On the menu
• The particularities of the Danish (wind
power)
– Early adoption and high penetration
– TSO’s involvement and cost sharing
– Public access to data – and ownership
– Repowering (*)
• Wind energy project cost drivers
• Cost development over time in
Denmark
2
THE PARTICULARITIES OF THE
DANISH WIND POWER
3
The particularities of the Danish wind
power: Early adoption & high penetration (1)
4
33.2%
0%
5%
10%
15%
20%
25%
30%
35%
0
1000
2000
3000
4000
5000
6000
1980
1982
1984
1986
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
Windpower%inelectricity
generation
Cumulativewindpowercapacity
(MW)
Onshore capacity [MW] Offshore capacity [MW]
Wind power % in electricity generation
Source: Danish Energy Agency ”Energistatistik2013”, Energinet.dk
5
Source: American Wind Energy Association(based on Berkeley Lab estimates,data from Navigant and EIA)
The particularities of the Danish wind
power: Early adoption & high penetration (2)
The particularities of the Danish wind
power: TSO’s involvement and cost sharing
6
• The developer only pays for the connection from the turbine to the
coupling point
– Transformers, substations, grid extension – cost socialized (covered by the grid
company/-ies)
• Also for offshore projects
– Exploratory studies (geophysical, geotechnical, metaocean and environmental
assessment) carried out by the TSO
• Impact on overall project risk and costs
Source: IEA Task 26 WP1 Report 2011, Energinet.dk.Photo source for the illustration: http://blog.journals.cambridge.org/,http://meship.com/
Wind power project Existing grid infrastructureNew connection line
Paid for by the
Developer
Paid for by the
Grid company
• Individual turbine-level data
starting 1978 reported and
published
• A regulation stipulating local
residents’ ‘right of purchase’
of 20% of the wind power
project shares at cost price
– Audited share purchase
offers (incl. cost data) are
publicly available
– Contributes to high
acceptance rate and
availability of sites across
the country (terrible noise
vs ‘the sound of money
being made’)
7
The particularities of the Danish wind power:
public access to data – and ownership
Interactivemap screenshot from http://vindinfo.dk/
WIND ENERGY PROJECT COST
DRIVERS
8
Wind energy project cost drivers: key
factors
• Materials, components, labour
– Especially significant in the period leading up to 2008
• Supply-demand dynamics, competitive landscape
– Over-supply in the early 2000s, bottle-necks leading
up to 2008
• O&M costs
– Increase in turbine size / production, among other
things, decreases per-kWh O&M costs
– More mature technology, higher capacity factors,
lower administration and other costs per MW
9
Source: Nielsen, P. ”VindmøllersØkonomi”
Wind energy project cost drivers: size
• Continuous turbine size increase over the past 20 years
• In 2012 and 2013 in Denmark, the newly-installed turbines were
predominantly 3 MW
10
Source: data from Stamdataregisterby the Danish Energy Agency (2004 and 2007 excluded due to limited sample), turbine sizes 100kW+
0
20
40
60
80
100
120
0
500
1000
1500
2000
2500
3000
3500
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2005
2006
2008
2009
2010
2011
2012
2013
Rotordiameter(m)
Hubheight(m)
Turbinecapacity(kW)
Average of Capacity (kW) Average of Rotor diameter (m) Average of Hub height (m)
Wind energy project cost drivers:
O&M costs
11
Source: Nielsen, P. ”VindmøllersØkonomi”. Data covers 1996 – 2008, all onshore turbines of nameplate capacity 600 kW+
• For projects 1996-2008 the average lifetime O&M costs (average for
years 6-13) estimated at ca.14.5 EUR/MWh (2012 prices)
• For new projects as of 2010, indications of 12.3 EUR/MWh (2012
prices)
– Significant reductions in O&M costs over time
Wind energy project cost drivers:
Repowering as a new cost category
12
Number of turbines by year of establishment
Year of establishment
Number decommissioned
Number existing
Total capacity (kW) by year of establishment
Year of establishment
kW decommissioned
kW existing
Source: Danish Energy Agency, Danish Wind Turbine Owners’ Association
• Introduction of Scrappage Certificates
– To continue deployment of wind resource
– To facilitate decommissioning of old and poorly sited turbines
• Turbines of 450 kW or less can be replaced with new and more
efficient wind turbines at an additional subsidy
– Scrappage certificate -> additional subsidy for the newly installed
capacity
– Several subsidy regimes depending on the time period:
• 0.02 EUR / kWh for 12 000 FLH of double the decommissioned capacity (upper
limit of market price + subsidy at EUR 0.05 / kWh)
• 0.01 EUR / kWh for 12 000 FLH of double the decommissioned capacity (fixed)
• Total pool of decommissioned capacity: 175 MW
• Scheme in force: 2005 – 2012
• An example from 2013 project proposal Nørhede-Hjortmose (22 *
3.3 MW): compensation of 0.5 M EUR per turbine
13
Source: Danish Energy Agency http://www.ens.dk/undergrund-forsyning/vedvarende-energi/vindkraft-vindmoller/vindmoller-pa-land/skrotningsordningen,
Wind energy project cost drivers:
Repowering as a new cost category (2)
COST DEVELOPMENT OVER TIME
14
Cost development over time in
Denmark (onshore)
15
-
500
1,000
1,500
2,000
2,500
3,000
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
€/kW(2013prices)
Cost of turnkey onshore wind power projects in Denmark 1981 - 2012
Source: Nielsen, P. ”VindmøllersØkonomi”
Lower
demand
than
expected;
oversupply
Steel /
material,
wage and
EBIT
increases
Overall
price
decrease
post-2008
crisis
16
Cost development over time in Denmark (vis-à-
vis other countries): capital cost 2003-2009
Source: Lantz, E., Wiser, R., Hand, M. et al ”IEA Wind Task 26 The Past and Future Cost of Wind Energy”, 2012
Cost development over time in Denmark
(vis-à-vis other countries): LCOE 2008
17
Source: Schwabe, P., Lensink, S., Hand, M. et al ”IEA Wind Task 26 Multi-nationalCase Study of the Financial Cost of Wind Energy”, 2011
Aisma Vitina
Ea Energy Analyses
Mobile: (+45) 603 917 02
E-mail: av@eaea.dk
Frederiksholms Kanal 4
1220 Copenhagen
Denmark
www.eaea.dk
Thank you

More Related Content

What's hot

Renewable Energy Innovation
Renewable Energy InnovationRenewable Energy Innovation
Renewable Energy Innovation
Ibodje, Oghenekevwe V.
 

What's hot (20)

Electric Vehicle (EV) Modelling for Smart Grid
Electric Vehicle (EV) Modelling for Smart GridElectric Vehicle (EV) Modelling for Smart Grid
Electric Vehicle (EV) Modelling for Smart Grid
 
HYBRID POWER GENERATION SYSTEM FOR DOMESTIC PIRPOSEES
HYBRID POWER GENERATION SYSTEM FOR DOMESTIC PIRPOSEESHYBRID POWER GENERATION SYSTEM FOR DOMESTIC PIRPOSEES
HYBRID POWER GENERATION SYSTEM FOR DOMESTIC PIRPOSEES
 
Nuclear battery-ppt
Nuclear battery-pptNuclear battery-ppt
Nuclear battery-ppt
 
Renewable Energy Innovation
Renewable Energy InnovationRenewable Energy Innovation
Renewable Energy Innovation
 
Wind power: introduction
Wind power: introductionWind power: introduction
Wind power: introduction
 
Tidal energy
Tidal energyTidal energy
Tidal energy
 
Renewable energy economics
Renewable energy economicsRenewable energy economics
Renewable energy economics
 
Energy storage system
Energy storage systemEnergy storage system
Energy storage system
 
Offshore wind energy in India Overview
Offshore wind energy in India OverviewOffshore wind energy in India Overview
Offshore wind energy in India Overview
 
Renewable energy and storage
Renewable energy and storageRenewable energy and storage
Renewable energy and storage
 
Energy storage system
Energy storage systemEnergy storage system
Energy storage system
 
Wind energy
Wind energyWind energy
Wind energy
 
Main Form of Renewable Energy Resources
Main Form of Renewable Energy ResourcesMain Form of Renewable Energy Resources
Main Form of Renewable Energy Resources
 
Integration of smart grid with renewable energy
Integration of smart grid with renewable energyIntegration of smart grid with renewable energy
Integration of smart grid with renewable energy
 
High Penetration of Renewable Energy
High Penetration of Renewable EnergyHigh Penetration of Renewable Energy
High Penetration of Renewable Energy
 
Compressed Air Energy Storage CAES
Compressed Air Energy Storage CAESCompressed Air Energy Storage CAES
Compressed Air Energy Storage CAES
 
Latest in energy storage
Latest in energy storageLatest in energy storage
Latest in energy storage
 
Affordable and Clean Energy.pdf
Affordable and Clean Energy.pdfAffordable and Clean Energy.pdf
Affordable and Clean Energy.pdf
 
Road power generation
Road power generationRoad power generation
Road power generation
 
Session 05 grid connected inverter
Session 05   grid connected inverterSession 05   grid connected inverter
Session 05 grid connected inverter
 

Similar to Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
weerokoster
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
guest8c8206
 

Similar to Wind Energy trends in Denmark - Aisma vitina, ea energy analyses (20)

Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)
 
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
Webinaire : Innovation et infrastructure - Moteurs de la transition energetiq...
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
 
Distributed power participation in the Danish electricity market: regulation ...
Distributed power participation in the Danish electricity market: regulation ...Distributed power participation in the Danish electricity market: regulation ...
Distributed power participation in the Danish electricity market: regulation ...
 
Wind energy – challenges
Wind energy – challengesWind energy – challenges
Wind energy – challenges
 
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
 
Europe’s Future Energy System: Local, Smart & 100% Renewable
Europe’s Future Energy System: Local, Smart & 100% Renewable Europe’s Future Energy System: Local, Smart & 100% Renewable
Europe’s Future Energy System: Local, Smart & 100% Renewable
 
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...
 
Ekstremsport tar vindenergi til nye høgder @ First Tuesday Bergen
Ekstremsport tar vindenergi til nye høgder @ First Tuesday BergenEkstremsport tar vindenergi til nye høgder @ First Tuesday Bergen
Ekstremsport tar vindenergi til nye høgder @ First Tuesday Bergen
 
Miro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable EnergyMiro Zeman - Department of Electrical Sustainable Energy
Miro Zeman - Department of Electrical Sustainable Energy
 
Influences on the Design and Viability of Large Offshore Wind Farms and their...
Influences on the Design and Viability of Large Offshore Wind Farms and their...Influences on the Design and Viability of Large Offshore Wind Farms and their...
Influences on the Design and Viability of Large Offshore Wind Farms and their...
 
Roadmap for achieving the 70% 2030 greenhouse gas emission reduction target i...
Roadmap for achieving the 70% 2030 greenhouse gas emission reduction target i...Roadmap for achieving the 70% 2030 greenhouse gas emission reduction target i...
Roadmap for achieving the 70% 2030 greenhouse gas emission reduction target i...
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
 
Ingeteam participates in round table on Power Transfer and Conversion
 Ingeteam participates in round table on Power Transfer and Conversion Ingeteam participates in round table on Power Transfer and Conversion
Ingeteam participates in round table on Power Transfer and Conversion
 
Modelling of offshore wind
Modelling of offshore windModelling of offshore wind
Modelling of offshore wind
 
NZC - Innis
NZC - InnisNZC - Innis
NZC - Innis
 
01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia01 Anne Hojer Simonsen Agencia Danesa De La Energia
01 Anne Hojer Simonsen Agencia Danesa De La Energia
 

More from SustainableEnergyAut

More from SustainableEnergyAut (20)

SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
 
Public Sector Conference 2023 Leadership Showcase
Public Sector Conference  2023 Leadership ShowcasePublic Sector Conference  2023 Leadership Showcase
Public Sector Conference 2023 Leadership Showcase
 
SME Business Briefing Feb 2023
SME Business Briefing Feb 2023SME Business Briefing Feb 2023
SME Business Briefing Feb 2023
 
SEAI 2022 Pilot Fellowship Call
SEAI 2022 Pilot Fellowship CallSEAI 2022 Pilot Fellowship Call
SEAI 2022 Pilot Fellowship Call
 
2022 Energy in Ireland Launch
2022 Energy in Ireland Launch2022 Energy in Ireland Launch
2022 Energy in Ireland Launch
 
SEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - BriefingSEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - Briefing
 
Reduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar PresentationReduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar Presentation
 
Reduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home OfficeReduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home Office
 
Electric Vehicle Dealer Webinar 10 November 2022
Electric Vehicle Dealer Webinar 10 November 2022Electric Vehicle Dealer Webinar 10 November 2022
Electric Vehicle Dealer Webinar 10 November 2022
 
Climate Action Roadmap Webinar
Climate Action Roadmap WebinarClimate Action Roadmap Webinar
Climate Action Roadmap Webinar
 
SME Business Briefing November 2022
SME Business Briefing November 2022SME Business Briefing November 2022
SME Business Briefing November 2022
 
SEAI Quality Management Systems Fundimentals
SEAI Quality Management Systems FundimentalsSEAI Quality Management Systems Fundimentals
SEAI Quality Management Systems Fundimentals
 
SEAI One Stop Shop Workshop September 2022
SEAI One Stop Shop Workshop September 2022SEAI One Stop Shop Workshop September 2022
SEAI One Stop Shop Workshop September 2022
 
Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022
 
Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022 Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022
 
Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022
 
Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022
 
Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022
 
Meet the Buyers Schools Workshop Presentation
Meet the Buyers Schools Workshop  Presentation Meet the Buyers Schools Workshop  Presentation
Meet the Buyers Schools Workshop Presentation
 
Public Sector Climate Action Leadership Briefing
Public Sector Climate Action Leadership BriefingPublic Sector Climate Action Leadership Briefing
Public Sector Climate Action Leadership Briefing
 

Recently uploaded

Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
BrixsonLajara
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
zubnm
 

Recently uploaded (20)

Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 

Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

  • 1. Wind Energy Trends in Denmark Aisma Vitina, Ea Energy Analyses SEAI and IEA Wind Task 26 seminar ”The Cost and Value of Wind Energy” Dublin, May 26, 2014
  • 2. On the menu • The particularities of the Danish (wind power) – Early adoption and high penetration – TSO’s involvement and cost sharing – Public access to data – and ownership – Repowering (*) • Wind energy project cost drivers • Cost development over time in Denmark 2
  • 3. THE PARTICULARITIES OF THE DANISH WIND POWER 3
  • 4. The particularities of the Danish wind power: Early adoption & high penetration (1) 4 33.2% 0% 5% 10% 15% 20% 25% 30% 35% 0 1000 2000 3000 4000 5000 6000 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 Windpower%inelectricity generation Cumulativewindpowercapacity (MW) Onshore capacity [MW] Offshore capacity [MW] Wind power % in electricity generation Source: Danish Energy Agency ”Energistatistik2013”, Energinet.dk
  • 5. 5 Source: American Wind Energy Association(based on Berkeley Lab estimates,data from Navigant and EIA) The particularities of the Danish wind power: Early adoption & high penetration (2)
  • 6. The particularities of the Danish wind power: TSO’s involvement and cost sharing 6 • The developer only pays for the connection from the turbine to the coupling point – Transformers, substations, grid extension – cost socialized (covered by the grid company/-ies) • Also for offshore projects – Exploratory studies (geophysical, geotechnical, metaocean and environmental assessment) carried out by the TSO • Impact on overall project risk and costs Source: IEA Task 26 WP1 Report 2011, Energinet.dk.Photo source for the illustration: http://blog.journals.cambridge.org/,http://meship.com/ Wind power project Existing grid infrastructureNew connection line Paid for by the Developer Paid for by the Grid company
  • 7. • Individual turbine-level data starting 1978 reported and published • A regulation stipulating local residents’ ‘right of purchase’ of 20% of the wind power project shares at cost price – Audited share purchase offers (incl. cost data) are publicly available – Contributes to high acceptance rate and availability of sites across the country (terrible noise vs ‘the sound of money being made’) 7 The particularities of the Danish wind power: public access to data – and ownership Interactivemap screenshot from http://vindinfo.dk/
  • 8. WIND ENERGY PROJECT COST DRIVERS 8
  • 9. Wind energy project cost drivers: key factors • Materials, components, labour – Especially significant in the period leading up to 2008 • Supply-demand dynamics, competitive landscape – Over-supply in the early 2000s, bottle-necks leading up to 2008 • O&M costs – Increase in turbine size / production, among other things, decreases per-kWh O&M costs – More mature technology, higher capacity factors, lower administration and other costs per MW 9 Source: Nielsen, P. ”VindmøllersØkonomi”
  • 10. Wind energy project cost drivers: size • Continuous turbine size increase over the past 20 years • In 2012 and 2013 in Denmark, the newly-installed turbines were predominantly 3 MW 10 Source: data from Stamdataregisterby the Danish Energy Agency (2004 and 2007 excluded due to limited sample), turbine sizes 100kW+ 0 20 40 60 80 100 120 0 500 1000 1500 2000 2500 3000 3500 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2005 2006 2008 2009 2010 2011 2012 2013 Rotordiameter(m) Hubheight(m) Turbinecapacity(kW) Average of Capacity (kW) Average of Rotor diameter (m) Average of Hub height (m)
  • 11. Wind energy project cost drivers: O&M costs 11 Source: Nielsen, P. ”VindmøllersØkonomi”. Data covers 1996 – 2008, all onshore turbines of nameplate capacity 600 kW+ • For projects 1996-2008 the average lifetime O&M costs (average for years 6-13) estimated at ca.14.5 EUR/MWh (2012 prices) • For new projects as of 2010, indications of 12.3 EUR/MWh (2012 prices) – Significant reductions in O&M costs over time
  • 12. Wind energy project cost drivers: Repowering as a new cost category 12 Number of turbines by year of establishment Year of establishment Number decommissioned Number existing Total capacity (kW) by year of establishment Year of establishment kW decommissioned kW existing Source: Danish Energy Agency, Danish Wind Turbine Owners’ Association
  • 13. • Introduction of Scrappage Certificates – To continue deployment of wind resource – To facilitate decommissioning of old and poorly sited turbines • Turbines of 450 kW or less can be replaced with new and more efficient wind turbines at an additional subsidy – Scrappage certificate -> additional subsidy for the newly installed capacity – Several subsidy regimes depending on the time period: • 0.02 EUR / kWh for 12 000 FLH of double the decommissioned capacity (upper limit of market price + subsidy at EUR 0.05 / kWh) • 0.01 EUR / kWh for 12 000 FLH of double the decommissioned capacity (fixed) • Total pool of decommissioned capacity: 175 MW • Scheme in force: 2005 – 2012 • An example from 2013 project proposal Nørhede-Hjortmose (22 * 3.3 MW): compensation of 0.5 M EUR per turbine 13 Source: Danish Energy Agency http://www.ens.dk/undergrund-forsyning/vedvarende-energi/vindkraft-vindmoller/vindmoller-pa-land/skrotningsordningen, Wind energy project cost drivers: Repowering as a new cost category (2)
  • 15. Cost development over time in Denmark (onshore) 15 - 500 1,000 1,500 2,000 2,500 3,000 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 €/kW(2013prices) Cost of turnkey onshore wind power projects in Denmark 1981 - 2012 Source: Nielsen, P. ”VindmøllersØkonomi” Lower demand than expected; oversupply Steel / material, wage and EBIT increases Overall price decrease post-2008 crisis
  • 16. 16 Cost development over time in Denmark (vis-à- vis other countries): capital cost 2003-2009 Source: Lantz, E., Wiser, R., Hand, M. et al ”IEA Wind Task 26 The Past and Future Cost of Wind Energy”, 2012
  • 17. Cost development over time in Denmark (vis-à-vis other countries): LCOE 2008 17 Source: Schwabe, P., Lensink, S., Hand, M. et al ”IEA Wind Task 26 Multi-nationalCase Study of the Financial Cost of Wind Energy”, 2011
  • 18. Aisma Vitina Ea Energy Analyses Mobile: (+45) 603 917 02 E-mail: av@eaea.dk Frederiksholms Kanal 4 1220 Copenhagen Denmark www.eaea.dk Thank you