Detailed Data
                                  Collections
                                      GEAE Account


Project Leader:   Richard Burton
                  SDL/GB
Start Date:       May 14, 2002
Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                     Deployment Data
                                                                           Collection
Customer Profile – 18,000 seat Aircraft Engines Manufacturing & Service Company
Business Problem & Impact                                            Process Capability – Before
Current tracking of GEAE end user data conversion details
involves both the technicians & customer completing a full          0.16
page of handwritten notes that takes between 2 – 5 minutes of      Sigma
non-value added production time per call.

Measure & Analyze
Data Collection: Speed of recording data on all calls was
measured. The existing process sigma was 1.5
Root Causes: Antiquated collection methods & the qty of
details recorded.                                                    Process Capability – After

Improve & Control
Script used as part of the data backup process, now collects all
the critical fields automated, then e-mails details to both                 7.0
                                                                           Sigma
customer and support staff.

Results/Benefits
After the 3 month project, the customer saved US$15.6K, with
now zero labor hours applied in the collection of deploy details


                         A savings of US$15.6K in 2002!

More Related Content

Viewers also liked (7)

100311 EEOC Press Release (Pitre Matter)
100311  EEOC Press Release (Pitre Matter)100311  EEOC Press Release (Pitre Matter)
100311 EEOC Press Release (Pitre Matter)
 
Carta de felicitación
Carta de felicitaciónCarta de felicitación
Carta de felicitación
 
ахметханов шухрат+певцы+идея
ахметханов шухрат+певцы+идеяахметханов шухрат+певцы+идея
ахметханов шухрат+певцы+идея
 
クロエパラティセレブリティに愛さ新しいバッグ
クロエパラティセレブリティに愛さ新しいバッグクロエパラティセレブリティに愛さ新しいバッグ
クロエパラティセレブリティに愛さ新しいバッグ
 
Boi 15 06 2012
Boi 15 06 2012Boi 15 06 2012
Boi 15 06 2012
 
Loyola2
Loyola2Loyola2
Loyola2
 
Imagen visual act 2
Imagen visual act 2Imagen visual act 2
Imagen visual act 2
 

Similar to Data Collection Six Sigma Case Study

Priya Vasudevan_Analytics_Summit_Poster
Priya Vasudevan_Analytics_Summit_PosterPriya Vasudevan_Analytics_Summit_Poster
Priya Vasudevan_Analytics_Summit_Poster
Priya Vasudevan
 
Issue tracking system
Issue tracking systemIssue tracking system
Issue tracking system
dharm18
 
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Apple Taton
 

Similar to Data Collection Six Sigma Case Study (20)

Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Bmw Imac Form Completeness Six Sigma Case Study
Bmw Imac Form Completeness Six Sigma Case StudyBmw Imac Form Completeness Six Sigma Case Study
Bmw Imac Form Completeness Six Sigma Case Study
 
Priya Vasudevan_Analytics_Summit_Poster
Priya Vasudevan_Analytics_Summit_PosterPriya Vasudevan_Analytics_Summit_Poster
Priya Vasudevan_Analytics_Summit_Poster
 
Issue Tracking System - My B.E. Project
Issue Tracking System - My B.E. ProjectIssue Tracking System - My B.E. Project
Issue Tracking System - My B.E. Project
 
Issue tracking system
Issue tracking systemIssue tracking system
Issue tracking system
 
Dw Kickoff Meeting V4
Dw Kickoff Meeting V4Dw Kickoff Meeting V4
Dw Kickoff Meeting V4
 
436333744-Bike-rental-ppt.pdf
436333744-Bike-rental-ppt.pdf436333744-Bike-rental-ppt.pdf
436333744-Bike-rental-ppt.pdf
 
IRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization ProcessIRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization Process
 
Services Industry Case Study: A Practical Approach To Process Automation
Services Industry Case Study: A Practical Approach To Process AutomationServices Industry Case Study: A Practical Approach To Process Automation
Services Industry Case Study: A Practical Approach To Process Automation
 
Database performance improvement, a six sigma project (control) by nirav shah
Database performance improvement, a six sigma project (control) by nirav shah Database performance improvement, a six sigma project (control) by nirav shah
Database performance improvement, a six sigma project (control) by nirav shah
 
Masterdata - why it matters and how SmartMDM™ can help?
Masterdata - why it matters and how SmartMDM™ can help?Masterdata - why it matters and how SmartMDM™ can help?
Masterdata - why it matters and how SmartMDM™ can help?
 
Dell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudyDell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case Study
 
Cisco System, Inc: Implementing ERP
Cisco System, Inc: Implementing ERPCisco System, Inc: Implementing ERP
Cisco System, Inc: Implementing ERP
 
Assessment Report of an Outdated Legacy Application
Assessment Report of an Outdated Legacy  ApplicationAssessment Report of an Outdated Legacy  Application
Assessment Report of an Outdated Legacy Application
 
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
Thailand SPIN Day 2014: มิตร ศัตรู หรือความไม่รู้ต่างหากที่หลอกเรา (29/5/2557...
 
JPSAHA
JPSAHAJPSAHA
JPSAHA
 
BHUVANESWAR_RAO_MIRYALA
BHUVANESWAR_RAO_MIRYALA BHUVANESWAR_RAO_MIRYALA
BHUVANESWAR_RAO_MIRYALA
 
Jp saha resume
Jp saha resumeJp saha resume
Jp saha resume
 

More from Steven Bonacorsi

Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
Steven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
Steven Bonacorsi
 

More from Steven Bonacorsi (20)

Lean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos OnlyLean Six Sigma Tollgate Template Videos Only
Lean Six Sigma Tollgate Template Videos Only
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic Plan
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement Strategic
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance News
 
A Balancing Act
A Balancing ActA Balancing Act
A Balancing Act
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity Model
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To Align
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports Metaphor
 
Themes Of Confusion
Themes Of ConfusionThemes Of Confusion
Themes Of Confusion
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 

Data Collection Six Sigma Case Study

  • 1. Detailed Data Collections GEAE Account Project Leader: Richard Burton SDL/GB Start Date: May 14, 2002 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action Deployment Data Collection Customer Profile – 18,000 seat Aircraft Engines Manufacturing & Service Company Business Problem & Impact Process Capability – Before Current tracking of GEAE end user data conversion details involves both the technicians & customer completing a full 0.16 page of handwritten notes that takes between 2 – 5 minutes of Sigma non-value added production time per call. Measure & Analyze Data Collection: Speed of recording data on all calls was measured. The existing process sigma was 1.5 Root Causes: Antiquated collection methods & the qty of details recorded. Process Capability – After Improve & Control Script used as part of the data backup process, now collects all the critical fields automated, then e-mails details to both 7.0 Sigma customer and support staff. Results/Benefits After the 3 month project, the customer saved US$15.6K, with now zero labor hours applied in the collection of deploy details A savings of US$15.6K in 2002!