SlideShare a Scribd company logo
1 of 159
Download to read offline
Widening of the
                                         Huey P. Long
                                            Bridge




EXISTING



        Tulane
     Engineering
     Forum - 2010



                    PROPOSED WIDENING
Introduction
• Background
• 4 Construction Contracts
   – Main Bridge – Substructure
   – Main Bridge – Superstructure
     Truss Widening
   – Railroad Modifications
                                          EXISTING
   – Approaches and Main Bridge
     Deck Widening


• Project Status
   – Project Timeline
   – Construction Photographs


                                    PROPOSED WIDENING
Location
   New Orleans Metro Area
                            French
                            Quarter




   Huey P. Long Bridge
Before the Bridge
Construction of The Existing Bridge
Construction of The Existing Bridge
Background – Huey P. Long Bridge

• Combined
  railroad –
  highway
  bridge

  – 2 tracks

  – 4 lanes – 9 ft.
    width
Background – Huey P. Long Bridge


• Very heavily
  built
• Carries largest
  modern RR
  load without
  distress
• Many years of
  service life
  remaining
Project Background
• By widening the existing
  structure rather than
  constructing a new river
  crossing:
  – Reduce environmental
    impact, property takings.
  – Reduce project cost.
  – Reuse existing right-of-
    way and traffic corridors.
• Final report published
  April 1988.
Project Background




EXISTING      PROPOSED WIDENING
Huey P. Long Widening Project


START PROJECT
                     WEST BANK RR MOD


                                    EAST BANK APPR.    END PROJECT




         WEST BANK
           APPR.
                                              EAST BANK RR MOD

           MAIN BRIDGE PIER, TRUSS, AND
                 DECK WIDENING
Main Bridge Pier Widening


START PROJECT
                     WEST BANK RR MOD


                                    EAST BANK APPR.    END PROJECT




         WEST BANK
           APPR.
                                              EAST BANK RR MOD

           MAIN BRIDGE PIER, TRUSS, AND
                 DECK WIDENING
Main Bridge Pier Widening




                                          EXISTING




Pier A    Piers I & II   Pier III   Pier IV




                                                     PROPOSED WIDENING
Widened Pier




            Steel
            Frame
            Upper
            Encase
            Lower
            Encase
Caisson
Existing Pier Conditions




     Pier I – North Face
Existing Pier Conditions




    Pier II – West Nose
Main Bridge Truss Widening


START PROJECT
                     WEST BANK RR MOD


                                    EAST BANK APPR.    END PROJECT




         WEST BANK
           APPR.
                                              EAST BANK RR MOD

           MAIN BRIDGE PIER, TRUSS, AND
                 DECK WIDENING
Main Bridge Truss Widening


                          Simple
                         Through
Cantilever Truss Span   Truss Span    EXISTING




                                     PROPOSED WIDENING
Cross Sections – Existing Bridge
Widened Main Bridge Features
            •   2 new trusses added, parallel
                to existing trusses.
            •   Roadways widened from 18
                ft. to 43 ft.
            •   Currently:     2 – 9 ft. lanes
                               No offset
            •   Proposed:      3 – 11 ft.
                lanes
                               8 ft. shoulder
                               2 ft. offset
Construction and Erection
• Sequence of
  construction
  – Widening Truss
    • Imbalance
  – Widened Floor
    System
Maintenance of Traffic Through Construction

• Marine Traffic Maintained
   – same vertical and horizontal
  clearances

• Rail Traffic Maintained

• Vehicular Traffic Maintained
   – by use of staged construction
Main Bridge
Maintenance of Traffic




                WORK PERFORMED IN
                 TRUSS WIDENING
                   CONTRACT
Railroad Modifications - Westbank


START PROJECT
                     WEST BANK RR MOD


                                    EAST BANK APPR.    END PROJECT




         WEST BANK
           APPR.
                                              EAST BANK RR MOD

           MAIN BRIDGE PIER, TRUSS, AND
                 DECK WIDENING
Railroad Modifications - Westbank


           Project Site

                                  Railroad




                          LA 18     Hwy. 90
EXISTING
Huey P. Long Widening Project
Westbank Railroad Modifications




                             LA
                               18
                                          Y 90
                                    US HW
                                       To Huey P. Long Bridge



         Existing Site Conditions
Huey P. Long Widening Project
Westbank Railroad Modifications
  Replacement Support




                                        LA
                                          18
                            ay
                        adw
                  e   Ro
               tur
             Fu                                           0
                                                     Y9
                                               US HW
                                                  To Huey P. Long Bridge


                Final Site Conditions
Huey P. Long Widening Project
Westbank Railroad Modifications
Huey P. Long Widening Project
Westbank Railroad Modifications
Railroad Modifications - Eastbank


START PROJECT
                    WESTBANK RR MOD


                                    EASTBANK APPR.   END PROJECT




         WESTBANK
           APPR.
                                             EASTBANK RR MOD

           MAIN BRIDGE PIER, TRUSS, AND
                 DECK WIDENING
Railroad Modifications - Eastbank


                           Clearview Pkwy.


EXISTING




           Project Site
                             Jefferson Hwy
Huey P. Long Widening Project
       Eastbank Railroad Modifications

                                                                  .
                                                               kwy




                                                                          Vac ation
                                                           P
                                                        ew
                                                   arvi




                                                                            St
                                                Cle




                                                                             a nt
                                                                                  Gas
                                               Power Poles & Power Line


          . Lon g   Bridge
To Huey P
                                  y.
                            on Hw




                                                                                        QWEST Line
                    Jeffers




                                                                             Existing Superstructure
                                                                             and Towers to be
                                       Existing Site Conditions              Replaced
Huey P. Long Widening Project
        Eastbank Railroad Modifications
                                        New Bents

                                                                         .
                                                                      kwy




                                                                                    Vac ation
                                                                  P
                                                               ew
                                                          arvi




                                                                                      St
                                                       Cle




                                                                                       a nt
                                                                                            Gas
                         d ge
            . Long Bri
To Huey P

                                                        d                      ay
                                                     ate                    dw
                                   y.




                                                El ev                    Ro
                                                                           a
                             on Hw




                                                      y             re
                                          t ure adwa             utu
                                        Fu Ro                   F                                 QWEST Line
                     Jeffers




                                                   Final Site Conditions
Huey P. Long Widening Project
Eastbank Railroad Modifications
Approaches & Deck Widening


START PROJECT
                     WEST BANK RR MOD


                                    EAST BANK APPR.    END PROJECT




         WEST BANK
           APPR.
                                              EAST BANK RR MOD

           MAIN BRIDGE PIER, TRUSS, AND
                 DECK WIDENING
Approaches & Deck Widening


Start Project               Bridge City Ave.
                              Interchange




                WEST BANK
                                           Conflict w/
                APPROACH                  Existing Rdwy
Approaches & Deck Widening


                          Simple
                         Through
Cantilever Truss Span   Truss Span    EXISTING




                                     PROPOSED WIDENING
Approaches & Deck Widening
                Jefferson Hwy
                 Interchange

                                         End Project




                           NOPBRR Spur



 Conflict w/    EAST BANK
Existing Rdwy   APPROACH
Main Bridge Deck Widening




               WORK PERFORMED IN
               APPROACH CONTRACT
Approaches & Deck Widening
Project Timeline
Project Schedule                        2004    2005   2006   2007   2008   2009   2010   2011   2012   2013

Main Bridge Substructure


Railroad Modifications


Superstructure Fabrication & Erection


Approaches & Main Bridge Re-decking




        • Work Completed
                  – Railroad Modifications
                  – Main Bridge Pier Widening
        • Work Under Construction
                  – Main Bridge Truss Widening
                  – West Bank Approach, Main Bridge Deck Widening,
                    East Bank Approach
Project Status – Completed
Main Bridge Pier Widening
• Letting Date:
  – December 14, 2005
• Notice To Proceed Date:
  – April 10, 2006
• Construction Bid:
  – $ 98,826,907
• Contractor:
  – Massman Construction Co.
Main Bridge Pier Widening




                                             EXISTING




Pier A   Piers I & II   Pier III   Pier IV




                                                        PROPOSED WIDENING
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening

             Distribution
                Block
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
             G&G Steel




                         New Orleans
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Main Bridge Pier Widening
Project Status - Completed
Railroad Modifications
• Letting Date:
  – May 10, 2006
• Notice To Proceed Date:
  – August 28, 2006
• Construction Bid:
  – $ 13,782,713
• Contractor:
  – Boh Bros. Construction Co.
Railroad Modifications - Westbank


           Project Site

                                  Railroad




                          LA 18     Hwy. 90
EXISTING
Railroad Modifications - Westbank
Railroad Modifications - Westbank
Railroad Modifications - Westbank
Railroad Modifications - Westbank

                 G&G Steel




                             New Orleans
Railroad Modifications - Westbank
Railroad Modifications - Westbank
Railroad Modifications - Westbank
Railroad Modifications - Westbank
Railroad Modifications - Westbank
Railroad Modifications - Westbank
Railroad Modifications - Westbank
Railroad Modifications - Eastbank


                           Clearview Pkwy.


EXISTING




           Project Site
                             Jefferson Hwy
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Huey P. Long Widening Project
Eastbank Railroad Modifications
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Railroad Modifications - Eastbank
Project Status – Under Construction

Main Bridge Truss Widening
• Letting Date:
  – March 28, 2007
• Notice to Proceed Date:
  – November 5, 2007
• Construction Bid:
  – $ 452,605,568
• Contractor:
  – Massman Construction Co., Traylor Brothers
    Inc., and IHI, Inc.
Main Bridge Truss Widening


                          Simple
                         Through
Cantilever Truss Span   Truss Span    EXISTING




                                     PROPOSED WIDENING
Main Bridge Truss Widening
Industrial Steel
 Construction
   Gary, IN




                     American
                      Bridge
                   Manufacturing
                   Coraopolis, PA


New Orleans
Main Bridge Truss Widening
     Truss Monitoring
                    STATIC MONITORING
                      SYSTEM
                        – 433 Members (777
                          Vibrating Wire Strain
                          Gages)
                        – 5 Piers (10 Vibrating
                          Wire Tilt Meters)
                        – Wind
                          Speed/Direction

                    DYNAMIC (LIVE LOAD)
                      MONITORING
                      SYSTEM
                        – 31 Members (50
                          Electrical Resistance
                          Strain Gages)
Main Bridge Truss Widening
      Work Platform
Main Bridge Truss Widening
      Work Platform
Main Bridge Truss Widening
  Floorbeam Modifications




              Template Fit Up Check
Main Bridge Truss Widening
           Floorbeam Modifications




Installation of Wedge Fill
Main Bridge Truss Widening
          Floorbeam Modifications




Installation of Wedge Fill
Main Bridge Truss Widening
Work on Existing Structure – Bottom Chord
Main Bridge Truss Widening
Work on Existing Structure – Top Chord
Main Bridge Truss Widening
Widening Truss Bottom Laterals
Main Bridge Truss Widening
Remove Existing Sidewalk – Install Temporary Steel Barrier
Main Bridge Truss Widening
     Main Bridge Erection - Methods




A             B         A         B              B


    A = “Stick Build”       B = “Span by Span”
Main Bridge Truss Widening
       Main Bridge Erection
Main Bridge Truss Widening
       Main Bridge Erection
Main Bridge Truss Widening
       Main Bridge Erection
Main Bridge Truss Widening
       Main Bridge Erection
Main Bridge Truss Widening
       Main Bridge Erection
Main Bridge Truss Widening
       Main Bridge Erection
Main Bridge Truss Widening
       Main Bridge Erection
Main Bridge Truss Widening
       Main Bridge Erection
Main Bridge Truss Widening
       Main Bridge Erection




          December 2009
Main Bridge Truss Widening
       Main Bridge Erection




          December 2009
Main Bridge Truss Widening
Contractor’s Erection Scheme – “Span by Span” Erection




                                     • East Anchor Arm
                                     • Suspended Span
                                     • Through Truss
                                       Span
Project Status – Under Construction

West Bank Approach, Main Bridge Deck
  Widening, East Bank Approach
• Letting Date:
  – March 19, 2008
• Notice to Proceed Date:
  – May 5, 2008
• Construction Bid:
  – $ 433,950,000
• Contractor:
  – Kiewit Massman Traylor Constructors
Approaches & Deck Widening


START PROJECT
                     WEST BANK RR MOD


                                    EAST BANK APPR.    END PROJECT




         WEST BANK
           APPR.
                                              EAST BANK RR MOD

           MAIN BRIDGE PIER, TRUSS, AND
                 DECK WIDENING
Approaches & Deck Widening
       Box Culverts
Approaches & Deck Widening
At Grade Roadways – West Bank
Approaches & Deck Widening
  Foundations - Westbank
Approaches & Deck Widening
  Foundations - Westbank
Approaches & Deck Widening
  Substructure - Westbank
Approaches & Deck Widening




Substructure -
  Westbank
Approaches & Deck Widening




              Substructure -
                Westbank
Approaches & Deck Widening




                  Substructure -
                    Westbank
Approaches & Deck Widening

                 Substructure -
                   Westbank
Approaches & Deck Widening

                 Substructure -
                   Westbank
Approaches & Deck Widening




Superstructure
 - Westbank
Approaches & Deck Widening
                Superstructure
                 - Westbank
Approaches & Deck Widening

                Superstructure
                 - Westbank
Approaches & Deck Widening
  Superstructure - Westbank
Approaches & Deck Widening
  Superstructure - Westbank
Approaches & Deck Widening
  Superstructure - Westbank
Approaches & Deck Widening
  Superstructure - Westbank
Approaches & Deck Widening
   Substructure – Pier IVA




                              Created using
                             Google SketchUp
Approaches & Deck Widening
   Substructure – Pier IVA
Approaches & Deck Widening
   Substructure – Pier IVA
Approaches & Deck Widening
   Substructure – Pier IVA
Approaches & Deck Widening
   Substructure – Pier IVA
Approaches & Deck Widening
   Substructure – Pier IVA
Acknowledgements
Ray Mumphrey
     Project Manager, Bridge Engineer
      Manager
Jan Grenfell
     Environmental Representative
Hossein Ghara
     Bridge Engineer
Tony Ducote
     Project Management Administrator
Acknowledgements
     J. Bridger
          General Manager
     R. Kollmar
          Chief Engineer
     D. Sponsel
          General Superintendant,
           Bridge
     M. Dumas
          Bridge Supervisor
     A. Marinello
          Chief Engineer (Ret.)
Acknowledgements
    Juan Murillo
    D. McDaniels
    B. Frederick
    T. Todd
    W. Aymond
Design Team
EUSTIS ENGINEER (Geotechnical)
• Gwen Sanders
• William Gwyn

COASTAL ENVIRONMENTS (Environmental)
• Karen Wicker
• Ed Fike
• D.Kelley

Coco Architects (HAER / HABS)
• Wayne L. Coco, AIA

GCR & Associates (Real Estate)
• Gregory Rigamer
• Mona Nosari

Riverlands Surveying
• Stephen Flynn
Design Team – M & M
                         • W. B. Conway           T. A. Cole
                         • D. F. Sorgenfrei       J. A. Martin
                         • Z. Prucz               J. J. Moore
                         • N. Soong           •   R. Mertz
                         • B. E. Peterson     •   R. Jackson
                         • M. L. Sternitzke   •   A. Temeles
                         • Y. Ouyang              J. E. Schade
                           S. P. Carr             B. T. Martin
                           D. A. Kanger       •   L. V. Borden
                           C. J. Ledet        •   G. L. Fasick
Denotes Tulane
                         • G. P. Doyle
   University Graduate     G. P. Taravella
Design Team – M & M (cont)
                            Former Team Members
                              M. Zeihl
                              B. Y. Ikeda
                              B. M. Hassett
                            • J. B. Johnson
                            • F. A. Aksin
                            • F. L. Suthon




Denotes Tulane University
   Graduate
Widening of the Huey P. Long Bridge




       Tulane Engineering
         Forum - 2010

More Related Content

What's hot

Concrete dam lecture 1
Concrete dam lecture 1Concrete dam lecture 1
Concrete dam lecture 1
Vidhi Khokhani
 
Dam construction
Dam constructionDam construction
Dam construction
alizay41
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
Mohammed Salahat
 
New Pacific Metals Corporate Presentation
New Pacific Metals Corporate PresentationNew Pacific Metals Corporate Presentation
New Pacific Metals Corporate Presentation
newpacific
 
Presentation - July 4, 2011
Presentation - July 4, 2011Presentation - July 4, 2011
Presentation - July 4, 2011
newpacificmetals
 

What's hot (18)

4410 8
4410 84410 8
4410 8
 
Body corctd
Body corctdBody corctd
Body corctd
 
Concrete dam lecture 1
Concrete dam lecture 1Concrete dam lecture 1
Concrete dam lecture 1
 
Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01
 
Kinnickinnic River Flood Management and Watercourse Rehabilitation
Kinnickinnic River Flood Management and Watercourse RehabilitationKinnickinnic River Flood Management and Watercourse Rehabilitation
Kinnickinnic River Flood Management and Watercourse Rehabilitation
 
Dam construction
Dam constructionDam construction
Dam construction
 
Drop structure lecture 1
Drop structure lecture 1Drop structure lecture 1
Drop structure lecture 1
 
Ppt of design of dams
Ppt of design of damsPpt of design of dams
Ppt of design of dams
 
SASHTOSoutheastern Association of State Highway and Transportation Officials ...
SASHTOSoutheastern Association of State Highway and Transportation Officials ...SASHTOSoutheastern Association of State Highway and Transportation Officials ...
SASHTOSoutheastern Association of State Highway and Transportation Officials ...
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
 
New Pacific Metals Corporate Presentation
New Pacific Metals Corporate PresentationNew Pacific Metals Corporate Presentation
New Pacific Metals Corporate Presentation
 
Presentation - July 4, 2011
Presentation - July 4, 2011Presentation - July 4, 2011
Presentation - July 4, 2011
 
Dam & Reservoir Structure
Dam & Reservoir StructureDam & Reservoir Structure
Dam & Reservoir Structure
 
Reservoir Dam Safety
Reservoir Dam SafetyReservoir Dam Safety
Reservoir Dam Safety
 
Dam
DamDam
Dam
 
DAM ENGINEERING
DAM ENGINEERINGDAM ENGINEERING
DAM ENGINEERING
 
Dam and types of dam with site selection
Dam and types of dam with site selectionDam and types of dam with site selection
Dam and types of dam with site selection
 
Pohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration ProjectPohick Creek Tributary Stream Restoration Project
Pohick Creek Tributary Stream Restoration Project
 

Viewers also liked (11)

KwaNogawu village Pedestrian Bridge Proposal
KwaNogawu village Pedestrian Bridge ProposalKwaNogawu village Pedestrian Bridge Proposal
KwaNogawu village Pedestrian Bridge Proposal
 
Building Construction II: Project One
Building Construction II: Project OneBuilding Construction II: Project One
Building Construction II: Project One
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Final Presentation (Balsa Wood Bridge Design)
Final Presentation (Balsa Wood Bridge Design)Final Presentation (Balsa Wood Bridge Design)
Final Presentation (Balsa Wood Bridge Design)
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
Bridge
BridgeBridge
Bridge
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridge
 

Similar to Widening of the Huey P. Long Bridge (9)

Bridge project
Bridge projectBridge project
Bridge project
 
Bridge project
Bridge projectBridge project
Bridge project
 
Bridgeprojectsource online-120723110339-phpapp02
Bridgeprojectsource online-120723110339-phpapp02Bridgeprojectsource online-120723110339-phpapp02
Bridgeprojectsource online-120723110339-phpapp02
 
ASCEMLSTPRESENTATION 05-06-03.PPT
ASCEMLSTPRESENTATION 05-06-03.PPTASCEMLSTPRESENTATION 05-06-03.PPT
ASCEMLSTPRESENTATION 05-06-03.PPT
 
Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012
 
City Council Feb. 5, 2013 river project update
City Council Feb. 5, 2013 river project updateCity Council Feb. 5, 2013 river project update
City Council Feb. 5, 2013 river project update
 
Hood Canal Bridge Demolition
Hood Canal Bridge DemolitionHood Canal Bridge Demolition
Hood Canal Bridge Demolition
 
Hood Canal Bridge Demolition, Pontoons R, S, T
Hood Canal Bridge Demolition, Pontoons R, S, THood Canal Bridge Demolition, Pontoons R, S, T
Hood Canal Bridge Demolition, Pontoons R, S, T
 
CPAC Meeting 6-12-06
CPAC Meeting 6-12-06CPAC Meeting 6-12-06
CPAC Meeting 6-12-06
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 

Widening of the Huey P. Long Bridge