More Related Content Similar to Kanban strategies (20) More from Ashutosh Kumar Jha (20) Kanban strategies3. The card is the authorization for the next container of the material to be produced. 8. The empty container becomes the signal for replenishment while other container used for production. 10. RIP is the primary replenishment location for the storage of materials used for refilling. 14. Determine the inventory remaining in second container. Daily Demand * Replenishment Days Packet Size = Quantity 22. IPK provides a temporary parking space for units completed faster than the consuming workstation. 24. To maintain the correct sequence of production to meet customer demand. 26. Used in shared manufacturing processes or processes with long replenishment time 30. ‘Move Card’ acts as authorization to move material from replenishment to consumption point 32. Each container has another card attached ‘Produce Card’ – card with part no., material description and no. of cards needed to equal a signal 33. When taken to consumption point, container’s produce card replaced with move card 34. Produce card moved to Wait/ Work board Daily Demand * Replenishment Days Container Quantity = No. of Containers & Cards 35. Replenishment Area Consumption Area Produce 1 of ___ Produce 1 of ___ Produce 1 of ___ Move Produce 1 of ___ Point of Consumption Produce 1 of ___ 36. Wait/ Work Board Work Wait 5 1 of 1 of 1 of 1 of 1 of 1 of 6 7 8 9 10 1 of 1 of 11 12 13 14 15