TRIC High Performance Infrastructure
Upcoming SlideShare
Loading in...5
×
 

TRIC High Performance Infrastructure

on

  • 5,300 views

 

Statistics

Views

Total Views
5,300
Views on SlideShare
2,067
Embed Views
3,233

Actions

Likes
0
Downloads
18
Comments
0

17 Embeds 3,233

http://www.trictrenchless.com 1765
http://www.trictools.com 1125
http://trictools.com 177
http://www.stifl.com 50
http://trictrenchless.com 33
http://design.espis1.com 29
http://design.espis.com 16
http://translate.googleusercontent.com 11
http://v3.trictrenchless.com 7
https://jujo00obo2o234ungd3t8qjfcjrs3o6k-a-sites-opensocial.googleusercontent.com 7
http://fbg.trictrenchless.com 5
http://webcache.googleusercontent.com 2
http://translate.yandex.net 2
http://perevod.yandex.net 1
http://207.46.192.232 1
http://209.85.229.132 1
http://www.slideshare.net 1
More...

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

TRIC High Performance Infrastructure TRIC High Performance Infrastructure Presentation Transcript

  • HIGH PERFORMANCE INFRASTRUCTURE RENEWAL JUNE 2007 City of Newburgh, N.Y.
  • TRIC WITHIN MATRIX OF BEST MANAGEMENT PRACTICES AND BENEFITS Trenchless Technologies are recognized as an Environmentally Sustainable Technology (EST) by the United Nations Environment Programme (UNEP). See Trenchless Technology Systems: An Environmentally Sound Technology’ UNEP-DTIE-IETC/ISTT . http://www .nodig- construction .com/praxisberichte/UNEP_Final .pdf (Accessed August 9, 2004).
  • Neversink Drive 8” HDPE SDR-17 800’ in 3 Insertions
  • Site Survey • Camera Mains • Locate 18 Laterals • Mark Utilities
  • Excavation • 2 HydroVacs • 2 Days • 18 Lateral Connections Benefit: Minimized impact of construction, particularly on adjacent utilities
  • Pipe • 8” Polyethylene Pipe • ASTM D1248 SDR-17 • 800 Feet Benefit: - (I & I) is totally eliminated. - Total corrosion resistance. - Cost-effective installation.
  • Manhole Reconnections • Water Stops • Link-Seal Benefit: - Permanently attached to pipe by electrofusion - Quick and easy installation
  • Lateral Reconnections • Inserta Tee • SDR-35 PVC Pipe – Lower Laterals Only Benefit: Ease of installation and positive, compression fitting directly into new pipe. Eliminates glues, epoxies, grouts, bands and gaskets.
  • Renewal Method – Pipe Busting
  • TRIC WC44 • Static Puller • 126 Tons @ 6,200 PSI Benefit: - Powerful tool yet compact tool minimizes excavation - Gimbals around adjacent utilities - Operate inside existing manholes
  • Backfill • Restoration of work areas Benefit: Minimal excavation of entry and exit pits leads to quick and easy restoration of work areas
  • Crews • TRIC Tools – 1 Engineer, 1 Manager • Whispering Pines – 3 Operators, 1 Manager • HydroVac – 4 Operators, 1 Manager • Stearns & Wheler – 1 Civil Engineer Benefit: Minimized impact of construction (men and equipment) on the community
  • Benefit: Your Community Functions Normally During The Renewal Process