Lean Practice and Value Streams
Operating Theatre Utilisation
discussion workshop 26 June 2007
Carol Makin
Lean Practice and Value Streams
Operating Theatre Utilisation
discussion workshop 26 June 2007
Carol Makin
Overview of presentationOverview of presentation
• Practical approach with examples based on
Clatterbridge Hospital rapid improvement
workshop May 2006
• Defining our problem
• Understanding our patient’s journey
• Finding our green stream
• Lessons learnt
• Practical approach with examples based on
Clatterbridge Hospital rapid improvement
workshop May 2006
• Defining our problem
• Understanding our patient’s journey
• Finding our green stream
• Lessons learnt
AimAim
To improve the quality
of the patient’s journey
To improve the quality
of the patient’s journey
Consider ….Consider ….
Have you ever met a
surgeon who doesn’t
want to operate?
How often have you met
a surgeon frustrated
that he can’t get his
case to theatre?
Have you ever met a
surgeon who doesn’t
want to operate?
How often have you met
a surgeon frustrated
that he can’t get his
case to theatre?
Where is the problem?Where is the problem?
• Porters?
• Anaesthetists?
• Theatre staff?
• Surgeons?
• Management?
• Solution?
– More staff, more time,
more resources……..
• Porters?
• Anaesthetists?
• Theatre staff?
• Surgeons?
• Management?
• Solution?
– More staff, more time,
more resources……..
Value stream mapValue stream map
Get down to the shop floor and
walk the walk
Get down to the shop floor and
walk the walk
Understand sequence of eventsUnderstand sequence of events
• Referral & OPA
• Pre-op assessment
• Admission
• Theatre
• Recovery & return to ward
• Discharge
• Follow up
• Referral & OPA
• Pre-op assessment
• Admission
• Theatre
• Recovery & return to ward
• Discharge
• Follow up
The Glenday SieveThe Glenday Sieve
70%99%
50%95%
6%50%
% “task”
Range
% Cumulative
activity
Clatterbridge green streamClatterbridge green stream
• LA & GA cystoscopy 26%
• hip/knee replacement & ‘scopes 9%
• hernias & vvs 7%
• lumps & bumps 4%
• lower GI endoscopy 3%
• carpal tunnel 3%
4.2% of procedures account for 52% of throughput
• LA & GA cystoscopy 26%
• hip/knee replacement & ‘scopes 9%
• hernias & vvs 7%
• lumps & bumps 4%
• lower GI endoscopy 3%
• carpal tunnel 3%
4.2% of procedures account for 52% of throughput
Agree green list rulesAgree green list rules
• ‘Green’ or ‘green start’ lists printed on
green paper
• Identify start, break and finish times
• No changes to order of list
• 4 weeks notice of list cancellations
• Standardise equipment
• Daily co-ordinators meeting
• ‘Green’ or ‘green start’ lists printed on
green paper
• Identify start, break and finish times
• No changes to order of list
• 4 weeks notice of list cancellations
• Standardise equipment
• Daily co-ordinators meeting
Orthopaedic exampleOrthopaedic example
• Rules
– Tuesday all day list CGH
– 4 primary knee replacements
– 8.30 start in anaesthetic room, 17.00 finish
– breaks and lunch to be taken flexibly to allow
continuous working
– list co-ordinated by Mr Parkinson/Margaret Hill
x 4365
• Rules
– Tuesday all day list CGH
– 4 primary knee replacements
– 8.30 start in anaesthetic room, 17.00 finish
– breaks and lunch to be taken flexibly to allow
continuous working
– list co-ordinated by Mr Parkinson/Margaret Hill
x 4365
Co-ordinators meetingCo-ordinators meeting
• Identify issues disrupting flow through
theatre on previous working day
• Predict and aim to prevent issues which
might arise today
• Knowledge shared
• Identify issues disrupting flow through
theatre on previous working day
• Predict and aim to prevent issues which
might arise today
• Knowledge shared
Results in other areasResults in other areas
• Pre-op assessment streamlined
– ECGs and bloods done in department
– 29% increase in same day assessment
– orthopaedic pre-op review clinic transferred to ward
area
• Pre-op assessment streamlined
– ECGs and bloods done in department
– 29% increase in same day assessment
– orthopaedic pre-op review clinic transferred to ward
area
Day unit throughput increased by 33%Day unit throughput increased by 33%
0
50
100
150
200
250
300
350
400
450
500
2001-2 2002-3 2003-4 2004-5 2005-6 2006-7
anal fissure
haemorrhoidectomy
cholecystectomy
varicose veins
inguinal hernia
circumcision
Day unit changesDay unit changes
• Day unit throughput increased by 33%
– LAs separated from GAs
– beds replaced by trolleys
– in patient beds reduced
– national move to increase day cases
• Day unit throughput increased by 33%
– LAs separated from GAs
– beds replaced by trolleys
– in patient beds reduced
– national move to increase day cases
Ward changesWard changes
• In patient ward flip
– 28% reduction in bed base
– £147k yearly savings
• In patient ward flip
– 28% reduction in bed base
– £147k yearly savings
NigglesNiggles
59 issues identified as fixable
74% fixed 26% actioned
Need a mechanism to identify problems
No problems means problems
Problems lead to opportunities
59 issues identified as fixable
74% fixed 26% actioned
Need a mechanism to identify problems
No problems means problems
Problems lead to opportunities
ImpactImpact
• Improved performance and efficiencies
• Identifying and eliminating bottle necks
• Improved communication between teams
• Predictable scheduling and theatre lists
• Highlights capability and capacity opportunities
• Less firefighting, less confusion, less uncertainty
• Improved morale
• Do more with less
• Improved performance and efficiencies
• Identifying and eliminating bottle necks
• Improved communication between teams
• Predictable scheduling and theatre lists
• Highlights capability and capacity opportunities
• Less firefighting, less confusion, less uncertainty
• Improved morale
• Do more with less
Lessons learntLessons learnt
• Committed team to progress actions
• All day lists need all day staff
• New surgeons and new lists set up as green
• Prospectively measure theatre utilisation
and publish
• Work with early adopters, don’t waste time
on laggards
• Committed team to progress actions
• All day lists need all day staff
• New surgeons and new lists set up as green
• Prospectively measure theatre utilisation
and publish
• Work with early adopters, don’t waste time
on laggards
Future?Future?
• Every member of the team valued
• Annualised hours
• More flexible working
• Pooled waiting lists for common conditions
• Less inventory on shelves
• Niggles considered normal
• Continuous process - never finished
• Every member of the team valued
• Annualised hours
• More flexible working
• Pooled waiting lists for common conditions
• Less inventory on shelves
• Niggles considered normal
• Continuous process - never finished

More Related Content

What's hot

What's hot (20)

The Osprey Programme - Training Clinical Systems Engineers
The Osprey Programme - Training Clinical Systems Engineers The Osprey Programme - Training Clinical Systems Engineers
The Osprey Programme - Training Clinical Systems Engineers
 
The Principles of Lean Value Stream Design
The Principles of Lean Value Stream DesignThe Principles of Lean Value Stream Design
The Principles of Lean Value Stream Design
 
Creating Lean Supply Chains
Creating Lean Supply ChainsCreating Lean Supply Chains
Creating Lean Supply Chains
 
Beyond Redesign other dimensions of Lean Implementation
Beyond Redesign other dimensions of Lean Implementation   Beyond Redesign other dimensions of Lean Implementation
Beyond Redesign other dimensions of Lean Implementation
 
The next steps in Lean Healthcare - Summarizing the Challenges
The next steps in Lean Healthcare - Summarizing the ChallengesThe next steps in Lean Healthcare - Summarizing the Challenges
The next steps in Lean Healthcare - Summarizing the Challenges
 
Medicines Breakthrough Collaborative 1
Medicines Breakthrough Collaborative 1Medicines Breakthrough Collaborative 1
Medicines Breakthrough Collaborative 1
 
Measurement for improvement
Measurement for improvementMeasurement for improvement
Measurement for improvement
 
Reliability by design
Reliability by designReliability by design
Reliability by design
 
ED Safety Checklist Masterclass Presentation
ED Safety Checklist Masterclass PresentationED Safety Checklist Masterclass Presentation
ED Safety Checklist Masterclass Presentation
 
Leanlondon mar12 presentation
Leanlondon mar12 presentationLeanlondon mar12 presentation
Leanlondon mar12 presentation
 
Lean in Hospitals - Lean Transformation in Gwent
Lean in Hospitals - Lean Transformation in GwentLean in Hospitals - Lean Transformation in Gwent
Lean in Hospitals - Lean Transformation in Gwent
 
How Lean are you?
How Lean are you?How Lean are you?
How Lean are you?
 
Designing Lean Supply Chains
Designing Lean Supply ChainsDesigning Lean Supply Chains
Designing Lean Supply Chains
 
Understanding the Gains from Lean
Understanding the Gains from LeanUnderstanding the Gains from Lean
Understanding the Gains from Lean
 
Leading Improvement in the NHS - Can Lean work in Healthcare
Leading Improvement in the NHS - Can Lean work in HealthcareLeading Improvement in the NHS - Can Lean work in Healthcare
Leading Improvement in the NHS - Can Lean work in Healthcare
 
Kano
KanoKano
Kano
 
The Lean Journey at Flinders Medical Centre
The Lean Journey at Flinders Medical CentreThe Lean Journey at Flinders Medical Centre
The Lean Journey at Flinders Medical Centre
 
Lean in Hospitals
Lean in HospitalsLean in Hospitals
Lean in Hospitals
 
Managing a Lean Organisation
Managing a Lean OrganisationManaging a Lean Organisation
Managing a Lean Organisation
 
Lean green stream in surgery
Lean green stream in surgery  Lean green stream in surgery
Lean green stream in surgery
 

Viewers also liked

Viewers also liked (10)

Moving to the Lean Enterprise in Healthcare
Moving to the Lean Enterprise in HealthcareMoving to the Lean Enterprise in Healthcare
Moving to the Lean Enterprise in Healthcare
 
What Toyota can teach us about Lean Leadership
What Toyota can teach us about Lean LeadershipWhat Toyota can teach us about Lean Leadership
What Toyota can teach us about Lean Leadership
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Value stream mapping training
Value stream mapping trainingValue stream mapping training
Value stream mapping training
 
Breaking Through to Flow
Breaking Through to Flow Breaking Through to Flow
Breaking Through to Flow
 
Lss overview
Lss   overviewLss   overview
Lss overview
 
Lean healthcare
Lean healthcareLean healthcare
Lean healthcare
 
Design Thinking Healthcare
Design Thinking HealthcareDesign Thinking Healthcare
Design Thinking Healthcare
 
Every Product Every Cycle in Production
Every Product Every Cycle in ProductionEvery Product Every Cycle in Production
Every Product Every Cycle in Production
 

Similar to Lean Practice and Value Streams

Parallel Session 1.8 Leading General Practice into the Future - Meeting Deman...
Parallel Session 1.8 Leading General Practice into the Future - Meeting Deman...Parallel Session 1.8 Leading General Practice into the Future - Meeting Deman...
Parallel Session 1.8 Leading General Practice into the Future - Meeting Deman...
NHSScotlandEvent
 
Acmg secondary findings open forum 3 28-12 final
Acmg secondary findings open forum 3 28-12 finalAcmg secondary findings open forum 3 28-12 final
Acmg secondary findings open forum 3 28-12 final
erikanature
 

Similar to Lean Practice and Value Streams (20)

Tips and tricks of one day hysterectomy
Tips and tricks of one day hysterectomy Tips and tricks of one day hysterectomy
Tips and tricks of one day hysterectomy
 
Merging Cath Labs: Using simulation to design a solution and understand the i...
Merging Cath Labs: Using simulation to design a solution and understand the i...Merging Cath Labs: Using simulation to design a solution and understand the i...
Merging Cath Labs: Using simulation to design a solution and understand the i...
 
Parallel Session 1.8 Leading General Practice into the Future - Meeting Deman...
Parallel Session 1.8 Leading General Practice into the Future - Meeting Deman...Parallel Session 1.8 Leading General Practice into the Future - Meeting Deman...
Parallel Session 1.8 Leading General Practice into the Future - Meeting Deman...
 
Jennifer Kosiol & Heidi Weber - Gold Coast Hospitals
Jennifer Kosiol & Heidi Weber - Gold Coast HospitalsJennifer Kosiol & Heidi Weber - Gold Coast Hospitals
Jennifer Kosiol & Heidi Weber - Gold Coast Hospitals
 
Leanlondon 19sep13
Leanlondon 19sep13Leanlondon 19sep13
Leanlondon 19sep13
 
Leanlondon 19sep13
Leanlondon 19sep13Leanlondon 19sep13
Leanlondon 19sep13
 
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20How To Drive Clinical Improvement Programs That Get Results - HAS  Session 20
How To Drive Clinical Improvement Programs That Get Results - HAS Session 20
 
Implementing oesphageal Doppler in Enhanced Recovery
Implementing oesphageal Doppler in Enhanced RecoveryImplementing oesphageal Doppler in Enhanced Recovery
Implementing oesphageal Doppler in Enhanced Recovery
 
Eliminating Harm
Eliminating Harm Eliminating Harm
Eliminating Harm
 
Realizing the Potential of Lean Thinking in Healthcare
Realizing the Potential of Lean Thinking in Healthcare Realizing the Potential of Lean Thinking in Healthcare
Realizing the Potential of Lean Thinking in Healthcare
 
AAA London Network Event 27 Nov 2015 Louise Wilkinson clinical audit presen...
AAA London Network Event 27 Nov 2015   Louise Wilkinson clinical audit presen...AAA London Network Event 27 Nov 2015   Louise Wilkinson clinical audit presen...
AAA London Network Event 27 Nov 2015 Louise Wilkinson clinical audit presen...
 
AAA London Network Event 27 Nov 2015 Louise Wilkinson clinical audit presen...
AAA London Network Event 27 Nov 2015   Louise Wilkinson clinical audit presen...AAA London Network Event 27 Nov 2015   Louise Wilkinson clinical audit presen...
AAA London Network Event 27 Nov 2015 Louise Wilkinson clinical audit presen...
 
Applying Lean in Radiology
Applying Lean in RadiologyApplying Lean in Radiology
Applying Lean in Radiology
 
Acmg secondary findings open forum 3 28-12 final
Acmg secondary findings open forum 3 28-12 finalAcmg secondary findings open forum 3 28-12 final
Acmg secondary findings open forum 3 28-12 final
 
Operating Room Design - Mayo Case Study
Operating Room Design - Mayo Case StudyOperating Room Design - Mayo Case Study
Operating Room Design - Mayo Case Study
 
Lean Veterinary Practice
Lean Veterinary PracticeLean Veterinary Practice
Lean Veterinary Practice
 
Overcoming the challenges of delivering 7DS for Echocardiogram and Ultrasound...
Overcoming the challenges of delivering 7DS for Echocardiogram and Ultrasound...Overcoming the challenges of delivering 7DS for Echocardiogram and Ultrasound...
Overcoming the challenges of delivering 7DS for Echocardiogram and Ultrasound...
 
Let's Talk Research Annual Conference - 24th-25th September 2014 (Gail Woodburn)
Let's Talk Research Annual Conference - 24th-25th September 2014 (Gail Woodburn)Let's Talk Research Annual Conference - 24th-25th September 2014 (Gail Woodburn)
Let's Talk Research Annual Conference - 24th-25th September 2014 (Gail Woodburn)
 
Breakout 2.4 Making the system work for you:Using levers and drivers to deliv...
Breakout 2.4 Making the system work for you:Using levers and drivers to deliv...Breakout 2.4 Making the system work for you:Using levers and drivers to deliv...
Breakout 2.4 Making the system work for you:Using levers and drivers to deliv...
 
Akc ppt
Akc pptAkc ppt
Akc ppt
 

More from Lean Enterprise Academy

More from Lean Enterprise Academy (20)

Uk lean summit 2015 lean transformation developing the capability to improv...
Uk lean summit 2015   lean transformation developing the capability to improv...Uk lean summit 2015   lean transformation developing the capability to improv...
Uk lean summit 2015 lean transformation developing the capability to improv...
 
What have we learnt about Lean?
What have we learnt about Lean?What have we learnt about Lean?
What have we learnt about Lean?
 
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi TanakaThe Basics of Oobeya by Sharon Tanner and Takashi Tanaka
The Basics of Oobeya by Sharon Tanner and Takashi Tanaka
 
Building a Lean Management System by Daniel T Jones
Building a Lean Management System by Daniel T JonesBuilding a Lean Management System by Daniel T Jones
Building a Lean Management System by Daniel T Jones
 
Toyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerToyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon Tanner
 
How to develop managers able to lean and sustain end to-end value streams
How to develop managers able to lean and sustain end to-end value streamsHow to develop managers able to lean and sustain end to-end value streams
How to develop managers able to lean and sustain end to-end value streams
 
Rethinking IT service delivery
Rethinking IT service deliveryRethinking IT service delivery
Rethinking IT service delivery
 
Lean Lessons from Three Healthcare Systems
Lean Lessons from Three Healthcare SystemsLean Lessons from Three Healthcare Systems
Lean Lessons from Three Healthcare Systems
 
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul JarvisDelivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
Delivering Results in Healthcare by Marc Baker, Ian Taylor and Dr Paul Jarvis
 
Leading a Lean Turnaround Workshop by Art Byrne
Leading a Lean Turnaround Workshop by Art ByrneLeading a Lean Turnaround Workshop by Art Byrne
Leading a Lean Turnaround Workshop by Art Byrne
 
Introduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David BruntIntroduction to Lean leadership Masterclass by David Brunt
Introduction to Lean leadership Masterclass by David Brunt
 
Implementing the Lean Turnaround Masterclass by Art Byrne
Implementing the Lean Turnaround Masterclass by Art ByrneImplementing the Lean Turnaround Masterclass by Art Byrne
Implementing the Lean Turnaround Masterclass by Art Byrne
 
Lean in new Product Development by Jim Morgan
Lean in new Product Development by Jim MorganLean in new Product Development by Jim Morgan
Lean in new Product Development by Jim Morgan
 
Leadership Lessons from Sports Coaching by Dr Peter Treadwell
Leadership Lessons from Sports Coaching by Dr Peter TreadwellLeadership Lessons from Sports Coaching by Dr Peter Treadwell
Leadership Lessons from Sports Coaching by Dr Peter Treadwell
 
A3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John KiffA3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John Kiff
 
Policy Deployment
Policy DeploymentPolicy Deployment
Policy Deployment
 
Lean Leadership for Executives: Initial findings from LGN Research
Lean Leadership for Executives: Initial findings from LGN ResearchLean Leadership for Executives: Initial findings from LGN Research
Lean Leadership for Executives: Initial findings from LGN Research
 
Why Responsiveness Matters
Why Responsiveness Matters   Why Responsiveness Matters
Why Responsiveness Matters
 
The Beginners Guide to Lean
The Beginners Guide to LeanThe Beginners Guide to Lean
The Beginners Guide to Lean
 
The Lean Strategic Challenge
The Lean Strategic Challenge  The Lean Strategic Challenge
The Lean Strategic Challenge
 

Recently uploaded

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Recently uploaded (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 

Lean Practice and Value Streams

  • 1. Lean Healthcare Summit Lean Healthcare Summit Lean Practice and Value Streams Operating Theatre Utilisation discussion workshop 26 June 2007 Carol Makin Lean Practice and Value Streams Operating Theatre Utilisation discussion workshop 26 June 2007 Carol Makin
  • 2. Overview of presentationOverview of presentation • Practical approach with examples based on Clatterbridge Hospital rapid improvement workshop May 2006 • Defining our problem • Understanding our patient’s journey • Finding our green stream • Lessons learnt • Practical approach with examples based on Clatterbridge Hospital rapid improvement workshop May 2006 • Defining our problem • Understanding our patient’s journey • Finding our green stream • Lessons learnt
  • 3.
  • 4. AimAim To improve the quality of the patient’s journey To improve the quality of the patient’s journey
  • 5. Consider ….Consider …. Have you ever met a surgeon who doesn’t want to operate? How often have you met a surgeon frustrated that he can’t get his case to theatre? Have you ever met a surgeon who doesn’t want to operate? How often have you met a surgeon frustrated that he can’t get his case to theatre?
  • 6. Where is the problem?Where is the problem? • Porters? • Anaesthetists? • Theatre staff? • Surgeons? • Management? • Solution? – More staff, more time, more resources…….. • Porters? • Anaesthetists? • Theatre staff? • Surgeons? • Management? • Solution? – More staff, more time, more resources……..
  • 7. Value stream mapValue stream map Get down to the shop floor and walk the walk Get down to the shop floor and walk the walk
  • 8. Understand sequence of eventsUnderstand sequence of events • Referral & OPA • Pre-op assessment • Admission • Theatre • Recovery & return to ward • Discharge • Follow up • Referral & OPA • Pre-op assessment • Admission • Theatre • Recovery & return to ward • Discharge • Follow up
  • 9. The Glenday SieveThe Glenday Sieve 70%99% 50%95% 6%50% % “task” Range % Cumulative activity
  • 10. Clatterbridge green streamClatterbridge green stream • LA & GA cystoscopy 26% • hip/knee replacement & ‘scopes 9% • hernias & vvs 7% • lumps & bumps 4% • lower GI endoscopy 3% • carpal tunnel 3% 4.2% of procedures account for 52% of throughput • LA & GA cystoscopy 26% • hip/knee replacement & ‘scopes 9% • hernias & vvs 7% • lumps & bumps 4% • lower GI endoscopy 3% • carpal tunnel 3% 4.2% of procedures account for 52% of throughput
  • 11. Agree green list rulesAgree green list rules • ‘Green’ or ‘green start’ lists printed on green paper • Identify start, break and finish times • No changes to order of list • 4 weeks notice of list cancellations • Standardise equipment • Daily co-ordinators meeting • ‘Green’ or ‘green start’ lists printed on green paper • Identify start, break and finish times • No changes to order of list • 4 weeks notice of list cancellations • Standardise equipment • Daily co-ordinators meeting
  • 12. Orthopaedic exampleOrthopaedic example • Rules – Tuesday all day list CGH – 4 primary knee replacements – 8.30 start in anaesthetic room, 17.00 finish – breaks and lunch to be taken flexibly to allow continuous working – list co-ordinated by Mr Parkinson/Margaret Hill x 4365 • Rules – Tuesday all day list CGH – 4 primary knee replacements – 8.30 start in anaesthetic room, 17.00 finish – breaks and lunch to be taken flexibly to allow continuous working – list co-ordinated by Mr Parkinson/Margaret Hill x 4365
  • 13. Co-ordinators meetingCo-ordinators meeting • Identify issues disrupting flow through theatre on previous working day • Predict and aim to prevent issues which might arise today • Knowledge shared • Identify issues disrupting flow through theatre on previous working day • Predict and aim to prevent issues which might arise today • Knowledge shared
  • 14. Results in other areasResults in other areas • Pre-op assessment streamlined – ECGs and bloods done in department – 29% increase in same day assessment – orthopaedic pre-op review clinic transferred to ward area • Pre-op assessment streamlined – ECGs and bloods done in department – 29% increase in same day assessment – orthopaedic pre-op review clinic transferred to ward area
  • 15. Day unit throughput increased by 33%Day unit throughput increased by 33% 0 50 100 150 200 250 300 350 400 450 500 2001-2 2002-3 2003-4 2004-5 2005-6 2006-7 anal fissure haemorrhoidectomy cholecystectomy varicose veins inguinal hernia circumcision
  • 16. Day unit changesDay unit changes • Day unit throughput increased by 33% – LAs separated from GAs – beds replaced by trolleys – in patient beds reduced – national move to increase day cases • Day unit throughput increased by 33% – LAs separated from GAs – beds replaced by trolleys – in patient beds reduced – national move to increase day cases
  • 17. Ward changesWard changes • In patient ward flip – 28% reduction in bed base – £147k yearly savings • In patient ward flip – 28% reduction in bed base – £147k yearly savings
  • 18. NigglesNiggles 59 issues identified as fixable 74% fixed 26% actioned Need a mechanism to identify problems No problems means problems Problems lead to opportunities 59 issues identified as fixable 74% fixed 26% actioned Need a mechanism to identify problems No problems means problems Problems lead to opportunities
  • 19. ImpactImpact • Improved performance and efficiencies • Identifying and eliminating bottle necks • Improved communication between teams • Predictable scheduling and theatre lists • Highlights capability and capacity opportunities • Less firefighting, less confusion, less uncertainty • Improved morale • Do more with less • Improved performance and efficiencies • Identifying and eliminating bottle necks • Improved communication between teams • Predictable scheduling and theatre lists • Highlights capability and capacity opportunities • Less firefighting, less confusion, less uncertainty • Improved morale • Do more with less
  • 20. Lessons learntLessons learnt • Committed team to progress actions • All day lists need all day staff • New surgeons and new lists set up as green • Prospectively measure theatre utilisation and publish • Work with early adopters, don’t waste time on laggards • Committed team to progress actions • All day lists need all day staff • New surgeons and new lists set up as green • Prospectively measure theatre utilisation and publish • Work with early adopters, don’t waste time on laggards
  • 21. Future?Future? • Every member of the team valued • Annualised hours • More flexible working • Pooled waiting lists for common conditions • Less inventory on shelves • Niggles considered normal • Continuous process - never finished • Every member of the team valued • Annualised hours • More flexible working • Pooled waiting lists for common conditions • Less inventory on shelves • Niggles considered normal • Continuous process - never finished