Elgin Country Estate Project Summary 2016-06-07
Rezoning Application and further activities to present date
Property Description:
Remainder of Farm No 296, and Portion 11 of Farm No 287 Grabouw
Current Zoning: Agricultural
Property Size: 16.65 Hectares
Proposed Development:
(A) 53 Group Housing units with density of 15 units per ha and an average erf size of 407m2
(B) 62 Single Residential houseson62 ervenwitha densityof 5 units per ha and average size of 1160m2
Site Location:
Approximately 2km north-west of the town of Grabouw
Geographical Co-ordinates: Latitude 34 ̊ 15’ 30” South
Longitude 19 ̊ 11’ 30” East
SG 21 Digit Code of the property: C01300000000029600000
Locality Map - Google Earth Images
Proposed Land Utilization
Working Plan
Date of ROD: 2011-10-19
Note:
Public Participation Process was complied with and provision for appeal by IAAP with no objections.
Conditions Imposed:
Integrated Waste Management Approach; based on waste minimization, incorporating reduction,
recycling and reuse and responsible disposal where appropriate. Separation of glass, plastic, tin and
paper waste materials.
Heritage and archaeological finds possibly occurring must be appropriately dealt with as set out.
Alien vegetation is to be removed in the development process.
The development must incorporate energy saving techniques.
The development must incorporate water saving techniques.
No construction work, earthworks or vegetation clearing may commence within the Klipdrif Valley
Corridor prior to approval from the Department of Water Affairs.
No connection to the municipal water or sewer system may be made until completion of the
TheewaterskloofWWTWand the waterinfrastructure upgrade,tobe confirmedbywrittenconfirmation
of bulk services capacity from the municipality.
Authorization granted on 31 March 2011 and waste licence issued by Dept of Environmental Affairs on
23 August 2011.
The upgrade has been completed within the given estimated time frame of end 2012, a current letter
confirming this status was requested from the local Theewaterskloof Municipality and the letter is
attached hereto for ease of reference..
Environmental Control Officer, suitably qualified and experienced to be appointed by developer.
NB! EIA exemptiongranteddue tothe Deptbeingadequately comfortable with Aurecon’s competence
in managing the development process!
NEMA Principles of the NEMA section24(7) have been observed in the integrated approach to this
application, biophysical, social and economic.
Scope of Works:
A 53 Group Housing units with density of 15 units per ha and an average erf size of 407m2
B 62 Single Residential houses on 62 erven with a density of 5 units per ha and average size of 1160m2
Offices on a stand of 3755m2
Private Open Space of approximately 3.5hectares
Roads of approximately 1.5hectares
RetentionPondof 1.1hectareswithcapacityof 5000m3 at depthof 1m, with525mm discharge pipe into
the Klipdrif River.
Engineering Services:
Alternatives Considered:
Alternative( 1) Preferred by client but not authorised!
Construction of a on-site sewer pump station
Construction of a 160mm sewer line to cross underneath the Klipdrif River and extend for 160m to
connect with the Molteno pump station along Arbor Drive road reserve for connection to the
Theewaterskloof WWTW provided capacity is available.
Constructionof a 160mm waterline fromthe existingwatermaininArborDrive acrossthe Klipdrif River
to the development site.
This alternative will necessitate the following:
Abstraction of 109m3 of water from the boreholes on the northern border of the site.
Construction of a water purification plant on site to ensure that water is purified to potable water
standards.
Construction of a water reservoir with a capacity of 300m3 at the south-eastern corner of the site to
ensure sufficient water capacity to meet the expected demand for a 48 hour period.
Constructionof a on-site predesigned approved unit WWTW with 30 000m3 per annum capacity, to be
locatedat the south-easterncornerof the site.Treatedeffluenttobe releasedintothe Klipdrif Riverand
sludge to be removed to the municipal sludge drying beds.
Caution!!! There is risk of environmental contamination of the Klipdrif River.
Alternative (2) (Off-site Services only) Authorised
Constructionof a sewerpumpstationonadjacentsite Erf 116 with160mm sewermain extending 310m
intotal, across the southernborder of the proposed site and crossing under the Klipdrif River adjacent
to Erf 69, along municipal land and connecting to the municipal pump station on Industria Rd for
disposal into the Theewaterskloof WWTW.
Construction of a new 160mm water pipeline from the water main on Industria Rd extending in total
310m across adjacent municipal land and under the Klipdrif River across the southern border of the
property into the proposed site.
The site fallswithin the 1:100 year flood line. The Klipdrif River will be widened along the eastern and
southeasternboundariesof the FarmNo.296 from approximately8m to approximately 18m on the left
bankto ensure thatthe proposedsite fallsoutside the 1:100 yearfloodline.The proposeddevelopment
also entails the infilling of the north-eastern corner of the property. The Klipdrif River will also be
widened along the southern boundary of Portion 11 of the Farm No. 287, for a distance of
approximately 300m.
Engineering Services Design:
The EngineeringServicesDesign forthe authorisedalternative (2) asabove,andmodificationof the river
bank has to date not yet been done, this will be completed by Aurecon in due course.
Proposed Mitigation Measures:
Temporary River Diversion
The river flow is to be diverted past the construction area via a temporary pipeline.
The dry stream bed is to be covered with a geo-textile fabric that can be removed after construction,
leaving the streambed clean.
Silt traps to be placed on top of the dry protected stream bed to catch any water pumped from
excavations to drop out any silt before the water is returned to the river downstream.
Water pumpedfromexcavationsmustbe pumpedtosediment dams situated well away from the river
where the dams can be allowed to overflow through the existing plant cover back to the river. This
process must be well managed to ensure that no erosion takes place during the process.
Silting and bank erosion
Adequate silting fences will be required to protect embankments where construction is to take place.
Walkwaysinthe formof boardwalksare to be constructedonthe river bank in the construction area, in
such a way thatworkersdo notwalkor handle equipmentdirectly on the river bank or in the river bed;
The constructionsite shouldbe fenced in such a way that the main stream and surrounds are managed
as a no-go area.
No eating, ablutions or latrines, or casual urination is to be allowed in the construction site area.
Drinking water and water for construction is to be abstracted from the river at one designated point
only and piped to the site camp and or the construction site. No one should be allowed to take water
from the river for any reason at any other point than the designated point.
Abstraction of water should conform to all regulations as determined by the Department of Water
Affairs.
Disruption of the flow of the existing storm water to the river
All storm water discharge to the area is to be diverted down-stream of the new works area before
construction work commences, even if construction work is not undertaken during the rainy season.
Pollution from construction works
All plant in the area to have drip trays.
No servicing of plant to be allowed anywhere except on the service area at the site camp.
Refuelling of plant to make use of drip trays to prevent spillages.
All cement work to be carried out using cement trays.
Batching plant protection to be effected as per the recommendations for the eastern portal works.
Site camp management including oil traps, drip trays and conservancy tanks as per the western
constructionsite management recommendationsandtoinclude sitingof the camp as far away from the
river environment as possible.
The entire construction area and construction camp should have enough suitable refuse removal
containersanda dailyrefuse cleanupsystem in place to prevent any litter pollution from entering the
river.
Geotechnical Conditions:
Class C1 and C2 soil types only.
Summary of Findings:
1) The proposed site for the development can be divided into two distinct areas on
the basis of the surface gradient and layout of the residential estate, namely
Area A and Area B.
• Area A slopes gently downwards to the south, towards the Klipdrift River
and is vegetated with grasses and lined with small to medium apple trees.
• Area B is level and has been cultivated with apple and pear trees of
between 2 m and 4 m in height. Studies have indicated that, under
existing conditions, a large portion of this area would be inundated during
1 in 50 year flood events.
The residential site class designation (as adopted by NHBRC4) of the soil profile for
the proposed development site is shown to be:
• Area A: C1
• Area B: C1/C2
C1 - Compressible and potentially collapsible soils with expected range of total soil
movement of 5 mm to 10 mm.
C2 - Compressible and potentially collapsible soils with expected range of total soil
movement of greater than 10 mm.
Recommendations:
(i) Flooding: The hydrological study carried out by Ninham Shand has shown that
improvements to the stream and river channels on the northern and western
boundaries of the site together with localised infilling of the of the north-eastern
corner of the site, would prevent inundation from floods up to the 1 in 100 year
event.
Foundations:
The consistency of the soils underlying the site is very variable with loose to very loose material.
The leastriskoptionfor foundingthe one andtwostoreyresidential unitswillbe touse raft foundations
in Area B. Units in Area A could be founded on lightly reinforced footings after having wetted and
compactedthe foundationtrenches.An alternative approach to Area B, will be to use raft foundations
along the western edge of the site and along the riverfront properties, along the southern edge. The
units within the central portion of area B may be founded on spread footings at depth of 0.5m after
having prepared the founding material by excavation to 800mm, compacting the trenches and
reinstating,withgoodcompaction,usingacceptableimported fill (free of organic matter), in layers not
exceeding150mm to above the -50mm proposedfounding level. Further trial holes and testing will be
requiredtoconfirmthe insituconditionsalongthe easternedge evenbefore the strip footing option is
used, (in place of raft foundations).
Excavation:
Excavation down to 1.5m depth will be in soft materials. Groundwater was encountered at depths of
between 1.3m and 2.5m below natural ground level. However the water table may rise during the
wetter, winter months and, should construction be carried out during this time of year, might lead to
the inundation of foundation excavations.
The in situ sandy materials are classified as G7/G8 in accordance with TRH 14, Guideline for Road
Construction Materials and are of marginal quality in respect to their suitability as selected layers for
road pavements.
The complete geotechnical report is available on request.
----------------------------------------------------------------------------------------------------------------------------------------
ELGIN COUNTRY ESTATE – INVESTMENT OPPORTUNITY IN A RESIDENTIAL DEVELOPMENT LESS THAN
ONE HOUR’S DRIVE FROM CAPE TOWN
DESCRIPTION: CYCLING & EQUESTRIAN ESTATE IN THE MOUNTAIN BIKING& OUTDOOR
ACTIVITIESMECCA OF THE WESTERN CAPE
TYPE OF TRANSACTION: RESIDENTIALLAND BENEFICIATION &SALEOF ERVEN FORHOUSE
CONSTRUCTION
LOCATION: GRABOUW, WESTERN CAPESOUTH AFRICA
DESCRIPTION OFAREA: ELGIN VALLEY, 2000 HA FORESTON THE EDGE OFTHE EIKENHOFDAM,
HOME TO CAPEMILE TRIATHLON EVENT
UNIQUE: ONLY RESIDENTIALDEVELOPMENT IN THE AREA
FEATURES: HIGHLY SOUGHT AFTER PRISTINELOCATION WITH RIVERFRONTAGE
BICYCLE ANDHORSE TRAILS MEMBERSHIP OF GRABOUW COUNTRY CLUB
ERF SIZE: 16.65 HECTARES
DISTANCES:
GORDON’S BAY: 10KM
CAPE TOWN INTER AIRPORT: 53KM
NOTE: THE DISTANCE FROMCAPE TOWN CITY TO CAPE TOWN INTERNATIONAL
AIRPORT IS 20KM
WEBSITE: www.elgincountryestate.co.za
STATUS OF LAND:
APPROVAL HAS BEEN GRANTED FOR:
 CONSOLIDATION OF TWO ERVEN
 SUBDIVISION
 REZONING
 AMENDMENT OF THE SPATIAL DEVELOPMENT FRAMEWORK (GRABOUW)
 APPROVAL OF HOMEOWNERS ASSOCIATION
PROJECT STATUS:
 ALL PLANNING & HOUSE DESIGN WORK COMPLETE
 INTERNAL SERVICES TO BE INSTALLED
 BULK SERVICES AVAILABLE AT BOUNDARY
 ELECTRICAL CAPACITY AVAILABLE
PROCLAMATION: ONCEINTERNALSERVICESARE INSTALLED
INVESTMENTAMOUNT: R5 MILLION
SECURITY: COVERINGMORTGAGE BOND
PARTICIPATION: FIVEPREFERENCE SHARESOF R 5 MILLION IN ELGIN COUNTRY ESTATE PTY
LTD
RETURN ON INVESTMENT: 20% (UNDERWRITTEN BY DEVELOPER) IN CASH OR IN THE FORMOF A
HOUSE
MECHANISM: PREFERENTIALPAYMENT OUT OFFIRST SURPLUS AFTER COSTS
PROJECT DETAIL:
NUMBER OF STANDS: 115
NUMBER OF 1500 SQMSTANDS: 53
NUMBER OF 400 SQM STANDS: 62
PRESALES: 49
BALANCEOF STANDSTO BE SOLD:
1500 SQM 13
400SQM 53
TOTAL INVESTMENTTO DATE: R19 MILLION (AFS2104)
AUDITED FINANCIALSTATEMENTS: FEBRUARY 2014
FINANCIALSTATUS: DEBT FREE
PROFESSIONAL TEAM:
CONSULTINGENGINEERS: AURECON
TOWNPLANNERS: URBAN DYNAMICSWESTERN CAPE
PROJECTMANAGERS: RAUBICON
ARCHITECTS: DEREK KOCKARCHITECTS

More Related Content

What's hot

Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍dreamsion
 
GREATER CLEVELAND AREA - NORTHEAST OHIO REGIONAL SEWER DISTRICT
GREATER CLEVELAND AREA - NORTHEAST OHIO REGIONAL SEWER DISTRICTGREATER CLEVELAND AREA - NORTHEAST OHIO REGIONAL SEWER DISTRICT
GREATER CLEVELAND AREA - NORTHEAST OHIO REGIONAL SEWER DISTRICTU.S. Water Alliance
 
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...Michael Hewitt, GISP
 
Feb 11 2014 public meeting
Feb 11 2014 public meetingFeb 11 2014 public meeting
Feb 11 2014 public meetingMCDEP
 
Teesta Barrage at Dalia
Teesta Barrage at DaliaTeesta Barrage at Dalia
Teesta Barrage at DaliaAbir Mohammad
 
Ganges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation ProjectGanges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation ProjectSeemanto
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Michael Hewitt, GISP
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012Mike Vernon
 
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Dean Rist
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaaJim Werner
 
Ecological networking of two quarries by Heidelberger Biotopschutz (Germany)
Ecological networking of two quarries by Heidelberger Biotopschutz (Germany)Ecological networking of two quarries by Heidelberger Biotopschutz (Germany)
Ecological networking of two quarries by Heidelberger Biotopschutz (Germany)Quarry Life Award by HeidelbergCement
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNew Jersey Future
 
Observed Impacts of Marcellus Shale Drilling on Agricultural Lands
Observed Impacts of Marcellus Shale Drilling on Agricultural LandsObserved Impacts of Marcellus Shale Drilling on Agricultural Lands
Observed Impacts of Marcellus Shale Drilling on Agricultural LandsGeorge_Frantz
 
Najafgarh Jheel (Lake) Revival, Delhi (India)
Najafgarh Jheel (Lake) Revival, Delhi (India)Najafgarh Jheel (Lake) Revival, Delhi (India)
Najafgarh Jheel (Lake) Revival, Delhi (India)Purushottam Uttarwar
 
The Marcellus Shale: Environmental Issues for Landowners
The Marcellus Shale: Environmental Issues for LandownersThe Marcellus Shale: Environmental Issues for Landowners
The Marcellus Shale: Environmental Issues for LandownersDan Arthur
 

What's hot (19)

Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍Singapore Managing   Stormwater For Water Resource And Flood Control  水资源介绍
Singapore Managing Stormwater For Water Resource And Flood Control 水资源介绍
 
Teesta Barrage Project
Teesta Barrage ProjectTeesta Barrage Project
Teesta Barrage Project
 
GREATER CLEVELAND AREA - NORTHEAST OHIO REGIONAL SEWER DISTRICT
GREATER CLEVELAND AREA - NORTHEAST OHIO REGIONAL SEWER DISTRICTGREATER CLEVELAND AREA - NORTHEAST OHIO REGIONAL SEWER DISTRICT
GREATER CLEVELAND AREA - NORTHEAST OHIO REGIONAL SEWER DISTRICT
 
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
 
Feb 11 2014 public meeting
Feb 11 2014 public meetingFeb 11 2014 public meeting
Feb 11 2014 public meeting
 
Teesta Barrage at Dalia
Teesta Barrage at DaliaTeesta Barrage at Dalia
Teesta Barrage at Dalia
 
Gravel pits sept_2010
Gravel pits sept_2010Gravel pits sept_2010
Gravel pits sept_2010
 
Ganges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation ProjectGanges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation Project
 
NYWEA 2012
NYWEA 2012NYWEA 2012
NYWEA 2012
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
 
Research uo j_foe_jaffna lagoons
Research uo j_foe_jaffna lagoonsResearch uo j_foe_jaffna lagoons
Research uo j_foe_jaffna lagoons
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
 
Missouri summary ndaa
Missouri summary ndaaMissouri summary ndaa
Missouri summary ndaa
 
Ecological networking of two quarries by Heidelberger Biotopschutz (Germany)
Ecological networking of two quarries by Heidelberger Biotopschutz (Germany)Ecological networking of two quarries by Heidelberger Biotopschutz (Germany)
Ecological networking of two quarries by Heidelberger Biotopschutz (Germany)
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 Forbes
 
Observed Impacts of Marcellus Shale Drilling on Agricultural Lands
Observed Impacts of Marcellus Shale Drilling on Agricultural LandsObserved Impacts of Marcellus Shale Drilling on Agricultural Lands
Observed Impacts of Marcellus Shale Drilling on Agricultural Lands
 
Najafgarh Jheel (Lake) Revival, Delhi (India)
Najafgarh Jheel (Lake) Revival, Delhi (India)Najafgarh Jheel (Lake) Revival, Delhi (India)
Najafgarh Jheel (Lake) Revival, Delhi (India)
 
The Marcellus Shale: Environmental Issues for Landowners
The Marcellus Shale: Environmental Issues for LandownersThe Marcellus Shale: Environmental Issues for Landowners
The Marcellus Shale: Environmental Issues for Landowners
 

Viewers also liked

Viewers also liked (9)

Logo ex a lumnos colegio san jose
Logo ex  a lumnos colegio san joseLogo ex  a lumnos colegio san jose
Logo ex a lumnos colegio san jose
 
Gohmann In Providence Vision Winter 2015
Gohmann In Providence Vision Winter 2015Gohmann In Providence Vision Winter 2015
Gohmann In Providence Vision Winter 2015
 
CompTIA N+ Certificate
CompTIA N+ CertificateCompTIA N+ Certificate
CompTIA N+ Certificate
 
Lettre Recommandation Afr
Lettre Recommandation AfrLettre Recommandation Afr
Lettre Recommandation Afr
 
pRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationpRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - Substation
 
Singular and plural teórico
Singular and plural teóricoSingular and plural teórico
Singular and plural teórico
 
VOL33N08-7A-EDU
VOL33N08-7A-EDUVOL33N08-7A-EDU
VOL33N08-7A-EDU
 
CYQ LEVEL 3 IN PERSONAL TRAINING
CYQ LEVEL 3 IN PERSONAL TRAININGCYQ LEVEL 3 IN PERSONAL TRAINING
CYQ LEVEL 3 IN PERSONAL TRAINING
 
Allotropes
AllotropesAllotropes
Allotropes
 

Similar to Elgin Country Estate Project Summary as on 20160606

Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongWater, Land and Ecosystems (WLE)
 
EIA Presentation.pptx
EIA Presentation.pptxEIA Presentation.pptx
EIA Presentation.pptxEmranKhandker
 
EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVERvikas rahangdale
 
L14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxL14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxPRACHI DESSAI
 
The Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Star Newspaper
 
Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Robert Sharpe
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plantRick Nabett
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Fu Michael Justin
 
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PAHarry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PAMichael Hewitt, GISP
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsAndrea Drabicki
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptRaghuGhu1
 
Enviro_Phase II Mitigations Recs
Enviro_Phase II Mitigations RecsEnviro_Phase II Mitigations Recs
Enviro_Phase II Mitigations RecsAndrea Drabicki
 
Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - RajasthanUdip Das
 
design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2Arvind Kumar
 
Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA) Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA) Monika Arora
 
Feb 11 2014 public meeting show
Feb 11 2014 public meeting showFeb 11 2014 public meeting show
Feb 11 2014 public meeting showMCDEP
 

Similar to Elgin Country Estate Project Summary as on 20160606 (20)

Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience Mekong
 
EIA Presentation.pptx
EIA Presentation.pptxEIA Presentation.pptx
EIA Presentation.pptx
 
EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVER
 
Final PPT.pptx
Final PPT.pptxFinal PPT.pptx
Final PPT.pptx
 
Virginia
VirginiaVirginia
Virginia
 
L14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxL14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptx
 
The Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project Report
 
Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plant
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PAHarry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
Harry E. Coal Waste Pile Reclamation Project in Swoyersville, PA
 
Wetland Mitigation Recommendaitons
Wetland Mitigation RecommendaitonsWetland Mitigation Recommendaitons
Wetland Mitigation Recommendaitons
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
 
Enviro_Phase II Mitigations Recs
Enviro_Phase II Mitigations RecsEnviro_Phase II Mitigations Recs
Enviro_Phase II Mitigations Recs
 
Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - Rajasthan
 
design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2
 
Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA) Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA)
 
Hydrology
HydrologyHydrology
Hydrology
 
Feb 11 2014 public meeting show
Feb 11 2014 public meeting showFeb 11 2014 public meeting show
Feb 11 2014 public meeting show
 

More from John M Riggs

Alch18.01 precious metalsintegritylbma financialcrimebrochure
Alch18.01 precious metalsintegritylbma financialcrimebrochureAlch18.01 precious metalsintegritylbma financialcrimebrochure
Alch18.01 precious metalsintegritylbma financialcrimebrochureJohn M Riggs
 
World directory of lbma accredited refineries (summer edition, 2018) (1)
World directory of lbma accredited refineries (summer edition, 2018) (1)World directory of lbma accredited refineries (summer edition, 2018) (1)
World directory of lbma accredited refineries (summer edition, 2018) (1)John M Riggs
 
Alch18.01 precious metals integrity lbma financial crime brochure
Alch18.01 precious metals integrity lbma financial crime brochureAlch18.01 precious metals integrity lbma financial crime brochure
Alch18.01 precious metals integrity lbma financial crime brochureJohn M Riggs
 
Gold hong kong hkma facts and procedures
Gold  hong kong    hkma facts and proceduresGold  hong kong    hkma facts and procedures
Gold hong kong hkma facts and proceduresJohn M Riggs
 
Aaa global precious metals code (1)
Aaa global precious metals code (1)Aaa global precious metals code (1)
Aaa global precious metals code (1)John M Riggs
 
Aaa gd rules 2013 july
Aaa gd rules  2013 julyAaa gd rules  2013 july
Aaa gd rules 2013 julyJohn M Riggs
 
Aaa alch18.01 precious metals integrity lbma financial crime brochure (1)
Aaa alch18.01 precious metals integrity lbma financial crime brochure (1)Aaa alch18.01 precious metals integrity lbma financial crime brochure (1)
Aaa alch18.01 precious metals integrity lbma financial crime brochure (1)John M Riggs
 
All gold deals were regulated by the BIS
All gold deals were regulated by the BISAll gold deals were regulated by the BIS
All gold deals were regulated by the BISJohn M Riggs
 
Arch guide (1) Guide to the BIS archives
Arch guide (1) Guide to the BIS archivesArch guide (1) Guide to the BIS archives
Arch guide (1) Guide to the BIS archivesJohn M Riggs
 
Steuerbefreiung bei der einfuhr / Tax exemptions on importation
Steuerbefreiung bei der einfuhr / Tax exemptions on importationSteuerbefreiung bei der einfuhr / Tax exemptions on importation
Steuerbefreiung bei der einfuhr / Tax exemptions on importationJohn M Riggs
 
Lbma changes in the price governance (1)
Lbma changes in the price governance (1)Lbma changes in the price governance (1)
Lbma changes in the price governance (1)John M Riggs
 
Raventech & University of North West presentation - emperors - 9 nov 2016-...
Raventech & University of  North West   presentation - emperors - 9 nov 2016-...Raventech & University of  North West   presentation - emperors - 9 nov 2016-...
Raventech & University of North West presentation - emperors - 9 nov 2016-...John M Riggs
 
Capepartymanifesto on 2011 110315061455-
Capepartymanifesto on 2011 110315061455-Capepartymanifesto on 2011 110315061455-
Capepartymanifesto on 2011 110315061455-John M Riggs
 
5 wear check naf-tech diesel - sans 342 report
5 wear check naf-tech diesel - sans 342 report5 wear check naf-tech diesel - sans 342 report
5 wear check naf-tech diesel - sans 342 reportJohn M Riggs
 
4 diesel electric serv - test report 090827
4 diesel electric serv - test report 0908274 diesel electric serv - test report 090827
4 diesel electric serv - test report 090827John M Riggs
 
3 cummins gensets naf-tech tests 09 11 20
3 cummins gensets naf-tech tests 09 11 203 cummins gensets naf-tech tests 09 11 20
3 cummins gensets naf-tech tests 09 11 20John M Riggs
 
Improve fuel consumption with Nanotechnology
Improve fuel consumption with Nanotechnology Improve fuel consumption with Nanotechnology
Improve fuel consumption with Nanotechnology John M Riggs
 
160630 lesedi la rona diamond fails to sell at auction (1)
160630 lesedi la rona diamond fails to sell at auction (1)160630 lesedi la rona diamond fails to sell at auction (1)
160630 lesedi la rona diamond fails to sell at auction (1)John M Riggs
 

More from John M Riggs (20)

Alch18.01 precious metalsintegritylbma financialcrimebrochure
Alch18.01 precious metalsintegritylbma financialcrimebrochureAlch18.01 precious metalsintegritylbma financialcrimebrochure
Alch18.01 precious metalsintegritylbma financialcrimebrochure
 
World directory of lbma accredited refineries (summer edition, 2018) (1)
World directory of lbma accredited refineries (summer edition, 2018) (1)World directory of lbma accredited refineries (summer edition, 2018) (1)
World directory of lbma accredited refineries (summer edition, 2018) (1)
 
Alch18.01 precious metals integrity lbma financial crime brochure
Alch18.01 precious metals integrity lbma financial crime brochureAlch18.01 precious metals integrity lbma financial crime brochure
Alch18.01 precious metals integrity lbma financial crime brochure
 
Gold hong kong hkma facts and procedures
Gold  hong kong    hkma facts and proceduresGold  hong kong    hkma facts and procedures
Gold hong kong hkma facts and procedures
 
Aaa pmc 2018
Aaa pmc 2018Aaa pmc 2018
Aaa pmc 2018
 
Aaa good delivery
Aaa good deliveryAaa good delivery
Aaa good delivery
 
Aaa global precious metals code (1)
Aaa global precious metals code (1)Aaa global precious metals code (1)
Aaa global precious metals code (1)
 
Aaa gd rules 2013 july
Aaa gd rules  2013 julyAaa gd rules  2013 july
Aaa gd rules 2013 july
 
Aaa alch18.01 precious metals integrity lbma financial crime brochure (1)
Aaa alch18.01 precious metals integrity lbma financial crime brochure (1)Aaa alch18.01 precious metals integrity lbma financial crime brochure (1)
Aaa alch18.01 precious metals integrity lbma financial crime brochure (1)
 
All gold deals were regulated by the BIS
All gold deals were regulated by the BISAll gold deals were regulated by the BIS
All gold deals were regulated by the BIS
 
Arch guide (1) Guide to the BIS archives
Arch guide (1) Guide to the BIS archivesArch guide (1) Guide to the BIS archives
Arch guide (1) Guide to the BIS archives
 
Steuerbefreiung bei der einfuhr / Tax exemptions on importation
Steuerbefreiung bei der einfuhr / Tax exemptions on importationSteuerbefreiung bei der einfuhr / Tax exemptions on importation
Steuerbefreiung bei der einfuhr / Tax exemptions on importation
 
Lbma changes in the price governance (1)
Lbma changes in the price governance (1)Lbma changes in the price governance (1)
Lbma changes in the price governance (1)
 
Raventech & University of North West presentation - emperors - 9 nov 2016-...
Raventech & University of  North West   presentation - emperors - 9 nov 2016-...Raventech & University of  North West   presentation - emperors - 9 nov 2016-...
Raventech & University of North West presentation - emperors - 9 nov 2016-...
 
Capepartymanifesto on 2011 110315061455-
Capepartymanifesto on 2011 110315061455-Capepartymanifesto on 2011 110315061455-
Capepartymanifesto on 2011 110315061455-
 
5 wear check naf-tech diesel - sans 342 report
5 wear check naf-tech diesel - sans 342 report5 wear check naf-tech diesel - sans 342 report
5 wear check naf-tech diesel - sans 342 report
 
4 diesel electric serv - test report 090827
4 diesel electric serv - test report 0908274 diesel electric serv - test report 090827
4 diesel electric serv - test report 090827
 
3 cummins gensets naf-tech tests 09 11 20
3 cummins gensets naf-tech tests 09 11 203 cummins gensets naf-tech tests 09 11 20
3 cummins gensets naf-tech tests 09 11 20
 
Improve fuel consumption with Nanotechnology
Improve fuel consumption with Nanotechnology Improve fuel consumption with Nanotechnology
Improve fuel consumption with Nanotechnology
 
160630 lesedi la rona diamond fails to sell at auction (1)
160630 lesedi la rona diamond fails to sell at auction (1)160630 lesedi la rona diamond fails to sell at auction (1)
160630 lesedi la rona diamond fails to sell at auction (1)
 

Recently uploaded

3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGIPanoram CGI
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|AkshayJoshi575980
 
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...asmaqueen5
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdfManishSaxena95
 
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfBabyrudram
 
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhidelhimodel235
 
Mahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdfMahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdfBabyrudram
 
Properties for Sale in Istanbul with Schools and Parks | Antalya Development
Properties for Sale in Istanbul with Schools and Parks | Antalya DevelopmentProperties for Sale in Istanbul with Schools and Parks | Antalya Development
Properties for Sale in Istanbul with Schools and Parks | Antalya DevelopmentAntalya Development
 
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In DelhiLow Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhiasmaqueen5
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Venturessheltercareglobal
 
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdfManishSaxena95
 
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhidelhimodel235
 
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time TogetherShapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Togetheraidasheikh47
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)Delhi Call girls
 
M3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, NoidaM3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, Noidasarak0han45400
 
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...asmaqueen5
 
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhidelhimodel235
 
2k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 92055419142k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 9205541914Delhi Call girls
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRasmaqueen5
 

Recently uploaded (20)

3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI3D Architectural Rendering Company by Panoram CGI
3D Architectural Rendering Company by Panoram CGI
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
 
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
Call girls in new Ashok NagarDelhi꧁ 8447779280꧂ Escort Service Women Seeking ...
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
 
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
 
Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdf
 
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
 
Mahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdfMahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdf
 
Properties for Sale in Istanbul with Schools and Parks | Antalya Development
Properties for Sale in Istanbul with Schools and Parks | Antalya DevelopmentProperties for Sale in Istanbul with Schools and Parks | Antalya Development
Properties for Sale in Istanbul with Schools and Parks | Antalya Development
 
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In DelhiLow Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
 
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
 
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 3 Delhi (Call Girls) Delhi
 
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time TogetherShapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
 
M3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, NoidaM3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, Noida
 
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
 
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
 
2k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 92055419142k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 9205541914
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
 

Elgin Country Estate Project Summary as on 20160606

  • 1. Elgin Country Estate Project Summary 2016-06-07 Rezoning Application and further activities to present date Property Description: Remainder of Farm No 296, and Portion 11 of Farm No 287 Grabouw Current Zoning: Agricultural Property Size: 16.65 Hectares Proposed Development: (A) 53 Group Housing units with density of 15 units per ha and an average erf size of 407m2 (B) 62 Single Residential houseson62 ervenwitha densityof 5 units per ha and average size of 1160m2 Site Location: Approximately 2km north-west of the town of Grabouw Geographical Co-ordinates: Latitude 34 ̊ 15’ 30” South Longitude 19 ̊ 11’ 30” East SG 21 Digit Code of the property: C01300000000029600000 Locality Map - Google Earth Images
  • 3. Date of ROD: 2011-10-19 Note: Public Participation Process was complied with and provision for appeal by IAAP with no objections. Conditions Imposed: Integrated Waste Management Approach; based on waste minimization, incorporating reduction, recycling and reuse and responsible disposal where appropriate. Separation of glass, plastic, tin and paper waste materials. Heritage and archaeological finds possibly occurring must be appropriately dealt with as set out. Alien vegetation is to be removed in the development process. The development must incorporate energy saving techniques. The development must incorporate water saving techniques.
  • 4. No construction work, earthworks or vegetation clearing may commence within the Klipdrif Valley Corridor prior to approval from the Department of Water Affairs. No connection to the municipal water or sewer system may be made until completion of the TheewaterskloofWWTWand the waterinfrastructure upgrade,tobe confirmedbywrittenconfirmation of bulk services capacity from the municipality. Authorization granted on 31 March 2011 and waste licence issued by Dept of Environmental Affairs on 23 August 2011. The upgrade has been completed within the given estimated time frame of end 2012, a current letter confirming this status was requested from the local Theewaterskloof Municipality and the letter is attached hereto for ease of reference.. Environmental Control Officer, suitably qualified and experienced to be appointed by developer. NB! EIA exemptiongranteddue tothe Deptbeingadequately comfortable with Aurecon’s competence in managing the development process! NEMA Principles of the NEMA section24(7) have been observed in the integrated approach to this application, biophysical, social and economic. Scope of Works: A 53 Group Housing units with density of 15 units per ha and an average erf size of 407m2 B 62 Single Residential houses on 62 erven with a density of 5 units per ha and average size of 1160m2 Offices on a stand of 3755m2 Private Open Space of approximately 3.5hectares Roads of approximately 1.5hectares RetentionPondof 1.1hectareswithcapacityof 5000m3 at depthof 1m, with525mm discharge pipe into the Klipdrif River. Engineering Services: Alternatives Considered: Alternative( 1) Preferred by client but not authorised! Construction of a on-site sewer pump station Construction of a 160mm sewer line to cross underneath the Klipdrif River and extend for 160m to connect with the Molteno pump station along Arbor Drive road reserve for connection to the Theewaterskloof WWTW provided capacity is available. Constructionof a 160mm waterline fromthe existingwatermaininArborDrive acrossthe Klipdrif River to the development site.
  • 5. This alternative will necessitate the following: Abstraction of 109m3 of water from the boreholes on the northern border of the site. Construction of a water purification plant on site to ensure that water is purified to potable water standards. Construction of a water reservoir with a capacity of 300m3 at the south-eastern corner of the site to ensure sufficient water capacity to meet the expected demand for a 48 hour period. Constructionof a on-site predesigned approved unit WWTW with 30 000m3 per annum capacity, to be locatedat the south-easterncornerof the site.Treatedeffluenttobe releasedintothe Klipdrif Riverand sludge to be removed to the municipal sludge drying beds. Caution!!! There is risk of environmental contamination of the Klipdrif River. Alternative (2) (Off-site Services only) Authorised Constructionof a sewerpumpstationonadjacentsite Erf 116 with160mm sewermain extending 310m intotal, across the southernborder of the proposed site and crossing under the Klipdrif River adjacent to Erf 69, along municipal land and connecting to the municipal pump station on Industria Rd for disposal into the Theewaterskloof WWTW. Construction of a new 160mm water pipeline from the water main on Industria Rd extending in total 310m across adjacent municipal land and under the Klipdrif River across the southern border of the property into the proposed site. The site fallswithin the 1:100 year flood line. The Klipdrif River will be widened along the eastern and southeasternboundariesof the FarmNo.296 from approximately8m to approximately 18m on the left bankto ensure thatthe proposedsite fallsoutside the 1:100 yearfloodline.The proposeddevelopment also entails the infilling of the north-eastern corner of the property. The Klipdrif River will also be widened along the southern boundary of Portion 11 of the Farm No. 287, for a distance of approximately 300m. Engineering Services Design: The EngineeringServicesDesign forthe authorisedalternative (2) asabove,andmodificationof the river bank has to date not yet been done, this will be completed by Aurecon in due course. Proposed Mitigation Measures: Temporary River Diversion The river flow is to be diverted past the construction area via a temporary pipeline. The dry stream bed is to be covered with a geo-textile fabric that can be removed after construction, leaving the streambed clean.
  • 6. Silt traps to be placed on top of the dry protected stream bed to catch any water pumped from excavations to drop out any silt before the water is returned to the river downstream. Water pumpedfromexcavationsmustbe pumpedtosediment dams situated well away from the river where the dams can be allowed to overflow through the existing plant cover back to the river. This process must be well managed to ensure that no erosion takes place during the process. Silting and bank erosion Adequate silting fences will be required to protect embankments where construction is to take place. Walkwaysinthe formof boardwalksare to be constructedonthe river bank in the construction area, in such a way thatworkersdo notwalkor handle equipmentdirectly on the river bank or in the river bed; The constructionsite shouldbe fenced in such a way that the main stream and surrounds are managed as a no-go area. No eating, ablutions or latrines, or casual urination is to be allowed in the construction site area. Drinking water and water for construction is to be abstracted from the river at one designated point only and piped to the site camp and or the construction site. No one should be allowed to take water from the river for any reason at any other point than the designated point. Abstraction of water should conform to all regulations as determined by the Department of Water Affairs. Disruption of the flow of the existing storm water to the river All storm water discharge to the area is to be diverted down-stream of the new works area before construction work commences, even if construction work is not undertaken during the rainy season. Pollution from construction works All plant in the area to have drip trays. No servicing of plant to be allowed anywhere except on the service area at the site camp. Refuelling of plant to make use of drip trays to prevent spillages. All cement work to be carried out using cement trays. Batching plant protection to be effected as per the recommendations for the eastern portal works. Site camp management including oil traps, drip trays and conservancy tanks as per the western constructionsite management recommendationsandtoinclude sitingof the camp as far away from the river environment as possible. The entire construction area and construction camp should have enough suitable refuse removal containersanda dailyrefuse cleanupsystem in place to prevent any litter pollution from entering the river. Geotechnical Conditions: Class C1 and C2 soil types only.
  • 7. Summary of Findings: 1) The proposed site for the development can be divided into two distinct areas on the basis of the surface gradient and layout of the residential estate, namely Area A and Area B. • Area A slopes gently downwards to the south, towards the Klipdrift River and is vegetated with grasses and lined with small to medium apple trees. • Area B is level and has been cultivated with apple and pear trees of between 2 m and 4 m in height. Studies have indicated that, under existing conditions, a large portion of this area would be inundated during 1 in 50 year flood events. The residential site class designation (as adopted by NHBRC4) of the soil profile for the proposed development site is shown to be: • Area A: C1 • Area B: C1/C2 C1 - Compressible and potentially collapsible soils with expected range of total soil movement of 5 mm to 10 mm. C2 - Compressible and potentially collapsible soils with expected range of total soil movement of greater than 10 mm. Recommendations: (i) Flooding: The hydrological study carried out by Ninham Shand has shown that improvements to the stream and river channels on the northern and western boundaries of the site together with localised infilling of the of the north-eastern corner of the site, would prevent inundation from floods up to the 1 in 100 year event. Foundations: The consistency of the soils underlying the site is very variable with loose to very loose material. The leastriskoptionfor foundingthe one andtwostoreyresidential unitswillbe touse raft foundations in Area B. Units in Area A could be founded on lightly reinforced footings after having wetted and compactedthe foundationtrenches.An alternative approach to Area B, will be to use raft foundations along the western edge of the site and along the riverfront properties, along the southern edge. The units within the central portion of area B may be founded on spread footings at depth of 0.5m after having prepared the founding material by excavation to 800mm, compacting the trenches and reinstating,withgoodcompaction,usingacceptableimported fill (free of organic matter), in layers not exceeding150mm to above the -50mm proposedfounding level. Further trial holes and testing will be requiredtoconfirmthe insituconditionsalongthe easternedge evenbefore the strip footing option is used, (in place of raft foundations). Excavation: Excavation down to 1.5m depth will be in soft materials. Groundwater was encountered at depths of between 1.3m and 2.5m below natural ground level. However the water table may rise during the
  • 8. wetter, winter months and, should construction be carried out during this time of year, might lead to the inundation of foundation excavations. The in situ sandy materials are classified as G7/G8 in accordance with TRH 14, Guideline for Road Construction Materials and are of marginal quality in respect to their suitability as selected layers for road pavements. The complete geotechnical report is available on request. ----------------------------------------------------------------------------------------------------------------------------------------
  • 9.
  • 10. ELGIN COUNTRY ESTATE – INVESTMENT OPPORTUNITY IN A RESIDENTIAL DEVELOPMENT LESS THAN ONE HOUR’S DRIVE FROM CAPE TOWN DESCRIPTION: CYCLING & EQUESTRIAN ESTATE IN THE MOUNTAIN BIKING& OUTDOOR ACTIVITIESMECCA OF THE WESTERN CAPE TYPE OF TRANSACTION: RESIDENTIALLAND BENEFICIATION &SALEOF ERVEN FORHOUSE CONSTRUCTION LOCATION: GRABOUW, WESTERN CAPESOUTH AFRICA DESCRIPTION OFAREA: ELGIN VALLEY, 2000 HA FORESTON THE EDGE OFTHE EIKENHOFDAM, HOME TO CAPEMILE TRIATHLON EVENT UNIQUE: ONLY RESIDENTIALDEVELOPMENT IN THE AREA FEATURES: HIGHLY SOUGHT AFTER PRISTINELOCATION WITH RIVERFRONTAGE BICYCLE ANDHORSE TRAILS MEMBERSHIP OF GRABOUW COUNTRY CLUB ERF SIZE: 16.65 HECTARES DISTANCES: GORDON’S BAY: 10KM CAPE TOWN INTER AIRPORT: 53KM NOTE: THE DISTANCE FROMCAPE TOWN CITY TO CAPE TOWN INTERNATIONAL AIRPORT IS 20KM WEBSITE: www.elgincountryestate.co.za STATUS OF LAND: APPROVAL HAS BEEN GRANTED FOR:  CONSOLIDATION OF TWO ERVEN  SUBDIVISION  REZONING  AMENDMENT OF THE SPATIAL DEVELOPMENT FRAMEWORK (GRABOUW)  APPROVAL OF HOMEOWNERS ASSOCIATION PROJECT STATUS:  ALL PLANNING & HOUSE DESIGN WORK COMPLETE  INTERNAL SERVICES TO BE INSTALLED  BULK SERVICES AVAILABLE AT BOUNDARY  ELECTRICAL CAPACITY AVAILABLE PROCLAMATION: ONCEINTERNALSERVICESARE INSTALLED
  • 11. INVESTMENTAMOUNT: R5 MILLION SECURITY: COVERINGMORTGAGE BOND PARTICIPATION: FIVEPREFERENCE SHARESOF R 5 MILLION IN ELGIN COUNTRY ESTATE PTY LTD RETURN ON INVESTMENT: 20% (UNDERWRITTEN BY DEVELOPER) IN CASH OR IN THE FORMOF A HOUSE MECHANISM: PREFERENTIALPAYMENT OUT OFFIRST SURPLUS AFTER COSTS PROJECT DETAIL: NUMBER OF STANDS: 115 NUMBER OF 1500 SQMSTANDS: 53 NUMBER OF 400 SQM STANDS: 62 PRESALES: 49 BALANCEOF STANDSTO BE SOLD: 1500 SQM 13 400SQM 53 TOTAL INVESTMENTTO DATE: R19 MILLION (AFS2104) AUDITED FINANCIALSTATEMENTS: FEBRUARY 2014 FINANCIALSTATUS: DEBT FREE PROFESSIONAL TEAM: CONSULTINGENGINEERS: AURECON TOWNPLANNERS: URBAN DYNAMICSWESTERN CAPE PROJECTMANAGERS: RAUBICON ARCHITECTS: DEREK KOCKARCHITECTS