
40
500
3805dia
(80)
Support Face
PLAN
40
40
250(BeamWidth)
64 (min = 4dia)
1
1
2
2
Rebars are embedded into the support by extending it to
a maximum possible length and then providing 1800
hook which project along the width of the beam
900 900 0.3D
900
900
(0.5D)
1500
8 - #16 in
4 Rows
475
(0.2D) 600
(0.6D)
1800
6 - #16 in 3 Rows (Zone 1)
1500* 1500*1500* 1500*
#10@450 ; cl 32.5 (a)
Vertical Stirrups
6 - #12 in
3 Rows
(Zone2)
5500 5500
3000
* Curtailment position measured
from support face
Additional Rebars in Support
Regions (A,B,C) on both faces
#10@450 (vertical)
+
#12 @450 (Horizontal)
A
B C
#12 @450
CL 32.5 (c)
250
8 - #16 in
4 Rows
6 - #12 in
3 Rows (Zone2)
6 - #16 in
3 Rows (Zone 1)
#10@450
Example 4 : Fixed ends and continuous Deep Beam
A reinforced girder 4.5 m deep is continuous over two spans 9 m c/c, resting on column supports 900 mm
width is to be designed to support a total load of 200 kN/m including its own weight. M20 and Fe415
Step 1: Check for bearing capacity at support
• Concrete Grade = M20; Allowable stress = 0.45 x 20 = 9 MPa CL 34.4
• Support width = 900 mm; Effective width of support = 0.2x Clear Span = 0.2 x 8100 = 1620 mm
• Adopt 900 mm
• Total Load W = 200 x 18.9 = 3780 kN
• Reaction at Interior support = W = 3780/2 =1890 kN
• 1.5 x 1890 x 103 / (900 x B) = 9 ; B = 350 mm
• Leff = 9000 mm or 1.15 x 8100 = 9315 mm
• Adopt Leff = 9000 mm CL 29.2
• D/b = 12.8 < 25 or L/b=25.7 < 50
• L/D = 9000/4500 = 2 > 1 and < 2.5
• Deep Beam category CL 29.1
Step 2 : Factored Moments, Ast
Span Moment
• Mu = 1. 5 x 200 x 92/24 = 1012.5 kNm
• Lever arm Z = 0.2 (Leff + 1.5D) = 0.2 x (9000 + 1.5 x 4500) = 3150mm CL 29.2 (b)
• Ast = Mu/(0.87fy Z) = 1012.5 x 106 /(0.87 x 415 x 3150) = 890 mm2
• Ast min = 0.85 x b x D /415 = 0.85 x 350 x 4500 /415 = 3226 mm2 CL 26.5.1.1
• Adopt 8 - #25 in 4 rows
Support Moment
• Mu = 1. 5 x 200 x 92/12 = 2025 kNm
• Ast = Mu/(0.87fy Z) = 2025 x 106 /(0.87 x 415 x 3150) = 1780 mm2
• Ast min = 3226 mm2 CL 26.5.1.1
• Adopt Ast = 3226 mm2
Step 3: Detailing of Rebars in Span region
CL 29.3.1
• Tension Zone Depth = 0.25 D – 0.05Leff = 0.25 x 4500 – 0.05 x 9000 = 675 mm
• Assume Clear bottom and side cover = 40 mm
• Arrange bars in 4 rows in a depth = 675 mm 675
45
210
210
210
350
Step 4: Detailing of Rebars in Support region CL 29.3.2
• Clear Span / D = 8100/ 4500 = 1.8 > 1 and < 2.5
• Rebars are placed in two zones CL 29.3.2 (b)
• Ast = 3226 mm2
• Zone1
• Depth = 0.2D = 0.2 x 4500 = 900 mm
• Ast1 = 3226 x 0.5 x (1.8 – 0.5) = 2097 mm2
• Adopt 8 - #20 – 2512 mm2 in Four rows
• Zone2
• Depth = 0.3D = 0.3 x 4500 = 1350 mm on both sides of mid depth
• Ast1 = (3226 – 2097) = 1129 mm2
• Adopt 6 - #16 – 1206 mm2 in three rows
Step 4: Detailing of Vertical Rebars: CL 32.5
• Ast min / m length = 0.0012 x 350 x 1000 = 420 mm2/m
• Provide on each face : 210 mm2/m
• Spacing of #10 rebars = 1000 x 78.5/210= 373 mm < 450 mm
• Adopt #10@300 mm c/c (stirrups)
Step 5: Detailing of Horizontal Rebars
29.3.4 Side Face Reinforcement
Side face reinforcement shall comply with requirements of minimum
reinforcement of walls
• Ast min / m length = 0.002 x 350 x 1000 = 700 mm2/m
• Provide on each face : 350 mm2/m
• Spacing of #12 rebars = 1000 x 113/350 = 322 mm < 450 mm
• Adopt #12@300 mm c/c
Dia 50 Dia
With 1800 hook
Anchorage
value = 16 dia
Ld 0.8Ld
12 600 -192 408 326
16 800 -256 544 435
20 1000 -320 680 544
25 1250 -400 850 680
End Anchorage as per CL 29.3.1(b)
40
900
7355dia
(125)
Support Face
PLAN
40
40
350(BeamWidth)
100 (min = 4dia)
1
1
2
2 Rebars are embedded into the support by extending it to
a maximum possible length and then providing 1800
hook which project along the width of the beam
For # 25 bars
1350 1350 0.3D
1350
1350
(0.5D)
2250
8 - #25 in
4 Rows
675
(0.2D) 900
(0.6D)
2700
8 - #20 in 4 Rows (Zone 1)
2250* 2250*2250* 2250*
#10@300 ; cl 32.5 (a)
Vertical Stirrups
6 - #16 in
3 Rows
(Zone2)
9000 9000
4500
*0.5D - Curtailment position
measured from support face
Additional Rebars in Support
Regions (A,B,C) on both faces
#10@300 (vertical)
+
#12 @300 (Horizontal)
A B C
#12 @300
CL 32.5 (c)

More Related Content

What's hot

Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab designSatish Narayan
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing MethodMd Tanvir Alam
 
Redistribution of moments-Part-1
Redistribution of moments-Part-1Redistribution of moments-Part-1
Redistribution of moments-Part-1Subhash Patankar
 
Direct and bending stress
Direct and bending stressDirect and bending stress
Direct and bending stressAditya Mistry
 
1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdf1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdfKRSrikrishnaSetty
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000PraveenKumar Shanmugam
 
Presentation Moment Distribution Method
Presentation Moment Distribution MethodPresentation Moment Distribution Method
Presentation Moment Distribution MethodAbhishekChavan63
 
crack control and crack width estimation
crack control and crack width estimationcrack control and crack width estimation
crack control and crack width estimationKumar Anjneya
 
Introduction to design of rcc column
Introduction to design of rcc columnIntroduction to design of rcc column
Introduction to design of rcc columnPHURTSHERINGSHERPA
 
Design Procedure of Singly,Doubly & T-Beam(As Per ACI code)
Design Procedure of Singly,Doubly & T-Beam(As Per ACI code)Design Procedure of Singly,Doubly & T-Beam(As Per ACI code)
Design Procedure of Singly,Doubly & T-Beam(As Per ACI code)Jahidur Rahman
 

What's hot (20)

Beam design
Beam designBeam design
Beam design
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Prestressed concrete continuous beam
Prestressed concrete continuous beamPrestressed concrete continuous beam
Prestressed concrete continuous beam
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab design
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
 
Deep beams
Deep beams Deep beams
Deep beams
 
Redistribution of moments-Part-1
Redistribution of moments-Part-1Redistribution of moments-Part-1
Redistribution of moments-Part-1
 
Design of columns as per IS 456-2000
Design of columns as per IS 456-2000Design of columns as per IS 456-2000
Design of columns as per IS 456-2000
 
Direct and bending stress
Direct and bending stressDirect and bending stress
Direct and bending stress
 
Torsion in beam
Torsion in beamTorsion in beam
Torsion in beam
 
1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdf1. Pile foundations (SL 1-143).pdf
1. Pile foundations (SL 1-143).pdf
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000
 
Presentation Moment Distribution Method
Presentation Moment Distribution MethodPresentation Moment Distribution Method
Presentation Moment Distribution Method
 
crack control and crack width estimation
crack control and crack width estimationcrack control and crack width estimation
crack control and crack width estimation
 
Stepped footing
Stepped footingStepped footing
Stepped footing
 
Introduction to design of rcc column
Introduction to design of rcc columnIntroduction to design of rcc column
Introduction to design of rcc column
 
Design Procedure of Singly,Doubly & T-Beam(As Per ACI code)
Design Procedure of Singly,Doubly & T-Beam(As Per ACI code)Design Procedure of Singly,Doubly & T-Beam(As Per ACI code)
Design Procedure of Singly,Doubly & T-Beam(As Per ACI code)
 
Bearing capacity of soil
Bearing capacity of soilBearing capacity of soil
Bearing capacity of soil
 
Reinforced slab
Reinforced slabReinforced slab
Reinforced slab
 

Similar to Design and Detailing of RC Deep beams as per IS 456-2000

Shear and diagonal tension in beams
Shear and diagonal tension in beamsShear and diagonal tension in beams
Shear and diagonal tension in beamsmuhammad musaab
 
seismic behaviour of beam column joint
seismic behaviour of beam column jointseismic behaviour of beam column joint
seismic behaviour of beam column jointsaurabh gehlod
 
Compression member
Compression memberCompression member
Compression memberVikas Mehta
 
4-flexuralbehaviorofrcbeams-170818223637.pdf
4-flexuralbehaviorofrcbeams-170818223637.pdf4-flexuralbehaviorofrcbeams-170818223637.pdf
4-flexuralbehaviorofrcbeams-170818223637.pdfEmHetchMaidabino
 
Compression_members1.ppt
Compression_members1.pptCompression_members1.ppt
Compression_members1.pptRijuDasgupta
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdfZeinab Awada
 
Lec03 Flexural Behavior of RC Beams (Reinforced Concrete Design I & Prof. Abd...
Lec03 Flexural Behavior of RC Beams (Reinforced Concrete Design I & Prof. Abd...Lec03 Flexural Behavior of RC Beams (Reinforced Concrete Design I & Prof. Abd...
Lec03 Flexural Behavior of RC Beams (Reinforced Concrete Design I & Prof. Abd...Hossam Shafiq II
 
CE 72.52 - Lecture6 - Member Behavior
CE 72.52 - Lecture6 - Member BehaviorCE 72.52 - Lecture6 - Member Behavior
CE 72.52 - Lecture6 - Member BehaviorFawad Najam
 
07-Ductile-detailing-RC-Buildings.pdf
07-Ductile-detailing-RC-Buildings.pdf07-Ductile-detailing-RC-Buildings.pdf
07-Ductile-detailing-RC-Buildings.pdfkksingh1010195
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920INTEZAAR ALAM
 
Compression member
Compression memberCompression member
Compression memberVikas Mehta
 
Module 1 Behaviour of RC beams in Shear and Torsion
Module 1   Behaviour of RC beams in Shear and TorsionModule 1   Behaviour of RC beams in Shear and Torsion
Module 1 Behaviour of RC beams in Shear and TorsionVVIETCIVIL
 
Connection_Design.ppt
Connection_Design.pptConnection_Design.ppt
Connection_Design.pptkasarla sagar
 
Connection_Design.ppt
Connection_Design.pptConnection_Design.ppt
Connection_Design.pptssuser474b33
 

Similar to Design and Detailing of RC Deep beams as per IS 456-2000 (20)

Deep beam
Deep beamDeep beam
Deep beam
 
Connections
Connections Connections
Connections
 
Shear and diagonal tension in beams
Shear and diagonal tension in beamsShear and diagonal tension in beams
Shear and diagonal tension in beams
 
RCD-Lecture 6-4.pdf
RCD-Lecture 6-4.pdfRCD-Lecture 6-4.pdf
RCD-Lecture 6-4.pdf
 
seismic behaviour of beam column joint
seismic behaviour of beam column jointseismic behaviour of beam column joint
seismic behaviour of beam column joint
 
Design of beam
Design of beamDesign of beam
Design of beam
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Compression member
Compression memberCompression member
Compression member
 
4-flexuralbehaviorofrcbeams-170818223637.pdf
4-flexuralbehaviorofrcbeams-170818223637.pdf4-flexuralbehaviorofrcbeams-170818223637.pdf
4-flexuralbehaviorofrcbeams-170818223637.pdf
 
Compression_members1.ppt
Compression_members1.pptCompression_members1.ppt
Compression_members1.ppt
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
 
Lec03 Flexural Behavior of RC Beams (Reinforced Concrete Design I & Prof. Abd...
Lec03 Flexural Behavior of RC Beams (Reinforced Concrete Design I & Prof. Abd...Lec03 Flexural Behavior of RC Beams (Reinforced Concrete Design I & Prof. Abd...
Lec03 Flexural Behavior of RC Beams (Reinforced Concrete Design I & Prof. Abd...
 
CE 72.52 - Lecture6 - Member Behavior
CE 72.52 - Lecture6 - Member BehaviorCE 72.52 - Lecture6 - Member Behavior
CE 72.52 - Lecture6 - Member Behavior
 
07-Ductile-detailing-RC-Buildings.pdf
07-Ductile-detailing-RC-Buildings.pdf07-Ductile-detailing-RC-Buildings.pdf
07-Ductile-detailing-RC-Buildings.pdf
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Deep beams
Deep beamsDeep beams
Deep beams
 
Compression member
Compression memberCompression member
Compression member
 
Module 1 Behaviour of RC beams in Shear and Torsion
Module 1   Behaviour of RC beams in Shear and TorsionModule 1   Behaviour of RC beams in Shear and Torsion
Module 1 Behaviour of RC beams in Shear and Torsion
 
Connection_Design.ppt
Connection_Design.pptConnection_Design.ppt
Connection_Design.ppt
 
Connection_Design.ppt
Connection_Design.pptConnection_Design.ppt
Connection_Design.ppt
 

Recently uploaded

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 

Recently uploaded (20)

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Design and Detailing of RC Deep beams as per IS 456-2000

  • 1. Module 3 Design of Reinforced Concrete Deep Beams Introduction – Minimum thickness -Steps of Designing Deep beams – design by IS 456 - Detailing of Deep beams. Two Span Continuous Deep Beam with Two Point Loading
  • 2. 1. Deep Beam Definition - IS 456 RC deep beams have useful applications in • tall buildings, • offshore structures and foundations 2. Deep Beam Application A deep beam is having a depth comparable to the span TRANSFER GIRDER RIBBED MAT FOUNDATION 3. Deep Beam – Types • Simply Supported or Continuous • Rectangular or Flanged Beams • Top or Bottom or Side Loaded • with or without openings
  • 3. 4. Behaviour of Deep Beams • The elementary theory of bending for simple beams may not be applicable to deep beams even under the linear elastic assumption. • A deep beam is in fact a vertical plate subjected to loading in its own plane. The strain or stress distribution across the depth is no longer a straight line, and the variation is mainly dependent on the aspect ratio of the beam. • The analysis of a deep beam should therefore be treated as a two dimensional plane stress problem, and two-dimensional stress analysis methods should be used in order to obtain a realistic stress distribution in deep beams even for a linear elastic solution.
  • 5. L/D  2 L/D < 1 • Following approximations are suggested for design purposes to compute the lever arm Z Z Z
  • 6. 5. Compressive force path concept • The load-carrying capacity of an RC structural member is associated with the strength of concrete in the region of the paths along which compressive forces are transmitted to the supports. • The path of a compressive force may be visualized as a flow of compressive stresses with varying sections perpendicular to the path direction and with the compressive force, representing the stress resultant at each section.
  • 7. • Failure is considered to be related to the development of tensile stresses in the region of the path that may develop due to a number of causes, the main ones being ; • Changes in the path direction • Varying intensity of compressive stress field along path Stress increase at the tip of inclined cracks • Bond failure
  • 8. 6. Arch and tie action • Mode of failure is not associated with beam action. • The variation in bending moment along the beam span is mainly effected by a change of the lever arm rather than the magnitude of the internal horizontal actions. • Such behaviour has been found to result from the fact that the force sustained by the tension reinforcement of a deep beam at its ultimate limit state is constant throughout the beam span. • RC deep beam at its ultimate limit state cannot rely on beam action to sustain the shear forces, it would have to behave as a tied arch.
  • 10. 7. Deep beam behaviour at ultimate limit state Behaviour of a deep RC beam with a rectangular cross section and without shear reinforcement may be divided into two types of behaviour depending on • either a/d, for beams subjected to two-point loading, • or L/d, for beams under UDL • The Figure indicates that the mode of failure is characterized by a deep inclined crack which appears to have formed within the shear span independently of the flexural cracks. • The inclined crack initiates at the bottom face of the beam close to the support, extends towards the top face of the beam in the region of the load point. Case 1:Deep beam without web reinforcement subjected to two-point loading with a / d=1.5 • Eventually causes failure of the compressive zone in the middle zone of the beam. • The causes of failure should therefore be sought within the middle, rather than the shear span of such beams
  • 11. • Failure is associated with a large reduction of the size of the compressive zone of the cross-section coinciding with the tip of the main inclined crack. • This type of failure may be prevented either by providing transverse reinforcement that would sustain the tensile stresses that cannot be sustained by concrete alone, or by reducing the compressive stresses. • Transverse reinforcement only within the shear span can be equally effective. • Such reinforcement reduces the compressive stresses that develop in the cross-section which coincides with the tip of the inclined crack, as it sustains a portion of the bending moment developing in that section. • However, the presence of transverse reinforcement beyond the critical section is essential, as with stirrups only to the critical section does not safeguard against brittle failure. • This type of failure may be prevented by extending the transverse reinforcement beyond the critical section to a distance approximately equal to the depth of the compressive zone.
  • 12. Case 2 ; Deep beam, without shear reinforcement, under two point loading with a/d = 1.0 • This mode of failure is characterized by a deep inclined crack which appears to have formed within the shear span independently of the flexural cracks. • Inclined crack almost coincides with the line joining the load point and the support. • It usually starts within the beam web, almost half way between the loading and support points, at a load level significantly lower than the beam load-carrying capacity, and propagates simultaneously towards these points with increasing load. • Eventually, collapse of the beam occurs owing to a sudden extension of the inclined crack towards the top and bottom face of the beam in the regions of the load point and support, respectively, within the shear span. • Such a mode of failure is usually referred to as ‘diagonal- splitting’ Diagonal Splitting
  • 13. • Due to the large compressive forces carried by deep beams, it is unlikely that, the presence of conventional web reinforcement in the form of vertical stirrups considerably improves load-carrying capacity. • Such reinforcement may delay the cracking process but may give only a small increase in load-carrying capacity. • Web reinforcement is provided in order to prevent splitting of the inclined portion of the compressive force path (diagonal splitting).
  • 15. NOTE: Anchorage of positive reinforcement may be achieved by bending of the bars in a horizontal plane
  • 17.
  • 18. C. Web Reinforcement in Deep Beams CASE 1: TOP LOADED DEEP BEAMS • Load is resisted by ARCH action as it is stiffer than Truss action • Stirrups are not necessary as they do not cross the cracks • A minimum reinforcement placed in both vertical and horizontal directions as in RC walls is adequate. Failure Pattern in TOP LOADED DEEP BEAMS
  • 19. • In continuous beams half the flexural reinforcement (horizontal) provided over the supports may be part of this • Near the supports, additional bars of the same size used for web reinforcement should be introduced as shown
  • 20. CASE 2: BOTTOM LOADED DEEP BEAMS Failure Pattern in BOTTOM LOADED DEEP BEAMS • Load is resisted mainly by vertical or inclined tension towards the supports • To enable the compression arch to develop, the whole of the suspended load must be transferred by means of vertical reinforcement into the compression zone of the beam. • Suspender Stirrups should completely surround the bottom flexural reinforcement and extend into the compression zone of the beam. • Spacing should not exceed 150 mm
  • 21. Example 1 – Simply Supported Deep Beam A transfer girder 5.25 m length supports two columns located at 1.75 m from each end. Column loads = 3750 kN . Total depth of the beam = 4.2m and width of support = 520mm. Concrete Grade = M40, Fe 415 steel. Design and Detail the girder. Leff 1. C/C distance between supports 2. 1.15 x clear span whichever is less
  • 22. Step 1: Check for bearing capacity at support • Let B = Beam width • Allowable stress = 0.45 x 40 = 18MPa • Support width = 520 mm • Effective width of support = 0.2x Clear Span = 0.2x(5250 - 2x520) = 842 mm • Adopt 520 mm • 18 = 1.5 x 3750 x 103 / (520 x B); B = 600 mm • Leff = 5250 - 520 = 4730 mm or 1.15 x (5250 – 2 x520) = 4841 mm ; Leff = 4730 mm CL 29.2 • D/b < 25 or L/b < 50 : 4200/600 = 7 ; 4730/600 = 7.88 • L/D = 4730/4200 = 1.13 > 1 and < 2 ; Deep Beam category CL 29.1
  • 23. Step 2 : Factored Moments, Ast • Mu = 1. 5 x ( 3750 x 1.49) = 8382 kNm • Lever arm Z = 0.2 (Leff + 2D) = 0.2 x (4730 + 2 x 4200) = 2626mm CL 29.2 (a) • Ast = Mu/(0.87fy Z) = 8382 x106 /(0.87 x 415 x 2626) = 8841 mm2 • Ast min = 0.85 x b x D /415 = 0.85 x 600 x 4200 /415 = 5161 mm2 cl 26.5.1.1 • Adopt 18 - #25 , Ast = 8836 mm2 Step 3: Detailing of Rebars CL 29.3.1 • Tension Zone Depth = 0.25 D – 0.05Leff = 0.25 x 4200 – 0.05 x 4730 = 814 mm Assume Clear bottom and side cover = 40 mm • Arrange bars in 6 rows in a depth = 814 mm 814 39 155 600
  • 24. Step 4: Detailing of Vertical Rebars: CL 32.5 • Ast min / m length = 0.0012 x 600 x 1000 = 720 mm2/m • Provide on each face : 360 mm2/m • Spacing of #12 rebars = 1000 x 113/360= 313 mm < 450 mm • Adopt #12@300 mm c/c Step 5: Detailing of Horizontal Rebars 29.3.4 Side Face Reinforcement Side face reinforcement shall comply with requirements of minimum reinforcement of walls • Ast min / m length = 0.002 x 600 x 1000 = 1200 mm2/m • Provide on each face : 600 mm2/m • Spacing of #16 rebars = 1000 x 201/600 = 335 mm < 450 mm • Adopt #16@300 mm c/c
  • 25. Dia 50 Dia Anchorage value Ld 0.8Ld With 900 Bend 8dia* With 1800 Hook 16 dia** * ** * ** 25 1250 -200 -400 1050 850 840 680 16 800 -128 -256 672 544 540 435 End Anchorage as per CL 29.3.1(b) 40 520 355 5dia (125) 485 • For #25 - middle bars Corner bars ELEVATION 40 520 3555dia (125) Support Face PLAN 40 40 600(BeamWidth) 325 1 1 2 2
  • 26. 814 Tension Zone CL 29.3.1 Compression Zone 3386 mm 5250 520 #12@300 ; cl 32.5 (a) Vertical Stirrups #16@300;cl32.5(c) 18-#25 in 6 Rows #12@300 Vertical additional rebars near support CL 32.5 (a) #16@300 additional rebars near support (horizontal) adequately anchored as per CL 32.5(c) 1260 2100 TYP
  • 27. Example 2 – Simply Supported Deep Beam ; M20, Fe415 Step 1: Check for bearing capacity at support • Allowable stress = 0.45 x 20 = 9MPa • Support width = 500 mm • Effective width of support = 0.2x Clear Span = 0.2 x 5000 = 1000 mm • Adopt 500 mm • Total Load W = 0.25 x 3.5 x 6 x 25 + 200 x 6 = 1332 kN • Reaction at each support = W/2 =666 kN • Bearing Pressure = 1.5 x 666 x 103 / (500 x 250) = 8 MPa < 9 MPa OK • Leff = 5500 mm or 1.15 x 5000 = 5750 mm ; Leff = 5500 mm CL 29.2 • D/b = 14 ; < 25 or L/b=22; < 50 • L/D = 5500/3500 = 1.57 > 1 and < 2 ; Deep Beam category CL 29.1
  • 28. Step 2 : Factored Moments, Ast • w(kN/m) = 1332/6 = 222 kN/m • Mu = 1. 5 x 222 x 5.52/8 = 1260 kNm • Lever arm Z = 0.2 (Leff+ 2D) = 0.2 x (5500 + 2 x 3500) = 2500mm CL 29.2 (a) • Ast = Mu/(0.87fy Z) = 1260 x 106 /(0.87 x 415 x 2500) = 1396 mm2 • Ast min = 0.85 x b x D /415 = 0.85 x 250 x 3500 /415 = 1792 mm2 CL 26.5.1.1 • Adopt 10 - #16 , Ast = 2010 mm2 Step 3: Detailing of Rebars CL 29.3.1 • Tension Zone Depth = 0.25 D – 0.05Leff = 0.25 x 3500 – 0.05 x 5500 = 600 mm • Assume Clear bottom and side cover = 40 mm • Arrange bars in 5 rows in a depth = 600 mm 600 40 140 140 140 250 140
  • 29. Step 4: Detailing of Vertical Rebars: CL 32.5 • Ast min / m length = 0.0012 x 250 x 1000 = 300 mm2/m • Provide on each face : 150 mm2/m • Spacing of #10 rebars = 1000 x 78.5/150= 523 mm > 450 mm • Adopt #10@450 mm c/c Step 5: Detailing of Horizontal Rebars 29.3.4 Side Face Reinforcement Side face reinforcement shall comply with requirements of minimum reinforcement of walls • Ast min / m length = 0.002 x 250 x 1000 = 500 mm2/m • Provide on each face : 250 mm2/m • Spacing of #12 rebars = 1000 x 113/250 = 452 mm > 450 mm • Adopt #12@450 mm c/c
  • 30. Dia 50 Dia With 1800 Bend Anchorage value = 16dia Ld 0.8Ld 12 600 -192 408 326 16 800 -256 544 435 End Anchorage as per CL 29.3.1(b) • For #16 in all rows 40 500 3805dia (80) Support Face PLAN 40 40 250(BeamWidth) 64 (min = 4dia) 1 1 2 2 Rebars are embedded into the support by extending it to a maximum possible length and then providing 1800 hook which project along the width of the beam
  • 31. 600 Tension Zone CL 29.2.1 Compression Zone 2900 mm 6000 500 #10@450 ; cl 32.5 (a) Vertical Stirrups #12@450 cl32.5(c) 10 -#16 in 5 Rows #10@450 Vertical additional rebars near support CL 32.5 (a) #12@450 additional rebars near support (horizontal) adequately anchored as per CL 32.5(c) 1050 1750 TYP 1050
  • 32. Example 3 : Fixed ends and continuous Deep Beam Step 1: Check for bearing capacity at support • Concrete Grade = M35 • Allowable stress = 0.45 x 35 = 15.75 MPa CL 34.4 • Support width = 500 mm • Effective width of support = 0.2x Clear Span = 0.2 x 5000 = 1000 mm • Adopt 500 mm • Total Load W = 0.25 x 3 x 11.5 x 25 + 200 x11.5 = 2515.625 kN • Reaction at Interior support = W = 2515.625/2 =1257.81 kN • Bearing Pressure = 1.5 x 1257.81 x 103 / (500 x 250) = 15 MPa < 15.75 MPa OK • Leff = 5500 mm or 1.15 x 5000 = 5750 mm • Adopt Leff = 5500 mm CL 29.2 • D/b = 12 < 25 or L/b=22; < 50 • L/D = 5500/3000 = 1.83 > 1 and < 2.5 • Deep Beam category CL 29.1
  • 33. Step 2 : Factored Moments, Ast w(kN/m) = 2515.625 /11.5 = 218.75 kN/m Span Moment • Mu = 1. 5 x 218.75 x 5.52/24 = 413.6 kNm • Lever arm Z = 0.2 (Leff + 1.5D) = 0.2 x (5500 + 1.5 x 3000) = 2000mm CL 29.2 (b) • Ast = Mu/(0.87fy Z) = 413.6 x 106 /(0.87 x 415 x 2000) = 573 mm2 • Ast min = 0.85 x b x D /415 = 0.85 x 250 x 3000 /415 = 1536 mm2 CL 26.5.1.1 • Adopt 8 - #16 , Ast = 1608 mm2 Support Moment • Mu = 1. 5 x 218.75 x 5.52/12 = 827 kNm • Lever arm Z = 0.2 (Leff + 1.5D) = 0.2 x (5500 + 1.5 x 3000) = 2000mm CL 29.2 (b) • Ast = Mu/(0.87fy Z) = 827 x 106 /(0.87 x 415 x 2000) = 1145 mm2 • Ast min = 0.85 x b x D /415 = 0.85 x 250 x 3000 /415 = 1536 mm2 CL 26.5.1.1 • Adopt Ast = 1536 mm2
  • 34. Step 3: Detailing of Rebars in Span region CL 29.3.1 • Tension Zone Depth = 0.25 D – 0.05Leff = 0.25 x 3000 – 0.05 x 5500 = 475 mm • Assume Clear bottom and side cover = 40 mm • Arrange bars in 4 rows in a depth = 475 mm 475 40 145 145 145 250
  • 35. Step 4: Detailing of Rebars in Support region CL 29.3.2 • Clear Span / D = 5000 / 3000 = 1.67 > 1 and < 2.5 • Rebars are placed in two zones CL 29.3.2 (b) • Ast = 1536 mm2 • Zone1 • Depth = 0.2D = 0.2 x 3000 = 600 mm • Ast1 = 1536 x 0.5 x (1.67 – 0.5) = 900 mm2 • Adopt 6 - #16 – 1206 mm2 in three rows • Zone2 • Depth = 0.3D = 0.3 x 3000 = 900 mm on both sides of mid depth • Ast1 = (1536 – 900) = 636 mm2 • Adopt 6 - #12 – 678 mm2 in three rows
  • 36. Step 5: Detailing of Vertical Rebars: CL 32.5 • Ast min / m length = 0.0012 x 250 x 1000 = 300 mm2/m • Provide on each face : 150 mm2/m • Spacing of #10 rebars = 1000 x 78.5/150= 523 mm > 450 mm • Adopt #10@450 mm c/c (stirrups) Step 6: Detailing of Horizontal Rebars 29.3.4 Side Face Reinforcement Side face reinforcement shall comply with requirements of minimum reinforcement of walls • Ast min / m length = 0.002 x 250 x 1000 = 500 mm2/m • Provide on each face : 250 mm2/m • Spacing of #12 rebars = 1000 x 113/250 = 452 mm > 450 mm • Adopt #12@450 mm c/c
  • 37. Dia 50 Dia With 1800 Bend Anchorage value = 16dia Ld 0.8Ld 12 600 -192 408 326 16 800 -256 544 435 End Anchorage as per CL 29.3.1(b) • For #16 in all rows 40 500 3805dia (80) Support Face PLAN 40 40 250(BeamWidth) 64 (min = 4dia) 1 1 2 2 Rebars are embedded into the support by extending it to a maximum possible length and then providing 1800 hook which project along the width of the beam
  • 38. 900 900 0.3D 900 900 (0.5D) 1500 8 - #16 in 4 Rows 475 (0.2D) 600 (0.6D) 1800 6 - #16 in 3 Rows (Zone 1) 1500* 1500*1500* 1500* #10@450 ; cl 32.5 (a) Vertical Stirrups 6 - #12 in 3 Rows (Zone2) 5500 5500 3000 * Curtailment position measured from support face Additional Rebars in Support Regions (A,B,C) on both faces #10@450 (vertical) + #12 @450 (Horizontal) A B C #12 @450 CL 32.5 (c) 250 8 - #16 in 4 Rows 6 - #12 in 3 Rows (Zone2) 6 - #16 in 3 Rows (Zone 1) #10@450
  • 39. Example 4 : Fixed ends and continuous Deep Beam A reinforced girder 4.5 m deep is continuous over two spans 9 m c/c, resting on column supports 900 mm width is to be designed to support a total load of 200 kN/m including its own weight. M20 and Fe415 Step 1: Check for bearing capacity at support • Concrete Grade = M20; Allowable stress = 0.45 x 20 = 9 MPa CL 34.4 • Support width = 900 mm; Effective width of support = 0.2x Clear Span = 0.2 x 8100 = 1620 mm • Adopt 900 mm • Total Load W = 200 x 18.9 = 3780 kN • Reaction at Interior support = W = 3780/2 =1890 kN • 1.5 x 1890 x 103 / (900 x B) = 9 ; B = 350 mm • Leff = 9000 mm or 1.15 x 8100 = 9315 mm • Adopt Leff = 9000 mm CL 29.2 • D/b = 12.8 < 25 or L/b=25.7 < 50 • L/D = 9000/4500 = 2 > 1 and < 2.5 • Deep Beam category CL 29.1
  • 40. Step 2 : Factored Moments, Ast Span Moment • Mu = 1. 5 x 200 x 92/24 = 1012.5 kNm • Lever arm Z = 0.2 (Leff + 1.5D) = 0.2 x (9000 + 1.5 x 4500) = 3150mm CL 29.2 (b) • Ast = Mu/(0.87fy Z) = 1012.5 x 106 /(0.87 x 415 x 3150) = 890 mm2 • Ast min = 0.85 x b x D /415 = 0.85 x 350 x 4500 /415 = 3226 mm2 CL 26.5.1.1 • Adopt 8 - #25 in 4 rows Support Moment • Mu = 1. 5 x 200 x 92/12 = 2025 kNm • Ast = Mu/(0.87fy Z) = 2025 x 106 /(0.87 x 415 x 3150) = 1780 mm2 • Ast min = 3226 mm2 CL 26.5.1.1 • Adopt Ast = 3226 mm2
  • 41. Step 3: Detailing of Rebars in Span region CL 29.3.1 • Tension Zone Depth = 0.25 D – 0.05Leff = 0.25 x 4500 – 0.05 x 9000 = 675 mm • Assume Clear bottom and side cover = 40 mm • Arrange bars in 4 rows in a depth = 675 mm 675 45 210 210 210 350
  • 42. Step 4: Detailing of Rebars in Support region CL 29.3.2 • Clear Span / D = 8100/ 4500 = 1.8 > 1 and < 2.5 • Rebars are placed in two zones CL 29.3.2 (b) • Ast = 3226 mm2 • Zone1 • Depth = 0.2D = 0.2 x 4500 = 900 mm • Ast1 = 3226 x 0.5 x (1.8 – 0.5) = 2097 mm2 • Adopt 8 - #20 – 2512 mm2 in Four rows • Zone2 • Depth = 0.3D = 0.3 x 4500 = 1350 mm on both sides of mid depth • Ast1 = (3226 – 2097) = 1129 mm2 • Adopt 6 - #16 – 1206 mm2 in three rows
  • 43. Step 4: Detailing of Vertical Rebars: CL 32.5 • Ast min / m length = 0.0012 x 350 x 1000 = 420 mm2/m • Provide on each face : 210 mm2/m • Spacing of #10 rebars = 1000 x 78.5/210= 373 mm < 450 mm • Adopt #10@300 mm c/c (stirrups) Step 5: Detailing of Horizontal Rebars 29.3.4 Side Face Reinforcement Side face reinforcement shall comply with requirements of minimum reinforcement of walls • Ast min / m length = 0.002 x 350 x 1000 = 700 mm2/m • Provide on each face : 350 mm2/m • Spacing of #12 rebars = 1000 x 113/350 = 322 mm < 450 mm • Adopt #12@300 mm c/c
  • 44. Dia 50 Dia With 1800 hook Anchorage value = 16 dia Ld 0.8Ld 12 600 -192 408 326 16 800 -256 544 435 20 1000 -320 680 544 25 1250 -400 850 680 End Anchorage as per CL 29.3.1(b) 40 900 7355dia (125) Support Face PLAN 40 40 350(BeamWidth) 100 (min = 4dia) 1 1 2 2 Rebars are embedded into the support by extending it to a maximum possible length and then providing 1800 hook which project along the width of the beam For # 25 bars
  • 45. 1350 1350 0.3D 1350 1350 (0.5D) 2250 8 - #25 in 4 Rows 675 (0.2D) 900 (0.6D) 2700 8 - #20 in 4 Rows (Zone 1) 2250* 2250*2250* 2250* #10@300 ; cl 32.5 (a) Vertical Stirrups 6 - #16 in 3 Rows (Zone2) 9000 9000 4500 *0.5D - Curtailment position measured from support face Additional Rebars in Support Regions (A,B,C) on both faces #10@300 (vertical) + #12 @300 (Horizontal) A B C #12 @300 CL 32.5 (c)