       Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility

                For more documentation and validation master plans, go to
                              http://www.ivtnetwork.com

             Use the promo code SLIDE1 for a 10% discount on membership!
DOCUMENT NO.:
                                                                                                                                                xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                                                                 TRAINING DATE:
         Inc. Springfield, NY Facility
                                                                                                   SUPERSEDES DATE:                     PAGE NO.:
                                                                                                                                                2 of 50

                                                                 Glossary
2.0    PURPOSE AND INTRODUCTION......................................................................................................3 
       2.1  INTRODUCTION ......................................................................................................................... 3 
       2.2  PURPOSE ..................................................................................................................................... 3 
3.0    SCOPE.....................................................................................................................................................4 
4.0    RESPONSIBILITIES ..............................................................................................................................4 
       4.1  SITE QUALITY ASSURANCE VALIDATION ......................................................................... 5 
       4.2  SITE ENGINEERING VALIDATION ........................................................................................ 6 
       4.3  SITE MANUFACTURING TECHNICAL SUPPORT .............................................................. 6 
       4.4  SITE MANUFACTURING .......................................................................................................... 7 
       4.5  SITE ENGINEERING ................................................................................................................. 8 
       4.6  QUALITY CONTROL ................................................................................................................. 8 
       4.7  REGULATORY AFFAIRS ......................................................................................................... 9 
5.0    DEFINITIONS, ABREVIATIONS AND REFERENCES ...................................................................9 
       5.1  DEFINITIONS LIST .................................................................................................................... 9 
       5.2  ABBREVIATION LIST .............................................................................................................. 12 
       5.3  REFERENCES .......................................................................................................................... 12 
6.0    MATERIALS ..........................................................................................................................................12 
7.0    PROCEDURE .......................................................................................................................................13 
       7.1  SPRINGFIELD, NY FACILITY OVERVIEW ......................................................................... 13 
       7.2  VALIDATION MASTER PLAN GOVERNANCE .................................................................. 13 
       7.3  VALIDATION APPROACH ...................................................................................................... 15 
       7.4  VALIDATION PROCEDURES ................................................................................................ 17 
       7.5  VALIDATION SUPPORT SYSTEMS..................................................................................... 18 
       7.6  KEY SOPs GOVERNING AND SUPPORTING THE ALLSTON LANDING VALIDATION
            PROGRAM ................................................................................................................................ 21 
       7.7  IDENTIFICATION AND DESCRIPTION OF MANUFACTURING SYSTEMS AND
            EQUIPMENT PRESENTLY IN USE AT THE SPRINGFIELD, NY FACILITY AND
            ASSOCIATED COMPLETED VALIDATION ........................................................................ 21 
       7.8  VALIDATION MASTER PLAN REVIEW ............................................................................... 21 
8.0    ATTACHMENTS...................................................................................................................................21 
       8.1  Attachment A: Process Flow Diagrams ................................................................................ 21 
       8.2  Attachment B: Key SOPs Governing and Supporting the Springfield, NY Facility
            Validation Program .................................................................................................................... 21 
       8.3  Attachment C: Process Equipment List and Associated Validation Protocol Numbers
            ..................................................................................................................................................... 21 
9.0    REVISION HISTORY...........................................................................................................................27 
       9.1  Revision History Table ............................................................................................................. 27 



                                                              NOTICE
                    THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                               xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                                  TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                            SUPERSEDES DATE:             PAGE NO.:
                                                                                                               3 of 50

2.0   PURPOSE AND INTRODUCTION

      2.1       INTRODUCTION

      The validation program at the Springfield, NY Facility is intended to satisfy current domestic
      and international regulations, guidelines and policies for drugs, biologics and APIs to verify
      the equipment, systems, utilities, software and processes are properly designed, installed,
      and function as intended in a consistent and controlled manner. The validation program
      complies with Corporate Quality Standards and Polices (Ref. SOP-XXXX – Validation
      Program).

      The revision of the Site Validation Master Plan (SVMP) comes from the validation
      philosophy changes resulting from the implementation of the “validation lifecycle” approach
      at Springfield, NY Facility. The changes made in this revision of the Springfield, NY Facility
      SVMP bring the plan into alignment with the new lifecycle approach. The Springfield, NY
      Facility has developed the site validation governance document SOP-XXXX, “Validation
      Project Life Cycle Approach at the Springfield, NY Facility”, which defines the
      validation philosophy to be used for validation at Springfield, NY Facility. SOP-XXXX uses
      a risk-based approach with emphasis on verification and qualification that is focused on the
      high risk attributes of facilities, utilities, equipment, and processes. This SVMP introduces
      use of subordinate VMPs (sub-VMPs) that are categorized into eight areas and address the
      full scope of Validation requirements applicable to the Springfield, NY Facility site in
      support of SVMP.

      2.2       PURPOSE

      The purpose of validation is to assure that the facility, manufacturing process, and
      supporting services are capable of supporting the manufacture of pharmaceutical product
      that consistently meets its predetermined quality attributes. For this reason, each facet of
      the Springfield, NY Facility site related to CGMP manufacture, monitoring, storage, and
      testing will be validated. The Validation program is integral to design, construction /
      fabrication, and CGMP Operation of the facility. Validation testing is intended to proactively
      establish CGMP compliance prior to initiating manufacture of commercial product for
      distribution. In addition, the sustenance operations at Springfield, NY Facility, such as
      quality change control, calibration program, preventive maintenance, and periodic
      requalification of critical equipment and processes ensure that manufacturing equipment
      and processes stay under the validated state.

      The purpose of this SVMP is to:

            •   Define the requirements and validation approach for validation of systems,
                equipment, and processes at Pharma Co., Inc. Corporation’s Springfield, NY Facility.
            •   To list or reference the documentation supporting the current validated state of the
                Springfield, NY Facility.


                                                          NOTICE
                THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                            xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                               TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                         SUPERSEDES DATE:             PAGE NO.:
                                                                                                            4 of 50

      This SVMP explains the governance structure in place that will achieve, demonstrate and
      maintain acceptable standards of validation for systems, equipment, and processes used in
      the manufacture of drug product at the Springfield, NY Facility. If the methodologies and
      rationale presented herein are not followed, the rationale behind the alternate approach
      must be documented appropriately.

      This document is designed to accomplish the following objectives:

         •   Identify the key Standard Operating Procedures governing and supporting the
             validation program presented in SOP-XXXX.
         •   Describe the manufacturing systems, equipment, and processes presently in use at
             the Springfield, NY Facility.
         •   Itemize the equipment and utilities used in the Springfield, NY Facility manufacturing
             systems and link them to completed validation studies as evidence of a validated
             state.

3.0   SCOPE

      This Site Validation Master Plan applies to all verification, qualification, and validation
      activities that support commercial manufacturing at Pharma Co., Inc. Corporation’s
      Springfield, NY Facility. This VMP is a high-level document that refers to various
      supporting documents. Validation program elements include:

         •   Validation/qualification of facilities/utilities/equipment and corresponding
             automation/controls
         •   Validation of manufacturing processes
         •   Cleaning validation
         •   Sterilization and depyrogenation
         •   Enterprise Computer systems
         •   QC Laboratory equipment and methods
         •   Interval based requalification

      The commercial products that are currently manufactured, packaged, or stored at the
      Springfield, NY Facility are listed in Table 7.1-1. The equipment within the scope of this
      Validation Master Plan are listed in Attachment D, Process Equipment List and Associated
      Validation.

4.0   RESPONSIBILITIES

      This SVMP will be approved by the heads of the departments (or their designees) listed in
      this section.




                                                       NOTICE
             THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                            xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                               TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                         SUPERSEDES DATE:             PAGE NO.:
                                                                                                            5 of 50

      The validation activities in Springfield, NY Facility are the responsibility of the Validation,
      Engineering, Manufacturing, MTS, and Quality Assurance groups as shown in Figure 1.




      The responsibilities outlined below align with the Validation Lifecycle Approach that is
      presented in SOP-XXXX.

      4.1    SITE QUALITY ASSURANCE VALIDATION
             •   Generate, review, and maintain approve SVMP
             •   Review and approve the sub-VMPs and Project VPs
             •   Assist with the generation of User Requirements (URs) document
             •   Review and approve the URS document
             •   Assist with the performance of risk assessments
             •   Review and approve Risk Assessments documents
             •   Review and approve Critical Aspects (CAs) list and acceptance criteria, as
                 applicable
             •   Review and approve the Process Control Strategy
             •   Review and approve the Operational Control Strategy
             •   Review and approve Commissioning and Qualification and Validation Plans
             •   Review and approve Qualification Protocols and Reports for facilities, utilities,
                 equipment, and processes that have CAs
             •   Review and approve Computerized Systems’ Protocols and Reports
             •   Review and approve Performance Qualification (PQ) Protocols and Reports

                                                       NOTICE
             THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           6 of 50

            •   Review and approve Process Validation (PV) and Continued Verification
                Protocols and Reports
            •   Review and approve Qualification and Validation Protocol Deviations
            •   Approve the use of vendor documentation to verify functionality of facility, utility,
                and equipment
            •   Reviewing and           approving      the    Site’s    Equipment        Requalification       related
                documents

      4.2   SITE ENGINEERING VALIDATION
            •   Review and approve SVMP
            •   Generate, review, approve, and maintain sub-VMP for Facilities, Equipment
                (including QC Lab storage and process equipment, such as refrigerators,
                autoclaves and incubators) and Utilities, Cleaning Process, Sterilization and
                Depyrogenation Process, and Computerized Systems
            •   Lead/generate, review and approve Site Project VP for new products or projects
            •   Maintain Validation Schedule per the Project Execution Plan (PEP) and Project
                VP and CCR timelines
            •   Assist with the generation of URS document
            •   Review and approve URS document
            •   Lead/perform risk assessments using CA list
            •   Review and approve the Operational Control Strategy
            •   Review and approve Risk Assessment document
            •   Generate, review, and approve IQ, OQ, PQ Protocols and Reports for facilities,
                utilities, equipment, and processes
            •   Generate, review, and approve PQ Protocols and Reports
            •   Generate, review, and approve Protocol Deviations
            •   Review and approve Computer Systems’ Protocols and Reports

      4.3   SITE MANUFACTURING TECHNICAL SUPPORT
            •   Review and approve the SVMP, sub-VMPs, and Project VPs, as appropriate
            •   Generate, review, approve, and maintain sub-VMP or PV
            •   Assist with the generation of URS document
            •   Review and approve URS of document
            •   Review and approve Risk Assessment document, as applicable
            •   Review and approve Validation Plans, as applicable
                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           7 of 50

            •   Review approve and assist in updating the Process Control Strategy
            •   Generate, review, and approve the Operational Control Strategy
            •   Lead /perform Technical Transfer activities for product transfer
            •   Lead/perform process development / engineering runs
            •   Lead. generate, review, and approve PV and Continued Verification Protocols
                and Reports
            •   Execute PV Protocols
            •   Generate, review, and approve PV Protocol Deviations
            •   Create and update Manufacturing Process Descriptions and associated
                Manufacturing Flow Diagrams (MFDs)
            •   Generate process related sections of the Project VPs
            •   Review and approve Project VPs that include PV
            •   Lead/perform risk assessments for PV
            •   Create and update Manufacturing History File (MHF)


      4.4   SITE MANUFACTURING
            •   Assist with the performance of risk assessments
            •   Assist with the generation of URS document
            •   Review and approve URS document
            •   Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as
                applicable
            •   Review and approve the SVMP, sub-VMPs, and Project VPs, as applicable
            •   Review and approve the Process Control Strategy
            •   Review and approve the Operational Control Strategy
            •   Assist Site Engineering with generation of project schedule
            •   Generate manufacturing SOPs for use during validation
            •   Review and approve IQ, OQ, PQ, PV, and Continued Verification Protocols and
                Reports for facilities, utilities, equipment, and processes as applicable
            •   Prepare schedule in support of IQ, OQ, PQ, PV, and Continued Verification
                Protocols execution
            •   Ensure equipment/facilities/materials/personnel availability and technical support
                on the operation of the equipment during execution of qualification and validation
                activities
                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           8 of 50

            •   Ensure manufacturing procedures are developed for maintaining the validated
                equipment in its validated state throughout its lifecycle
            •   Review and approve Protocol Deviations affecting process equipment
            •   Manage and execute the Site’s Equipment Requalification program

      4.5   SITE ENGINEERING
            •   Assist with the performance of risk assessments
            •   Lead the generation of URS document
            •   Review and approve URS document
            •   Generate Functional Specifications based on URS
            •   Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as
                applicable
            •   Review and approve the SVMP, sub-VMPs, and Project VPs, as applicable
            •   Generate, review, approve, and maintain sub-VMP for Computer Systems
            •   Review and approve the Operational Control Strategy
            •   Generate, review, and approve Computer Systems Protocols and Reports
            •   Review and approve Verification (including IQ and OQ) and PQ Protocols and
                Reports for facilities, utilities, equipment, and processes as applicable
            •   Participate in execution of Verification Protocols, as necessary
            •   Review and approve Protocol Deviations affecting facilities, utilities, and
                Computer Systems
            •   Review and approve the Site’s Equipment Requalification documents related to
                facilities and utilities

      4.6   QUALITY CONTROL
            •   Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as
                applicable
            •   Review and approve the SVMP and sub-VMPs, as applicable
            •   Generate, review, approve, manage execution of, and maintain sub-VMPs for
                QC Laboratories
            •   Review and approve Site Project VP for new products when QC testing is
                required
            •   Receive and use transferred validated methods
            •   Review and approve method validation protocols and reports
                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           9 of 50

            •   Generate, review and approve validation protocols and reports for laboratory test
                instrumentation
            •   Review and approve laboratory equipment validation protocols and reports
                storage and process equipment, such as refrigerators, autoclaves and incubators
            •   Review the PQ and PV protocols for analytical and microbiological testing
                requirements, as applicable
            •   Perform testing required for validation samples, as applicable
            •   Review the PQ and PV Final Reports and verify the accuracy of testing data, as
                applicable
            •   Review and approve Protocol Deviations affecting QC test results and equipment

      4.7   REGULATORY AFFAIRS
            •   Assist with the review of SVMP, sub-VMPs, and validation requirements to
                ensure compliance with regulatory filings
            •   Update regulatory filings as necessary based on approved validation data
            •   Assess the impact of validation activities on current approved product filings
            •   Provide filing dates as part of validation activity scheduling
            •   Incorporate pertinent validation data into annual reports

5.0   DEFINITIONS, ABREVIATIONS AND REFERENCES

      5.1   DEFINITIONS LIST


       Cleaning       Documented evidence that a cleaning process is consistently and
       Validation (CV)effectively reducing potential product and/or cleaning agent residues to
                      pre-determined acceptable limits.
       Cleaning       Documented evidence that equipment is cleaned to pre-determined
       Verification   specifications and may be released for use.
       Clean in Place Introduction of cleaning solution and/or water rinses into equipment that
       (CIP)          is fixed in place, for purposes of removing potential product and/or
                      cleaning agent residues.
       Clean out of Cleaning of portable or disassembled equipment/parts involving the use
       Place (COP)    of a cleaning station in a remote designated location.
       Commissioning A well-planned, documented, and managed engineering approach to
                      the startup and turnover of facilities, systems, and equipment to the
                      System Owner that results in a safe and functional environment that
                      meets established design requirements and stakeholder expectations.
       Concurrent     Validation of equipment, systems or processes while the equipment,
       Validation     system or process is in current use for clinical or commercial production.
                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           10 of 50

       Critical        Elements of the systems or equipment, which are critical to the product
       Aspects (CA)    quality.
       Critical ProcessA process parameter whose variability has an impact on a critical quality
       Parameter       attribute and therefore should be monitored or controlled to ensure the
       (CPP)           process produces the desired quality (ICH Q8 (R2)).
       Critical QualityA physical, chemical, biological or microbiological property or
       Attribute (CQA) characteristic that should be within an appropriate limit, range, or
                       distribution to ensure the desired product quality (ICH Q8 (R2)).
       Design Review A formal, documented, comprehensive and systematic examination of
                       the technical aspects of a product design or process. (21CFR Part
                       820.30)
       Direct Impact Utility that is used for manufacturing of the product or critical processes
       Utility         (CIP, SIP) such as Water for Injection, Clean Steam, and Process
                       Gases
       Family          A Performance Qualification approach that allows for a reduced number
       Approach        of validation studies when using equipment of equivalent design,
                       manufacture and operational functionality. This approach is typically
                       used for PQ for Bioreactors and Vessels
       Functional      A prospective document that builds on the User Requirement
       Requirement     Specification (URS) and provides a basic narrative on what functions
       Specification   the process and its control system are expected to perform.
       Installation    Establishing documented evidence that the equipment, system or
       Qualification   software received is correct, is installed properly, in accordance with
       (IQ)            Pharma Co., Inc.’s and the manufacturer’s requirements, and has the
                       proper documentation and support information.
       Matrix approach A validation approach that uses a philosophy which allows for the
                       testing of a subset of product batches or “model / placebo products to
                       validate the entire range of a product /batch, in lieu of testing each
                       product / batch in the matrix. Typical examples of appropriate
                       applications of this approach include mixing validation and pooling
                       validation. The bracketing selection is based upon product / batch
                       attributes such as concentration, solubility, ingredient types, and batch
                       size.
       Operational     Establishing documented evidence that the equipment, system or
       Qualification   software installed, functions in accordance with Pharma Co., Inc.’s and
       (OQ)            the manufacturer’s requirements over the intended range of use, or for
                       the intended applications.
       Performance     Establishing documented evidence that equipment or systems perform
       Qualification   in a controlled and reproducible manner in accordance with Pharma
       (PQ)            Co., Inc.’s requirements under specific operational parameters, either at
                       the allowable upper and lower limits of the operation or using worse
                       case conditions compared to intended operating ranges.
       Process         The collection and evaluation of data, from the process design stage
       Validation (PV) through commercial production, which establishes scientific evidence
                       that a process is capable of consistently delivering quality products.
                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           11 of 50

                         (Guidance for Industry – Process Validation: General Principles and
                         Practices, FDA, January 2011, Rev 1).
       Project           A prospective document that defines the scope, requirements, rationale
       Validation Plan and protocols necessary for the validation of a new project or process in
                         an existing site, which is under validated state.
       Prospective       Validation of equipment, systems or processes prior to the
       Validation        release/approval of the equipment, system or process for commercial
                         production or commercial distribution of product.
       Protocol          A prospective or concurrent test plan with pre-established acceptance
                         criteria that when executed is intended to produce documented
                         evidence that a system or system component has been properly tested.
       Quality Attribute A physical, chemical, or microbiological property of characteristic of a
                         material that directly or indirectly impacts quality.
       Re-Qualification Establishing documented evidence that existing equipment and
       (Periodic         processes continue to operate in a validated state, demonstrating
       Qualification)    continued compliance, effective and reproducibility. This protocol type is
                         utilized for time based re-qualification activities, such as autoclaves,
                         SIP, ovens, SIP ovens, lyophilizers, environmental rooms, and cleaning
                         and is not applicable to Change Control Request driven validation.
       Re-Validation     The validation of a previously validated process typically necessitated
                         by a change modification to the process.
       Risk Based        An approach that allows basing the project related activities on risk
       Approach          analysis and placing extra effort on activities that are assessed as
                         posing a higher risk to the processes and product quality.
       User              A prospective document that describes what the equipment or system is
       Requirement       supposed to do, thus containing at least a set of criteria or conditions
       Specification     that have to be met. This can include regulatory, corporate, and process
       (URS)             requirements.
       Validation        Documented evidence, which provides a high degree of assurance that
                         a specific process will consistently meet its pre-determined
                         specifications and quality attributes.
       Validation        A prospective document that defines the scope, requirements, rationale,
       Master Plan       and protocols necessary for the validation of a new project or process.
       Validation        A prospective document that provides a detailed test plan used to
       Protocol          qualify/validate equipment, systems, utilities, software or processes.
       Validation        A document that provides a detailed summary of the results from the
       Protocol Final    execution of a Validation Protocol.
       Report




                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           12 of 50

      5.2   ABBREVIATION LIST

                  API                   Active Pharmaceutical Ingredient
                ASME                    American Society of Mechanical Engineers
                 CFR                    Code of Federal Regulations
                cGMP                    current Good Manufacturing Practices
                  CIP                   Clean-In-Place
                CPP                     Critical Process Parameters
                CQA                     Critical Quality Attributes
                  CA                    Critical Aspects
                 EMA                    European Medicines Agency
                  FDA                   Food and Drug Administration
                GAMP                    Good Automated Manufacturing Practices
                  ICH                   International Conference on Harmonization
                   IQ                   Installation Qualification
                  ISO                   International Standards Organization
                 ISPE                   International Society of Pharmaceutical Engineers
                  KPP                   Key Process Parameter
                 MFD                    Manufacturing Flow Diagram
                  OQ                    Operational Qualification
                  PEP                   Project Execution Plan
                   PQ                   Performance Qualification
                   PV                   Process Validation
                   QA                   Quality Assurance
                  QC                    Quality Control
                  RQ                    Re-Qualification
                  SIP                   Steam-In-Place
                 SME                    Subject Matter Expert
                 SOP                    Standard Operating Procedure
                SVMP                    Site Validation Master Plan
                   UR                   User Requirement
                 VMP                    Validation Master Plan


      5.3   REFERENCES
            •   See Attachment B for Key regulatory references and Corporate and site SOPs
                Governing and Supporting the Springfield, NY Facility Validation Program.

6.0   MATERIALS

      All materials needed to perform the functions referenced in this document will be found in
      the individual referenced documents.

                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                            xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                               TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                         SUPERSEDES DATE:             PAGE NO.:
                                                                                                            13 of 50

7.0   PROCEDURE

      7.1   SPRINGFIELD, NY FACILITY OVERVIEW

            The Pharma Co., Inc., and is located at: 1 Main Street, Springfield, NY.
            Pharma Co., Inc.’s Springfield, NY facility is a multi-product manufacturing facility for
            xxxx products. Manufacturing operations performed at the Springfield, NY facility
            include bulk drug substance activities, testing, labeling, and packaging.
            Drug substance manufacture for Product A is performed at this facility (see
            Attachment A for Process Flow Diagram.)
            Packaging and labeling operations are performed at this facility for Product A.
            Quality Control (QC) testing for Product A may be performed in qualified laboratories
            at Springfield, NY Facility, and approved vendor sites.
            Table 7.1-1 outlines the manufacturing activities performed at the Springfield, NY
            Facility for each product.

            Table 7.1-1: Manufacturing Activities Performed at Springfield by Product
                  Product                      Activities Performed at Springfield, NY Facility
              Product A            Manufacturing, formulation, testing, labeling, and packaging


      7.2   VALIDATION MASTER PLAN GOVERNANCE

      The Validation Program incorporates evaluation and testing to establish:
            • Manufacturing & Laboratory Facility Installation
            • Direct Impact Utility Installation, Operation, & Performance
            • Manufacturing Equipment Installation, Operation, & Performance
            • Validation of Computer Systems & Software
            • Validation of Manufacturing Equipment Cleaning Processes and Cycles
            • Qualification of Laboratory Equipment and Instruments
            • Validation of Analytical, Physical, & Microbiological Test Methods
            • Transfer / Development of Manufacturing Processes
            • Qualification of Environmental Controls and Clean Rooms
            • Validation of Manufacturing Processes
            • Assessment and pre-determination of the longevity of CGMP equipment

      It is not intended that the SVMP will describe the requirements in detail for execution of the
      various Validation Program elements. The detailed requirement description may be found
      in sub-VMPs, Standard Operating Procedures, Corporate Level Standards or Practices, or
      relevant protocols.


                                                       NOTICE
             THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                            xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                               TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                         SUPERSEDES DATE:             PAGE NO.:
                                                                                                            14 of 50

      This SVMP will be revised at a minimum once per year to reflect the changes made to the
      validated facilities, utilities, equipment, and processes at Springfield, NY Facility. In
      addition, a periodic SVMP Summary Report (issued annually, at minimum) will document
      the summary of changes to the validated systems and corresponding validation documents.
      The Process Equipment List and associated document numbers will be updated with the
      new document numbers and titles.

      In order to address the full scope of Validation requirements applicable to the Springfield,
      NY Facility site, validation activities have been categorized into eight areas, which will be
      executed by corresponding sub-VMPs, to be created, and as listed below:

                •    Sterilization and Depyrogenation Master Plan for Springfield, NY Facility
                •    Cleaning Validation Master Plan for Springfield, NY Facility
                •    Process Validation Master Plan for Springfield, NY Facility
                •    Facility, Equipment, and Utility Validation Master Plan for Springfield, NY
                     Facility
                •    Computer System Validation Master Plan for Springfield, NY Facility
                •    Requalification Validation Master Plan for Springfield, NY Facility
                •    QC Laboratory Equipment and Instrumentation Qualification Master Plan for
                     Springfield, NY Facility
                •    Test Method Validation Master Plan for Springfield, NY Facility

      The eight sub-VMPs will supplement the overarching SVMP, and will be governed by
      corresponding Corporate Quality Operations Standards. The Sub-VMPs will present the
      specific validation requirements and projects within each of these validation groupings,
      along with the necessary details on the scope, validation approach, roles and
      responsibilities, required deliverables (equipment, systems, processes to be validated and
      corresponding protocols and documentation, URS, SOPs, test methods, etc.), and
      acceptance criteria. The projected schedule and required resources will be covered by the
      Project Execution Plan (PEP) and Project VP.

      Standard content of the Sub-VMPs will include:
         • Policy statement and description of Validation Methodology to be followed.
         • Listing of applicable governance policy and procedures describing program
            requirements.
         • Listing of current approved documentation supporting the validated state for the
            program addressed.
         • Execution plan for the specific validation program addressed (based on calendar
            year)

      Upon approval of the Sub-VMP, annual updates will be issued to describe the current
      year’s project plan status. Record of the annual review will be attached to the Sub-VMP.



                                                       NOTICE
             THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           15 of 50

      7.3   VALIDATION APPROACH

            Validation of facilities, equipment, computer systems, and processes is performed at
            the Springfield, NY Facility for production, monitoring, control, evaluation, and
            storage of CGMP products. As indicated in the INTRODUCTION section, this site
            VMP is based on the Validation Life Cycle approaches presented at the site level
            through governing document SOP-XXXX. SOP-XXXX focuses extensively on the
            early phases of a project (risk assessment, requirement specification, design,
            construction, and engineering). The Validation Lifecycle Process Key Activities
            shown in Figure 2 depicts the use of risk based approach that drives the verification
            and qualification activities, which are within the scope of this VMP.

            The Life Cycle Approach may be summarized as follows:

            Facility Qualification will entail verifying that construction and utility installation is
            according to design, and that the process requirements are met. Equipment &
            Instrument Verification will verify and document that installation is according to
            design (Installation Qualification), meets functional requirements (Operational
            Qualification), and user requirements (Performance Qualification). All computer and
            automated control systems employed in the facility will also be validated.

            Process demonstration, or engineering runs, for new processes/products will be
            executed utilizing the proposed manufacturing processes.                The process
            demonstration phase will be based on documented process descriptions developed
            for the product to be transferred to the Springfield, NY Facility site. To support
            process demonstration, the test instruments will be qualified, and test methods will
            be validated and / or formally transferred to the site Quality Control / Microbiology
            Laboratories. During the demonstration phase, raw material supply, equipment
            settings, process parameters, batch record, product storage, standard operating
            procedures, and testing will be evaluated to assure satisfactory function. During the
            demonstration phase, evaluations specific to processing and product quality may
            also be undertaken.

            After successful demonstration, confirmatory production performance qualification
            and continued verification protocols will be executed to verify and document that the
            manufacturing processes are capable of consistently yielding product that meets
            predetermined quality attributes when run at prescribed operating settings and within
            acceptable operating ranges. Stability testing will also be conducted to support
            product expiration dating intervals.

            Cleaning validation will be performed for process contact surfaces to assure that the
            cleaning operation reduces product and cleaning agent to acceptable levels.

            Subsequent to initial validation activities, the facilities, equipment, systems, and
            processes are to be maintained in the validated state through implementation of site
            procedures, including calibration, preventive maintenance, requalification, work
                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           16 of 50

            order review, and change control. The validated manufacturing processes will be
            assessed regularly to assure that it operates within specified critical parameter
            ranges and the product produced continues to meet critical quality attribute
            specifications. As necessary validation activities can and will be repeated for
            facilities, equipment, instruments or processes that have been modified, replaced, or
            otherwise altered to a state outside of the originally validated operating parameters.
            The validated state of the critical processes, such as cleaning, sterilization, and
            storage rooms, will be requalified periodically.

      NOTES about the Validation Life Cycle Process:
            •   The activities in this process are executed by a cross functional team, which
                include Subject Matter Experts (SMEs) from the impacted stakeholder
                departments. The responsibilities of SMEs from various functional areas are
                listed in Section 4.0 of this VMP.
            •   The order of activities in the Life Cycle Process follows the sequence shown in
                Figure 2.
            •   The requirement documents (user, functional, regulatory, etc) are generated by
                contributions from stakeholder groups.
            •   Risk assessment is conducted to identify Critical Aspects (CA) of the equipment
                and processes.
            •   Relevant documents are generated and executed per the Verification Plan, such
                as FAT, SAT, commissioning, IQ, OQ, and approved prior to starting the next
                activity.
            •   Content of the verification protocols will depend upon the risk assessment as
                delineated in the Verification Plan.




                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                            xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                               TRAINING DATE:
       Inc. Springfield, NY Facility
                                                                         SUPERSEDES DATE:             PAGE NO.:
                                                                                                            17 of 50




The procedures that follow are part of the infrastructure for the validation process and are a
harmonization of these approaches supplemented by direction to specific Standards and SOPs,
when appropriate.

      7.4    VALIDATION PROCEDURES

             Validation activities occur for new or modified equipment, systems, utilities, software,
             processes or routinely for the re-qualification of equipment, systems or processes
             per VP-XXXX, Validation Program for Springfield Manufacturing Operations.
                                                       NOTICE
             THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           18 of 50

            Prospective validation is required for all new facilities, equipment, systems, utilities,
            software, or processes that are necessary for the manufacture, testing, and
            storage/distribution of commercial product and for clinical material. The steps
            followed for a validation project are referred to as the Validation Life Cycle.
            Concurrent validation can be used for PV if the manufactured product must be used
            for commercial needs in which case, the PV test results must meet all of acceptance
            criteria defined in the protocol as well as any other QA, corporate, and regulatory
            requirements. For concurrent validation, the details of the conditions that have to be
            met prior to the release of the batch for commercial use must be included in the PV
            protocol.

            The verification (commissioning, IQ, OQ, etc), PQ, and PV protocols are generated
            and executed per the SOPs XXXX. The verification / qualification / validation results
            are summarized in corresponding final reports.

            The final reports are written in accordance with procedure SOP-XXXX and are
            reviewed and approved by the same departments that reviewed and approved the
            initial protocol.


      7.5   VALIDATION SUPPORT SYSTEMS

            7.5.1 Re-Qualification Program

                    The Re-Qualification (RQ) process is governed by SOP-XXXX. The purpose of
                    this standard is to provide the mandatory compliance requirements for the
                    routine requalification practices to be utilized for equipment and processes
                    used in the manufacture of commercial and clinical material. The intent of
                    requalification is to ensure critical equipment and processes continue to
                    perform within defined limits and operate in a similar manner as originally
                    validated. This document is intended to provide direction to all applicable
                    Pharma Co., Inc. sites to ensure validation requalification programs comply
                    with current regulations and guidance documents authored by regulatory
                    agencies and industry organizations worldwide.

                    Detailed re-qualification requirements for equipment, systems and processes
                    at Pharma Co., Inc. facilities, which include the Springfield, NY Facility, are
                    governed by SOP-XXXX. This procedure is intended to define the time-based
                    re-qualification program for equipment, systems, and processes at Pharma
                    Co., Inc. facilities. Specifically, the procedure will identify the equipment,
                    systems and processes requiring routine re-qualification, the required
                    frequency and the type of testing and documentation required.

                    In addition, the Steam-in-Place requalification schedule at Pharma Co., Inc.’s
                    Springfield, NY Facility is governed by SOP-XXXX. This requalification plan
                    identifies the equipment / systems group into families requiring Steam-in-Place
                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           19 of 50

                    sterilization procedures as part of a validated process. This requalification
                    plan also specifies and justifies the requalification frequency of the family
                    group and the family group members. The validated family groups then
                    require requalification according to SOP-XXXX.

                    The re-qualification program assures that critical equipment, systems, and
                    processes continue to perform within prescribed limits and are operating in a
                    similar manner as originally validated, thereby demonstrating a continued state
                    of control.

                    The re-qualification approach is to perform similar testing utilized during the
                    initial validation, however at an attenuated level deemed sufficient to evaluate
                    the performance of the equipment, system or process, and detect potential
                    adverse changes.

            7.5.2 Metrology Program

                    Calibration policies and procedures are governed by SOP-XXXX, Metrology
                    Program. The Metrology Program covers the services provided by the
                    Pharma Co., Inc. Metrology Department to Pharma Co., Inc. Corporation. This
                    includes, but is not limited to, all Manufacturing and Quality Control operations
                    at Pharma Co., Inc.’s Springfield, NY Facility. Services by the Pharma Co.,
                    Inc. Metrology Department may also be provided to Pharma Co., Inc.’s
                    subsidiaries and to joint projects involving other companies having
                    partnerships with Pharma Co., Inc. and its subsidiaries.

                    In order for equipment to be included in this program, it must be used to
                    measure, gauge, test, inspect or otherwise examine a quantitative value to a
                    known degree of accuracy. If such equipment is used, it must be identified as
                    a Critical, Non-Critical, or Reference Use Only instrument.

                    Instrumentation requiring calibration must be current prior to and remain
                    current during protocol execution and throughout the Validation Program.

            7.5.3 Change Control Program

                    The Corporate Quality Operations Standard for Change Control is documented
                    as SOP-XXXX. The Change Control Program to ensure that equipment within
                    the Springfield, NY Facility maintains its validated state is governed by SOP-
                    XXXX.

                    These program requirements apply to all Pharma Co., Inc. functional groups
                    involved in the manufacture and testing of products (both commercial and
                    clinical including material/ assays used to demonstrate product comparability)
                    at the Springfield, NY Facility.

                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           20 of 50

                    New equipment, both within Quality Control and Manufacturing intended to be
                    validated, is covered under this Change Control System.

            7.5.4 Maintenance Program

                    The process used for developing and optimizing an effective asset
                    maintenance program is governed by SOP-XXXX, Springfield, NY Facility
                    Maintenance Management Program / Work Order System Procedure. The
                    procedure applies to new and in-service assets based on risks and operational
                    reliability while assuring employee safety. The process calls for utilizing
                    operational and maintenance experience relative to 21 CFR Part 210/211 and
                    quality management systems that must be compliant with CGMP regulations.
                    The process to determine / evaluate Part 11 compliance and security risks is
                    included.

                    The maintenance program targets critical production equipment, QC
                    Laboratory equipment and test instrumentation, plant utilities and
                    environmental areas with significant risk to product quality. Process steps for
                    developing / optimizing the maintenance program are described in the
                    program. Additionally, instructions for work order management and integration
                    with the Computerized Maintenance Management System (CMMS) are also
                    described.

            7.5.5 Training Program
                  The general definitions, responsibilities, methodologies for assignments,
                  assessments, documentation of training, and integration with the LMS is
                  governed by SOP-XXXX Learning Management System. This document
                  outlines the activities required to document training in compliance with CGMPs
                  and other applicable regulatory requirements and ensures personnel
                  performing work affecting product quality will be competent on the basis of
                  appropriate education, training, and experience.

                    This document applies to the recording of training for full-time, part-time and
                    non-employees (temporary/contractors) and either concurrent or subsequent
                    entry of records into the LMS database, where applicable. If a Business Unit
                    has its own local training procedures, that procedure may take precedence.

                    Training is further defined in SOP-XXXX, to establish a set of initial, minimal
                    regulatory training requirements for personnel having the ability to impact
                    medical device or therapeutic product quality. This document applies to all
                    full-time, part-time, and temporary employees at all levels whose tasks affect
                    the design, production, testing, handling and distribution of products, or affect
                    the environment, process or systems in which products or data are produced,
                    controlled or managed.


                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           21 of 50

      7.6   KEY SOPs GOVERNING                      AND      SUPPORTING            THE      ALLSTON         LANDING
            VALIDATION PROGRAM

            See Attachment B for a full list of key SOPs and standards used to support the
            Springfield, NY Facility Validation Program. The site SOPs are written, revised, and
            controlled per SOP-XXXX, Documentation System and Control.


      7.7   IDENTIFICATION AND DESCRIPTION OF MANUFACTURING SYSTEMS AND
            EQUIPMENT PRESENTLY IN USE AT THE SPRINGFIELD, NY FACILITY AND
            ASSOCIATED COMPLETED VALIDATION

            See Attachment C for a Process Equipment List and Associated Validation Protocol
            Numbers.

      7.8   VALIDATION MASTER PLAN REVIEW

            This document must be reviewed, updated and approved on an annual basis to
            reflect current philosophy, standards and Good Manufacturing Practices. A “VMP
            Review Schedule” must be generated for the time of the year, when the Site VMP
            and sub-VMPs will be reviewed and a VMP Review Summary Report generated.

8.0   ATTACHMENTS

      8.1   Attachment A: Process Flow Diagrams
      8.2   Attachment B: Key SOPs Governing and Supporting the Springfield, NY Facility
                           Validation Program
      8.3   Attachment C: Process Equipment List and Associated Validation Protocol Numbers




                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           22 of 50


                          8.1      Attachment A: Product Process Flow Diagrams




                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           23 of 50

      8.2    Attachment B: Key Documents Governing and Supporting the Springfield, NY Facility
                                         Validation Program


            Reference Documents
                •   Food and Drug Administration (FDA) – 21 CFR Parts 11, 210 & 211
                •   European Medicines Agency (EMA) – EudraLex Vol 4
                •   International Committee on Harmonization (ICH) – Q7, Q8, Q9 & Q10
                •   International Standards Organization (ISO) - ISO 9001
                •   FDA Guidance for Industry – Quality Systems Approach to Pharmaceutical
                    cGMP Regulations
                •   FDA Guidance for Industry – Process Validation: General Principles and
                    Practices – January 2011
                •   ASTM International – Designation E2500-07, Standard Guide for the
                    Specification, Design, and Verification of Pharmaceutical and
                    Biopharmaceutical Manufacturing Systems and Equipment

            Corporate Standards:
                •   SOP-XXXX: Change Control
                •   SOP-XXXX: Quality Manual for the Pharma Co., Inc. Quality System
                •   SOP-XXXX: Corporate Quality Operations Standard: Risk Management
                •   SOP-XXXX: Corporate Quality Operations Standard for Equipment and
                         Process Requalification
                •   SOP-XXXX: Method Development and Validation
                •   SOP-XXXX: Validation Program
                •   SOP-XXXX: Laboratory Equipment Qualification
                •   SOP-XXXX: Cleaning Validation
                •   SOP-XXXX: Process Validation
                •   SOP-XXXX: Sterilization and Depyrogenation Validation




                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           24 of 50

            General and Administrative SOPs:

                •   SOP-XXXX: Documentation System and Control
                •   SOP-XXXX: Generation of Protocols and Final Reports for Validation
                •   SOP-XXXX: Change Control Procedure
                •   SOP-XXXX: Metrology Program
                •   SOP-XXXX: Records Retention
                •   SOP-XXXX: Springfield, NY Facility Maintenance Management Program /
                              Work Order System Procedure
                •   SOP-XXXX: Technology Transfer into TMD Manufacturing and Quality
                •   SOP-XXXX: Guidance for 21 CFR Part 11 Compliance for
                              TMD Computer Systems
                •   SOP-XXXX: Pharma Co., Inc. Corporate Quality Manual
                              Note: This manual also lists pertinent SOPs for validation
                                    related topics
                •   SOP-XXXX: Documentation of Employee Training
                •   SOP-XXXX: Installation Qualification of Laboratory Instruments
                •   SOP-XXXX: Learning Management System (LMS)– Governance and
                              Documentation
                •   SOP-XXXX: cGMP & Regulatory Training Requirements for Personnel

            Engineering SOPs:
                •    SOP-XXXX: Technical Project Management Process for Springfield, NY
                     Facility Manufacturing Facility
                •    SOP-XXXX:                Project Lifecycle Management Process - Springfield, NY
                     Facility
                •    SOP-XXXX: Commissioning Procedure for Start-Up of Systems and
                     Equipment at Springfield, NY Facility
                •    SOP-XXXX: Engineering Document Management Procedure at the
                     Springfield, NY Facility
                •    SOP-XXXX: Administration of Drawings at Pharma Co., Inc. Springfield, NY
                     Facility
                •    SOP-XXXX: Project Change Management Procedure at the Springfield, NY
                     Facility



                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                           xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                              TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                        SUPERSEDES DATE:             PAGE NO.:
                                                                                                           25 of 50

            Technical SOPs:
                •   SOP-XXXX: Validation of Autoclaves
                •   SOP-XXXX: Validation of Dry Heat Ovens used in Sterilization or
                              Depyrogenation Processes
                •   SOP-XXXX: Validation of Filter Integrity Test Instruments
                •   SOP-XXXX: Validation of Temperature/Relative Humidity Controlled Warm
                              Rooms/Chambers

            Key Validation Department Operational SOPs:
                •   SOP-XXXX: Master Validation Plan for the Pharma Co., Inc. Laboratory
                              Information Management System
                •   SOP-XXXX: Standard Operating Procedure Guidelines for Determination of
                              Validation Requirements for Change Control Requests
                •   SOP-XXXX: Guidelines for Computer Validation Protocols
                •   SOP-XXXX: Guidelines for Generating, Approving, Amending and Closing-
                              out a Validation Plan at Pharma Co., Inc.
                •   SOP-XXXX: Guidelines for the Performance of Airflow Pattern Testing for
                              Clean Rooms and Laminar Flow Hoods
                •   SOP-XXXX: Protocol Execution Procedure at Springfield, NY Facility
                •   SOP-XXXX: Routine Re-Qualification of Equipment, Systems and Processes
                •   SOP-XXXX: Cleaning Validation and Changeover Verification
                •   SOP-XXXX: Process Validation for Springfield, NY Facility
                •   SOP-XXXX: Process Equipment Steam-in-Place (SIP) Requalification
                              Matrices and Scheduling Plan at Springfield, NY Facility
                •   SOP-XXXX: Cleaning Master Plan for the Springfield, NY Facility
                              Manufacturing Facility
                •   SOP-XXXX: Validation Project Execution Life Cycle Approach at the
                    Springfield, NY Facility




                                                      NOTICE
            THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                             xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                                TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                          SUPERSEDES DATE:             PAGE NO.:
                                                                                                             26 of 50

             8.3      Attachment C: Process Equipment List and Associated Validation Protocol
                                                   Numbers

      EQ #         Description   Size      Location    IQ          OQ         CIP         SIP         CQ         PQ/PV




                                                        NOTICE
              THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
DOCUMENT NO.:
                                                                                                               xxxx
TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE:                                  TRAINING DATE:
      Inc. Springfield, NY Facility
                                                                            SUPERSEDES DATE:             PAGE NO.:
                                                                                                               27 of 50


9.0   REVISION HISTORY

      9.1       Revision History Table

      Revision                    Description of Changes                         DCR           Related             Date
                                                                                Number        document
            1      Initial Release                                                 xxxx           xxxx          mm/dd/yyyy




                                                          NOTICE
                THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.

More Related Content

What's hot

aseptic process technology
 aseptic process technology aseptic process technology
aseptic process technologyPRANJAY PATIL
 
21 CFR, Part 210 and 211 current.pptx
21 CFR, Part 210 and 211 current.pptx21 CFR, Part 210 and 211 current.pptx
21 CFR, Part 210 and 211 current.pptxAartiVats5
 
Non sterile manufacturing process technology
Non sterile manufacturing process technologyNon sterile manufacturing process technology
Non sterile manufacturing process technologyPRANJAY PATIL
 
Deviation, OOS & complaint investigation and CAPA
Deviation, OOS & complaint investigation and CAPADeviation, OOS & complaint investigation and CAPA
Deviation, OOS & complaint investigation and CAPADr. Amsavel A
 
APT Manufacturing Flowcharts.pptx
APT Manufacturing Flowcharts.pptxAPT Manufacturing Flowcharts.pptx
APT Manufacturing Flowcharts.pptxDhruvi50
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection modelVaishali Dandge
 
Protocol for compressed air validation
Protocol for compressed air  validationProtocol for compressed air  validation
Protocol for compressed air validationAvinash Verma
 
Aseptic process tech & advanced sterile product mfg rashmi nasare
Aseptic process tech & advanced sterile product mfg  rashmi nasareAseptic process tech & advanced sterile product mfg  rashmi nasare
Aseptic process tech & advanced sterile product mfg rashmi nasareRASHMINasare
 
Change management system
Change management systemChange management system
Change management systemmanusb07
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationShihabPatel
 
Packaging validation
Packaging validationPackaging validation
Packaging validationGomtesh447
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validationSagar Savale
 
Pharmaceutical development report (pdr)
Pharmaceutical development report (pdr)Pharmaceutical development report (pdr)
Pharmaceutical development report (pdr)Atul Bhombe
 
Auditing in pharmacutical industries
Auditing in pharmacutical industriesAuditing in pharmacutical industries
Auditing in pharmacutical industriesPriyanka Kandhare
 
Computerized system validation_final
Computerized system validation_finalComputerized system validation_final
Computerized system validation_finalDuy Tan Geek
 
Six System Inspection Model.pptx
Six System Inspection Model.pptxSix System Inspection Model.pptx
Six System Inspection Model.pptxVIJAYAVICHARE
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validationchitralekha48
 
Good documentation practice
Good documentation practiceGood documentation practice
Good documentation practicePharmaceutical
 

What's hot (20)

DEVIATION, OOS &OOT
DEVIATION, OOS &OOT DEVIATION, OOS &OOT
DEVIATION, OOS &OOT
 
aseptic process technology
 aseptic process technology aseptic process technology
aseptic process technology
 
21 CFR, Part 210 and 211 current.pptx
21 CFR, Part 210 and 211 current.pptx21 CFR, Part 210 and 211 current.pptx
21 CFR, Part 210 and 211 current.pptx
 
Non sterile manufacturing process technology
Non sterile manufacturing process technologyNon sterile manufacturing process technology
Non sterile manufacturing process technology
 
New WHO Guidance on Process Validation
New WHO Guidance on Process ValidationNew WHO Guidance on Process Validation
New WHO Guidance on Process Validation
 
Deviation, OOS & complaint investigation and CAPA
Deviation, OOS & complaint investigation and CAPADeviation, OOS & complaint investigation and CAPA
Deviation, OOS & complaint investigation and CAPA
 
APT Manufacturing Flowcharts.pptx
APT Manufacturing Flowcharts.pptxAPT Manufacturing Flowcharts.pptx
APT Manufacturing Flowcharts.pptx
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection model
 
Protocol for compressed air validation
Protocol for compressed air  validationProtocol for compressed air  validation
Protocol for compressed air validation
 
Aseptic process tech & advanced sterile product mfg rashmi nasare
Aseptic process tech & advanced sterile product mfg  rashmi nasareAseptic process tech & advanced sterile product mfg  rashmi nasare
Aseptic process tech & advanced sterile product mfg rashmi nasare
 
Change management system
Change management systemChange management system
Change management system
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Packaging validation
Packaging validationPackaging validation
Packaging validation
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Pharmaceutical development report (pdr)
Pharmaceutical development report (pdr)Pharmaceutical development report (pdr)
Pharmaceutical development report (pdr)
 
Auditing in pharmacutical industries
Auditing in pharmacutical industriesAuditing in pharmacutical industries
Auditing in pharmacutical industries
 
Computerized system validation_final
Computerized system validation_finalComputerized system validation_final
Computerized system validation_final
 
Six System Inspection Model.pptx
Six System Inspection Model.pptxSix System Inspection Model.pptx
Six System Inspection Model.pptx
 
Computer System Validation
Computer System ValidationComputer System Validation
Computer System Validation
 
Good documentation practice
Good documentation practiceGood documentation practice
Good documentation practice
 

Similar to Validation Master Plan

Approve standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversApprove standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversWiroj Kaewkan
 
QbD Model Case Study of VACCINE : A-Vax.
QbD Model Case Study of VACCINE : A-Vax.QbD Model Case Study of VACCINE : A-Vax.
QbD Model Case Study of VACCINE : A-Vax.Shivang Chaudhary
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master planBharatlal Sain
 
Cementa Ab Applied Process Management Group Iv Report Process Blue Printing
Cementa Ab Applied Process Management Group Iv Report Process Blue PrintingCementa Ab Applied Process Management Group Iv Report Process Blue Printing
Cementa Ab Applied Process Management Group Iv Report Process Blue Printingdzikothunde
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxTanmayPanigrahy
 
Productivity Improvement In Sw Industry
Productivity Improvement In Sw IndustryProductivity Improvement In Sw Industry
Productivity Improvement In Sw IndustryAmit Kumar Nayak
 
Obstacle Driven Development Report v0.9
Obstacle Driven Development Report v0.9Obstacle Driven Development Report v0.9
Obstacle Driven Development Report v0.9Jonathan Herring
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical
 
Measuring the Impact: KPIs for Assesing Business Agilityin a Tech Driven Envi...
Measuring the Impact: KPIs for Assesing Business Agilityin a Tech Driven Envi...Measuring the Impact: KPIs for Assesing Business Agilityin a Tech Driven Envi...
Measuring the Impact: KPIs for Assesing Business Agilityin a Tech Driven Envi...AgileNetwork
 
Mq peptide-quantitation-tutorial-en
Mq peptide-quantitation-tutorial-enMq peptide-quantitation-tutorial-en
Mq peptide-quantitation-tutorial-enKrishna Kumar
 
AMBOK Guide 2012 Edition
AMBOK Guide 2012 EditionAMBOK Guide 2012 Edition
AMBOK Guide 2012 EditionjensenPMP
 
Designed Precision Castings-Project Report (1)
Designed Precision Castings-Project Report (1)Designed Precision Castings-Project Report (1)
Designed Precision Castings-Project Report (1)Kushal Gandhi
 
WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS Kunal Roy
 

Similar to Validation Master Plan (20)

Kế hoạch thẩm định gốc và thẩm định vệ sinh
Kế hoạch thẩm định gốc và thẩm định vệ sinhKế hoạch thẩm định gốc và thẩm định vệ sinh
Kế hoạch thẩm định gốc và thẩm định vệ sinh
 
Kế hoạch thẩm định gốc – thẩm định vệ sinh (e)
Kế hoạch thẩm định gốc – thẩm định vệ sinh (e)Kế hoạch thẩm định gốc – thẩm định vệ sinh (e)
Kế hoạch thẩm định gốc – thẩm định vệ sinh (e)
 
Approve standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump driversApprove standard for diesel engine fire pump drivers
Approve standard for diesel engine fire pump drivers
 
QbD Model Case Study of VACCINE : A-Vax.
QbD Model Case Study of VACCINE : A-Vax.QbD Model Case Study of VACCINE : A-Vax.
QbD Model Case Study of VACCINE : A-Vax.
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
 
Cementa Ab Applied Process Management Group Iv Report Process Blue Printing
Cementa Ab Applied Process Management Group Iv Report Process Blue PrintingCementa Ab Applied Process Management Group Iv Report Process Blue Printing
Cementa Ab Applied Process Management Group Iv Report Process Blue Printing
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptx
 
Software testing services growth report oct 11
Software testing services growth report oct 11Software testing services growth report oct 11
Software testing services growth report oct 11
 
Productivity Improvement In Sw Industry
Productivity Improvement In Sw IndustryProductivity Improvement In Sw Industry
Productivity Improvement In Sw Industry
 
Obstacle Driven Development Report v0.9
Obstacle Driven Development Report v0.9Obstacle Driven Development Report v0.9
Obstacle Driven Development Report v0.9
 
Business plan
Business planBusiness plan
Business plan
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Measuring the Impact: KPIs for Assesing Business Agilityin a Tech Driven Envi...
Measuring the Impact: KPIs for Assesing Business Agilityin a Tech Driven Envi...Measuring the Impact: KPIs for Assesing Business Agilityin a Tech Driven Envi...
Measuring the Impact: KPIs for Assesing Business Agilityin a Tech Driven Envi...
 
concept of validation
concept of validationconcept of validation
concept of validation
 
Mq peptide-quantitation-tutorial-en
Mq peptide-quantitation-tutorial-enMq peptide-quantitation-tutorial-en
Mq peptide-quantitation-tutorial-en
 
Quality by design pharma
Quality by design pharmaQuality by design pharma
Quality by design pharma
 
AMBOK Guide 2012 Edition
AMBOK Guide 2012 EditionAMBOK Guide 2012 Edition
AMBOK Guide 2012 Edition
 
Designed Precision Castings-Project Report (1)
Designed Precision Castings-Project Report (1)Designed Precision Castings-Project Report (1)
Designed Precision Castings-Project Report (1)
 
The Application Lifecycle Toolbox
The Application Lifecycle ToolboxThe Application Lifecycle Toolbox
The Application Lifecycle Toolbox
 
WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS
 

More from Institute of Validation Technology

Incorporate Domestic and International Regulations for Effective GMP Auditing
Incorporate Domestic and International Regulations for Effective GMP AuditingIncorporate Domestic and International Regulations for Effective GMP Auditing
Incorporate Domestic and International Regulations for Effective GMP AuditingInstitute of Validation Technology
 
Notification Tactics for Improved Notification Tactics For Improved Field Act...
Notification Tactics for Improved Notification Tactics For Improved Field Act...Notification Tactics for Improved Notification Tactics For Improved Field Act...
Notification Tactics for Improved Notification Tactics For Improved Field Act...Institute of Validation Technology
 
Computer System Validation Then and Now — Learning Management in the Cloud
Computer System Validation Then and Now — Learning Management in the CloudComputer System Validation Then and Now — Learning Management in the Cloud
Computer System Validation Then and Now — Learning Management in the CloudInstitute of Validation Technology
 
Management Strategies to Facilitate Continual Quality Improvement
Management Strategies to Facilitate Continual Quality ImprovementManagement Strategies to Facilitate Continual Quality Improvement
Management Strategies to Facilitate Continual Quality ImprovementInstitute of Validation Technology
 
Understand the Evolving Regulations for Aseptic Cleaning and Environmental Mo...
Understand the Evolving Regulations for Aseptic Cleaning and Environmental Mo...Understand the Evolving Regulations for Aseptic Cleaning and Environmental Mo...
Understand the Evolving Regulations for Aseptic Cleaning and Environmental Mo...Institute of Validation Technology
 
Designing Stability Studies for Early Stages of Pharmaceutical Development
Designing Stability Studies for Early Stages of Pharmaceutical DevelopmentDesigning Stability Studies for Early Stages of Pharmaceutical Development
Designing Stability Studies for Early Stages of Pharmaceutical DevelopmentInstitute of Validation Technology
 
Incorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanIncorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanInstitute of Validation Technology
 
Introduction to Statistical Applications for Process Validation
Introduction to Statistical Applications for Process ValidationIntroduction to Statistical Applications for Process Validation
Introduction to Statistical Applications for Process ValidationInstitute of Validation Technology
 
GMP Systems Integration–Combine Results and Utilize as a Compliance Tool
GMP Systems Integration–Combine Results and Utilize as a Compliance ToolGMP Systems Integration–Combine Results and Utilize as a Compliance Tool
GMP Systems Integration–Combine Results and Utilize as a Compliance ToolInstitute of Validation Technology
 

More from Institute of Validation Technology (20)

Incorporate Domestic and International Regulations for Effective GMP Auditing
Incorporate Domestic and International Regulations for Effective GMP AuditingIncorporate Domestic and International Regulations for Effective GMP Auditing
Incorporate Domestic and International Regulations for Effective GMP Auditing
 
Notification Tactics for Improved Notification Tactics For Improved Field Act...
Notification Tactics for Improved Notification Tactics For Improved Field Act...Notification Tactics for Improved Notification Tactics For Improved Field Act...
Notification Tactics for Improved Notification Tactics For Improved Field Act...
 
Lifecycle Approach to Cleaning Validation
Lifecycle Approach to Cleaning ValidationLifecycle Approach to Cleaning Validation
Lifecycle Approach to Cleaning Validation
 
Computer System Validation Then and Now — Learning Management in the Cloud
Computer System Validation Then and Now — Learning Management in the CloudComputer System Validation Then and Now — Learning Management in the Cloud
Computer System Validation Then and Now — Learning Management in the Cloud
 
Applying QbD to Biotech Process Validation
Applying QbD to Biotech Process ValidationApplying QbD to Biotech Process Validation
Applying QbD to Biotech Process Validation
 
Management Strategies to Facilitate Continual Quality Improvement
Management Strategies to Facilitate Continual Quality ImprovementManagement Strategies to Facilitate Continual Quality Improvement
Management Strategies to Facilitate Continual Quality Improvement
 
Understand the Evolving Regulations for Aseptic Cleaning and Environmental Mo...
Understand the Evolving Regulations for Aseptic Cleaning and Environmental Mo...Understand the Evolving Regulations for Aseptic Cleaning and Environmental Mo...
Understand the Evolving Regulations for Aseptic Cleaning and Environmental Mo...
 
Effective Use of Environmental Monitoring Data Trending
Effective Use of Environmental Monitoring Data TrendingEffective Use of Environmental Monitoring Data Trending
Effective Use of Environmental Monitoring Data Trending
 
Mock Inspection Case Studies
Mock Inspection Case StudiesMock Inspection Case Studies
Mock Inspection Case Studies
 
Designing Stability Studies for Early Stages of Pharmaceutical Development
Designing Stability Studies for Early Stages of Pharmaceutical DevelopmentDesigning Stability Studies for Early Stages of Pharmaceutical Development
Designing Stability Studies for Early Stages of Pharmaceutical Development
 
Determine Exceptions to Validation
Determine Exceptions to ValidationDetermine Exceptions to Validation
Determine Exceptions to Validation
 
Conduct a Gap Analysis of a Validation Programme
Conduct a Gap Analysis of a Validation ProgrammeConduct a Gap Analysis of a Validation Programme
Conduct a Gap Analysis of a Validation Programme
 
FDA Inspection
FDA InspectionFDA Inspection
FDA Inspection
 
Incorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanIncorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation Plan
 
Compliance by Design and Compliance Master Plan
Compliance by Design and Compliance Master PlanCompliance by Design and Compliance Master Plan
Compliance by Design and Compliance Master Plan
 
Introduction to Statistical Applications for Process Validation
Introduction to Statistical Applications for Process ValidationIntroduction to Statistical Applications for Process Validation
Introduction to Statistical Applications for Process Validation
 
Risk-Based Approaches in GMP’s Project Life Cycles
Risk-Based Approaches in GMP’s Project Life CyclesRisk-Based Approaches in GMP’s Project Life Cycles
Risk-Based Approaches in GMP’s Project Life Cycles
 
GMP Systems Integration–Combine Results and Utilize as a Compliance Tool
GMP Systems Integration–Combine Results and Utilize as a Compliance ToolGMP Systems Integration–Combine Results and Utilize as a Compliance Tool
GMP Systems Integration–Combine Results and Utilize as a Compliance Tool
 
A Lifecycle Approach to Process Validation
A Lifecycle Approach to Process ValidationA Lifecycle Approach to Process Validation
A Lifecycle Approach to Process Validation
 
Setting Biological Process Specifications
Setting Biological Process SpecificationsSetting Biological Process Specifications
Setting Biological Process Specifications
 

Recently uploaded

Call Girl Coimbatore Prisha☎️ 8250192130 Independent Escort Service Coimbatore
Call Girl Coimbatore Prisha☎️  8250192130 Independent Escort Service CoimbatoreCall Girl Coimbatore Prisha☎️  8250192130 Independent Escort Service Coimbatore
Call Girl Coimbatore Prisha☎️ 8250192130 Independent Escort Service Coimbatorenarwatsonia7
 
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safenarwatsonia7
 
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...Miss joya
 
Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Gabriel Guevara MD
 
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls JaipurCall Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipurparulsinha
 
College Call Girls Vyasarpadi Whatsapp 7001305949 Independent Escort Service
College Call Girls Vyasarpadi Whatsapp 7001305949 Independent Escort ServiceCollege Call Girls Vyasarpadi Whatsapp 7001305949 Independent Escort Service
College Call Girls Vyasarpadi Whatsapp 7001305949 Independent Escort ServiceNehru place Escorts
 
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...narwatsonia7
 
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment BookingCall Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Bookingnarwatsonia7
 
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service MumbaiVIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbaisonalikaur4
 
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls ServiceKesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Servicemakika9823
 
Call Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
Call Girl Lucknow Mallika 7001305949 Independent Escort Service LucknowCall Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
Call Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknownarwatsonia7
 
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Miss joya
 
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safenarwatsonia7
 
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...Miss joya
 
Call Girls Frazer Town Just Call 7001305949 Top Class Call Girl Service Avail...
Call Girls Frazer Town Just Call 7001305949 Top Class Call Girl Service Avail...Call Girls Frazer Town Just Call 7001305949 Top Class Call Girl Service Avail...
Call Girls Frazer Town Just Call 7001305949 Top Class Call Girl Service Avail...narwatsonia7
 
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service MumbaiLow Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbaisonalikaur4
 
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls ServiceCall Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Servicesonalikaur4
 
Call Girl Indore Vrinda 9907093804 Independent Escort Service Indore
Call Girl Indore Vrinda 9907093804 Independent Escort Service IndoreCall Girl Indore Vrinda 9907093804 Independent Escort Service Indore
Call Girl Indore Vrinda 9907093804 Independent Escort Service IndoreRiya Pathan
 
Call Girl Surat Madhuri 7001305949 Independent Escort Service Surat
Call Girl Surat Madhuri 7001305949 Independent Escort Service SuratCall Girl Surat Madhuri 7001305949 Independent Escort Service Surat
Call Girl Surat Madhuri 7001305949 Independent Escort Service Suratnarwatsonia7
 

Recently uploaded (20)

Call Girl Coimbatore Prisha☎️ 8250192130 Independent Escort Service Coimbatore
Call Girl Coimbatore Prisha☎️  8250192130 Independent Escort Service CoimbatoreCall Girl Coimbatore Prisha☎️  8250192130 Independent Escort Service Coimbatore
Call Girl Coimbatore Prisha☎️ 8250192130 Independent Escort Service Coimbatore
 
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
 
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Marathahalli 📞 9907093804 High Profile Service 100% Safe
 
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
 
Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024
 
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls JaipurCall Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
 
College Call Girls Vyasarpadi Whatsapp 7001305949 Independent Escort Service
College Call Girls Vyasarpadi Whatsapp 7001305949 Independent Escort ServiceCollege Call Girls Vyasarpadi Whatsapp 7001305949 Independent Escort Service
College Call Girls Vyasarpadi Whatsapp 7001305949 Independent Escort Service
 
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
Call Girls Service in Bommanahalli - 7001305949 with real photos and phone nu...
 
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment BookingCall Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
Call Girl Koramangala | 7001305949 At Low Cost Cash Payment Booking
 
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service MumbaiVIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
VIP Call Girls Mumbai Arpita 9910780858 Independent Escort Service Mumbai
 
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls ServiceKesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
Kesar Bagh Call Girl Price 9548273370 , Lucknow Call Girls Service
 
Call Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
Call Girl Lucknow Mallika 7001305949 Independent Escort Service LucknowCall Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
Call Girl Lucknow Mallika 7001305949 Independent Escort Service Lucknow
 
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
 
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% SafeBangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
Bangalore Call Girls Majestic 📞 9907093804 High Profile Service 100% Safe
 
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
 
Call Girls Frazer Town Just Call 7001305949 Top Class Call Girl Service Avail...
Call Girls Frazer Town Just Call 7001305949 Top Class Call Girl Service Avail...Call Girls Frazer Town Just Call 7001305949 Top Class Call Girl Service Avail...
Call Girls Frazer Town Just Call 7001305949 Top Class Call Girl Service Avail...
 
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service MumbaiLow Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
 
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls ServiceCall Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
 
Call Girl Indore Vrinda 9907093804 Independent Escort Service Indore
Call Girl Indore Vrinda 9907093804 Independent Escort Service IndoreCall Girl Indore Vrinda 9907093804 Independent Escort Service Indore
Call Girl Indore Vrinda 9907093804 Independent Escort Service Indore
 
Call Girl Surat Madhuri 7001305949 Independent Escort Service Surat
Call Girl Surat Madhuri 7001305949 Independent Escort Service SuratCall Girl Surat Madhuri 7001305949 Independent Escort Service Surat
Call Girl Surat Madhuri 7001305949 Independent Escort Service Surat
 

Validation Master Plan

  • 1.                                 Validation Master Plan (VMP) for the Pharma Co., Inc. Springfield, NY Facility For more documentation and validation master plans, go to http://www.ivtnetwork.com Use the promo code SLIDE1 for a 10% discount on membership!
  • 2. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 2 of 50 Glossary 2.0  PURPOSE AND INTRODUCTION......................................................................................................3  2.1  INTRODUCTION ......................................................................................................................... 3  2.2  PURPOSE ..................................................................................................................................... 3  3.0  SCOPE.....................................................................................................................................................4  4.0  RESPONSIBILITIES ..............................................................................................................................4  4.1  SITE QUALITY ASSURANCE VALIDATION ......................................................................... 5  4.2  SITE ENGINEERING VALIDATION ........................................................................................ 6  4.3  SITE MANUFACTURING TECHNICAL SUPPORT .............................................................. 6  4.4  SITE MANUFACTURING .......................................................................................................... 7  4.5  SITE ENGINEERING ................................................................................................................. 8  4.6  QUALITY CONTROL ................................................................................................................. 8  4.7  REGULATORY AFFAIRS ......................................................................................................... 9  5.0  DEFINITIONS, ABREVIATIONS AND REFERENCES ...................................................................9  5.1  DEFINITIONS LIST .................................................................................................................... 9  5.2  ABBREVIATION LIST .............................................................................................................. 12  5.3  REFERENCES .......................................................................................................................... 12  6.0  MATERIALS ..........................................................................................................................................12  7.0  PROCEDURE .......................................................................................................................................13  7.1  SPRINGFIELD, NY FACILITY OVERVIEW ......................................................................... 13  7.2  VALIDATION MASTER PLAN GOVERNANCE .................................................................. 13  7.3  VALIDATION APPROACH ...................................................................................................... 15  7.4  VALIDATION PROCEDURES ................................................................................................ 17  7.5  VALIDATION SUPPORT SYSTEMS..................................................................................... 18  7.6  KEY SOPs GOVERNING AND SUPPORTING THE ALLSTON LANDING VALIDATION PROGRAM ................................................................................................................................ 21  7.7  IDENTIFICATION AND DESCRIPTION OF MANUFACTURING SYSTEMS AND EQUIPMENT PRESENTLY IN USE AT THE SPRINGFIELD, NY FACILITY AND ASSOCIATED COMPLETED VALIDATION ........................................................................ 21  7.8  VALIDATION MASTER PLAN REVIEW ............................................................................... 21  8.0  ATTACHMENTS...................................................................................................................................21  8.1  Attachment A: Process Flow Diagrams ................................................................................ 21  8.2  Attachment B: Key SOPs Governing and Supporting the Springfield, NY Facility Validation Program .................................................................................................................... 21  8.3  Attachment C: Process Equipment List and Associated Validation Protocol Numbers ..................................................................................................................................................... 21  9.0  REVISION HISTORY...........................................................................................................................27  9.1  Revision History Table ............................................................................................................. 27  NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 3. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 3 of 50 2.0 PURPOSE AND INTRODUCTION 2.1 INTRODUCTION The validation program at the Springfield, NY Facility is intended to satisfy current domestic and international regulations, guidelines and policies for drugs, biologics and APIs to verify the equipment, systems, utilities, software and processes are properly designed, installed, and function as intended in a consistent and controlled manner. The validation program complies with Corporate Quality Standards and Polices (Ref. SOP-XXXX – Validation Program). The revision of the Site Validation Master Plan (SVMP) comes from the validation philosophy changes resulting from the implementation of the “validation lifecycle” approach at Springfield, NY Facility. The changes made in this revision of the Springfield, NY Facility SVMP bring the plan into alignment with the new lifecycle approach. The Springfield, NY Facility has developed the site validation governance document SOP-XXXX, “Validation Project Life Cycle Approach at the Springfield, NY Facility”, which defines the validation philosophy to be used for validation at Springfield, NY Facility. SOP-XXXX uses a risk-based approach with emphasis on verification and qualification that is focused on the high risk attributes of facilities, utilities, equipment, and processes. This SVMP introduces use of subordinate VMPs (sub-VMPs) that are categorized into eight areas and address the full scope of Validation requirements applicable to the Springfield, NY Facility site in support of SVMP. 2.2 PURPOSE The purpose of validation is to assure that the facility, manufacturing process, and supporting services are capable of supporting the manufacture of pharmaceutical product that consistently meets its predetermined quality attributes. For this reason, each facet of the Springfield, NY Facility site related to CGMP manufacture, monitoring, storage, and testing will be validated. The Validation program is integral to design, construction / fabrication, and CGMP Operation of the facility. Validation testing is intended to proactively establish CGMP compliance prior to initiating manufacture of commercial product for distribution. In addition, the sustenance operations at Springfield, NY Facility, such as quality change control, calibration program, preventive maintenance, and periodic requalification of critical equipment and processes ensure that manufacturing equipment and processes stay under the validated state. The purpose of this SVMP is to: • Define the requirements and validation approach for validation of systems, equipment, and processes at Pharma Co., Inc. Corporation’s Springfield, NY Facility. • To list or reference the documentation supporting the current validated state of the Springfield, NY Facility. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 4. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 4 of 50 This SVMP explains the governance structure in place that will achieve, demonstrate and maintain acceptable standards of validation for systems, equipment, and processes used in the manufacture of drug product at the Springfield, NY Facility. If the methodologies and rationale presented herein are not followed, the rationale behind the alternate approach must be documented appropriately. This document is designed to accomplish the following objectives: • Identify the key Standard Operating Procedures governing and supporting the validation program presented in SOP-XXXX. • Describe the manufacturing systems, equipment, and processes presently in use at the Springfield, NY Facility. • Itemize the equipment and utilities used in the Springfield, NY Facility manufacturing systems and link them to completed validation studies as evidence of a validated state. 3.0 SCOPE This Site Validation Master Plan applies to all verification, qualification, and validation activities that support commercial manufacturing at Pharma Co., Inc. Corporation’s Springfield, NY Facility. This VMP is a high-level document that refers to various supporting documents. Validation program elements include: • Validation/qualification of facilities/utilities/equipment and corresponding automation/controls • Validation of manufacturing processes • Cleaning validation • Sterilization and depyrogenation • Enterprise Computer systems • QC Laboratory equipment and methods • Interval based requalification The commercial products that are currently manufactured, packaged, or stored at the Springfield, NY Facility are listed in Table 7.1-1. The equipment within the scope of this Validation Master Plan are listed in Attachment D, Process Equipment List and Associated Validation. 4.0 RESPONSIBILITIES This SVMP will be approved by the heads of the departments (or their designees) listed in this section. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 5. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 5 of 50 The validation activities in Springfield, NY Facility are the responsibility of the Validation, Engineering, Manufacturing, MTS, and Quality Assurance groups as shown in Figure 1. The responsibilities outlined below align with the Validation Lifecycle Approach that is presented in SOP-XXXX. 4.1 SITE QUALITY ASSURANCE VALIDATION • Generate, review, and maintain approve SVMP • Review and approve the sub-VMPs and Project VPs • Assist with the generation of User Requirements (URs) document • Review and approve the URS document • Assist with the performance of risk assessments • Review and approve Risk Assessments documents • Review and approve Critical Aspects (CAs) list and acceptance criteria, as applicable • Review and approve the Process Control Strategy • Review and approve the Operational Control Strategy • Review and approve Commissioning and Qualification and Validation Plans • Review and approve Qualification Protocols and Reports for facilities, utilities, equipment, and processes that have CAs • Review and approve Computerized Systems’ Protocols and Reports • Review and approve Performance Qualification (PQ) Protocols and Reports NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 6. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 6 of 50 • Review and approve Process Validation (PV) and Continued Verification Protocols and Reports • Review and approve Qualification and Validation Protocol Deviations • Approve the use of vendor documentation to verify functionality of facility, utility, and equipment • Reviewing and approving the Site’s Equipment Requalification related documents 4.2 SITE ENGINEERING VALIDATION • Review and approve SVMP • Generate, review, approve, and maintain sub-VMP for Facilities, Equipment (including QC Lab storage and process equipment, such as refrigerators, autoclaves and incubators) and Utilities, Cleaning Process, Sterilization and Depyrogenation Process, and Computerized Systems • Lead/generate, review and approve Site Project VP for new products or projects • Maintain Validation Schedule per the Project Execution Plan (PEP) and Project VP and CCR timelines • Assist with the generation of URS document • Review and approve URS document • Lead/perform risk assessments using CA list • Review and approve the Operational Control Strategy • Review and approve Risk Assessment document • Generate, review, and approve IQ, OQ, PQ Protocols and Reports for facilities, utilities, equipment, and processes • Generate, review, and approve PQ Protocols and Reports • Generate, review, and approve Protocol Deviations • Review and approve Computer Systems’ Protocols and Reports 4.3 SITE MANUFACTURING TECHNICAL SUPPORT • Review and approve the SVMP, sub-VMPs, and Project VPs, as appropriate • Generate, review, approve, and maintain sub-VMP or PV • Assist with the generation of URS document • Review and approve URS of document • Review and approve Risk Assessment document, as applicable • Review and approve Validation Plans, as applicable NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 7. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 7 of 50 • Review approve and assist in updating the Process Control Strategy • Generate, review, and approve the Operational Control Strategy • Lead /perform Technical Transfer activities for product transfer • Lead/perform process development / engineering runs • Lead. generate, review, and approve PV and Continued Verification Protocols and Reports • Execute PV Protocols • Generate, review, and approve PV Protocol Deviations • Create and update Manufacturing Process Descriptions and associated Manufacturing Flow Diagrams (MFDs) • Generate process related sections of the Project VPs • Review and approve Project VPs that include PV • Lead/perform risk assessments for PV • Create and update Manufacturing History File (MHF) 4.4 SITE MANUFACTURING • Assist with the performance of risk assessments • Assist with the generation of URS document • Review and approve URS document • Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as applicable • Review and approve the SVMP, sub-VMPs, and Project VPs, as applicable • Review and approve the Process Control Strategy • Review and approve the Operational Control Strategy • Assist Site Engineering with generation of project schedule • Generate manufacturing SOPs for use during validation • Review and approve IQ, OQ, PQ, PV, and Continued Verification Protocols and Reports for facilities, utilities, equipment, and processes as applicable • Prepare schedule in support of IQ, OQ, PQ, PV, and Continued Verification Protocols execution • Ensure equipment/facilities/materials/personnel availability and technical support on the operation of the equipment during execution of qualification and validation activities NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 8. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 8 of 50 • Ensure manufacturing procedures are developed for maintaining the validated equipment in its validated state throughout its lifecycle • Review and approve Protocol Deviations affecting process equipment • Manage and execute the Site’s Equipment Requalification program 4.5 SITE ENGINEERING • Assist with the performance of risk assessments • Lead the generation of URS document • Review and approve URS document • Generate Functional Specifications based on URS • Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as applicable • Review and approve the SVMP, sub-VMPs, and Project VPs, as applicable • Generate, review, approve, and maintain sub-VMP for Computer Systems • Review and approve the Operational Control Strategy • Generate, review, and approve Computer Systems Protocols and Reports • Review and approve Verification (including IQ and OQ) and PQ Protocols and Reports for facilities, utilities, equipment, and processes as applicable • Participate in execution of Verification Protocols, as necessary • Review and approve Protocol Deviations affecting facilities, utilities, and Computer Systems • Review and approve the Site’s Equipment Requalification documents related to facilities and utilities 4.6 QUALITY CONTROL • Assist with the generation of the SVMP, sub-VMPs, and Project VPs, as applicable • Review and approve the SVMP and sub-VMPs, as applicable • Generate, review, approve, manage execution of, and maintain sub-VMPs for QC Laboratories • Review and approve Site Project VP for new products when QC testing is required • Receive and use transferred validated methods • Review and approve method validation protocols and reports NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 9. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 9 of 50 • Generate, review and approve validation protocols and reports for laboratory test instrumentation • Review and approve laboratory equipment validation protocols and reports storage and process equipment, such as refrigerators, autoclaves and incubators • Review the PQ and PV protocols for analytical and microbiological testing requirements, as applicable • Perform testing required for validation samples, as applicable • Review the PQ and PV Final Reports and verify the accuracy of testing data, as applicable • Review and approve Protocol Deviations affecting QC test results and equipment 4.7 REGULATORY AFFAIRS • Assist with the review of SVMP, sub-VMPs, and validation requirements to ensure compliance with regulatory filings • Update regulatory filings as necessary based on approved validation data • Assess the impact of validation activities on current approved product filings • Provide filing dates as part of validation activity scheduling • Incorporate pertinent validation data into annual reports 5.0 DEFINITIONS, ABREVIATIONS AND REFERENCES 5.1 DEFINITIONS LIST Cleaning Documented evidence that a cleaning process is consistently and Validation (CV)effectively reducing potential product and/or cleaning agent residues to pre-determined acceptable limits. Cleaning Documented evidence that equipment is cleaned to pre-determined Verification specifications and may be released for use. Clean in Place Introduction of cleaning solution and/or water rinses into equipment that (CIP) is fixed in place, for purposes of removing potential product and/or cleaning agent residues. Clean out of Cleaning of portable or disassembled equipment/parts involving the use Place (COP) of a cleaning station in a remote designated location. Commissioning A well-planned, documented, and managed engineering approach to the startup and turnover of facilities, systems, and equipment to the System Owner that results in a safe and functional environment that meets established design requirements and stakeholder expectations. Concurrent Validation of equipment, systems or processes while the equipment, Validation system or process is in current use for clinical or commercial production. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 10. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 10 of 50 Critical Elements of the systems or equipment, which are critical to the product Aspects (CA) quality. Critical ProcessA process parameter whose variability has an impact on a critical quality Parameter attribute and therefore should be monitored or controlled to ensure the (CPP) process produces the desired quality (ICH Q8 (R2)). Critical QualityA physical, chemical, biological or microbiological property or Attribute (CQA) characteristic that should be within an appropriate limit, range, or distribution to ensure the desired product quality (ICH Q8 (R2)). Design Review A formal, documented, comprehensive and systematic examination of the technical aspects of a product design or process. (21CFR Part 820.30) Direct Impact Utility that is used for manufacturing of the product or critical processes Utility (CIP, SIP) such as Water for Injection, Clean Steam, and Process Gases Family A Performance Qualification approach that allows for a reduced number Approach of validation studies when using equipment of equivalent design, manufacture and operational functionality. This approach is typically used for PQ for Bioreactors and Vessels Functional A prospective document that builds on the User Requirement Requirement Specification (URS) and provides a basic narrative on what functions Specification the process and its control system are expected to perform. Installation Establishing documented evidence that the equipment, system or Qualification software received is correct, is installed properly, in accordance with (IQ) Pharma Co., Inc.’s and the manufacturer’s requirements, and has the proper documentation and support information. Matrix approach A validation approach that uses a philosophy which allows for the testing of a subset of product batches or “model / placebo products to validate the entire range of a product /batch, in lieu of testing each product / batch in the matrix. Typical examples of appropriate applications of this approach include mixing validation and pooling validation. The bracketing selection is based upon product / batch attributes such as concentration, solubility, ingredient types, and batch size. Operational Establishing documented evidence that the equipment, system or Qualification software installed, functions in accordance with Pharma Co., Inc.’s and (OQ) the manufacturer’s requirements over the intended range of use, or for the intended applications. Performance Establishing documented evidence that equipment or systems perform Qualification in a controlled and reproducible manner in accordance with Pharma (PQ) Co., Inc.’s requirements under specific operational parameters, either at the allowable upper and lower limits of the operation or using worse case conditions compared to intended operating ranges. Process The collection and evaluation of data, from the process design stage Validation (PV) through commercial production, which establishes scientific evidence that a process is capable of consistently delivering quality products. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 11. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 11 of 50 (Guidance for Industry – Process Validation: General Principles and Practices, FDA, January 2011, Rev 1). Project A prospective document that defines the scope, requirements, rationale Validation Plan and protocols necessary for the validation of a new project or process in an existing site, which is under validated state. Prospective Validation of equipment, systems or processes prior to the Validation release/approval of the equipment, system or process for commercial production or commercial distribution of product. Protocol A prospective or concurrent test plan with pre-established acceptance criteria that when executed is intended to produce documented evidence that a system or system component has been properly tested. Quality Attribute A physical, chemical, or microbiological property of characteristic of a material that directly or indirectly impacts quality. Re-Qualification Establishing documented evidence that existing equipment and (Periodic processes continue to operate in a validated state, demonstrating Qualification) continued compliance, effective and reproducibility. This protocol type is utilized for time based re-qualification activities, such as autoclaves, SIP, ovens, SIP ovens, lyophilizers, environmental rooms, and cleaning and is not applicable to Change Control Request driven validation. Re-Validation The validation of a previously validated process typically necessitated by a change modification to the process. Risk Based An approach that allows basing the project related activities on risk Approach analysis and placing extra effort on activities that are assessed as posing a higher risk to the processes and product quality. User A prospective document that describes what the equipment or system is Requirement supposed to do, thus containing at least a set of criteria or conditions Specification that have to be met. This can include regulatory, corporate, and process (URS) requirements. Validation Documented evidence, which provides a high degree of assurance that a specific process will consistently meet its pre-determined specifications and quality attributes. Validation A prospective document that defines the scope, requirements, rationale, Master Plan and protocols necessary for the validation of a new project or process. Validation A prospective document that provides a detailed test plan used to Protocol qualify/validate equipment, systems, utilities, software or processes. Validation A document that provides a detailed summary of the results from the Protocol Final execution of a Validation Protocol. Report NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 12. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 12 of 50 5.2 ABBREVIATION LIST API Active Pharmaceutical Ingredient ASME American Society of Mechanical Engineers CFR Code of Federal Regulations cGMP current Good Manufacturing Practices CIP Clean-In-Place CPP Critical Process Parameters CQA Critical Quality Attributes CA Critical Aspects EMA European Medicines Agency FDA Food and Drug Administration GAMP Good Automated Manufacturing Practices ICH International Conference on Harmonization IQ Installation Qualification ISO International Standards Organization ISPE International Society of Pharmaceutical Engineers KPP Key Process Parameter MFD Manufacturing Flow Diagram OQ Operational Qualification PEP Project Execution Plan PQ Performance Qualification PV Process Validation QA Quality Assurance QC Quality Control RQ Re-Qualification SIP Steam-In-Place SME Subject Matter Expert SOP Standard Operating Procedure SVMP Site Validation Master Plan UR User Requirement VMP Validation Master Plan 5.3 REFERENCES • See Attachment B for Key regulatory references and Corporate and site SOPs Governing and Supporting the Springfield, NY Facility Validation Program. 6.0 MATERIALS All materials needed to perform the functions referenced in this document will be found in the individual referenced documents. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 13. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 13 of 50 7.0 PROCEDURE 7.1 SPRINGFIELD, NY FACILITY OVERVIEW The Pharma Co., Inc., and is located at: 1 Main Street, Springfield, NY. Pharma Co., Inc.’s Springfield, NY facility is a multi-product manufacturing facility for xxxx products. Manufacturing operations performed at the Springfield, NY facility include bulk drug substance activities, testing, labeling, and packaging. Drug substance manufacture for Product A is performed at this facility (see Attachment A for Process Flow Diagram.) Packaging and labeling operations are performed at this facility for Product A. Quality Control (QC) testing for Product A may be performed in qualified laboratories at Springfield, NY Facility, and approved vendor sites. Table 7.1-1 outlines the manufacturing activities performed at the Springfield, NY Facility for each product. Table 7.1-1: Manufacturing Activities Performed at Springfield by Product Product Activities Performed at Springfield, NY Facility Product A Manufacturing, formulation, testing, labeling, and packaging 7.2 VALIDATION MASTER PLAN GOVERNANCE The Validation Program incorporates evaluation and testing to establish: • Manufacturing & Laboratory Facility Installation • Direct Impact Utility Installation, Operation, & Performance • Manufacturing Equipment Installation, Operation, & Performance • Validation of Computer Systems & Software • Validation of Manufacturing Equipment Cleaning Processes and Cycles • Qualification of Laboratory Equipment and Instruments • Validation of Analytical, Physical, & Microbiological Test Methods • Transfer / Development of Manufacturing Processes • Qualification of Environmental Controls and Clean Rooms • Validation of Manufacturing Processes • Assessment and pre-determination of the longevity of CGMP equipment It is not intended that the SVMP will describe the requirements in detail for execution of the various Validation Program elements. The detailed requirement description may be found in sub-VMPs, Standard Operating Procedures, Corporate Level Standards or Practices, or relevant protocols. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 14. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 14 of 50 This SVMP will be revised at a minimum once per year to reflect the changes made to the validated facilities, utilities, equipment, and processes at Springfield, NY Facility. In addition, a periodic SVMP Summary Report (issued annually, at minimum) will document the summary of changes to the validated systems and corresponding validation documents. The Process Equipment List and associated document numbers will be updated with the new document numbers and titles. In order to address the full scope of Validation requirements applicable to the Springfield, NY Facility site, validation activities have been categorized into eight areas, which will be executed by corresponding sub-VMPs, to be created, and as listed below: • Sterilization and Depyrogenation Master Plan for Springfield, NY Facility • Cleaning Validation Master Plan for Springfield, NY Facility • Process Validation Master Plan for Springfield, NY Facility • Facility, Equipment, and Utility Validation Master Plan for Springfield, NY Facility • Computer System Validation Master Plan for Springfield, NY Facility • Requalification Validation Master Plan for Springfield, NY Facility • QC Laboratory Equipment and Instrumentation Qualification Master Plan for Springfield, NY Facility • Test Method Validation Master Plan for Springfield, NY Facility The eight sub-VMPs will supplement the overarching SVMP, and will be governed by corresponding Corporate Quality Operations Standards. The Sub-VMPs will present the specific validation requirements and projects within each of these validation groupings, along with the necessary details on the scope, validation approach, roles and responsibilities, required deliverables (equipment, systems, processes to be validated and corresponding protocols and documentation, URS, SOPs, test methods, etc.), and acceptance criteria. The projected schedule and required resources will be covered by the Project Execution Plan (PEP) and Project VP. Standard content of the Sub-VMPs will include: • Policy statement and description of Validation Methodology to be followed. • Listing of applicable governance policy and procedures describing program requirements. • Listing of current approved documentation supporting the validated state for the program addressed. • Execution plan for the specific validation program addressed (based on calendar year) Upon approval of the Sub-VMP, annual updates will be issued to describe the current year’s project plan status. Record of the annual review will be attached to the Sub-VMP. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 15. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 15 of 50 7.3 VALIDATION APPROACH Validation of facilities, equipment, computer systems, and processes is performed at the Springfield, NY Facility for production, monitoring, control, evaluation, and storage of CGMP products. As indicated in the INTRODUCTION section, this site VMP is based on the Validation Life Cycle approaches presented at the site level through governing document SOP-XXXX. SOP-XXXX focuses extensively on the early phases of a project (risk assessment, requirement specification, design, construction, and engineering). The Validation Lifecycle Process Key Activities shown in Figure 2 depicts the use of risk based approach that drives the verification and qualification activities, which are within the scope of this VMP. The Life Cycle Approach may be summarized as follows: Facility Qualification will entail verifying that construction and utility installation is according to design, and that the process requirements are met. Equipment & Instrument Verification will verify and document that installation is according to design (Installation Qualification), meets functional requirements (Operational Qualification), and user requirements (Performance Qualification). All computer and automated control systems employed in the facility will also be validated. Process demonstration, or engineering runs, for new processes/products will be executed utilizing the proposed manufacturing processes. The process demonstration phase will be based on documented process descriptions developed for the product to be transferred to the Springfield, NY Facility site. To support process demonstration, the test instruments will be qualified, and test methods will be validated and / or formally transferred to the site Quality Control / Microbiology Laboratories. During the demonstration phase, raw material supply, equipment settings, process parameters, batch record, product storage, standard operating procedures, and testing will be evaluated to assure satisfactory function. During the demonstration phase, evaluations specific to processing and product quality may also be undertaken. After successful demonstration, confirmatory production performance qualification and continued verification protocols will be executed to verify and document that the manufacturing processes are capable of consistently yielding product that meets predetermined quality attributes when run at prescribed operating settings and within acceptable operating ranges. Stability testing will also be conducted to support product expiration dating intervals. Cleaning validation will be performed for process contact surfaces to assure that the cleaning operation reduces product and cleaning agent to acceptable levels. Subsequent to initial validation activities, the facilities, equipment, systems, and processes are to be maintained in the validated state through implementation of site procedures, including calibration, preventive maintenance, requalification, work NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 16. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 16 of 50 order review, and change control. The validated manufacturing processes will be assessed regularly to assure that it operates within specified critical parameter ranges and the product produced continues to meet critical quality attribute specifications. As necessary validation activities can and will be repeated for facilities, equipment, instruments or processes that have been modified, replaced, or otherwise altered to a state outside of the originally validated operating parameters. The validated state of the critical processes, such as cleaning, sterilization, and storage rooms, will be requalified periodically. NOTES about the Validation Life Cycle Process: • The activities in this process are executed by a cross functional team, which include Subject Matter Experts (SMEs) from the impacted stakeholder departments. The responsibilities of SMEs from various functional areas are listed in Section 4.0 of this VMP. • The order of activities in the Life Cycle Process follows the sequence shown in Figure 2. • The requirement documents (user, functional, regulatory, etc) are generated by contributions from stakeholder groups. • Risk assessment is conducted to identify Critical Aspects (CA) of the equipment and processes. • Relevant documents are generated and executed per the Verification Plan, such as FAT, SAT, commissioning, IQ, OQ, and approved prior to starting the next activity. • Content of the verification protocols will depend upon the risk assessment as delineated in the Verification Plan. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 17. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 17 of 50 The procedures that follow are part of the infrastructure for the validation process and are a harmonization of these approaches supplemented by direction to specific Standards and SOPs, when appropriate. 7.4 VALIDATION PROCEDURES Validation activities occur for new or modified equipment, systems, utilities, software, processes or routinely for the re-qualification of equipment, systems or processes per VP-XXXX, Validation Program for Springfield Manufacturing Operations. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 18. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 18 of 50 Prospective validation is required for all new facilities, equipment, systems, utilities, software, or processes that are necessary for the manufacture, testing, and storage/distribution of commercial product and for clinical material. The steps followed for a validation project are referred to as the Validation Life Cycle. Concurrent validation can be used for PV if the manufactured product must be used for commercial needs in which case, the PV test results must meet all of acceptance criteria defined in the protocol as well as any other QA, corporate, and regulatory requirements. For concurrent validation, the details of the conditions that have to be met prior to the release of the batch for commercial use must be included in the PV protocol. The verification (commissioning, IQ, OQ, etc), PQ, and PV protocols are generated and executed per the SOPs XXXX. The verification / qualification / validation results are summarized in corresponding final reports. The final reports are written in accordance with procedure SOP-XXXX and are reviewed and approved by the same departments that reviewed and approved the initial protocol. 7.5 VALIDATION SUPPORT SYSTEMS 7.5.1 Re-Qualification Program The Re-Qualification (RQ) process is governed by SOP-XXXX. The purpose of this standard is to provide the mandatory compliance requirements for the routine requalification practices to be utilized for equipment and processes used in the manufacture of commercial and clinical material. The intent of requalification is to ensure critical equipment and processes continue to perform within defined limits and operate in a similar manner as originally validated. This document is intended to provide direction to all applicable Pharma Co., Inc. sites to ensure validation requalification programs comply with current regulations and guidance documents authored by regulatory agencies and industry organizations worldwide. Detailed re-qualification requirements for equipment, systems and processes at Pharma Co., Inc. facilities, which include the Springfield, NY Facility, are governed by SOP-XXXX. This procedure is intended to define the time-based re-qualification program for equipment, systems, and processes at Pharma Co., Inc. facilities. Specifically, the procedure will identify the equipment, systems and processes requiring routine re-qualification, the required frequency and the type of testing and documentation required. In addition, the Steam-in-Place requalification schedule at Pharma Co., Inc.’s Springfield, NY Facility is governed by SOP-XXXX. This requalification plan identifies the equipment / systems group into families requiring Steam-in-Place NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 19. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 19 of 50 sterilization procedures as part of a validated process. This requalification plan also specifies and justifies the requalification frequency of the family group and the family group members. The validated family groups then require requalification according to SOP-XXXX. The re-qualification program assures that critical equipment, systems, and processes continue to perform within prescribed limits and are operating in a similar manner as originally validated, thereby demonstrating a continued state of control. The re-qualification approach is to perform similar testing utilized during the initial validation, however at an attenuated level deemed sufficient to evaluate the performance of the equipment, system or process, and detect potential adverse changes. 7.5.2 Metrology Program Calibration policies and procedures are governed by SOP-XXXX, Metrology Program. The Metrology Program covers the services provided by the Pharma Co., Inc. Metrology Department to Pharma Co., Inc. Corporation. This includes, but is not limited to, all Manufacturing and Quality Control operations at Pharma Co., Inc.’s Springfield, NY Facility. Services by the Pharma Co., Inc. Metrology Department may also be provided to Pharma Co., Inc.’s subsidiaries and to joint projects involving other companies having partnerships with Pharma Co., Inc. and its subsidiaries. In order for equipment to be included in this program, it must be used to measure, gauge, test, inspect or otherwise examine a quantitative value to a known degree of accuracy. If such equipment is used, it must be identified as a Critical, Non-Critical, or Reference Use Only instrument. Instrumentation requiring calibration must be current prior to and remain current during protocol execution and throughout the Validation Program. 7.5.3 Change Control Program The Corporate Quality Operations Standard for Change Control is documented as SOP-XXXX. The Change Control Program to ensure that equipment within the Springfield, NY Facility maintains its validated state is governed by SOP- XXXX. These program requirements apply to all Pharma Co., Inc. functional groups involved in the manufacture and testing of products (both commercial and clinical including material/ assays used to demonstrate product comparability) at the Springfield, NY Facility. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 20. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 20 of 50 New equipment, both within Quality Control and Manufacturing intended to be validated, is covered under this Change Control System. 7.5.4 Maintenance Program The process used for developing and optimizing an effective asset maintenance program is governed by SOP-XXXX, Springfield, NY Facility Maintenance Management Program / Work Order System Procedure. The procedure applies to new and in-service assets based on risks and operational reliability while assuring employee safety. The process calls for utilizing operational and maintenance experience relative to 21 CFR Part 210/211 and quality management systems that must be compliant with CGMP regulations. The process to determine / evaluate Part 11 compliance and security risks is included. The maintenance program targets critical production equipment, QC Laboratory equipment and test instrumentation, plant utilities and environmental areas with significant risk to product quality. Process steps for developing / optimizing the maintenance program are described in the program. Additionally, instructions for work order management and integration with the Computerized Maintenance Management System (CMMS) are also described. 7.5.5 Training Program The general definitions, responsibilities, methodologies for assignments, assessments, documentation of training, and integration with the LMS is governed by SOP-XXXX Learning Management System. This document outlines the activities required to document training in compliance with CGMPs and other applicable regulatory requirements and ensures personnel performing work affecting product quality will be competent on the basis of appropriate education, training, and experience. This document applies to the recording of training for full-time, part-time and non-employees (temporary/contractors) and either concurrent or subsequent entry of records into the LMS database, where applicable. If a Business Unit has its own local training procedures, that procedure may take precedence. Training is further defined in SOP-XXXX, to establish a set of initial, minimal regulatory training requirements for personnel having the ability to impact medical device or therapeutic product quality. This document applies to all full-time, part-time, and temporary employees at all levels whose tasks affect the design, production, testing, handling and distribution of products, or affect the environment, process or systems in which products or data are produced, controlled or managed. NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 21. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 21 of 50 7.6 KEY SOPs GOVERNING AND SUPPORTING THE ALLSTON LANDING VALIDATION PROGRAM See Attachment B for a full list of key SOPs and standards used to support the Springfield, NY Facility Validation Program. The site SOPs are written, revised, and controlled per SOP-XXXX, Documentation System and Control. 7.7 IDENTIFICATION AND DESCRIPTION OF MANUFACTURING SYSTEMS AND EQUIPMENT PRESENTLY IN USE AT THE SPRINGFIELD, NY FACILITY AND ASSOCIATED COMPLETED VALIDATION See Attachment C for a Process Equipment List and Associated Validation Protocol Numbers. 7.8 VALIDATION MASTER PLAN REVIEW This document must be reviewed, updated and approved on an annual basis to reflect current philosophy, standards and Good Manufacturing Practices. A “VMP Review Schedule” must be generated for the time of the year, when the Site VMP and sub-VMPs will be reviewed and a VMP Review Summary Report generated. 8.0 ATTACHMENTS 8.1 Attachment A: Process Flow Diagrams 8.2 Attachment B: Key SOPs Governing and Supporting the Springfield, NY Facility Validation Program 8.3 Attachment C: Process Equipment List and Associated Validation Protocol Numbers NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 22. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 22 of 50 8.1 Attachment A: Product Process Flow Diagrams NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 23. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 23 of 50 8.2 Attachment B: Key Documents Governing and Supporting the Springfield, NY Facility Validation Program Reference Documents • Food and Drug Administration (FDA) – 21 CFR Parts 11, 210 & 211 • European Medicines Agency (EMA) – EudraLex Vol 4 • International Committee on Harmonization (ICH) – Q7, Q8, Q9 & Q10 • International Standards Organization (ISO) - ISO 9001 • FDA Guidance for Industry – Quality Systems Approach to Pharmaceutical cGMP Regulations • FDA Guidance for Industry – Process Validation: General Principles and Practices – January 2011 • ASTM International – Designation E2500-07, Standard Guide for the Specification, Design, and Verification of Pharmaceutical and Biopharmaceutical Manufacturing Systems and Equipment Corporate Standards: • SOP-XXXX: Change Control • SOP-XXXX: Quality Manual for the Pharma Co., Inc. Quality System • SOP-XXXX: Corporate Quality Operations Standard: Risk Management • SOP-XXXX: Corporate Quality Operations Standard for Equipment and Process Requalification • SOP-XXXX: Method Development and Validation • SOP-XXXX: Validation Program • SOP-XXXX: Laboratory Equipment Qualification • SOP-XXXX: Cleaning Validation • SOP-XXXX: Process Validation • SOP-XXXX: Sterilization and Depyrogenation Validation NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 24. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 24 of 50 General and Administrative SOPs: • SOP-XXXX: Documentation System and Control • SOP-XXXX: Generation of Protocols and Final Reports for Validation • SOP-XXXX: Change Control Procedure • SOP-XXXX: Metrology Program • SOP-XXXX: Records Retention • SOP-XXXX: Springfield, NY Facility Maintenance Management Program / Work Order System Procedure • SOP-XXXX: Technology Transfer into TMD Manufacturing and Quality • SOP-XXXX: Guidance for 21 CFR Part 11 Compliance for TMD Computer Systems • SOP-XXXX: Pharma Co., Inc. Corporate Quality Manual Note: This manual also lists pertinent SOPs for validation related topics • SOP-XXXX: Documentation of Employee Training • SOP-XXXX: Installation Qualification of Laboratory Instruments • SOP-XXXX: Learning Management System (LMS)– Governance and Documentation • SOP-XXXX: cGMP & Regulatory Training Requirements for Personnel Engineering SOPs: • SOP-XXXX: Technical Project Management Process for Springfield, NY Facility Manufacturing Facility • SOP-XXXX: Project Lifecycle Management Process - Springfield, NY Facility • SOP-XXXX: Commissioning Procedure for Start-Up of Systems and Equipment at Springfield, NY Facility • SOP-XXXX: Engineering Document Management Procedure at the Springfield, NY Facility • SOP-XXXX: Administration of Drawings at Pharma Co., Inc. Springfield, NY Facility • SOP-XXXX: Project Change Management Procedure at the Springfield, NY Facility NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 25. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 25 of 50 Technical SOPs: • SOP-XXXX: Validation of Autoclaves • SOP-XXXX: Validation of Dry Heat Ovens used in Sterilization or Depyrogenation Processes • SOP-XXXX: Validation of Filter Integrity Test Instruments • SOP-XXXX: Validation of Temperature/Relative Humidity Controlled Warm Rooms/Chambers Key Validation Department Operational SOPs: • SOP-XXXX: Master Validation Plan for the Pharma Co., Inc. Laboratory Information Management System • SOP-XXXX: Standard Operating Procedure Guidelines for Determination of Validation Requirements for Change Control Requests • SOP-XXXX: Guidelines for Computer Validation Protocols • SOP-XXXX: Guidelines for Generating, Approving, Amending and Closing- out a Validation Plan at Pharma Co., Inc. • SOP-XXXX: Guidelines for the Performance of Airflow Pattern Testing for Clean Rooms and Laminar Flow Hoods • SOP-XXXX: Protocol Execution Procedure at Springfield, NY Facility • SOP-XXXX: Routine Re-Qualification of Equipment, Systems and Processes • SOP-XXXX: Cleaning Validation and Changeover Verification • SOP-XXXX: Process Validation for Springfield, NY Facility • SOP-XXXX: Process Equipment Steam-in-Place (SIP) Requalification Matrices and Scheduling Plan at Springfield, NY Facility • SOP-XXXX: Cleaning Master Plan for the Springfield, NY Facility Manufacturing Facility • SOP-XXXX: Validation Project Execution Life Cycle Approach at the Springfield, NY Facility NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 26. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 26 of 50 8.3 Attachment C: Process Equipment List and Associated Validation Protocol Numbers EQ # Description Size Location IQ OQ CIP SIP CQ PQ/PV NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.
  • 27. DOCUMENT NO.: xxxx TITLE: Validation Master Plan (VMP) for the Pharma Co., EFFECTIVE DATE: TRAINING DATE: Inc. Springfield, NY Facility SUPERSEDES DATE: PAGE NO.: 27 of 50 9.0 REVISION HISTORY 9.1 Revision History Table Revision Description of Changes DCR Related Date Number document 1 Initial Release xxxx xxxx mm/dd/yyyy NOTICE THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PHARMA CO., INC.