GRA_Test
- 2. Goals
• Facilitate further dissemination of focused topic short-duration
events, consistent with GRA’s educational goals.
• Leverage today’s electronic technology to reduce costs and
hopefully allow moderate profitability with lower registrations
than in-person events.
• Use phased approach to improve on the currently existing
structure.
• Learn from past successes in conference calls/GRA
Casts/focused in-person meetings
-2- © AQUI-VER, INC.
- 3. Pressure on Water Supplies is Increasing
• 2003 Colorado River decision
• Recent Delta-Smelt decision (State Water Project)
• Climate-change related issues
– Increased flooding/vulnerability
– Change in precipitation/timing
– Change in runoff/recharge to groundwater
– Change in surface water deliveries
• Contaminated water supplies
• Continued population growth
-3- © AQUI-VER, INC.
- 4. Water Supply: Dry Years vs. Wet Years
• UWMP’s were relatively well vetted in 2005, however the
primary issue is we live in a relatively dry region and have
mixed water sources, in terms of local control and seasonal
variability
Source: DWR, 2007: http://www.publicaffairs.water.ca.gov/swp/supply.cfm
-4- © AQUI-VER, INC.
- 5. Southern California’s Water Delivery
State Water Project
(Delta to Los Angeles)
Colorado River Aqueduct
(State Line to LA/San Diego)
Source: DWR, 2007: http://www.water.ca.gov/maps/allprojects.cfm
-5- © AQUI-VER, INC.
- 9. Climate Change and Water Resources
Sources: After DWR, 2006: baydeltaoffice.water.ca.gov/climatechange/ClimateChange_MetWaterDist_Chung_8-18-06.pdf
• Direct changes: http://www.seed.slb.com/en/scictr/watch/climate_change/images/global_temp1.jpg
– Air temperature
– Sea level rise
– Extreme weather events
– Precipitation form, timing and quantity
• Effects:
– Water supplies
– Water demands
– Water quality
– Ecosystems
– Systems operations
– Flood management
-9-
– Energy issues © AQUI-VER, INC.
- 10. Water Supply Timeline
• 2001: SB 610/221: Water Supply Planning
• 2003 Colorado River decision
• 2004: Santa Clarita UWMP, contamination challenge
• 2005 Urban Water Management Plan updates
• 2005: Governor’s Executive Order on Climate Change
– 2005: DWR Delivery Reliability Report, next due in 2007
• 2006: AB 32, State reports on climate change impacts
• 2007: Delta-smelt issues, climate change prediction
refinements
-10- © AQUI-VER, INC.
- 11. Future Timeline
• 2007: GHG CARB Early Action Decisions
• 2009: SWP Delivery Reliability Report
• 1/1/2010: GHG Early Actions Become enforceable
• 2010: UWMPs due
-11- © AQUI-VER, INC.