Raul Becerril has over 21 years of experience in engineering and manufacturing roles in the automotive industry. He has held various positions managing vehicle systems, quality launch coordination, process engineering, and manufacturing supervision. The document provides details on his educational background, skills, work history, and contact information while highlighting his objective of continuous self-improvement.
James a.hinkle resume quality manufacturing 1976 - 2016
CURR RB Ing 2015 rev
1. CURRICULUM VITAE
Objective: Continuous improvement of personal skills and knowledge of organizational work systems to
achieve the Company's objectives and self-development goals
Scholarship: ITESM Campus Toluca (1991 – 1995) Industrial and Productive Systems Engineer
WORK EXPERIENCE > 21 years of professional experience
FCA MEXICO Manufacturing - Automotive Industry
Engineering Manager /
Electrical & Electronics,
Inst. Panel, HVAC, WIS
2015
-
2013
Toluca Complex Engineering Manager for: Wiring, Modules, Instrument Panel, HVAC Systems and Plant
Warranty Management. Coordinate activities and responsibilities for 4 Resident Engineering
Design & Components
Release Engineer /
Heavy Duty Truck
2015
-
2013
Santa Fe Corporate Office Heavy Duty Truck Wiring Design and Components release by: Circuits integration,
2D Drawing creation, 3D Model design & update, Design Change documents, Quality indicators tracking and
Problem Solving Analysis.
Product Engineer /
Instrument Panel, HVAC
Systems & Warranty
2013
-
2011
Toluca Complex Vehicle Systems Management of: Instrument Panel, HVAC Systems management. Fit & Finish
build objectives validation, Product Evaluation Tests, Engineering & Process Changes implementation
coordination, Components Quality indicators tracking, Problem Solving Analysis. Responsible of Total Plant
Warranty Analysis and Improvement Strategies.
F500 Quality Launch
Coordinator
2011
-
2010
Toluca Complex Quality Departments Launch activities Coordination. Quality Plan development, Training Plan
development, Facilities & Equipment’s readiness, Red Items Follow up.
Product Engineer /
Electrical & Electronic
Systems
2011
-
2005
Toluca Complex Vehicle Systems Management of: Wiring and Modules. CAN (Control Area Network) System
Architecture validation, Product Evaluation Tests, Engineering & Process Changes implementation
coordination, Components Quality indicators tracking, Problem Solving Analysis.
Product Engineer /
Chassis Systems
2005
-
2001
Toluca Complex Vehicle Systems Management of: Suspension, Power Steering, Fuel, Brakes, Tires, Wheels and
Exhaust. Product Evaluation Tests, Engineering & Process Changes implementation coordination, Components
Quality indicators tracking, Problem Solving Analysis.
Direct Labor Process
Industrial Engineer /
Chassis & Final
2001
-
2000
Toluca Complex Process Standards development, Manpower labor balance optimization, material & process
flow optimization, work instructions development, line process transfer projects, lay out optimization/
development, Process Tools assignment.
Indirect Labor Process
Industrial Engineer /
Quality & Maintenance
2000
-
1998
Toluca Complex Process Standards development, Manpower labor balance optimization, material& process
flow optimization, work instructions development, line process transfer projects, lay out optimization/
development, Process Tools assignment, Scorecard, Manpower Budget, Organization charts, ISO 9000 & ISO
1400 integration and Internal Auditor ISO.
Tool Shop Supervisor /
Torque Tools
2000
-
1998
Toluca Complex Pneumatic & Electrical Torque Tool Shop Supervisor - Two Shifts / 26 operators direct
responsibility. Preventive Maintenance schedule, Spare parts program, Tool Calibration schedule, Tool Audit
certification, Tool stations assignment layout, all procedures under ISO 9000.
ACCO MEXICANA
Lerma Manufacturing
Manufacturing - Office Products
Metal Cell Coordinator /
Stapler, Punches and
Clips
1998
-
1995
Project Coordinator for expansion – product lines transfer, Feasibility Analysis, Manpower balance
optimization, process & material flow optimization, work instructions control, bill of materials, lay-out
optimization. Two Shifts / 4 Supervisors direct responsibility + operators.
2. Training & Knowledge
TRAINING Advance Kaizen Techniques. Chrysler, July 2009
Shainin-Green Belt. Chrysler, March 2003
Keepner-Tregoe. Chrysler, March 2003
PPA/PSO. Chrysler, August 2002
PFMA/DFMA. Chrysler, April 2001
LANGUAGES Advance English (95%)
Canadian as a Second Language Institute. Vancouver B.C.
Canada
ISO 9000/ISO 14000 Auditor. Chrysler, Mayo 1998
Calibration. Chrysler, April 1998
Instructor training.
Instituto Tecnológico Empresarial de Toluca 1996.
SOFTWARE NX, Team Center
CANalyzer
Windows
MAC
MSOffice
Lotus Notes
Personal Information
Contact
Status
522059rb@gmail.com / raul.becerril@fcagroup.com
Office: (722) 279-5261 / Cell: (722) 261-2673
42 years old / Married / 1 Son
Address La Arboleda #22 Casa 22
Privada Ocote
Col. San Mateo Otzacatipan, CP. 50220
Toluca, Edo. de Méx.