Towards Closer ASEAN Connectivity 36th ASEAN RAILWAY CEOs’ CONFERENCE 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASE1A8N- C2o0nn Nectoivvietymber 2014, Hanoi, Vietnam Technical Working Group
Contents 
Railway Rehabilitation Project in Cambodia 
1- Southern Line : Phnom Penh – Sihanouk Ville 264 km 
2- Construction of Sihanouk Ville Container Railway Terminal 
3- 48 km Missing Link from SISOPHON – POIPET 
(6km from Pk 380+000 to Cambodia-Thai Border) 
4- Northern Line : Phnom Penh – SISOPHON 338 km 
5- SAMRONG area Development and Green Trade Warehouse, (KM6) 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
1- PHNOM PENH – SIHANOUK VILLE 264 km 
The constriction was completed in 2013, Speed design 50 Km/h, 20T 
axle load, Concrete Sleeper, Rail P 43, Single Track Meter gauge (1000mm). 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Flush-butt welding of rails 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
2- Construction of Sihanouk Ville Container Railway Terminal 
-Contractor : SINOHYDRO CORPORATION 
-Notice to Proceed : 5 June 2013 
-Contract Period : 365 days 
-Construction was completed: 10, 2014 
-Contract Value : USD 3,7 Million 
-Construction size : 4ha 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
2- Construction of Sihanouk Ville Container Railway Terminal 
Installation of interlocking concrete block 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
3- 48km Missing Link from SISOPHON – POIPET 
(6km, from Pk 380+000 to Cambodia-Thai Border) 
Rebuilding 48 km Missing Link from SISOPHON – POIPET, this section 
was completed in April 2012 for 42km. 
The remaining section 6km close to the border railway bridge has not 
completed yet. 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
3- 48km Missing Link from SISOPHON – POIPET 
(6km, from Pk 380+000 to Cambodia-Thai Border) 
The remaining section 6km closed to the border of the railway bridge 
will start the construction in January 2015 
-PC sleepers are stocked at PK 42nd 
-Rail BS 80 are stocked at POIPET Station 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
3- 48km Missing Link from SISOPHON – POIPET 
(6km, from Pk 380+000 to Cambodia-Thai Border) 
Ground Breaking Ceremony of the new railway border bridge 
- On 25 July 2014, the Royal Government of Cambodia and Royal 
Government of Thailand started to construct a railway bridge at border 
in the total length of 43m. 
- Contractor : Italian-Thai Development Public Company Limited 
- Consultant for the Construction : The State of Railway Thailand 
- The Project will be completed in April 2015 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
4- Northern Line : Phnom Penh – SISOPHON 338 km 
-The existing of northern line Phnom Penh Station – SISOPHON 338km 
this section was completed in September 2012 for 23km, from PK 9+400 to 
Batdeung Station. 
- The section Batdeung Station – SISOPHON 315km has not completed 
yet and The government is looking for additional funds. 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
5- SAMRONG area development and Green Trade Warehouse, (KM6) 
These development s are under consideration for future construction due to 
the resettlement issues 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group
Railway Rehabilitation Project 
THANK YOU !! 
ASEAN RAILWAY CEOs’ CONFERENCE 36th 
Towards Closer ASEAN Connectivity Technical Working Group

More Related Content

What's hot

06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
Consultrans, S.A.
 
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Lecture 1, introduction; history, role, classification, alignment & survey1 ....Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Durga Rai
 
Cambodian Railway Network
Cambodian Railway NetworkCambodian Railway Network
Cambodian Railway Network
Ratha Chan
 
Transport poster
Transport posterTransport poster
Transport poster
Gordon Best
 

What's hot (20)

The Next Steps in Creating Export Capacity
The Next Steps in Creating Export CapacityThe Next Steps in Creating Export Capacity
The Next Steps in Creating Export Capacity
 
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
 
Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017
 
Highways
HighwaysHighways
Highways
 
LMRC summer training
LMRC summer trainingLMRC summer training
LMRC summer training
 
doubling project synopsis
doubling project synopsisdoubling project synopsis
doubling project synopsis
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
 
Risk and assurance on Crossrail_Rob Halstead
Risk and assurance on Crossrail_Rob HalsteadRisk and assurance on Crossrail_Rob Halstead
Risk and assurance on Crossrail_Rob Halstead
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
Trans Eurasia 2014
Trans Eurasia 2014Trans Eurasia 2014
Trans Eurasia 2014
 
TeamTX Austin 2015 Presentations
TeamTX Austin 2015 PresentationsTeamTX Austin 2015 Presentations
TeamTX Austin 2015 Presentations
 
Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
 
Construction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossingsConstruction of limited height subway/elimination of level crossings
Construction of limited height subway/elimination of level crossings
 
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Lecture 1, introduction; history, role, classification, alignment & survey1 ....Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
 
Cambodian Railway Network
Cambodian Railway NetworkCambodian Railway Network
Cambodian Railway Network
 
Lahore orange line train project
Lahore orange line train projectLahore orange line train project
Lahore orange line train project
 
Sarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training reportSarita Vihar Depot, Delhi Metro training report
Sarita Vihar Depot, Delhi Metro training report
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
 
Transport poster
Transport posterTransport poster
Transport poster
 

Viewers also liked

Viewers also liked (8)

Gattaca
GattacaGattaca
Gattaca
 
RDB ACC Presentation
RDB ACC PresentationRDB ACC Presentation
RDB ACC Presentation
 
Genetic engineering
Genetic engineeringGenetic engineering
Genetic engineering
 
Human Genetic Manipulation
Human Genetic ManipulationHuman Genetic Manipulation
Human Genetic Manipulation
 
A-level Gene technology
A-level Gene technologyA-level Gene technology
A-level Gene technology
 
Genetic engineering-stem-cells-and-cloning-
Genetic engineering-stem-cells-and-cloning-Genetic engineering-stem-cells-and-cloning-
Genetic engineering-stem-cells-and-cloning-
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 
Genetic engineering
Genetic engineeringGenetic engineering
Genetic engineering
 

Similar to Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference

CV ไตรสิทธิ์ (Eng)
CV ไตรสิทธิ์ (Eng)CV ไตรสิทธิ์ (Eng)
CV ไตรสิทธิ์ (Eng)
Traisit Yutthavisut
 
Performance analysis of_logistic_kunming-bangkok_infrastructure_
Performance analysis of_logistic_kunming-bangkok_infrastructure_Performance analysis of_logistic_kunming-bangkok_infrastructure_
Performance analysis of_logistic_kunming-bangkok_infrastructure_
liyan_km
 
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
AnandMohan271812
 
CV_Nguyen Van Khoa_Bridge&Tunnel Engineer
CV_Nguyen Van Khoa_Bridge&Tunnel EngineerCV_Nguyen Van Khoa_Bridge&Tunnel Engineer
CV_Nguyen Van Khoa_Bridge&Tunnel Engineer
Nguyen Van Khoa
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
Saravanan rulez
 

Similar to Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference (20)

CV ไตรสิทธิ์ (Eng)
CV ไตรสิทธิ์ (Eng)CV ไตรสิทธิ์ (Eng)
CV ไตรสิทธิ์ (Eng)
 
Railway station narowal
Railway station narowalRailway station narowal
Railway station narowal
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Performance analysis of_logistic_kunming-bangkok_infrastructure_
Performance analysis of_logistic_kunming-bangkok_infrastructure_Performance analysis of_logistic_kunming-bangkok_infrastructure_
Performance analysis of_logistic_kunming-bangkok_infrastructure_
 
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
 
NEDA
NEDANEDA
NEDA
 
CV_Nguyen Van Khoa_Bridge&Tunnel Engineer
CV_Nguyen Van Khoa_Bridge&Tunnel EngineerCV_Nguyen Van Khoa_Bridge&Tunnel Engineer
CV_Nguyen Van Khoa_Bridge&Tunnel Engineer
 
Project Outline
Project OutlineProject Outline
Project Outline
 
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
 
Cam presentation current status & master plan_rd_05_jan18
Cam presentation current status & master plan_rd_05_jan18Cam presentation current status & master plan_rd_05_jan18
Cam presentation current status & master plan_rd_05_jan18
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
CV_Rattapoohm_may2016
CV_Rattapoohm_may2016CV_Rattapoohm_may2016
CV_Rattapoohm_may2016
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Singapore-Kunming rail link project making good progress
Singapore-Kunming rail link project making good progressSingapore-Kunming rail link project making good progress
Singapore-Kunming rail link project making good progress
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 

Recently uploaded

VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 

Recently uploaded (20)

Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Top Rated Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Wadgaon Sheri ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 

Presentation for Railways Rehabilitation Project in Cambodia for Technical Working Group of 36th ASEAN Railway CEO's Conference

  • 1. Towards Closer ASEAN Connectivity 36th ASEAN RAILWAY CEOs’ CONFERENCE ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASE1A8N- C2o0nn Nectoivvietymber 2014, Hanoi, Vietnam Technical Working Group
  • 2. Contents Railway Rehabilitation Project in Cambodia 1- Southern Line : Phnom Penh – Sihanouk Ville 264 km 2- Construction of Sihanouk Ville Container Railway Terminal 3- 48 km Missing Link from SISOPHON – POIPET (6km from Pk 380+000 to Cambodia-Thai Border) 4- Northern Line : Phnom Penh – SISOPHON 338 km 5- SAMRONG area Development and Green Trade Warehouse, (KM6) ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 3. Railway Rehabilitation Project 1- PHNOM PENH – SIHANOUK VILLE 264 km The constriction was completed in 2013, Speed design 50 Km/h, 20T axle load, Concrete Sleeper, Rail P 43, Single Track Meter gauge (1000mm). ASEAN RAILWAY CEOs’ CONFERENCE 36th Flush-butt welding of rails Towards Closer ASEAN Connectivity Technical Working Group
  • 4. Railway Rehabilitation Project 2- Construction of Sihanouk Ville Container Railway Terminal -Contractor : SINOHYDRO CORPORATION -Notice to Proceed : 5 June 2013 -Contract Period : 365 days -Construction was completed: 10, 2014 -Contract Value : USD 3,7 Million -Construction size : 4ha ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 5. Railway Rehabilitation Project 2- Construction of Sihanouk Ville Container Railway Terminal Installation of interlocking concrete block ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 6. Railway Rehabilitation Project 3- 48km Missing Link from SISOPHON – POIPET (6km, from Pk 380+000 to Cambodia-Thai Border) Rebuilding 48 km Missing Link from SISOPHON – POIPET, this section was completed in April 2012 for 42km. The remaining section 6km close to the border railway bridge has not completed yet. ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 7. Railway Rehabilitation Project 3- 48km Missing Link from SISOPHON – POIPET (6km, from Pk 380+000 to Cambodia-Thai Border) The remaining section 6km closed to the border of the railway bridge will start the construction in January 2015 -PC sleepers are stocked at PK 42nd -Rail BS 80 are stocked at POIPET Station ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 8. Railway Rehabilitation Project 3- 48km Missing Link from SISOPHON – POIPET (6km, from Pk 380+000 to Cambodia-Thai Border) Ground Breaking Ceremony of the new railway border bridge - On 25 July 2014, the Royal Government of Cambodia and Royal Government of Thailand started to construct a railway bridge at border in the total length of 43m. - Contractor : Italian-Thai Development Public Company Limited - Consultant for the Construction : The State of Railway Thailand - The Project will be completed in April 2015 ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 9. Railway Rehabilitation Project 4- Northern Line : Phnom Penh – SISOPHON 338 km -The existing of northern line Phnom Penh Station – SISOPHON 338km this section was completed in September 2012 for 23km, from PK 9+400 to Batdeung Station. - The section Batdeung Station – SISOPHON 315km has not completed yet and The government is looking for additional funds. ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 10. Railway Rehabilitation Project 5- SAMRONG area development and Green Trade Warehouse, (KM6) These development s are under consideration for future construction due to the resettlement issues ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 11. Railway Rehabilitation Project ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group
  • 12. Railway Rehabilitation Project THANK YOU !! ASEAN RAILWAY CEOs’ CONFERENCE 36th Towards Closer ASEAN Connectivity Technical Working Group